CII Seminar 2012-07-31 | Page 2
Ericsson supply site Jaipur
› Node Assembly & Test
› Module Assembly & Test
› Printed Circuit Board Mfg & Test
› Repair Service
Manufacturing Services Offering
Year Founded 1994
Footprint80747 sq.mt (Total Factory Area)
20758 sq mt (Built up Area)
Work Force 1130
Mission
To create competitive advantage
by driving end to end, flexible,
reliable and cost effective Supply
Chain to fulfill customer demands
in India and other Regions.
ProductsRadio Base Stations
CORE
Transmission & Access
Certifications ISO 9001:2008, ISO 14001:2004
ESSJ – SITE DETAILS
CII Seminar 2012-07-31 | Page 3
ESSJ – journey…
Year Milestones
1994 JAIPUR Factory operations started
1995 Inauguration by Dr. Lars Ramqvist, Ericson Group CEO
1995 BSI Awarded ISO 9002
1997
1st telecom Company in India & 3rd in Ericsson to be BSI Awarded
ISO14001.
2001
1.3 M lines Wire-line Subscriber Exchanges delivered to DOT/ BSNL /
MTNL
2004 550 KC D-TAX Exchanges delivered to BSNL / Reliance
2005 DNV Global Certification for ISO QMS 9001:2000 and ISO EMS14001
2005 Inauguration of RBS 2204 Production by Telecom Minister, GOI
2006 AXE 810 Production Started
2007 Mobile Soft Switch production started
2008 MINILINK – E production started
CII Seminar 2012-07-31 | Page 4
ESSJ – journey…
Year Milestones
2008
1/3RD Global RBS volume Delivered , Highest Global monthly RBS
Delivery volume in May
2008
100,000th RBS delivered in sept’08 & 2000th core node delivered in
dec’08
2008
TEMA 2008 Award for “Excellence in Telecom Equipment
Manufacturing (Cat.->1 BINR)”
2009
INFOCOM CMAI Telecom Awards 2009 for "Largest Telecom
Equipment Manufacturer
2009 Minilink- TN deliveries Started
2010 1st deliveries of RBS 6000
2010 SMT line 1 installed
2010 Repair Business started
2011 SMT line 2 installed
2011 1st Delivery of LTE
2011 Export started
CII Seminar 2012-07-31 | Page 5
A glance of 2010-2012
New Facility
Start up of Repair Centre
1st SMT Line
2nd SMT LineStart up of Repair Centre
CII Seminar 2012-07-31 | Page 6
Portfolio localized
Equipment Board level
EDRU MMU R/RUS TRX Board
› Core, Radio and
Transmission
– MSC, MGw
– Base Station Controller
– Radio Base Station for 2G, 3G and LTE
› Indoor, Outdoor, Main-Remote
– Mini Link
› Radio Modules
› Transmission Modules
CII Seminar 2012-07-31 | Page 7
delivered volumes till date
~ 250 000
~ 64 000
~ 30 000
RBS
MINILINK
REPAIR
~ 10 000
CORE
CII Seminar 2012-07-31 | Page 8
Supplier base – local suppliers within india
DELHIDELHI
CHENNAICHENNAI
PUNEPUNE
CALCUTTACALCUTTA
BANGALOREBANGALORE
GUJRAT
RUDRAPURRUDRAPUR
ANDRA PRADESHANDRA PRADESH
Delta Rudrapur
Emerson Pune
Epcos Calcutta
Ebm Papst Local Hub
Prasha Gurgaon
Flex Chennai
Foxconn Chenai
Rittal Bangalore
AQ India Pune
Nefab Gurgaon
Brady Pune
MS Chhabra NCR
SAPA Andra Pradesh
Alteams Chennai
Cast Master NCR
G Ace Chennai
Rosenberger Gurgaon
Amphenol Chennai
Huber & Suhner Gurgaon
Tyco Bangalore
Volex Chennai
FCI Bangalore
Molex Bangalore
ESK India Gurgaon
Jabil India Pune
CII Seminar 2012-07-31 | Page 9
17/20 Top Supplier
17/20 Top Supplier
1/20 Top Supplier
1/20 Top Supplier
Top 20 Import Suppliers -ESSJ
2/20 Top Supplier
2/20 Top Supplier
ESSJESSJ
Europe
S.E. AsiaChina
NANJING ERICSSON PANDA
SCANFIL OYJ
EFORE OYJ
EMERSON ENERGY SYSTEMS AB
MULTEK HONG KONG LTD
EATON INDUSTRIES MANUFACTURING GMBH
TAT FOOK (SHENZHEN) TECHNOLOGY CO
AAVID THERMALLOY SRL
PANASONIC CORPORATION
JST TECHNOLOGIES
DANTHERM A/S
DENSO CORPORATION
CHONGQING DAJIANG MILLISON DIE-CAST
SUZHOU DONGSHAN SHEET METAL WORKING
SOURCE PHOTONICS INC.
ELEC & ELTEK COMPANY LTD
COOLER MASTER CO. LTD
ARROW Components Sweden AB HK
BOARDTEK ELECTRONICS CORP TW
EBM-PAPST GMBH
CII Seminar 2012-07-31 | Page 10
Localization, value addition
Localization Value Addition
› Available Domestic Supplier and capabilities are in place,
– Network of >25 suppliers
› Board level Manufacturing, Assembly, and Testing are done locally
› Local BoM & Local Conversion incld Boards
– Substantial Transformation
› Value Addition shall be seen as
– (Local BoM + Local Conversion Cost)/ Total BoM
– Depends on the Product Volumes, Market Demand and maturity.
› BTS is the volume product
› 2G is matured, 3G &
LTE picking up
CII Seminar 2012-07-31 | Page 11
Achieve higher local value add
› Step by Step approach and Deemed % of Value Add.
– Final Assembly & Test (FAT) : Say 25% Value Add
– FAT + PCBA (Printed Circuit Board Assembly) : Say 50% Value
Add
– FAT+ PCBA + domestic component sourcing: 80% Value add.
› Support existing & Create environment for new companies to set up manufacturing base in India.
CII Seminar 2012-07-31 | Page 12
Achieve higher local value add
› Government Support needed to build the eco System in India
– Eliminate disability factors relating to Infrastructure, rules and regulations etc.
– Incentives for setting up Electronic Manufacturing Clusters (EMCs) geographically
– Encourage domestic supplier through funding, subsidy to start component Level Manufacturing.
– Facilitate setting up of Semiconductor Wafer Fab
– Invite Global Suppliers, extend benefits eg. Tax, funding etc..
› Availability of Global Suppliers in India
Ericsson is committed to meet the target of NTP 2012 for DM and LVAEricsson is committed to meet the target of NTP 2012 for DM and LVA