12 1030 Filling Equipment No 2145 Other information to include: Valve stems Arthur Products VT312-2=--5/16” tube and 1 3/8” sleeve Allen-Bradley PowerFlex 40 PLC 7.5 HP 240v 3 Phase controls filler motor Allen-Bradley PowerFlex40 PLC 3.0 HP 460-600v 3Phase controls capper and conveyer motors Equipment details Year/Make: 1974 Meyer Model: 40-8 HD S/N: HP-3741 Power: 230/460v 3 phase, 60hz Drive: 5HP, 1750rpm Capacity: 2L—135 BPM 1L—230 BPM 591ml—280 BPM DC Variable Speed Cntlr Power flex 40: Allen Bradley. Controls speed of Filler, Capper and conveyors up to the Labeler. Other Motor on filler is an A/C motor 230/460v 60Hz 3 Phase 1750 rpm. 5 HP Frame 184T 1 1/8” Major work done (date and item): Date Work done 1994/05/15 Equipment Purchased 1994/11/01to 1995/01/15— equipment refurbished bottom to top 1995/02/15-- Installed into PABL line 1995/01/15—added 40-R20 valves and Electro Pneumatic valve openers installed 2002/02/15—complete main drive replaced by Doug Miller 2005/06/27 —installed lift cylinder system, new bowl elevating jacks, new snift cam, infeed and discharge wear places, new pulldown cam for cylinders and new hanger stabilizing rollers

Upload: vothuan

Post on 12-Apr-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

12

1030 Filling Equipment No 2145

Other information to include:

Valve stems Arthur Products VT312-2=--5/16” tube and 1 3/8” sleeve

Allen-Bradley PowerFlex 40 PLC 7.5 HP 240v 3 Phase controls filler motor

Allen-Bradley PowerFlex40 PLC 3.0 HP 460-600v 3Phase controls capper and conveyer motors

Equipment details

Year/Make: 1974 Meyer

Model: 40-8 HD

S/N: HP-3741

Power: 230/460v 3 phase, 60hz

Drive: 5HP, 1750rpm Capacity: 2L—135 BPM

1L—230 BPM

591ml—280 BPM DC Variable Speed Cntlr

Power flex 40: Allen Bradley. Controls speed of Filler, Capper and conveyors up to the Labeler.

Other

Motor on filler is an A/C motor

230/460v 60Hz 3 Phase 1750 rpm. 5 HP

Frame 184T 1 1/8”

Major work done (date and item):

Date Work done

1994/05/15 – Equipment Purchased

1994/11/01to

1995/01/15— equipment refurbished bottom to top

1995/02/15-- Installed into PABL line

1995/01/15—added 40-R20 valves and Electro

Pneumatic valve openers installed

2002/02/15—complete main drive replaced by

Doug Miller

2005/06/27 —installed lift cylinder system, new

bowl elevating jacks, new snift cam,

infeed and discharge wear places, new

pulldown cam for cylinders and new

hanger stabilizing rollers

13

14

15

16

17

18

Variable speed controller Allen Bradley PowerFlex 40