erowa mts tooling on large machine tables mts application for milling cast aluminum parts

7
EROWA MTS Tooling on Large Machine tables MTS Application for Milling Cast Aluminum parts

Upload: laureen-morgan

Post on 05-Jan-2016

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EROWA MTS Tooling on Large Machine tables MTS Application for Milling Cast Aluminum parts

EROWA MTS Tooling on Large Machine tables

MTS Application for Milling Cast Aluminum parts

Page 2: EROWA MTS Tooling on Large Machine tables MTS Application for Milling Cast Aluminum parts

iGUZZINI

COMPANY SEGMENT MACHINE PROCESSING TOOLING HANDLING

Production, Lighting Technology 5 AXIS M/C MillingMTSMANUAL (with forklift)

Page 3: EROWA MTS Tooling on Large Machine tables MTS Application for Milling Cast Aluminum parts

iGUZZINI

Machine is a 5 axis milling machine with 10,000 mm X-axis

Page 4: EROWA MTS Tooling on Large Machine tables MTS Application for Milling Cast Aluminum parts

iGUZZINI

60 Pallets customer made Spigot spacing of 350x500mm

350mm

500mm

500mm

500mm

Page 5: EROWA MTS Tooling on Large Machine tables MTS Application for Milling Cast Aluminum parts

iGUZZINI

Two MTS Integral chucks in four customer-constructed base plates at two pallet locations for a total of sixteen MTS chucks.

Page 6: EROWA MTS Tooling on Large Machine tables MTS Application for Milling Cast Aluminum parts

iGUZZINI

While the machining center is processing parts on the next pallet, the operator changes the pallet containing the previously finished parts.

1 2

1

2

CNC Processing Area

Changing pallet Area

Page 7: EROWA MTS Tooling on Large Machine tables MTS Application for Milling Cast Aluminum parts

iGUZZINI Benefit

Without EROWA MTS

Setup time: 6-8 hours Setup per weeks: 2 Number of pieces limited to

number of available vises No flexibility to modify

production schedule after set-up has been completed without repeating 6-8 hour set-up.

With EROWA MTSWith EROWA MTS

Setup time: 30 min.Time savings per week: 2 x 6 hours

Total = 12 hours per weekMultiple pieces on palletsChanges in production schedules

can be easily accommodated with minimal impact on productivity.

Reduced lead-times and work-in-process inventory levels