erection , testing & commissioning of isolators
TRANSCRIPT
-
8/10/2019 Erection , Testing & Commissioning of Isolators
1/13
Erection , Testing &Commissioning of
Isolators
-
8/10/2019 Erection , Testing & Commissioning of Isolators
2/13
ISOLATORS TESTING &
COMMISSIONING
Objectives
To ensure the completeness of theequipment before energisation.
To rectify the defects identified duringthe testing.
To ensure reliable trouble free operation
of the isolators in all respects.To facilitate the charging clearance from
the statutory authority.
-
8/10/2019 Erection , Testing & Commissioning of Isolators
3/13
ISOLATORS - TESTING
The testing procedures for isolatorsare classified as given below.
General checks
Electrical Motor checks
Operational checks
IR Value test
Contact Resistance measurement
Checking of interlocks
-
8/10/2019 Erection , Testing & Commissioning of Isolators
4/13
ISOLATORSGENERAL
CHECKS
Equipment is free from all visible defectson physical inspection
Support structures, marshalling box has
been provided with two earthing pads All nuts and bolts are tightened as per the
specified torque
Equipment erection is complete in allrespects as per the approved drawing
-
8/10/2019 Erection , Testing & Commissioning of Isolators
5/13
ISOLATORSGENERAL
CHECKS
Leveling and alignment of structureand base frame
Control box/marshalling box is freefrom any physical defects
Tightness of nuts and bolts ofterminal connectors
Auxiliary contacts and relays havebeen cleaned and free from dust
-
8/10/2019 Erection , Testing & Commissioning of Isolators
6/13
ISOLATORSGENERAL
CHECKS
Corona rings are provided andproperly fixed
Cable termination and tightness
External cabling completed in allrespects
All the cable identification tags
provided and all cores are providedwith identification ferules at M.B
All moving parts are lubricated
-
8/10/2019 Erection , Testing & Commissioning of Isolators
7/13
ISOLATORSGENERAL
CHECKS
Freeness of manual operation
Greasing has been made on the maincontacts according to manufacturers
specificationFunctional checking of auxiliary
contacts for indications and
interlocksErection completion certificate along
with list of outstanding activities
-
8/10/2019 Erection , Testing & Commissioning of Isolators
8/13
ISOLATORSGENERAL
CHECKS
All spare wires are terminated at theterminal blocks
Earth switch connected to earththrough braided wires.
-
8/10/2019 Erection , Testing & Commissioning of Isolators
9/13
ISOLATORS CHECKS ON
ELECTRICAL MOTOR
IR value of the motor windingbetween phase to ground for all thethree phases.
-
8/10/2019 Erection , Testing & Commissioning of Isolators
10/13
ISOLATOROPERATIONAL
CHECKS
Operate the isolator and record themotor current
Operation of isolator fromlocal/remote
Measurement of operating time.
Auxiliary contacts checking bothunder close and open condition
Checking of control circuit
-
8/10/2019 Erection , Testing & Commissioning of Isolators
11/13
ISOLATORS INSULATION
RESISTANCE TEST
Isolator close condition
Between male side to ground andfemale side to ground
Isolator open condition
Between male side to ground andfemale side to ground
Between male side to female side
-
8/10/2019 Erection , Testing & Commissioning of Isolators
12/13
ISOLATORS OTHER CHECKS
Contact resistance measurement
Checking of interlocks
Final documentation and approval ofthe test results.
-
8/10/2019 Erection , Testing & Commissioning of Isolators
13/13
Thankyou