ERCOT ROS Planning Working Group (PLWG) Scope Approved at 3-12-10 ROS Meeting

Upload: buddy-mathews

Post on 18-Jan-2018

219 views

Category:

Documents


0 download

DESCRIPTION

PLWG Scope Functions of the PLWG include: – Assignments from the ROS – Review the criteria, processes and data provision requirements included in the Planning Guides, to identify any needed improvements and recommend appropriate solutions for ROS action or approval. – Review proposed Planning Guides Revisions and make recommendations for ROS approval.

TRANSCRIPT

Page 1: ERCOT ROS Planning Working Group (PLWG) Scope Approved at 3-12-10 ROS Meeting

ERCOT ROS Planning Working Group (PLWG)

Scope

Approved at 3-12-10 ROS Meeting

Page 2: ERCOT ROS Planning Working Group (PLWG) Scope Approved at 3-12-10 ROS Meeting

PLWG Scope• Non-voting group open to all stakeholders, PUCT

Staff and ERCOT.• Reports to the Reliability and Operations

Subcommittee (ROS) on a regular basis.• The ROS approves the PLWG chair and subgroup

chairs as recommended by PLWG.• The chair schedules meetings as required to

discharge its responsibilities.• When consensus cannot be achieved on an issue,

the issue should be fully described and options presented to the ROS for disposition.

Page 3: ERCOT ROS Planning Working Group (PLWG) Scope Approved at 3-12-10 ROS Meeting

PLWG Scope

• Functions of the PLWG include:– Assignments from the ROS– Review the criteria, processes and data provision

requirements included in the Planning Guides, to identify any needed improvements and recommend appropriate solutions for ROS action or approval.

– Review proposed Planning Guides Revisions and make recommendations for ROS approval.

Page 4: ERCOT ROS Planning Working Group (PLWG) Scope Approved at 3-12-10 ROS Meeting

PLWG Scope

• Functions of the PLWG include:– Review Planning Guides for alignment with North

American Electric Reliability Corporation (NERC) Reliability Standards requirements and recommend appropriate Regional Standard Authorization Requests (SARs), Planning Guide Revision Requests (PLGRRs), or Protocol Revision Requests (PRRs) as needed.

– Assist with review and analysis of unusual or emergency type events having a significant impact on ERCOT as

Page 5: ERCOT ROS Planning Working Group (PLWG) Scope Approved at 3-12-10 ROS Meeting

Planning Guides Outline

Approved at 5-13-10 ROS Meeting

Page 6: ERCOT ROS Planning Working Group (PLWG) Scope Approved at 3-12-10 ROS Meeting

Planning Guides Outline

• Rev 0 indicates inserting document without change.

• Rev 1 indicates inserting document with moves and deletions

• Rev 2 indicates inserting new or significantly revised document

Page 7: ERCOT ROS Planning Working Group (PLWG) Scope Approved at 3-12-10 ROS Meeting

Planning Guides Outline

• Introduction (Rev 2)• Process For Planning Guide Revisions (From

Section 1 of Operating Guides - Rev 1) • Regional Planning Process Rev 0 (RPG Charter)– Move TPIT to Section 5.6 Data (Rev 1)– Move ALDR to Data (Rev 1)– Move Economic Criteria to Criteria section (Rev 1)

Page 8: ERCOT ROS Planning Working Group (PLWG) Scope Approved at 3-12-10 ROS Meeting

Planning Guides Outline• Generation Interconnection Process (From

Generation Interconnection or Change Request Procedure - Rev 0)

• Planning Criteria – Reliability criteria (Section 5 of the current operating

guides – Rev 0)– Evaluate if section 7 (or parts thereof) of Operating

Guides dealing with System Protection should be moved to the Planning Guides. (Rev 1 or 2)

– Economic Criteria(from RPG Charter Rev 1)– Requirement for posting TSP Specific Planning Criteria

(Rev 1 or 2)

Page 9: ERCOT ROS Planning Working Group (PLWG) Scope Approved at 3-12-10 ROS Meeting

Planning Guides Outline

• Data/Modeling– Transmission Planning Steady State models base

case development (SSWG Procedures- Rev 1)(revised Nodal version Rev 2)

– Dynamic Model development (DWG procedures Rev 1)

– SPWG Procedures Model development (DWG procedures Rev 1)

– TPIT Report Procedures (Rev 1 or 2)– ALDR Procedures (Rev 1 or 2)

Page 10: ERCOT ROS Planning Working Group (PLWG) Scope Approved at 3-12-10 ROS Meeting

Planning Guides Outline

• Data/Modeling– Economic Assumptions development Procedures (Rev 2)– Data Dictionary Explanation and Procedures (move from

SSWG procedures-Rev 1)– Generator Data Procedures for use in Transmission

Planning (Rev 2)– Contingency List (Multiple Circuits) Submission and

Procedures (move from SSWG procedures-Rev 1)– Connectivity node group development procedures with

NMMS (Rev 1 or 2)

Page 11: ERCOT ROS Planning Working Group (PLWG) Scope Approved at 3-12-10 ROS Meeting

Planning Guides Outline

• Should the Planning Guides include PASA/SOO documentation? (PUC Sub Rule 25.505) (At 5-13-10 ROS meeting direction was to include only portions that need further documentation)

• Should the Planning Guides include CDR procedures? (Generation Adequacy TF/LOLP) (At 5-13-10 ROS meeting direction was that including documentation of CDR procedures should probably be added to Planning Guides.)