Page 1: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

ERCOT Nodal 101

Page 2: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

2

This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended from time to time. If any conflict exists between this presentation and the ERCOT Protocols, the ERCOT Protocols shall control in all respects.

For more information, please visit:

http://www.ercot.com/mktrules/nprotocols/

PROTOCOL DISCLAIMER

Legal

Page 3: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

3

• Restrooms

• Refreshments

• Attendance sheet

• Exam

• Questions

Housekeeping

Please silence smart phones & other electronics

Page 4: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

4

A high-level overview of the ERCOT Nodal Market for all Market Participants and ERCOT personnel.

ERCOT Nodal 101

Target Audience

Page 5: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

5

• Identify major components of the Nodal Market

• For each component of the Nodal Market, describe

• Purpose

• Inputs

• Outputs

• Processes

Upon completion of this course you will be able to:

Course Objectives

Page 6: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

6

Modules in this course include:

Course Modules

Introduction to ERCOT and Market

Locational Marginal Pricing

Congestion Revenue Rights

Day-Ahead Market

Reliability Unit Commitment

Real-Time Operations

1

2

3

4

5

6

Page 7: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

Module 1

Introduction to ERCOT

Page 8: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

8

• Key features of the ERCOT Grid

• ERCOT Responsibilities

• Reliability and Markets

• Capacity and Energy

• Congestion Management

• Network Modeling

• Market Overview

Topics in this lesson . . .

Overview

Page 9: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

9

• Represents 90% of Texas Load

• 77,000 MW of generation capacity

• 46,500 miles of transmission lines

• Electrical island with several DC Ties

Key Features of the ERCOT Grid

ERCOT Introduction

Natural Gas53%

Coal22%

Wind18%

Nuclear6%

Other*1%

2015 Generation Capacity*Includes solar, hydro and biomass

Page 10: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

10

• Match generation with demand

• Operate transmission system within established limits

ERCOT’s Primary Responsibility is Reliability

ERCOT Responsibility

Execute competitive markets for reliability services

Page 11: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

11

• Markets support reliability

• Reliability makes the markets possible

Reliability and Competitive Markets

ERCOT Operational Concepts

ERCOT finds the balance between Reliability and

Economics

Page 12: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

12

Energy and Capacity

ERCOT Responsibility

ERCOT dispatches Energy to follow the

system demand

Page 13: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

13

Energy and Capacity

ERCOT Responsibility

ERCOT must also ensure sufficient Capacity is on-line

to meet the forecasted demand

Forecast

Page 14: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

14

More about Capacity

ERCOT Responsibility

Capacity Reserved for Ancillary Services

Forecast

System Capacity

System Demand

Ancillary Services needed to respond quickly to changing system conditions

Page 15: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

15

Acquired through competitive markets

Ancillary Service Capacity

ERCOT Responsibility

System Capacity

Ancillary Service Capacity

Page 16: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

16

Ancillary Service Capacity

ERCOT Responsibility

System Capacity

Non-Spin Reserve

Regulation Reserve

Responsive Reserve

Three types of Ancillary Services

Page 17: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

17

• Generators and Loads separated by distance

• Transmission system has limits

Transmission Congestion

ERCOT Responsibility

Congestion management keeps transmission system

operating within limits

Page 18: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

18

Models allow ERCOT to:

• “See” grid at any point in time

• Predict how various actions affect grid

Network Operations Model

ERCOT Responsibility

Representation of a physical system.

Page 19: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

19

• Physical characteristics

• Ratings

• Operational limits

Including

• Transmission elements

• Resources

• Topology

• Telemetry mapping

Network Operations Model

ERCOT Responsibility

Page 20: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

Market Introduction

Page 21: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

21

Who are the ERCOT Players?

Market Participants

Transmission and/or Distribution Service Providers

Resource Entities

Load Serving Entities

Qualified Scheduling Entities

Page 22: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

22

Market Participants

Page 23: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

23

• Bilateral Market

• ERCOT Facilitated Markets

• Day-Ahead Ancillary Services Market

• Day-Ahead Energy Market

• Real-Time Energy Market

Commercial Markets

ERCOT Nodal Market Design

Page 24: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

24

Energy Dispatch

• Resource-specific offers• Resource-specific dispatch

Goal

• Balance generation &demand

• Manage congestion

Energy Pricing

• Location-specific prices for energy• Prices include congestion costs

ERCOT Nodal Market Design

Page 25: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

25

• All costs are directly assigned

• Congestion Revenue Rights available for hedging

Congestion Costs

ERCOT Nodal Market Design

Page 26: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

26

It’s all about the recovery of costs to build generation.

ERCOT is an energy-only market … but what does that mean?

ERCOT Nodal Market Design

In ERCOT, these costs must be recovered with revenues from

energy production and operating reserves.

Page 27: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

27

Energy Pricing must support investment in new generation

ERCOT is an energy-only market … but what does that mean?

ERCOT Nodal Market Design

Scarcity pricing – higher energy prices during periods where energy reserves are scarce

Page 28: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

28

You Are Here!

Page 29: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

29

Market Information System

An Independent Market Information System Registered Entity (IMRE) may register with ERCOT solely to access MIS Secure.

Page 30: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

30

You Are Here!

Page 31: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

Module 2

Locational Marginal Pricing

Page 32: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

32

• Locational Marginal Prices (LMPs)

• Define LMPs

• Determination of LMPs

• Congestion Rent

• Settlement Point Prices

• Scarcity Pricing Mechanism

• Market Information

Topics in this lesson ...

Overview

Page 33: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

33

Locational Marginal Pricing

What is Locational Marginal Pricing (LMP)?

Pricing: Cost

Marginal: to serve the next increment of Load

Locational: at an Electrical Bus

Locational Marginal Pricing

Page 34: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

34

• Energy

• Congestion

LMP Components

Locational Marginal Pricing

In some markets, LMPs have a component for losses.

The Nodal Market does NOTinclude losses in LMPs.

Page 35: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

35

Introducing the players … Example

Locational Marginal Pricing

Gen 1

Gen 2

Page 36: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

36

Introducing the players … Example

Locational Marginal Pricing

Gen 1

10 MW($4 per MWh)

Gen 2

20 MW ($2 per MWh)

10 MW

Page 37: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

37

Introducing the players … Example

Locational Marginal Pricing

Gen 1

10 MW($4 per MWh)

Gen 2

20 MW ($2 per MWh)

10 MW

When there is no congestion, all LMPs are equal

Page 38: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

38

Example: No Congestion

Locational Marginal Pricing

Charges to Load

LMP MW

$2 10 $20

Total $20

Payment to Resources

LMP MW

$2 0 $0

$2 10 $20

Total $20

Gen 1

Gen 2

Page 39: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

39

Now there is congestionExample

Locational Marginal Pricing

Gen 1

10 MW($4 per MWh)

Gen 2

20 MW ($2 per MWh)

10 MW4 MW constraint

Page 40: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

40

Example

Locational Marginal Pricing

Gen 1

10 MW($4 per MWh)

Gen 2

20 MW ($2 per MWh)

10 MW4 MW constraint

With congestion, LMPs are different

Page 41: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

41

Example: Congestion

Locational Marginal Pricing

Charges to Load

LMP MW

$4 10 $40

Total $40

Payment to Resources

LMP MW

$4 6 $24

$2 4 $8

Total $32

Gen 1

Gen 2

Page 42: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

42

Locational Marginal Pricing

$40

$32

$8

Chargesto

Load

Paymentsto

Resources

Congestion Rent used to fund Congestion Revenue Rights (CRRs)

Page 43: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

43

• LMPs at Electrical Buses

• Settlement Points used for financial settlement

• Settlement Point Prices calculated using LMPs

LMPs and Settlement Point Prices

Settlement Point Prices

LMP1

LMP2

LMP3

LMP4

LMP5

Electrical Buses

Settlement Point Price

Page 44: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

44

• Reserve Price Adder: the economic value of reserves that are available for energy dispatch in Real-Time

• LMPs and Reserve Price Adders are used together to form SPPs in Real-Time

Additional Real-Time pricing component …

Settlement Point Prices

LMPs are location-specific. Reserve Price Adders represent the value of

reserves ERCOT-wide.

Page 45: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

45

LMPs and Settlement Point Prices

• Every Hour

LMPs and Reserve Price Adders• Every 5 minutes*

Settlement Point Prices

• Every 15 minutes

How often are LMPs & Settlement Point Prices calculated?

Settlement Point Prices

* LMPs and Reserve Price Adders generated at each SCED cycle (possibly more often than 5 minutes)

Page 46: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

46

Three Types of Settlement Points:

Settlement Point Prices

ResourceNodes

LoadZones

Hubs

Page 47: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

47

An Electrical Bus where a Resource’s measured output is settled

What is a Resource Node?

Settlement Point Prices

Resource Electrical Bus

Page 48: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

48

Day-Ahead Market

LMP at the Resource Node

Real-Time Operations

Time-Weighted Average of LMPs at the Resource Node

Time-Weighted Average of Reserve Price Adders

Settlement Point Prices for Resource Nodes

Settlement Point Prices

+

Resource Electrical Bus

Page 49: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

49

A group of Electrical Buses assigned to the same geographical zone

What is a Load Zone?

Settlement Point Prices

Every Electrical Bus with Load must be assigned to

a Load Zone for Settlement purposes

Page 50: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

50

Day-Ahead Market

Load-Weighted Average of LMPs in Load Zone

Real-Time Operations

Load-Weighted and Time-Weighted Averages of LMPs in Load Zone

Time-Weighted Average of Reserve Price Adders

Settlement Point Price for Load Zones

Settlement Point Prices

+

Page 51: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

51

• Competitive Load Zones

• Non Opt-in Entity Load Zones

• DC Tie Load Zones

Three types of Load Zones

Settlement Point Prices

Page 52: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

52

• North

• South

• West

• Houston

Competitive Load Zones

Settlement Point Prices

2003 Congestion Management zones

Page 53: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

53

• Established by one or more NOIE(s)

• Some large NOIEs required to establish own NOIE Load Zones

• NOIEs that don’t establish NOIE Load Zone are assigned to Competitive Load Zone

Non Opt-in Entity Load Zones

Settlement Point Prices

Page 54: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

54

• Used to settle exports across DC Ties

• One for each DC Tie

• Contains only the electrical bus connected to the DC Tie

DC Tie Load Zones

Settlement Point Prices

All Load must be assigned to a Load Zone for

Settlement purposes

Page 55: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

55

• Group of 345kV Hub-buses

• Defined by Protocols

What is a Hub?

Settlement Point Prices

Hub

Page 56: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

56

Four Regional Hubs

• North

• West

• South

• Houston

Six Hubs in ERCOT Market

Settlement Point Prices

ERCOT Hub Average

ERCOT Bus Average

Two Average Hubs

Page 57: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

57

Day-Ahead Market

• Simple average of LMPs at Hub Buses in each Hub

Real-Time Operations

• Simple average of Time-Weighted Average LMPs at the Hub Buses in the Hub

• Time-Weighted Average of Reserve Price Adders

Settlement Point Price for Hubs

Settlement Point Prices

+

HubHub

Page 58: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

58

• LMP Contour Map

• Day-Ahead Market SPPs

• Real-Time LMPs

• Real-Time SPPs

Market Information System

Page 59: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

Nodal Market Operations

Page 60: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

60

Market Components

Nodal Market Operations

Page 61: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

Module 3

Congestion Revenue Rights

Page 62: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

62

• Purpose of CRRs

• CRR Account Holders

• Types of CRRs

• How CRRs are acquired

• Settlements

• Market Information System

Topics in this lesson . . .

Overview

Page 63: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

63

You Are Here!

Page 64: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

64

• Financial instruments

• Hedge against congestion costs

• Financial investment

• Payment or charge when Grid is congested

Purpose of Congestion Revenue Rights

Congestion Revenue Rights

A CRR is not a right to deliver physical energy

Page 65: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

65

Congestion Cost exposure

Congestion Costs

Congestion costs are built in to the Settlement Point prices

Resource Node A

Resource Node B

$30/MWh$40/MWh

$45/MWh

Load Zone

Page 66: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

66

Congestion Revenue Rights

Introducing a new player:CRR Account Holder

Page 67: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

67

Congestion Revenue Rights

To own CRRs, Market Participants:• Must be registered with ERCOT• Must qualify as CRR Account Holders

Page 68: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

68

Congestion Revenue Rights

Barred from owning CRRs:• TSPs & DSPs• ERCOT

Page 69: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

69

• Designated point of injection (source) and point of withdrawal (sink)

• Settlement based on difference between sink and source Settlement Point Prices

• Two Instruments:

• PTP Options – payment only• PTP Obligations – payment or

charge

Congestion Revenue Rights as Financial Instruments

Congestion Revenue Rights

Point-to-Point Congestion

Revenue Rights

Page 70: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

70

Point-to-Point (PTP) ObligationsExample

Congestion Revenue Rights

$5/MWh

$10/MWh

$15/MWh

Source A

Source C

Sink B

Obligation AB Payment = $5.00

Obligation CB Payment = -$5.00 ?

Page 71: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

71

Point-to-Point (PTP) OptionsExample

Congestion Revenue Rights

$5/MWh

$10/MWh

$15/MWh

Source A

Source C

Sink B

Option AB Payment = $5.00

Option CB Payment = $0.00 ?

Page 72: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

72

• CRR Auction

• Allocation (Special Case)

• Bilateral Trades

Three ways of acquiring CRRs:

Congestion Revenue Rights

CRRs

Auction

Allocation

Trade

Page 73: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

73

• Time-of-Use Blocks

• One month strips

CRRs are auctioned and allocated by:

Congestion Revenue Rights

Mon. Tues. Wed. Thurs. Fri. Sat. Sun.

Off-Peak (0100 – 0600)

Off-Peak (2300 – 2400)

Peak Weekday (0700 – 2200) Peak Weekend (0700-2200)

Page 74: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

74

• CRR Auction

• Monthly and Semi-Annual Auctions

• Based on Network Operations Model

Congestion Revenue Rights

Bids

Offers

CRRAuction

Awarded Offers

Awarded Bids

Page 75: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

75

Pre-Assigned CRRs (PCRRs)

• Allocated to Non-Opt-In Entities (NOIEs)

• Based on long-term supply contracts

• May be allocated as Options or Obligations

• No charge or a percentage of the Auction clearing price

Allocation of CRRs

Congestion Revenue Rights

Page 76: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

76

• PTP Options

• PTP Obligations

• Characteristics remain unchanged

• Both parties must meet credit requirements

Trading CRRs Bilaterally

Congestion Revenue Rights

Page 77: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

77

Three Settlement Processes

• CRR Auction Settlement

• CRR Settlement

• CRR Balancing Account

CRR Settlements

Congestion Revenue Rights

Page 78: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

78

CRR Auction Settlements

Congestion Revenue Rights Settlements

Settlements

Payments

Charges

Page 79: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

79

CRR Auction Settlement Timeline

Congestion Revenue Rights

Auction Completed Day 1* Day 3** Day 4**

Auction Invoice

PaymentsDue to ERCOT

PaymentsDue to CRR Account Holders

Auction Results

Day 2**

** Bank Business Day

*** ERCOT Business Day and Bank Business Day

* ERCOT Business Day

Day 5***

Page 80: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

80

CRR Auction Settlement

Congestion Revenue Rights

Monthly

CRR Auction Revenues

+PCRR Revenues

Pay to QSEs representing Load

Page 81: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

81

CRR Settlement

Congestion Revenue Rights

Payments

Charges

CRRs are settled in the Day-Ahead Market

Page 82: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

82

CRR Settlement

Congestion Revenue Rights

Payment due toCRR Account Holders

Hourly

Page 83: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

83

CRR Settlement

Congestion Revenue Rights

Payment due toCRR Account Holders

Hourly

may be short paid in some hours

Page 84: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

84

CRR Balancing Account

Congestion Revenue Rights

Payment due toCRR Account Holders

MonthlyPay to QSEs representing Load

Page 85: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

85

CRR Balancing Account

Congestion Revenue Rights

Payment due toCRR Account Holders

Monthly

X

may remain short paid

Page 86: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

86

Posted after each Auction:

Market Information System

• CRRs awarded • CRR Account Holders• Auction clearing prices• CRR Bids and offers

Page 87: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

Module 4

Day-Ahead Market

Page 88: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

88

• Purpose of Day-Ahead Market

• Market Participants

• Day-Ahead Market Process

• Process Inputs and Outputs

• Settlements

• Market Information System

Topics in this lesson ...

Overview

Page 89: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

89

You Are Here!

Page 90: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

90

• Centralized Forward Market

• Buy and sell Energy

• Sell Ancillary Services to ERCOT

• Forward market provides price certainty

Purpose of the Day-Ahead Market

Day-Ahead Market

Page 91: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

91

Day-Ahead Market

Only QSEs participate in the Day-Ahead Market.

Page 92: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

92

Day-Ahead Market

CRRs are settled with Day-Ahead Market Prices

Page 93: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

93

• Market opens at 0600

• Clearing Process begins at 1000

• Results posted by 1330

When does the Day-Ahead Market occur?

Day-Ahead Market

0600 1330 0000 Real-TimeOperations

Page 94: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

94

An Offer is a proposal to sell:

• A Product• At a Location• For a Price

A Bid is a proposal to buy:

• A Product• At a Location• For a Price

Day-Ahead Market

EnergyLoadZone 4

$40

Page 95: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

95

The Day-Ahead Market

Day-Ahead Market

Day-AheadMarket

Awards

PricingBids

Current Operating Plans

Network Operations Model

Offers

Page 96: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

96

The Day-Ahead Market

Day-Ahead Market

Day-AheadMarket

Awards

PricingBids

Current Operating Plans

Network Operations Model

Offers

Page 97: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

97

The Day-Ahead Market

Day-Ahead Market

Day-AheadMarket

Awards

PricingBids

Current Operating Plans

Network Operations Model

Offers

Types of Offers:• Three-Part Supply Offer • Ancillary Service (AS) Offer• Day-Ahead Market Energy-Only Offer

Page 98: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

98

Three-Part Supply Offer

Day-Ahead Market

Energy Offer Curve

$ / MWh (at LSL) $ / MWh (above LSL)

$ / Start

Energy Offer Curve can be submitted without Start-up or Minimum Energy Offers

Startup Offer Minimum-Energy Offer Energy Offer Curve

Page 99: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

99

• Resource specific

• Regulation Reserve

• Responsive Reserve

• Non-Spinning Reserve

• A Resource may be offered

• For multiple Ancillary Services

• For Energy and Ancillary Services

Ancillary Service (AS) Offers:

Day-Ahead Market

Ancillary Service Offer

Page 100: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

100

• Proposal to sell energy in DAM

• Offered at any Settlement Point

Day-Ahead Market Energy-Only Offer

Day-Ahead Market

DAM Energy-Only Offer

Valid only in the Day-Ahead Market

Financial obligation in Real-Time

Page 101: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

101

The Day-Ahead Market

Day-Ahead Market

Day-AheadMarket

Awards

PricingBids

Current Operating Plans

Network Operations Model

Offers

Types of Bids:• Energy Bid• PTP Obligation Bid

Page 102: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

102

• Proposal to buy energy

• Submitted at any Settlement Point

Day-Ahead Market Energy Bid

Day-Ahead Market

h

DAM Energy Bid

Valid only in the Day-Ahead Market

Financial credit in Real-Time

Page 103: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

103

Purpose of DAM PTP Obligations

• Hedge against congestion costs in Real-Time

• Charge or payment when Grid is congested in Real-Time

Day-Ahead Market PTP Obligation Bids

Day-Ahead Market

Page 104: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

104

• Like coupled Energy Bid and Energy Offer

• Purchased at DAM Settlement Point Price Spread

• Settled at Real-Time Settlement Point Price Spread

Day-Ahead Market PTP Obligation Bids

Day-Ahead Market

Source A

Sink BEnergy Offer

Energy Bid

PTP ObligationDAM PTP Obligation can

result in a payment or charge

Page 105: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

105

Day-Ahead Market PTP ObligationsExample

Day-Ahead Market

QSE charge in Day Ahead Market = $2

QSE payment in Real Time = $7 ?

?

$10/MWh $12/MWh

Source A Sink B

PTP Obligation

DAM :

$8/MWh $15/MWhReal-Time :

Settlement Point Prices

Page 106: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

106

Day-Ahead Market

CRR Auction Day-Ahead Market Real-Time

Page 107: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

107

The Day-Ahead Market

Day-Ahead Market

Day-AheadMarket

Awards

PricingBids

Current Operating Plans

Network Operations Model

Offers

Page 108: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

108

• Anticipated Resource operating conditions

• Resource Status

• Resource Limits

• Ancillary Service Commitments

• Submitted by QSE

The Current Operating Plan (COP)

Day-Ahead Market

QSE must maintain the COP for each hour of the next 7 days

Page 109: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

109

The Day-Ahead Market

Day-Ahead Market

Day-AheadMarket

Awards

PricingBids

Current Operating Plans

Network Operations Model

Offers

Page 110: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

110

• Day-Ahead Market does not solve reliability issues

• System must support the Day-Ahead Market solution

The Network Model in the Day-Ahead Market

Day-Ahead Market

The Network Operations Model ensures that DAM solution

respects system limits

Page 111: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

111

The Day-Ahead Market

Day-Ahead Market

Day-AheadMarket

Awards

PricingBids

Current Operating Plans

Network Operations Model

Offers

Page 112: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

112

The Day-Ahead Market

Day-Ahead Market

Day-AheadMarket

Awards

PricingBids

Current Operating Plans

Network Operations Model

Offers

Cleared Offers = CostsCleared Bids = Revenues

Page 113: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

113

The Day-Ahead Market clearing process

Day-Ahead Market

MaximizeThe Gap

Bid-based Revenues

Offer-based Costs

Page 114: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

114

The Day-Ahead Market clearing process

Day-Ahead Market

MaximizeThe Gap

Bid-based Revenues

Offer-based CostsEnergy&AncillaryService Costs

The Day-Ahead Market is a Co-optimized Market

Page 115: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

115

The Day-Ahead Market

Day-Ahead Market

Day-AheadMarket

Awards

PricingBids

Current Operating Plans

Network Operations Model

Offers

Page 116: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

116

• QSEs may update COP

• Awarded Energy Offers• Ancillary Service Commitments

• QSEs may submit Trades

After Day-Ahead Market

Day-Ahead Market

Page 117: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

117

• QSE-QSE transactions

• Transfers financial responsibility

• Types

• Capacity

• Energy

• Ancillary Service

Trades

Day-Ahead Market

Trades are used onlyin Settlements

Page 118: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

118

Day-Ahead Market Settlements

Payments

Charges

Page 119: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

119

Daily statements include

• Payments due

• Charges incurred

Day-Ahead Settlement Timeline

Day-Ahead Market

When are Day-Ahead Market Statements available?

Operating Day

Day 2Day Ahead

DAM Statement

Day 1

Page 120: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

120

Daily invoices include

• DAM Statements

• RTM Statements

Single Daily Settlement Invoice

Day-Ahead Market

InvoiceDay + 2

InvoiceDay + 3

InvoiceDay

ERCOT Issues Invoice• DAM• RTM initial • RTM final• RTM True-Up

Payment Due (to ERCOT)

Payment Due (to Market

Participant)

17001700

Page 121: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

121

Posted by 0600 Day-Ahead:

Market Information System

• Network Operations Model

• Weather Assumptions • Load Forecasts (next 7 days)• Forecasted Load Profiles

Page 122: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

122

Posted by 1330 Day-Ahead:

Market Information System

• LMPs • Settlement Point Prices• MCPCs for each Ancillary Service• Energy bought and sold

Page 123: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

Module 5

Reliability Unit Commitment

Page 124: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

124

• Purpose of Reliability Unit Commitment (RUC)

• Market Participants involved

• The RUC Process

• Settlements

• Capacity Shortfall

• Market Information System

Topics in this lesson ...

Overview

Page 125: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

125

You Are Here!

Page 126: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

126

It ensures:

• Enough capacity is committed to serve the forecasted load

• Committed capacity is in the right locations

Purpose of Reliability Unit Commitment (RUC)

Reliability Unit Commitment

Page 127: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

127

Reliability Unit Commitment

Operational impacts on:QSEs with Resources

Page 128: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

128

Reliability Unit Commitment

Funds collected from:• Capacity-Short QSEs• QSEs representing Load

Page 129: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

129

The Reliability Unit Commitment Process

Reliability Unit Commitment

Reliability Unit Commitment

TransmissionSecurity Analysis

(TSA)

Reliability UnitCommitment

(RUC)

Current Operating Plans

NetworkOperations

Model

Contingencies

Load Forecast

Offers Three-Part Supply Offers

Resource Commitments

Resource Decommitments

Page 130: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

130

Contingencies

NetworkOperations

Model

Committing Enough Capacity

Reliability Unit Commitment

Reliability Unit Commitment

TransmissionSecurity Analysis

(TSA)

Reliability UnitCommitment

(RUC)

Current Operating Plans

Load Forecast

Offers Three-Part Supply Offers

Resource Commitments

Resource Decommitments

Page 131: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

131

Current Operating Plans

Load Forecast

Contingencies

NetworkOperations

Model

Committing Capacity in the Right Locations

Reliability Unit Commitment

Reliability Unit Commitment

Reliability UnitCommitment

(RUC)

Offers Three-Part Supply Offers

TransmissionSecurity Analysis

(TSA)

Resource Commitments

Resource Decommitments

Page 132: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

132

Reliability Unit Commitment

Offers Three-Part Supply Offers

NetworkOperations

Model

Current Operating Plans

Load Forecast

Contingencies

What if ERCOT must commit additional capacity?

Reliability Unit Commitment

Reliability UnitCommitment

(RUC)

TransmissionSecurity Analysis

(TSA)

Resource Commitments

Resource Decommitments

Page 133: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

133

Current Operating Plans

Load Forecast

Contingencies

NetworkOperations

Model

• Resource Commitments• Resource Decommitments• No additional Commitments

Potential Results of RUC Process:

Reliability Unit Commitment

Reliability Unit Commitment

Reliability UnitCommitment

(RUC)

Offers

Resource Commitments

Resource Decommitments

Three-Part Supply Offers

TransmissionSecurity Analysis

(TSA)

Page 134: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

134

• Day-Ahead Reliability Unit Commitment (DRUC)

• Hourly Reliability Unit Commitment (HRUC)

When does Reliability Unit Commitment (RUC) occur?

Reliability Unit Commitment

HRUCDRUC

Page 135: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

135

Reliability Unit Commitment

Make-Whole

Payments

*RUC-Committed Resources

Capacity Short

Charges

Make-Whole Uplift

Charges

Page 136: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

136

• Make-Whole Payments

• RUC-committed Resources recover their commitment costs

Reliability Unit Commitment

Resource Costs

Resource Revenues

$

RUC Make-Whole Payment

Make-Whole Payment

Page 137: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

137

Capacity Short Charge

Reliability Unit Commitment

QSEs with Capacity Shortfall may be assessed Capacity Short Charges

Capacity Obligations

Capacity Supply

Capacity Shortfall

Page 138: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

138

• Load (Adjusted Metered Load)

• Capacity Trades where the QSE is a seller

• Energy Trade where the QSE is a seller

• Cleared DAM Energy Offer

What is included in the QSE’s capacity obligation?

Reliability Unit Commitment

Capacity Obligations

Page 139: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

139

• Show capacity from its Resources in its COP

• Capacity Trades where the QSE is a buyer

• Energy Trades where the QSE is a buyer

• Cleared DAM Energy bids

How can a QSE arrange to meet these obligations?

Reliability Unit Commitment

Capacity Obligations

Capacity Supply

Page 140: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

140

QSE must arrange for enough Capacity to meet Obligations

To Minimize Capacity Short Charges …

Reliability Unit Commitment

Capacity Obligations

Capacity Supply

Capacity Shortfall

Page 141: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

141

Difference uplifted to QSEs representing Load

Revenues may not be enough for make-Whole Payments

Reliability Unit Commitment

Slide 141

Gen 1

RUC Make-Whole

Payments

Make-WholeUplift

Charges

CapacityShortfallCharges

Capacity Short

Page 142: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

142

Reliability Unit Commitment

Make-Whole

Payments Capacity Short

Charges

Make-Whole Uplift

Charges

RUC Payments and Charges are included in Real-Time Settlements

Page 143: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

143

Posted after process completion:

Market Information System

• Resources committed • Resources decommitted• Active transmission constraints

Page 144: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

Module 6

Real-Time Operations

Page 145: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

145

• Purpose of Real-Time Operations

• Market Participants

• Real-Time Operations Process

• Security Constrained Economic Dispatch

• Load Frequency Control

• Settlements

• Market Information System

Topics in this lesson ...

Overview

Page 146: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

146

You Are Here!

Page 147: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

147

• Manage reliability

• Match generation with demand

• Operate transmission system within established limits

• Operate the system at least cost

Purpose of Real-Time Operations

Real-Time Operations

Page 148: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

148

Real-Time Operations

ERCOT provides dispatch instructions to QSEs with Resources

Page 149: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

149

Real-Time Operations

ERCOT may also provide dispatch instructions to TSP’s

Page 150: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

150

• Operating Period

• Includes Operating Hour and Hour-Ahead

When do Real-Time Operations occur?

Real-Time Operations

60 mins.prior to

Operating Hour

00000600 Real-TimeOperations

Page 151: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

151

• Operating Hour - Real-Time dispatch of energy

• Hour-Ahead – Preparations for Real-Time Operations

The Operating Period includes:

Real-Time Operations

60 mins.prior to

Operating Hour

00000600 Real-TimeOperations

Page 152: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

152

Real-Time Operations

Telemetry

NetworkOperations

Model

ContingenciesReal-Time Operations

Security-ConstrainedEconomic Dispatch

Offers

Pricing

Locational Marginal Prices

Dispatch Instructions

Base Points

Real-Time Network Security Analysis

Page 153: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

153

• Network Security Analysis identifies transmission constraints

• Security Constrained Economic Dispatch (SCED) determines least-cost solution

Network Security Analysis and SCED

Real-Time Operations

Real-Time Operations

Security-ConstrainedEconomic Dispatch

Network Security Analysis

Page 154: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

154

Provide Real-Time system data

Real-Time Operations

Telemetry

NetworkOperations

Model

ContingenciesReal-Time Operations

Security-ConstrainedEconomic Dispatch

Offers

Pricing

Locational Marginal Prices

Dispatch Instructions

Base Points

Real-Time Network Security Analysis

Page 155: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

155

Identify Constraints, both Transmission & Resource

Real-Time Operations

Telemetry

NetworkOperations

Model

ContingenciesReal-Time Operations

Security-ConstrainedEconomic Dispatch

Offers

Pricing

Locational Marginal Prices

Dispatch Instructions

Base Points

Real-Time Network Security Analysis

TransmissionConstraints

& Resource

Dispatch Limits

Page 156: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

156

Real-Time Operations

SCED evaluates Offers to determine least-cost solution

Real-Time Operations

Telemetry

NetworkOperations

Model

Contingencies

Security-ConstrainedEconomic Dispatch

Offers

Pricing

Locational Marginal Prices

Dispatch Instructions

Base Points

Real-Time Network Security Analysis

TransmissionConstraints

& Resource

Dispatch Limits

Page 157: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

157

Submitted by QSEs:

• Three-Part Supply Offer

• Stand Alone Energy Offer Curve

During:

• Day-Ahead Market

• Adjustment Period

SCED uses Energy Offer Curves:

Real-Time Operations

Energy Offer Curve

Page 158: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

158

SCED produces Prices and Dispatch Instructions

Real-Time Operations

Telemetry

NetworkOperations

Model

ContingenciesReal-Time Operations

Security-ConstrainedEconomic Dispatch

Offers

Pricing

Locational Marginal Prices

Dispatch Instructions

Base Points

Real-Time Network Security Analysis

Page 159: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

159

How often does all this happen?

Real-Time Operations

Telemetry

NetworkOperations

Model

ContingenciesReal-Time Operations

Security-ConstrainedEconomic Dispatch

Offers

Pricing

Locational Marginal Prices

Dispatch Instructions

Base Points

Real-Time Network Security Analysis

At least every 5 minutes

Page 160: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

160

Every 5 minutes (when SCED runs)

LMPs

• Electrical buses

Every 15 minutes

Settlement Point Prices

• Resource Nodes

• Load Zones

• Hubs

Real-Time Price Calculations

Real-Time Operations

Reserve Price Adders

• ERCOT-wide

Page 161: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

161

• Matches generation with demand

• Manages congestion

• Achieves least cost dispatch

Security Constrained Economic Dispatch (SCED)

Real-Time Operations

5 minutes

Base point

Base point

Base point

SCEDSCED SCED

5 minutes

Page 162: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

162

• Matches generation with demand

• Responds to frequency deviations

• Deploys Regulation Reserve Service

Load Frequency Control (LFC)

Real-Time Operations

Frequency (Hz)

60. 0000

5 minutes 5 minutes

Base point

Base point

Base point

Page 163: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

163

Real-Time Operations Settlements

Payment for Net Supply

Charge for Net Obligation

Page 164: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

164

Real-Time Operations Settlements

Examples•__________________ •__________________•__________________

Page 165: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

165

Real-Time Operations Settlements

Examples•__________________ •__________________•__________________

Page 166: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

166

Daily statements include

• Payments due

• Charges incurred

Real-Time Settlement Timeline

Real-Time Operations Settlements

When are Real-Time Statements available?

Day 180Operating Day

Day 5

Initial Statement

Final Statement

True-Up Statement

Day 55

Page 167: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

167

Daily invoices include

• DAM Statements

• RTM Statements

Single Daily Settlement Invoice

Real-Time Operations Settlements

InvoiceDay + 2

InvoiceDay + 3

InvoiceDay

ERCOT Issues Invoice• DAM• RTM initial • RTM final• RTM True-Up

Payment Due (to ERCOT)

Payment Due (to Market

Participant)

17001700

Page 168: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

168

• Active transmission constraints

Posted after completion of SCED:

Market Information System

• Locational Marginal Prices• Settlement Point Prices

Page 169: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

Course Conclusion

Page 170: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

170

• ERCOT Client [email protected]

• ERCOT Mailing Listshttp://lists.ercot.com/

• ERCOT Nodal Market Protocolshttp://www.ercot.com/mktrules/nprotocols/

• ERCOT Traininghttp://www.ercot.com/services/training/

• Market Education [email protected]

Additional Resources

Page 171: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

171

Scan this QR code to take the course survey!

Got Feedback?

Page 172: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

Appendix

Page 173: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

173

Access Market Information System from ERCOT public website:

Appendix: Pathways to Referenced Data

Digital Certificate required

Page 174: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

174

LMP Contour Map: http://www.ercot.com/content/cdr/contours/rtmLmpHg.html

Appendix: Pathways to Referenced Data

Page 175: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

175

Public access:

http://www.ercot.com/mktinfo/crr/index.html

CRR Auction section, Auction Results posting (zip folder)

• CRRs, CRRAHs awarded, and Auction Clearing Prices

• Common Market Results file (CSV or XML format)

• CRR Bids and Offers

• Common Auction Bids and Offers file (CSV or XML format)

CRR Auction Results

Appendix: Pathways to Referenced Data

Page 176: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

176

CRR Auction Results via Market Information System

Appendix: Pathways to Referenced Data

Page 177: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

177

Day-Ahead Network Operations Model (posted by 0600)

Appendix: Pathways to Referenced Data

Page 178: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

178

• Weather assumptions

• Public access: http://www.ercot.com/mktinfo/dam/index.html,under System Conditions

• MIS Secure: Markets > Day-Ahead Market >Day-Ahead Public Information

• Forecasted Load Profiles

• Public access: http://www.ercot.com/mktinfo/loadprofile/index.html, under Current Information

• MIS Secure: Markets > Load Profiling > Load Profiling Reports and Extracts (Public)

Posted by 0600 Day-Ahead:

Appendix: Pathways to Referenced Data

Page 179: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

179

• Load Forecasts (next 7 days)

• Public access:http://www.ercot.com/gridinfo/load/index.html, under Current Information

• MIS Secure: Grid > Forecasts > Significant System Conditions

• List of transmission constraints

• Public access:http://www.ercot.com/gridinfo/generation/index.html, under Current Information

• MIS Secure: Grid > Generation > Public Generation Information > Weekly RUC Active and Binding Transmission Constraints

Posted by 0600 Day-Ahead:

Appendix: Pathways to Referenced Data

Page 180: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

180

• DAM Hourly LMPs

• DAM Settlement Point Prices

• DAM Clearing Prices for Capacity

• DAM Total Energy Purchased

• DAM Total Energy sold

• Public access: http://www.ercot.com/mktinfo/dam/index.html, under Day-Ahead Market Results Reports

• MIS Secure: Markets > Day-Ahead Market > Day-Ahead Market Results

Posted by 1330 Day-Ahead:

Appendix: Pathways to Referenced Data

Page 181: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

181

• RUC Committed or Decommitted Resources

• MIS Secure: Grid > Generation > ReliabilityUnit Commitment

• Active transmission constraints

• Public access: http://www.ercot.com/gridinfo/generation/index.htmlunder Current Information

• MIS Secure: Grid > Generation > PublicGeneration Information

Posted after RUC completion:

Appendix: Pathways to Referenced Data

Page 182: ERCOT Nodal 101 · 2017-08-01 · 2 This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended

182

• Locational Marginal Prices

• Settlement Point Prices

• Public access: http://www.ercot.com/mktinfo/rtm/index.html, under Real-Time Prices Reports

• MIS Secure: Markets > Real-Time Market > Real-Time Prices

• Active transmission constraints

• MIS Secure: Markets > Real-Time Market > Real-Time Operations

Posted after completion of SCED:

Appendix: Pathways to Referenced Data