ercot nodal 101 · congestion revenue rights. day-ahead market. reliability unit commitment....
TRANSCRIPT
![Page 1: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/1.jpg)
ERCOT Nodal 101
![Page 2: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/2.jpg)
This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended from time to time. If any conflict exists between this presentation and the ERCOT Protocols, the ERCOT Protocols shall control in all respects.
For more information, please visit:http://www.ercot.com/mktrules/nprotocols/
Legal
PROTOCOL DISCLAIMER
2
![Page 3: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/3.jpg)
Housekeeping
• Restrooms
• Refreshments
• Attendance sheet
• Exam
• Questions Please turn off cell phones & other electronics
![Page 4: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/4.jpg)
A high-level overview of the ERCOT Nodal Market for all Market Participants and ERCOT personnel.
Target Audience
ERCOT Nodal 101:
4
![Page 5: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/5.jpg)
• Identify major components of the Nodal Market
• For each component of the Nodal Market, describe
• Purpose
• Inputs
• Outputs
• Processes
Course Objectives
Upon completion of this course you will be able to:
5
![Page 6: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/6.jpg)
Modules in this course include:
Introduction to ERCOT and MarketModule 1
Module 2
Module 3
Module 4
Module 5
Module 6
Locational Marginal Pricing
Congestion Revenue Rights
Day-Ahead Market
Reliability Unit Commitment
Real-Time Operations
![Page 7: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/7.jpg)
Introduction to ERCOT
![Page 8: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/8.jpg)
• Key features of the ERCOT Grid
• ERCOT Responsibilities
• Reliability and Markets
• Capacity and Energy
• Congestion Management
• Network Modeling
• Market Overview
Overview
Topics in this lesson . . .
8
![Page 9: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/9.jpg)
• Represents 90% of Texas Load
• 77,000 MW of generation capacity
• 46,500 miles of transmission lines
• Electrical island with several DC Ties
ERCOT Introduction
Key Features of the ERCOT Grid
9
![Page 10: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/10.jpg)
• Match generation with demand• Operate transmission system within established limits
ERCOT Responsibility
ERCOT’s Primary Responsibility is Reliability
10
Execute competitive markets for reliability services
![Page 11: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/11.jpg)
• Markets support reliability• Reliability makes the markets
possible
ERCOT Operational Concepts
Reliability and Competitive Markets
11
ERCOT finds the balance between Reliability and
Economics
![Page 12: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/12.jpg)
ERCOT Responsibility
Energy and Capacity
12
ERCOT dispatches Energy to follow the
system demand
![Page 13: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/13.jpg)
ERCOT Responsibility
Energy and Capacity
13
Capacity
Forecast
ERCOT must also ensure sufficient Capacity is on-line
to meet the forecasted demand
![Page 14: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/14.jpg)
ERCOT Responsibility
More about Capacity
14
Capacity Reserved for Ancillary Services
Ancillary Services needed to respond quickly to changing system conditions
![Page 15: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/15.jpg)
Acquired through competitive markets
ERCOT Responsibility
Ancillary Service Capacity
15
System Capacity
Ancillary Service Capacity
![Page 16: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/16.jpg)
ERCOT Responsibility
Ancillary Service Capacity
16
Non-Spin Reserve
Regulation Reserve
Responsive ReserveThree types of Ancillary Services
![Page 17: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/17.jpg)
• Generators and Loads separated by distance
• Transmission system has limits
ERCOT Responsibility
Transmission Congestion
17
Congestion management keeps transmission system
operating within limits
![Page 18: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/18.jpg)
ERCOT Responsibility
Network Operations Model
18
Models allow ERCOT to:• “See” grid at any point in time• Predict how various actions
affect grid
Representation of a physical system
![Page 19: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/19.jpg)
• Physical characteristics• Ratings• Operational limits
Including• Transmission Elements• Resources• Topology• Telemetry mapping
ERCOT Responsibility
19
Network Operations Model
![Page 20: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/20.jpg)
Checkpoint Jeopardy!
20
ERCOT finds the balance!
Match the following answers with the questions:
$50
Capacities reserved for responding quickly to changing conditions!$50
The process of keeping the transmission system operating within limits!$50
![Page 21: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/21.jpg)
Market Introduction
![Page 22: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/22.jpg)
Market Participants
Who are the Players?
22
Qualified Scheduling EntitiesQSE
Load Serving EntitiesLSE
Transmission and/or DistributionService ProvidersTDSP
Resource EntitiesResource Entity
![Page 23: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/23.jpg)
Market Participants
23
![Page 24: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/24.jpg)
• Bilateral Market• ERCOT Facilitated Markets
• Day-Ahead Ancillary Services Market
• Day-Ahead Energy Market• Real-Time Energy Market
ERCOT Nodal Market Design
Commercial Markets
24
![Page 25: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/25.jpg)
Energy Dispatch• Resource-specific offers• Resource-specific dispatch
Goal• Balance generation & demand• Manage congestion
Energy Pricing• Location-specific prices for energy• Prices include congestion costs
ERCOT Nodal Market Design
25
![Page 26: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/26.jpg)
• All costs are directly assigned
• Congestion Revenue Rights available for hedging
ERCOT Nodal Market Design
Congestion Costs
26
![Page 27: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/27.jpg)
ERCOT Nodal Market Design
ERCOT is an energy-only market … but what does that mean?
27
In ERCOT, these costs must be recovered with revenues from energy production and operating reserves.
It’s all about the recovery of costs to build generation.
![Page 28: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/28.jpg)
ERCOT Nodal Market Design
ERCOT is an energy-only market … but what does that mean?
28
Scarcity pricing – higher energy prices during periods where energy reserves are scarce
Energy Pricing must support investment in new generation
![Page 29: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/29.jpg)
You Are Here!
29
![Page 30: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/30.jpg)
Market Information System
30
An Independent Market Information System Registered Entity (IMRE) may register with ERCOT solely to access MIS Secure.
![Page 31: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/31.jpg)
You Are Here!
31
![Page 32: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/32.jpg)
Locational Marginal Pricing
![Page 33: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/33.jpg)
• Locational Marginal Prices (LMPs)• Define LMPs• Determination of LMPs
• Congestion Rent• Settlement Point Prices• Reserve Prices• Market Information
Overview
Topics in this lesson . . .
33
![Page 34: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/34.jpg)
What is Locational Marginal Pricing (LMP)?
• Pricing: Cost • Marginal: to serve the next increment of Load• Locational: at an Electrical Bus
Locational Marginal Pricing
34
Locational Marginal Pricing
![Page 35: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/35.jpg)
• Energy• Congestion
Locational Marginal Pricing
LMP Components
35
In some markets, LMPs have a component for
losses.
The Nodal Market does NOT include losses in
LMPs.
![Page 36: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/36.jpg)
36
Introducing the players… EXAMPLE
Locational Marginal Pricing
Gen 1
Gen 2
![Page 37: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/37.jpg)
37
Let’s solve for LMPs at each Bus:EXAMPLE
Locational Marginal Pricing
10 MW($4 per MWh)
20 MW ($2 per MWh)
10 MW
Gen 1
Gen 2
![Page 38: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/38.jpg)
38
Let’s solve for LMPs at each Bus:EXAMPLE
Locational Marginal Pricing
10 MW($4 per MWh)
20 MW ($2 per MWh)
10 MW
Gen 1
Gen 2
When there is no congestion, all LMPs are equal
![Page 39: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/39.jpg)
Locational Marginal Pricing
Example: No Congestion
39
Charges to Load
LMP MW
$2 10 $20
Total $20
Payment to Resources
LMP MW
$2 0 $0
$2 10 $20
Total $20
Gen 1
Gen 2
![Page 40: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/40.jpg)
40
Now there is congestion.EXAMPLE
Locational Marginal Pricing
10 MW($4 per MWh)
20 MW ($2 per MWh)
10 MW
4 MW constraint
Gen 1
Gen 2
![Page 41: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/41.jpg)
41
EXAMPLE
Locational Marginal Pricing
10 MW($4 per MWh)
20 MW ($2 per MWh)
10 MW
4 MW constraint
Gen 1
Gen 2
With congestion, LMPs are different.
![Page 42: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/42.jpg)
Charges to Load
LMP MW
$4 10 $40
Total $40
Payment to Resources
LMP MW
$4 6 $ 24
$2 4 $8
Total $32
Locational Marginal Pricing
42
Example: Congestion
Gen 1
Gen 2
![Page 43: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/43.jpg)
Congestion Rent
43
$40
$32
$8
Payments to
ResourcesCharges to Load
Congestion Rent used to fund Congestion
Revenue Rights (CRRs)
![Page 44: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/44.jpg)
• LMPs at Electrical Buses
• Settlement Points used for financial settlement
• Settlement Point Prices calculated using LMPs
Settlement Point Prices
LMPs and Settlement Point Prices
44
Settlement Point Price
LMP1
LMP2
LMP3
LMP4
LMP5
Electrical Buses
![Page 45: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/45.jpg)
• Reserve Price Adder: the economic value of reserves that are available for energy dispatch in Real-Time
• LMPs and Reserve Price Adders are used together to form SPPs in Real-Time
Settlement Point Prices
Additional Real-Time pricing component…
43
LMPs are location-specific. Reserve Price Adders represent the value of reserves ERCOT-wide.
![Page 46: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/46.jpg)
LMPs and Settlement Point Prices• Every Hour
LMPs and Reserve Price Adders• Every 5 minutes*
Settlement Point Prices• Every 15 minutes
Settlement Point Prices
How often are LMPs & Settlement Point Prices calculated?
46
* LMPs and Reserve Price Adders generated at each SCED cycle (possibly more often than 5 minutes)
![Page 47: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/47.jpg)
Settlement Point Prices
Three Types of Settlement Points:
47
ResourceNodes
LoadZones
Hubs
![Page 48: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/48.jpg)
An Electrical Bus where a Resource’s measured output is settled
Settlement Point Prices
What is a Resource Node?
48
Resource Electrical Bus
![Page 49: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/49.jpg)
Day-Ahead MarketLMP at the Resource Node
Real-Time OperationsTime-Weighted Average of LMPs at the Resource Node
Time-Weighted Average of Reserve Price Adders
Settlement Point Prices
Settlement Point Prices for Resource Nodes
49
+
Resource Electrical Bus
![Page 50: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/50.jpg)
A group of Electrical Buses assigned to the same geographical zone
Settlement Point Prices
What is a Load Zone?
50
Every Electrical Bus with Load must be assigned to
a Load Zone for Settlement purposes
![Page 51: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/51.jpg)
Day-Ahead MarketLoad-Weighted Average of LMPs in Load Zone
Real-Time OperationsLoad-Weighted and Time-Weighted Averages of LMPs in Load Zone
Time-Weighted Average of Reserve Price Adders
Settlement Point Prices
Settlement Point Price for Load Zones
51
+
![Page 52: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/52.jpg)
• Competitive Load Zones
• Non Opt-in Entity Load Zones
• DC Tie Load Zones
Settlement Point Prices
Three types of Load Zones
52
![Page 53: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/53.jpg)
• North
• South
• West
• Houston
2003 Congestion Management zones
Settlement Point Prices
Competitive Load Zones
53
![Page 54: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/54.jpg)
• Established by one or more NOIE(s)
• Some large NOIEs required to establish own NOIE Load Zones
• NOIEs that don’t establish NOIE Load Zone are assigned to Competitive Load Zone
Settlement Point Prices
Non Opt-in Entity Load Zones
54
![Page 55: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/55.jpg)
• Used to settle exports across DC Ties
• One for each DC Tie
• Contains only the electricalbus connected to the DC Tie
Settlement Point Prices
DC Tie Load Zones
55
All Load must be assigned to a Load Zone for Settlement purposes
![Page 56: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/56.jpg)
• Group of 345kV Hub-buses• Defined by Protocols
Settlement Point Prices
What is a Hub?
56
Hub
![Page 57: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/57.jpg)
ERCOT Hub Average
ERCOT Bus Average
Settlement Point Prices
Six Hubs in ERCOT Market
57
Four Regional Hubs• North
• West
• South
• Houston
Two Average Hubs
![Page 58: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/58.jpg)
Hub
Day-Ahead MarketSimple average of LMPs at Hub Buses in each Hub
Real-Time OperationsSimple average of Time-Weighted Average LMPs at the Hub Buses in the Hub
Time-Weighted Average of Reserve Price Adders
Settlement Point Prices
Settlement Point Price for Hubs
58
+
![Page 59: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/59.jpg)
• LMP Contour Map• Day-Ahead Market SPPs• Real-Time LMPs• Real-Time SPPs
Market Information System
59
![Page 60: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/60.jpg)
$100
Checkpoint Jeopardy!
60
These Settlement Points come in half-a-dozen!
Match the following answers with the questions:
$25
Energy and congestion!$50
A price formed by combining LMP’s with Reserve Price Adders!
![Page 61: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/61.jpg)
Nodal Market Operations
![Page 62: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/62.jpg)
Nodal Market Operations
Market Components
62
![Page 63: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/63.jpg)
Congestion Revenue Rights
![Page 64: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/64.jpg)
• Purpose of CRRs• CRR Account Holders• Types of CRRs• How CRRs are acquired• Settlements• Market Information System
Overview
Topics in this lesson . . .
64
![Page 65: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/65.jpg)
You Are Here!
65
![Page 66: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/66.jpg)
• Financial instruments• Hedge against congestion costs• Financial investment
• Payment or charge when Grid is congested
Congestion Revenue Rights
Purpose of Congestion Revenue Rights
66
A CRR is not a right to
deliver physical energy
![Page 67: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/67.jpg)
Congestion Costs
Congestion Cost exposure
67
Resource Node A
Resource Node B
$30/MWh$40/MWh
$45/MWh
Congestion costs are built in to the Settlement Point prices
Load Zone
![Page 68: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/68.jpg)
Congestion Revenue Rights
68
Introducing a new player:CRR Account Holder
![Page 69: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/69.jpg)
Congestion Revenue Rights
69
To own CRRs, Market Participants:• Must be registered with ERCOT
• Must qualify as CRR Account Holders
![Page 70: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/70.jpg)
Congestion Revenue Rights
70
Barred from owning CRRs:• TSPs & DSPs
• ERCOT
![Page 71: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/71.jpg)
Point-to-Point Congestion
Revenue Rights
• Designated point of injection (source) and point of withdrawal (sink)
• Settlement based on difference between sink and source Settlement Point Prices
• Two Instruments:• PTP Options – payment only• PTP Obligations – payment or
charge
Congestion Revenue Rights
Congestion Revenue Rights as Financial Instruments
71
![Page 72: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/72.jpg)
72
$5/MWh
$10/MWh
$15/MWh
Source A
Source C
Sink B
Obligation AB Payment = $5.00
Obligation CB Payment = -$5.00
Point-to-Point (PTP) ObligationsEXAMPLE
Congestion Revenue Rights
?
![Page 73: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/73.jpg)
73
Option AB Payment = $5.00
Option CB Payment = $0.00
$5/MWh
$15/MWh
Source A
Source C
Sink B
Point-to-Point (PTP) OptionsEXAMPLE
Congestion Revenue Rights
?
$10/MWh
![Page 74: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/74.jpg)
• CRR Auction• Allocation (Special Case)• Bilateral Trades
Congestion Revenue Rights
Three ways of acquiring CRRs:
74
Auction
Allocation
Trade
CRRs
![Page 75: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/75.jpg)
• Time-of-Use Blocks• One month strips
Congestion Revenue Rights
CRRs are auctioned and allocated by:
75
![Page 76: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/76.jpg)
• CRR Auction• Monthly and Semi-Annual Auctions• Based on Network Operations Model
Congestion Revenue Rights
76
![Page 77: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/77.jpg)
• Pre-Assigned CRRs (PCRRs)• Allocated to Non-Opt-In Entities (NOIEs)• Based on long-term supply contracts• May be allocated as Options or Obligations• No charge or a percentage of the Auction clearing price
Congestion Revenue Rights
Allocation of CRRs
77
![Page 78: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/78.jpg)
• PTP Options• PTP Obligations• Characteristics remain unchanged• Both parties must meet credit requirements
Congestion Revenue Rights
Trading CRRs Bilaterally
78
![Page 79: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/79.jpg)
Three Settlement Processes• CRR Auction Settlement• CRR Settlement• CRR Balancing Account
Congestion Revenue Rights
CRR Settlements
79
![Page 80: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/80.jpg)
Congestion Revenue Rights Settlements
CRR Auction Settlements
80
Settlements
Payments
Charges
![Page 81: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/81.jpg)
Congestion Revenue Rights
CRR Auction Settlements Timeline
81
Auction Completed Day 1* Day 3** Day 4**
Auction Invoice
PaymentsDue to ERCOT
PaymentsDue to CRR Account Holders
Auction Results
Day 2** Day 5***
** Bank Business Day
*** Business Day and Bank Business Day
* Business Day
![Page 82: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/82.jpg)
Congestion Revenue Rights
CRR Auction Settlement
82
Monthly
CRR Auction Revenues
+PCRR Revenues
Pay to QSEs representing Load
![Page 83: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/83.jpg)
Congestion Revenue Rights
CRR Settlement
83
CRRs are settled in the Day-Ahead Market
Payments
Charges
![Page 84: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/84.jpg)
Payment due toCRR Account Holders
Hourly
Congestion Revenue Rights
CRR Settlement
84
![Page 85: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/85.jpg)
Payment due toCRR Account Holders
Hourly
Congestion Revenue Rights
CRR Settlement
85
may be short paid in some hours
![Page 86: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/86.jpg)
Payment due toCRR Account Holders
MonthlyPay to QSEs representing Load
Congestion Revenue Rights
CRR Balancing Account
86
![Page 87: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/87.jpg)
Payment due toCRR Account Holders
Congestion Revenue Rights
CRR Balancing Account
87
Monthly
X
may remain short paid
![Page 88: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/88.jpg)
Market Information System
Posted after each Auction:
88
• CRRs awarded • CRR Account Holders• Auction clearing prices• CRR Bids and offers
![Page 89: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/89.jpg)
$100
Checkpoint Jeopardy!
89
Assigned, awarded, or traded!
Match the following answers with the questions:
$25
A fund that is used to pay CRR Account Holders what they are due!$50
A fund that is uplifted to QSEs representing Load!
![Page 90: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/90.jpg)
Day-Ahead Market
![Page 91: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/91.jpg)
• Purpose of Day-Ahead Market• Market Participants• Day-Ahead Market Process• Process Inputs and Outputs• Settlements• Market Information System
Overview
Topics in this lesson . . .
91
![Page 92: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/92.jpg)
You Are Here!
92
![Page 93: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/93.jpg)
• Centralized Forward Market• Buy and sell Energy• Sell Ancillary Services to ERCOT• Forward market provides price
certainty
Day-Ahead Market
Purpose of the Day-Ahead Market
93
![Page 94: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/94.jpg)
Day-Ahead Market
94
Only QSEs participate in the Day-Ahead Market.
![Page 95: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/95.jpg)
Day-Ahead Market
95
CRRs are settled with Day-Ahead Market Prices
![Page 96: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/96.jpg)
When does the Day-Ahead Market occur?• Market opens at 0600• Clearing Process begins at 1000• Results posted by 1330
Day-Ahead Market
96
0600 1330 0000 Real-TimeOperations
![Page 97: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/97.jpg)
An Offer is a proposal to sell:• A Product• At a Location• For a Price
A Bid is a proposal to buy:• A Product• At a Location• For a Price
Day-Ahead Market
97
EnergyLoadZone 4
$40
![Page 98: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/98.jpg)
Day-Ahead Market
The Day-Ahead Market
98
![Page 99: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/99.jpg)
Day-Ahead Market
The Day-Ahead Market
99
![Page 100: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/100.jpg)
Day-Ahead Market
The Day-Ahead Market
100
Types of Offers:• Three-Part Supply Offer • Ancillary Service (AS) Offer• Day-Ahead Market Energy-Only Offer
![Page 101: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/101.jpg)
Startup Offer Minimum-Energy Offer Energy Offer Curve
$ / MWh (at LSL) $ / MWh (above LSL)
$ / Start
Day-Ahead Market
Three-Part Supply Offer
101
Energy Offer Curve can be submitted without Start-up or Minimum Energy Offers
![Page 102: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/102.jpg)
• Resource specific • Regulation Reserve• Responsive Reserve• Non-Spinning Reserve
• A Resource may be offered• For multiple Ancillary Services• For Energy and Ancillary
Services
Day-Ahead Market
Ancillary Service (AS) Offers:
102
Ancillary Service Offer
![Page 103: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/103.jpg)
• Proposal to sell energy in DAM• Offered at any Settlement Point
Day-Ahead Market
Day-Ahead Market Energy-Only Offer
103
DAM Energy-Only Offer
h
Valid only in the Day-Ahead Market
Financial obligation in Real-Time
Slide 103
![Page 104: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/104.jpg)
Day-Ahead Market
The Day-Ahead Market
104
Types of Bids:• Energy Bid• PTP Obligation Bid
![Page 105: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/105.jpg)
• Proposal to buy energy• Submitted at any Settlement Point
DAM Energy Bid
h
Day-Ahead Market
Day-Ahead Market Energy Bid
105
Valid only in the Day-Ahead Market
Financial credit in Real-Time
![Page 106: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/106.jpg)
Purpose of DAM PTP Obligations
• Hedge against congestion costs in Real-Time
• Charge or payment when Grid is congested in Real-Time
Day-Ahead Market
Day-Ahead Market PTP Obligation Bids
106
![Page 107: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/107.jpg)
• Like coupled Energy Bid and Energy Offer• Purchased at DAM Settlement Point Price Spread• Settled at Real-Time Settlement Point Price Spread
Day-Ahead Market
Day-Ahead Market PTP Obligation Bids
107
Source A
Sink BEnergy Offer
Energy Bid
PTP Obligation
DAM PTP Obligation canresult in a payment or
charge
![Page 108: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/108.jpg)
108
Day-Ahead Market PTP ObligationsEXAMPLE
Day-Ahead Market
QSE charge in Day Ahead Market = $2
QSE payment in Real Time = $7 ?
?
$10/MWh $12/MWh
Source A Sink B
PTP Obligation
DAM :
$8/MWh $15/MWhReal-Time :
Settlement Point Prices {{
![Page 109: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/109.jpg)
Day-Ahead Market
109
CRR Auction Day-Ahead Market Real-Time
![Page 110: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/110.jpg)
Day-Ahead Market
110
The Day-Ahead Market
![Page 111: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/111.jpg)
• Anticipated Resource operating conditions• Resource Status• Resource Limits• Ancillary Service Commitments
• Submitted by QSE
Day-Ahead Market
The Current Operating Plan (COP)
111
QSE must maintain the COP for each hour of the next 7 days
![Page 112: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/112.jpg)
Day-Ahead Market
The Day-Ahead Market
112
![Page 113: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/113.jpg)
• Day-Ahead Market does not solve reliability issues
• System must support the Day-Ahead Market solution
Day-Ahead Market
The Network Model in the Day-Ahead Market
113
The Network Operations Model ensures that DAM solution
respects system limits
![Page 114: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/114.jpg)
Day-Ahead Market
The Day-Ahead Market
114
![Page 115: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/115.jpg)
Day-Ahead Market
The Day-Ahead Market
115
Cleared Offers = Costs
Cleared Bids = Revenues
![Page 116: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/116.jpg)
Day-Ahead Market
The Day-Ahead Market clearing process
116
MaximizeThe Gap
Bid-based Revenues
Offer-based Costs
![Page 117: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/117.jpg)
Offer-based Costs
MaximizeThe Gap
Bid-based Revenues
Day-Ahead Market
The Day-Ahead Market clearing process
117
Energy&AncillaryService Costs
The Day-Ahead Market is a Co-optimized Market
![Page 118: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/118.jpg)
Day-Ahead Market
The Day-Ahead Market
118
![Page 119: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/119.jpg)
QSEs may update COP• Awarded Energy Offers• Ancillary Service Commitments
QSEs may submit Trades
Day-Ahead Market
After Day-Ahead Market
119
![Page 120: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/120.jpg)
• QSE-QSE transactions• Transfers financial responsibility• Types
• Capacity• Energy• Ancillary Service
Day-Ahead Market
Trades
120
Trades are used only in Settlements
![Page 121: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/121.jpg)
Day-Ahead Market Settlements
121
Payments
Charges
![Page 122: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/122.jpg)
Daily statements include • Payments due• Charges incurred
Day-Ahead Market
Day-Ahead Settlement Timeline
122
Operating Day
Day 2Day Ahead
DAM Statement
Day 1
![Page 123: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/123.jpg)
Daily invoices include• DAM Statements• RTM Statements
Day-Ahead Market
Single Daily Settlement Invoice
123
Operating Day
Day 5 Day 6
ERCOT Issues DAM
Statement & Invoice Payment Due
(to ERCOT)
Payment Due (to Market Participant)
Day 2
17001700
Day Ahead
InvoiceDay + 2
InvoiceDay + 3
ERCOT Issues Invoice• DAM Statements • RTM Statements Payment Due
(to ERCOT)
Payment Due (to Market
Participant)
InvoiceDay
17001700
![Page 124: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/124.jpg)
Market Information System
Posted by 0600 Day-Ahead:
124
• Network Operations Model
• Weather Assumptions • Load Forecasts (next 7 days)• Forecasted Load Profiles
![Page 125: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/125.jpg)
Market Information System
Posted by 1330 Day-Ahead:
125
• LMPs • Settlement Point Prices• MCPCs for each Ancillary Service• Energy bought and sold
![Page 126: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/126.jpg)
$100
Checkpoint Jeopardy!
126
Inputs that indicate a willingness to buy or sell products in DAM!
Match the following answers with the questions:
$25
A DAM transaction that creates a financial credit in Real-time!$50
Products that may be offered simultaneously from the same Resource!
![Page 127: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/127.jpg)
Reliability Unit Commitment
![Page 128: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/128.jpg)
• Purpose of Reliability Unit Commitment (RUC)• Market Participants involved • The RUC Process• Settlements• Capacity Shortfall• Market Information System
Overview
Topics in this lesson . . .
128
![Page 129: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/129.jpg)
You Are Here!
129
![Page 130: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/130.jpg)
It ensures:
• Enough capacity is committed to serve the forecasted load
• Committed capacity is in the right locations
Reliability Unit Commitment
Purpose of Reliability Unit Commitment (RUC)
130
![Page 131: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/131.jpg)
Reliability Unit Commitment
131
Operational impacts on:QSEs with Resources
![Page 132: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/132.jpg)
Reliability Unit Commitment
132
Funds collected from:• Capacity-Short QSEs
• QSEs representing Load
![Page 133: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/133.jpg)
Reliability Unit Commitment
The Reliability Unit Commitment Process
133
![Page 134: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/134.jpg)
Reliability Unit Commitment
Committing Enough Capacity
134
![Page 135: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/135.jpg)
Reliability Unit Commitment
Committing Capacity in the Right Locations
135
![Page 136: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/136.jpg)
Reliability Unit Commitment
What if ERCOT must commit additional capacity?
136
![Page 137: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/137.jpg)
Reliability Unit Commitment
Potential Results of RUC Process:
137
• Resource Commitments• Resource Decommitments• No additional Commitments
![Page 138: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/138.jpg)
• Day-Ahead Reliability Unit Commitment (DRUC)• Hourly Reliability Unit Commitment (HRUC)
Reliability Unit Commitment
When does Reliability Unit Commitment (RUC) occur?
138
HRUCDRUC
![Page 139: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/139.jpg)
Make-Whole
Payments
Reliability Unit Commitment
139
*RUC-Committed Resources
Capacity Short
Charges
Make-Whole Uplift
Charges
![Page 140: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/140.jpg)
• Make-Whole Payments• RUC-committed Resources recover their
commitment costs
Reliability Unit Commitment
140
Resource Costs
Resource Revenues
$
RUC Make-Whole Payment
Make-Whole Payment
![Page 141: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/141.jpg)
Reliability Unit Commitment
Capacity Short Charge
141
Capacity Obligations
Capacity Supply
Capacity Shortfall
QSEs with Capacity Shortfall may be assessed Capacity Short Charges
![Page 142: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/142.jpg)
• Load (Adjusted Metered Load)• Capacity Trades where the QSE is a seller• Energy Trade where the QSE is a seller• Cleared DAM Energy Offer
Reliability Unit Commitment
What is included in the QSE’s capacity obligation?
142
Capacity Required to meet QSE Obligations
Capacity Obligations
![Page 143: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/143.jpg)
• Show capacity from its Resources in its COP• Capacity Trades where the QSE is a buyer• Energy Trades where the QSE is a buyer• Cleared DAM Energy bids
Reliability Unit Commitment
How can a QSE arrange to meet these obligations?
143
Capacity arranged by QSE
Capacity Supply
![Page 144: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/144.jpg)
QSE must arrange for enough Capacity to meet Obligations
Reliability Unit Commitment
To Minimize Capacity Short Charges…
144
Capacity Obligations
Capacity Supply
Capacity Shortfall
![Page 145: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/145.jpg)
Difference uplifted to QSEs representing Load
Reliability Unit Commitment
Revenues may not be enough for make-Whole Payments
145
Gen 1
RUC Make-Whole
Payments
Make-WholeUplift
Charges
CapacityShortfallCharges
Capacity Short
![Page 146: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/146.jpg)
Reliability Unit Commitment
146
Make-Whole
Payments Capacity Short
Charges
Make-Whole Uplift
Charges
RUC Payments and Charges are included in Real-Time Settlements
![Page 147: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/147.jpg)
Market Information System
Posted after process completion:
147
• Resources committed • Resources decommitted• Active transmission constraints
![Page 148: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/148.jpg)
$100
Checkpoint Jeopardy!
148
An input used by RUC to determine how much capacity is needed!
Match the following answers with the questions:
$25
Possible result of a snapshot of a QSE’s obligations!$50
An input used by RUC to determine the least cost solution to commit a Resource!
![Page 149: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/149.jpg)
Real-Time Operations
![Page 150: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/150.jpg)
• Purpose of Real-Time Operations• Market Participants• Real-Time Operations Process
• Security Constrained Economic Dispatch• Load Frequency Control
• Settlements• Market Information System
Overview
Topics in this lesson . . .
150
![Page 151: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/151.jpg)
You Are Here!
151
![Page 152: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/152.jpg)
• Manage reliability• Match generation with demand• Operate transmission system
within established limits• Operate the system at least cost
Real-Time Operations
Purpose of Real-Time Operations
152
![Page 153: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/153.jpg)
Real-Time Operations
153
ERCOT provides dispatch instructions to QSEs with Resources
![Page 154: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/154.jpg)
Real-Time Operations
154
ERCOT may also provide dispatch instructions to TSP’s
![Page 155: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/155.jpg)
• Operating Period• Includes Operating Hour and Hour-Ahead
Real-Time Operations
When do Real-Time Operations occur?
155
60 mins.prior to
Operating Hour
00000600 Real-TimeOperations
![Page 156: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/156.jpg)
• Operating Hour - Real-Time dispatch of energy• Hour-Ahead – Preparations for Real-Time Operations
Real-Time Operations
The Operating Period includes:
156
60 mins.prior to
Operating Hour
0000Real-TimeOperations
0600
![Page 157: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/157.jpg)
Real-Time Operations
157
![Page 158: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/158.jpg)
• Network Security Analysisidentifies transmission constraints
• Security Constrained Economic Dispatch (SCED) determines least-cost solution
Real-Time Operations
Network Security Analysis and SCED
158
NetworkSecurityAnalysis
SecurityConstrainedEconomicDispatch
Real-Time Operations
![Page 159: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/159.jpg)
Real-Time Operations
Provide Real-Time system data
159
![Page 160: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/160.jpg)
Real-Time Operations
Identify Constraints, both Transmission & Resource
160
TransmissionConstraints& ResourceDispatch Limits
![Page 161: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/161.jpg)
Real-Time Operations
SCED evaluates Offers to determine least-cost solution
161
TransmissionConstraints& ResourceDispatch Limits
![Page 162: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/162.jpg)
Real-Time Operations
SCED uses Energy Offer Curves:
162
Energy Offer Curve Submitted by QSEs:• Three-Part Supply Offer• Stand Alone Energy Offer Curve
During:• Day-Ahead Market• Adjustment Period
![Page 163: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/163.jpg)
Real-Time Operations
SCED produces Prices and Dispatch Instructions
163
![Page 164: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/164.jpg)
Real-Time Operations
How often does all this happen?
164
At least every 5 minutes
![Page 165: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/165.jpg)
Every 5 minutes (when SCED runs)LMPs• Electrical buses
Every 15 minutesSettlement Point Prices• Resource Nodes• Load Zones• Hubs
Real-Time Operations
Real-Time Price Calculations
165
Reserve Price Adders• ERCOT-wide
![Page 166: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/166.jpg)
SCED
• Matches generation with demand• Manages congestion• Achieves least cost dispatch
Real-Time Operations
Security Constrained Economic Dispatch (SCED)
166
SCED
SCED
5 minutes 5 minutes
Base points
Base points
Base points
![Page 167: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/167.jpg)
• Matches generation with demand• Responds to frequency deviations• Deploys Regulation Reserve Service
Real-Time Operations
Load Frequency Control (LFC)
167
Frequency (Hz)
60. 0000
5 minutes 5 minutes
Base points
Base points
Base points
![Page 168: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/168.jpg)
Real-Time Operations Settlements
168
Payment for Net Supply
Charge for Net Obligation
![Page 169: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/169.jpg)
• Metered Generation• DAM Purchase• Trades as Buyer
Examples•__________________ •__________________•__________________
Real-Time Operations Settlements
169
![Page 170: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/170.jpg)
•Metered Load•DAM Sale•Trades as Seller
Examples•__________________ •__________________•__________________
Real-Time Operations Settlements
170
![Page 171: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/171.jpg)
Daily statements include • Payments due• Charges incurred
Real-Time Operations Settlements
Real-Time Settlement Timeline
171
Day 180
Operating Day
Day 5
Initial Statement
Final Statement
True-Up Statement
Day 55
![Page 172: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/172.jpg)
Daily invoices include• DAM Statement• RTM Statements
Real-Time Operations Settlements
Single Daily Settlement Invoice
172
Operating Day
Day 5 Day 6
ERCOT Issues DAM
Statement & Invoice Payment Due
(to ERCOT)
Payment Due (to Market Participant)
Day 2
17001700
Day Ahead
InvoiceDay + 2
InvoiceDay + 3
ERCOT Issues Invoice• DAM • RTM Initial• RTM Final• RTM True-up
Payment Due (to ERCOT)
Payment Due (to Market
Participant)
InvoiceDay
17001700
![Page 173: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/173.jpg)
Market Information System
Posted after completion of SCED:
173
• Locational Marginal Prices• Settlement Point Prices
• Active transmission constraints
![Page 174: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/174.jpg)
$100
Checkpoint Jeopardy!
174
The QSE’s submitted energy offer for a specific Resource!
Match the following answers with the questions:
$25
The first leg of the Operating Period!$50
Real-Time value of reserves across the wide range of ERCOT!
![Page 175: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/175.jpg)
Course Conclusion
![Page 176: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/176.jpg)
NODAL MARKET CURRICULUM ** available as web-based courseNodal 101 ** An introduction to the ERCOT Nodal Market.
Retail 101 An introduction to the competitive retail market in the ERCOT Region.
LSE 201 ** Market tools to manage cost of serving Load in the ERCOT Nodal Market.
Basic Training Program Comprehensive overview of Market and System Operations in the Nodal Market design.
CRR Market Comprehensive overview of Congestion Revenue Rights.
Settlements 301 Comprehensive overview of financial settlements in the ERCOT Nodal Market.
Credit Management Comprehensive overview of financial credit management in the ERCOT Nodal Market.
Transmission 101 Overview of processes in the planning and operation of the ERCOT grid.
Nodal Market Education
ERCOT Market Education [email protected]
ERCOT Training Cataloghttp://www.ercot.com/services/training/
![Page 177: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/177.jpg)
Your Feedback
Your Feedback
ERCOT values your feedback on your experience in completing this instructor-led course.
Survey Handout
www.surveymonkey.com/r/ERCOTMarketTraining
Survey Launch QR Code:
![Page 178: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/178.jpg)
ERCOT.comERCOT Protocolshttp://www.ercot.com/mktrules/nprotocols/
ERCOT Client [email protected]
ERCOT Account Management [email protected]
ERCOT Market [email protected]
Accessing additional information
![Page 179: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/179.jpg)
APPENDIX
![Page 180: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/180.jpg)
Checkpoint Jeopardy Answers
180
Module 1 – ERCOT ResponsibilitiesAnswer: ERCOT finds the balance!Question: How does reliability and markets work together?
Answer: Capacities reserved for responding quickly to changing conditions.Question: What are Ancillary Services?
Answer: The process of keeping the transmission system operating within limits.Question: What is congestion management?
Module 3 – LMPAnswer: These Settlement Points come in half-a-dozen!Question: How many Hub Settlement Points are there?
Answer: Energy and congestion.Question: What are the two components of LMP?
Answer: A price formed by combining LMP’s with Reserve Price Adders.Question: What is a Settlement Point Price?
![Page 181: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/181.jpg)
Checkpoint Jeopardy Answers
181
Module 4 – Congestion Revenue RightsAnswer: Assigned, awarded, or traded!Question: How can a CRRAH acquire a CRR?
Answer: A fund that is used to pay CRR Account Holders what they are due.Question: What is Congestion Rent?
Answer: A fund that is uplifted to QSEs representing Load.Question: What is CRR Auction Revenue?
Module 5 – Day-Ahead MarketAnswer: Inputs that indicate a willingness to buy or sell products in DAM.Question: What are Bids and Offers?
Answer: A DAM transaction that creates a financial credit in Real-time.Question: What is a cleared Energy Bid?
Answer: Products that may be offered simultaneously from the same Resource.Question: What are Energy and Ancillary Services?
![Page 182: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/182.jpg)
Checkpoint Jeopardy Answers
182
Module 6 – Reliability Unit CommittmentAnswer: An input used by RUC to determine how much capacity is needed.Question: What is the Load Forecast?
Answer: Possible result of a test in time of a QSE’s obligations!Question: Why might a QSE receive a Capacity Short charge?
Answer: An input used by RUC to determine the least cost solution to commit a Resource.Question: What is the Three-Part Supply Offer?
Module 7 – Real-Time OperationsAnswer: The QSE’s submitted energy offer for a specific Resource!Question: What is the primary input into SCED?
Answer: The first leg of the Operating Period!Question: When does Hour-Ahead occur?
Answer: Real-Time value of reserves across the wide range of ERCOT!Question: What are Reserve Price Adders?
![Page 183: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/183.jpg)
Appendix: Pathways to Referenced Data
Access Market Information System from ERCOT public website:
183
Digital Certificate required
![Page 184: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/184.jpg)
LMP Contour Map: http://www.ercot.com/content/cdr/contours/rtmLmpHg.html
Appendix: Pathways to Referenced Data
184
![Page 185: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/185.jpg)
Public access: http://www.ercot.com/mktinfo/crr/index.html
CRR Auction section, Auction Results posting (zip folder)• CRRs, CRRAHs awarded, and Auction Clearing Prices
• Common Market Results file (CSV or XML format) • CRR Bids and Offers
• Common Auction Bids and Offers file (CSV or XML format)
Appendix: Pathways to Referenced Data
CRR Auction Results
185
![Page 186: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/186.jpg)
Appendix: Pathways to Referenced Data
CRR Auction Results via Market Information System
186
![Page 187: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/187.jpg)
Appendix: Pathways to Referenced Data
Day-Ahead Network Operations Model (posted by 0600)
187
![Page 188: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/188.jpg)
Appendix: Pathways to Referenced Data
Posted by 0600 Day-Ahead:
188
• Weather assumptions• Public access:
http://www.ercot.com/mktinfo/dam/index.html, under System Conditions
• MIS Secure: Markets > Day-Ahead Market > Day-Ahead Public Information
• Forecasted Load Profiles• Public access:
http://www.ercot.com/mktinfo/loadprofile/index.html, under Current Information
• MIS Secure: Markets > Load Profiling > Load Profiling Reports and Extracts (Public)
![Page 189: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/189.jpg)
Appendix: Pathways to Referenced Data
Posted by 0600 Day-Ahead:
189
• Load Forecasts (next 7 days)• Public access:
http://www.ercot.com/gridinfo/load/index.html, under Current Information
• MIS Secure: Grid > Forecasts > Significant System Conditions
• List of transmission constraints• Public access:
http://www.ercot.com/gridinfo/generation/index.html, under Current Information
• MIS Secure: Grid > Generation > Public Generation Information > Weekly RUC Active and Binding Transmission Constraints
![Page 190: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/190.jpg)
Appendix: Pathways to Referenced Data
Posted by 1330 Day-Ahead:
190
• DAM Hourly LMPs• DAM Settlement Point Prices• DAM Clearing Prices for Capacity• DAM Total Energy Purchased• DAM Total Energy sold
• Public access: http://www.ercot.com/mktinfo/dam/index.html, under Day-Ahead Market Results Reports
• MIS Secure: Markets > Day-Ahead Market > Day-Ahead Market Results
![Page 191: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/191.jpg)
Appendix: Pathways to Referenced Data
Posted after RUC completion:
191
• RUC Committed or DecommittedResources
• MIS Secure: Grid > Generation > Reliability Unit Commitment
• Active transmission constraints• Public access:
http://www.ercot.com/gridinfo/generation/index.html under Current Information
• MIS Secure: Grid > Generation > Public Generation Information
![Page 192: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted](https://reader034.vdocuments.mx/reader034/viewer/2022043009/5f9b765b9f5e22312333f731/html5/thumbnails/192.jpg)
Appendix: Pathways to Referenced Data
Posted after completion of SCED:
192
• Locational Marginal Prices• Settlement Point Prices
• Public access: http://www.ercot.com/mktinfo/rtm/index.html, under Real-Time Prices Reports
• MIS Secure: Markets > Real-Time Market > Real-Time Prices
• Active transmission constraints• MIS Secure: Markets > Real-Time Market >
Real-Time Operations