eramet tokyo pressconference · view of market conditions early in the year. focused on improving...
TRANSCRIPT
![Page 1: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/1.jpg)
ERAMET TOKYO PRESS CONFERENCE
July 6th, 2017
![Page 2: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/2.jpg)
ERAMET TOKYO PRESS CONFERENCE
CONTENTS
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 20172
Key Figures
2016 financial results / improving performance
Operating performance
� ERAMET Nickel
� ERAMET Alloys
� ERAMET Manganese
Conclusion - outlook
Appendice
![Page 3: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/3.jpg)
ERAMET AT A GLANCE
3
� About 14 000 people worldwide
� A presence in more than 20 countries
� 220 employees dedicated to R&D
� 150 products in portfolio
Manganese - Gabon
40+ years resources
Mining
Zircon and Ilmenite –
Senegal
25+ years ressources
Nickel – New Caledonia
50+ years ressources
#2 in Manganese alloys
worldwide
#1 in refined manganese
alloys worldwide
#1 in FeNi worldwide
Extractive Metallurgy
First metallurgical complex for Mn
metal produced in Africa
# 1 in nickel chloride worldwide
# 3 in high grade Ni worldwide
# 2 in high power closed-die
forged parts worldwide
# 1 capacity in gas-atomized
metal powders worldwide
Elaboration & transformation
high-value products
From Mining to Metallurgy to serve our Japanese clients
ERAMET Manganese
48%
ERAMET Nickel20%
ERAMET Alloys32%ERAMET
Group turnover
(2016)
2984 M€
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 2017
![Page 4: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/4.jpg)
After a very difficult 2015 year, 2016 has shown some recovery thanks to a combination of better metal prices and internal cost reduction
4
Millions of €
Millions of € 2016 2015
Nickel (119) (261)
Alloys 27 27
Manganese 219 58
Holding (43) (31)
Group 84 (207)-400
-300
-200
-100
0
100
200
300
400
500
600
2011 2012 2013 2014 2015 2016
Nickel Alliages Manganèse Groupe
Current Operating Income (COI)
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 2017
![Page 5: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/5.jpg)
2016 : GIVING PRIORITY TO CASH-FLOW GENERATION
� Focused our efforts on our core businesses.
5
Suspension of
major projects
Projects
Restriction of
capital
expenditure
CAPEX
Program for
2016-2017
Asset disposals
� Increased competitiveness to strengthen our market positions.
€360 million(1) in cost
reduction and productivity
improvement
Operational plan for
2014-2017
The performance
improvement plan has been
stepped up:
target: USD 4.5/lb(2)
ERAMET Nickel - SLN
(1) Annual impact on current operating income relative to 2013 at the end of the plan.
(2) Cash-cost, on an annual basis, to the end of 2017, based on economic conditions at the start of 2016.
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 2017
![Page 6: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/6.jpg)
ACCELERATION AND AMPLIFICATION OF THE 2014 - 2017 COST REDUCTION AND PRODUCTIVITY IMPROVEMENT PLAN
6
(1) annual impact on current operating income relative to 2013
Initial plan: target of €360 millionAnnual impact on current operating income
€129 million achieved in 2016
€306 million since 2014(1)
2014
2015
Total:€400
million (1)
2014-2017
2016
2017
Updated plan: target of €400 millionAnnual impact on current operating income
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 2017
![Page 7: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/7.jpg)
STRENGTHENING OF ERAMET'S BALANCE SHEET
7
Drawdown of the revolving credit facility (RCF) in early
January 2016.
Strengthening of ERAMET's equity through the issue of
€100 million in net share settled undated bonds convertible
into new shares (ODIRNAN) in September 2016.
Completion of the asset disposal program, generating in
2016 an impact of €142 million on the Group's net debt.
2-year extension to the maturity of the revolving credit
facility in January 2017.
630
1 698
981
0
200
400
600
800
1 000
1 200
1 400
1 600
1 800 1,6981,611
31/12/201631/12/2015
ERAMET group financial liquidity
(millions of €)
� Substantial financial liquidity
� 47% Net Debt / Equity ratio
Revolving credit facilityAvailable cash
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 2017
![Page 8: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/8.jpg)
� World number 1 producer of ferronickel.
� World number 1 producer of nickel chloride.
� One of only three producers of high-purity nickel in the world.
8
ERAMET NICKEL
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 2017
![Page 9: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/9.jpg)
NICKEL PRICES REMAINING AT LOW LEVELS
9
030 00060 00090 000120 000150 000180 000210 000240 000270 000300 000330 000360 000390 000420 000450 000480 000510 000540 000
6 000
8 000
10 000
12 000
14 000
16 000
18 000
20 000
22 000
Jan-
14F
eb-1
4M
ar-1
4A
pr-1
4M
ay-1
4Ju
n-14
July
-14
Aug
-14
Sep
-14
Oct
-14
Nov
-14
Dec
-14
Jan-
15F
eb-1
5M
ar-1
5A
pr-1
5M
ay-1
5Ju
n-15
Jul-1
5A
ug-1
5S
ep-1
5O
ct-1
5N
ov-1
5D
ec-1
5Ja
n-16
Feb
-16
Mar
-16
Apr
-16
May
-16
Jun-
16Ju
l-16
Aug
-16
Sep
-16
Oct
-16
Nov
-16
Dec
-16
Jan-
17F
eb-1
7M
ar-1
7A
pr-1
7M
ay-1
7Ju
n-17
LME stocks SHFE stocks LME Nickel spot price (USD/t) Nickel inventories(in tonnes)
Low nickel price environment and high level of nickel inventories In LME and SHFE warehouses.
Sustained primary nickel demand despite current slowdown in China.
Impact of Indonesia and the Philippines on global primary nickel supply.
A change of USD 1/lb in LME price results in a change of approximately €110 million in ERAMET's annual current operating income (at an exchange rate of USD 1.1/€).
LME nickel prices
USD / lbUSD/tonne
2014 2015 2016 2017
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 2017
![Page 10: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/10.jpg)
SLN HAS PUT A STRONG FOCUS ON COST REDUCTION
10
6.00
05
-25%
end-2020end-20172016
5.06
2015
*Annual rate, based on economic conditions at the start of 2016
SLN cash-cost* (USD/lb)
� SLN's cash-cost fell 16% in 2016 compared with 2015, as it rapidly implemented the
performance plan.
2018-20204.5
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 2017
![Page 11: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/11.jpg)
NEW SETUP AT SANDOUVILLE PLANT WITH AN OBJECTIVE OF INCREASED PROFITABILITY
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 201711
Decoupling the Sandouville refinery from SLN feed
Long-term agreement for the supply of Sandouville with nickel matte as of the second half of 2017
Start of the new process 19 June 2017. Ramping-up over the next months
Target capacity : 15 000 t Ni in high purity products
![Page 12: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/12.jpg)
Strand Minerals Pte. Ltd.(Singapore)
AGREEMENT WITH TSINGSHAN, THE WORLD'S LEADING STAINLESS STEEL PRODUCER TO DEVELOP WEDA BAY NICKEL
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 201712
� April 2016: Put option exercised by Mitsubishi
� June 2017: Agreement finalised with the
Tsingshan group to develop the Weda Bay Nickel
deposit in Indonesia
� An integrated partnership for:
• Mining operations
• Production in Indonesia of nickel ferroalloys, with a
target annual output of 30,000 tonnes of nickel
content
• The parties will each market their own share
� The Weda Bay deposit is one of the largest unexploited nickel oxide deposits in the world.
� Resources in excess of 9 million tonnes of nickel content*
Shareholding planned for Strand Minerals Pte Ltd,
controlling holding of Pt Weda Bay Nickel
PT WEDA BAY Nickel (Indonesia)
PT Antam Tbk(Indonesia)
90% 10%
Tsingshan
group
57%
ERAMET
group
43%
Indonesian Government
65%
* Inferred, indicated and measured resources
![Page 13: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/13.jpg)
ERAMET WILL GROW IN NICKEL BY CA. 50%
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 201713
� ERAMET Nickel will grow : SLN, Sandouville and Weda Bay
55 22753 36955 012
0
10 000
20 000
30 000
40 000
50 000
60 000
70 000
80 000
90 000 ERAMET Nickel projected size: 87 000 t
Sandouville
production SLN
2014 2015
Weda Bay
2016 2020
kt
![Page 14: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/14.jpg)
� World number 2 producer of high-power closed-die forged parts
� World number 1 player in gas atomized powder metallurgy
� A leading producer of high-performance special steels
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 201714
ERAMET ALLOYS
![Page 15: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/15.jpg)
15
EXCELLENT PERSPECTIVES IN AEROSPACE SECTOR
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 2017
� 60% of our sales ordered in Aerospace, a growing business
� Production rates are sustained at a high level for single aisle at both Boeing and Airbus
� Success of the new Leap engine program developed by CFM (JV Safran / GE)
� Globally order books are strong and full for the 5 years to come at OEMs
� Aubert & Duval is well positioned on high-power closed-die forged parts:
� Examples : Jet engine turbines disks for A350 and B777, landing gears for A350, wing parts for Airbus…
� Aubert & Duval has been awarded the Best Performer supplier from Airbus Helicopters 2016,
during Le Bourget Air Show (Paris, June 2017).
![Page 16: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/16.jpg)
ERAMET ALLOYS IS WORKING ON IMPROVING ITSPERFORMANCE…
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 201716
Across the division, roll out of strong improvement plans:
� Cost reduction and productivity at shopfloor levels:
o Boosting the usage of recycled materials
o Simplifying manufacturing routes to shorten production steps
o Improving OEE (Overall Equipment Efficiency, especially on large forging
presses, melting shops, rolling mills, machining and finishing equipment)
� Shorter lead times and better customer service
o Re-designing and accelerating product flows all along our industrial
processes.
� Products quality enhancement
New industrial setup for melting shops concentrating high performance and
stainless steels metal elaboration on one site at Les Ancizes, France.
Forging press at UKAD
![Page 17: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/17.jpg)
17
… WHILE INVESTING TO GROW AND TO REINFORCE ITS
BUSINESS POSITION
� Opening of the MKAD plant, a joint venture between Aubert & Duval and
Mecachrome, on 14 October 2016
� Machining of aerospace-grade titanium parts
� Start-up of EcoTitanium on 3 February 2017
� the first producer of aerospace-grade titanium in Europe using recycled materials
� Start-up of spent catalysts and batteries recycling facilities early 2017
at the Commentry (Allier) site
� New market segment, set to be ramped up progressively throughout 2017:
recycling of molybdenum, nickel, manganese, cobalt, zinc
� Powder metallurgy : Start up of a new atomizing tower on 11 May 2017
� New atomization tower to produce superalloys powders, especially for aerospace
and additive manufacturing sectors
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 2017
![Page 18: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/18.jpg)
� World number 2 producer of high-grade manganese ore
� World number 2 producer of manganese alloys
� World leading producer of refined manganese alloys
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 201718
ERAMET MANGANESE
![Page 19: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/19.jpg)
MANGANESE ORE PRICES REMAIN FIRM
19 ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 2017
CIF CHINA HIGH-GRADE (44%) MONTHLY MANGANESE ORE PR ICES
Chart source: CRU
0
1
2
3
4
5
6
7
8
9
Jan-17Jun-16Jan-16Jul-15Jan-15Jul-14Jan-14Jul-13Jan-13Jul-12Jan-12Jul-11Jan-11 Jul-17
US
D/d
mtu
2011 2012 2013 2014 2015 2016
� The "CRU 44% CIF China" manganese ore price index hit a record low in February 2016. Prices recovered strongly
during the second half of the year and peaked end-2016. Prices remain firm in this first half 2017.
� A change of USD 1/dmtu in this price translates into an impact of approximately €95 million on ERAMET's annual
current operating income (at an exchange rate of USD 1.1 /€ at nominal production level).
2017
![Page 20: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/20.jpg)
MANGANESE ALLOYS PRICES AT HISTORICAL HIGH LEVEL
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 201720
From their low point early 2016, manganese alloys prices trended upward strongly. Theycontinue to remain firm in H1 2017.
A change of USD 100/t in the price of manganese alloys translates into an impact ofapproximately €65 million on ERAMET's annual current operating income (at an exchange rateof USD 1.1 /€).
Source: CRU Western Europe Spot Prices
![Page 21: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/21.jpg)
MANGANESE ORE PRODUCTION SHOULD BE BACK TO NORMAL IN 2017
Output was primarily affected by our decision to halt mine production for one month in Q1 2016, in
view of market conditions early in the year.
Focused on improving performance at our Moanda mine and modernization of railway.
Ramp-up of Mn alloys and Mn metal facility in Gabon.
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 201721
MANGANESE ORE AND SINTER PRODUCTION
3 4133 868
0
500
1 000
1 500
2 000
2 500
3 000
3 500
4 000
2011
3,703
2012
3,481
2013 2014 2015
4 000
2016
-12%
2017
3,0373,434
kt
![Page 22: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/22.jpg)
TIZIR: MARKET ENVIRONMENT IMPROVING IN 2017
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 2017
Ilmenite, Rutile, Leucoxene and Titanium Slag
� Ilmenite, rutile and leucoxene sold to pigment, slag producers
and for welding applications; this market is firming up in the
beginning of 2017.
� Titanium slag product from TiZir Norway used to make
TiO2 pigments
� Stable prices in 2016
Zircon
� Used notably for ceramics
� Market prices seem well oriented in the beginning of 2017
22
![Page 23: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/23.jpg)
TIZIR: AN INTEGRATED PLAYER FOR TITANIUM DIOXIDE AND ZIRCON
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 2017
TiZir:
� Joint venture with Mineral Deposits Limited
(Australia)
� Positive EBITDA: €16 million in 2016
Upstream: TiZir Senegal
� production of heavy mineral concentrates of
614,000 tonnes in 2016
� Ramp-up in progress with 194,000 tonnes in Q4
in 2016 and good outlook for 2017
Downstream: TiZir Norway
� After the incident of 15 August 2016, the
furrnace is back to normal operations.
23
![Page 24: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/24.jpg)
LITHIUM PROJECT WHICH PREPARES ERAMET’S FUTURE
ERAMET LITHIUM PROJECT IN ARGENTINA ENTERS ITS LAST PHASE OF DEVELOPMENT BEFORE INVESTMENT DECISION
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 201724
Extremely dynamic lithium market in 2016. Bright
perspectives
Success in piloting the innovative proprietary
extraction process : few hundreds of kg of lithium carbonate battery grade
produced in 2016
Pre-feasibility study performedInvestment of 350-380 MUSD
Environmental permittingdemand filed in December
2016
2017- 2018 : Detailed feasibility study and economical valuation
Start of construction scheduled early 2019 subject to investment decision
Start of production end of 2021Production capacity : 20 ktpy Lithium carbonate.
Active continuation of CSR programs
![Page 25: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/25.jpg)
ROBUST CSR POLICY
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 201725
Sustainable development is at the core of ERAMET's strategy
� Protect men and women by placing health and safety at the heart of our
objectives.
� Create processes which respect both regulations and the environment.
� Develop ways to reduce environmental impacts, commit to biodiversity.
� Implement "product" responsiblity ("license to market").
� Increase resource effectiveness and promote recycling.
� Maintain a trusting relationship with stakeholders.
ERAMET is implementing this sustainable development policy
across all Group activities through:
� An environmental charter.
� A biodiversity policy deployed in 2015.
� An ethics charter updated in 2015.
� A sustainable purchasing charter.
� An energy policy.
![Page 26: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/26.jpg)
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 201726
CONCLUSION -OUTLOOK
![Page 27: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/27.jpg)
CONCLUSION
� ERAMET is at a turning point with significant potential ahead.
� But in a still fragile and volatile environment, ERAMET needs to
transform itself:
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 201727
� To accelerate improvement initiatives for performance and launch new ones
� To review organisation and working flows to develop agility and adaptation capacity to fast changing market conditions
� To design a new strategy for growth with ambitious targets
![Page 28: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/28.jpg)
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 201728
APPENDICE
![Page 29: ERAMET TOKYO PRESSCONFERENCE · view of market conditions early in the year. Focused on improving performance at our Moandamine and modernization of railway. Ramp-up of Mnalloys and](https://reader033.vdocuments.mx/reader033/viewer/2022060423/5f19efdf43959652062eef9f/html5/thumbnails/29.jpg)
SHAREHOLDER STRUCTURE ON 31 DECEMBER 2016
ERAMET – TOKYO PRESS CONFERENCE – JULY 6TH 201729
Number of issued shares: 26,550,443
Famille Duval : SORAME +
CEIR37.05%
APE25.65%
STCPI1
4.03%
BRGM2
1.34%
Autres31.93%
Notes
1 STCPI (Société Territoriale Calédonienne de Participation Industrielle): an entity owned by the neo-Caledonian provinces
2 BRGM (Bureau de Recherches Géologiques et Minières)