Submission Guide for BUIL1262 Construction Planning and Design3: PublicPrivate Partnerships EXPRESSION OF INTEREST FOR MELBOURNE METRO 1 AS A PUBLICPRIVATE PARTNERSHIP to the attention of “Public Transport Victoria” This assignment is to be submitted in digital format on October 2013 (8 th or 15 th – week 11 or 12). EOI registrations at: WEBLINK EOI Report Submission: Save your assignment in word or preferable in PDF format. Log onto your RMIT Blackboard (RMIT Student Number + Password). Search for BUIL1262 Construction Planning and Design 3. Click on the topright column – EOI Melbourne Metro Assignment submission Proceed with uploading your file. One submission per SPV team (any team member) You can try uploading your assignment up to three times If finding any difficulties email me

Upload: guillermo-aranda-mena

Post on 12-Mar-2016

223 views

Category:

Documents


2 download

DESCRIPTION

 

TRANSCRIPT

Page 1: EOI guide for Melbourne Metro 1

Submission  Guide  for  BUIL1262  Construction  Planning  and  Design3:      Public-­‐Private  Partnerships    EXPRESSION  OF  INTEREST  FOR  MELBOURNE  METRO  1  AS  A  PUBLIC-­‐PRIVATE  PARTNERSHIP    to  the  attention  of  “Public  Transport  Victoria”      This  assignment  is  to  be  submitted  in  digital  format  on  October  2013  (8th  or  15th  –  week  11  or  12).    EOI  registrations  at:  WEB-­‐LINK      EOI  Report  Submission:  

• Save  your  assignment  in  word  or  preferable  in  PDF  format.  • Log  onto  your  RMIT  Blackboard  (RMIT  Student  Number  +  Password).  • Search  for  BUIL1262  Construction  Planning  and  Design  3.  • Click  on  the  top-­‐right  column  –  EOI  Melbourne  Metro  Assignment  

submission    • Proceed  with  uploading  your  file.    • One  submission  per  SPV  team  (any  team  member)  • You  can  try  uploading  your  assignment  up  to  three  times  • If  finding  any  difficulties  email  me  

         

Page 2: EOI guide for Melbourne Metro 1

REFERENCE  SCOPE    Key  components  of  the  $4.5  billion  Melbourne  Metro  1  reference  Scope  are:          Melbourne  Metro  

• City-­‐shaping  project  that  will  overhaul  Melbourne's  rail  network,  resulting  in  major  improvements  in  capacity,  reliability  and  travel  times  across  the  bulk  of  the  metropolitan  rail  lines.  

• 9  kilometre  rail  tunnel  through  inner  Melbourne  that  will  link  the  Sunbury  and  Pakenham/Cranbourne  rail  lines.  

• 5  new  underground  stations  to  be  located  at  Arden,  Parkville,  CBD  North,  CBD  South  and  Domain.  

 Scope  elements  

• Portals  (tunnel  entrances)  • Tunnel  • Stations  • Rail  systems  • Track,  power,  signalling  hardware  • Signalling  systems  and  software  • Station  maintenance  and  operations  • Train  operations  and  ticketing

   

Page 3: EOI guide for Melbourne Metro 1

EOI  written  submission:    Teams  are  to  form  their  SPV  consortia  and  proceed  with  preparing  and  Expression  of  Interest  for  the  9  kilometer,  5  stations  and  $4.5  Billion  AuDlls  Melbourne  Metro  1.  

 The  legal  expert  is  to  form  the  Special  Purpose  Vehicle  to  deliver  and  operate  Melbourne  Metro  1.  Remember  to:  Do  your  research  for  competent  consultants  and  contractors  with  track  record.  For  social  infrastructure  such  as  the  stations  contextual  understanding  of  Melbourne  is  important.    Bring  the  right  balance  of  organisations,  including  a  mix  of  national  and  international  experts.  Remember  that  Melbourne  Metro  1  has  both,  social  and  civil  infrastructure  components.    

   

 

Finance  expertise  leads  the  “business  sustainability”  of  the  PPP.  Looking  at  the  right  balance  of  providing  social  and  economic  infrastructure  and  services  to  Melbourne  commuters  and  the  community  at  large  but  also  finding  sources  of  monetary  revenue  to  pay-­‐off  debt  and  make  a  profit  over  the  duration  of  the  concession.  There  is  a  need  of  business  innovative  and  strategic  thinking  just  as  in  setting  up  any  ambitious  new  enterprise!  

 

The  design  (engineering  +  architecture)  team  is  the  responsible  to  ensure  that  there  are  clear  innovative  design,  architecture  and  tunneling  concepts  and  technologies  to  make  the  EOI  the  winning  proposal.  Remember  that  you  are  responsible  to  investigate  planning  and  technology  aspects  that  are  innovative  providing  short  and  long  term  value!  

 

The  operations  specialist  consultant  is  to  bring  the  best  ICT  technologies,  measures  and  policies  to  ensure  high  operational  standards  and  KPIs.  Benchmarking  will  be  and  important  aspect  of  ensuring  improved  service  and  delivery  to  the  community.  Provide  benchmark  figures  and  hierarchy  of  performance  indicators.  Keep  always  in  mind  end-­‐users  commuters,  staff  and  community  at  large!      

 

Page 4: EOI guide for Melbourne Metro 1

For  the  EOI  presentation  schedule  will  be  finalised  once  all  SPV  teams  are  registered.  This  will  include  date,  time  and  venue  location.        Guideline  to  the  EOI  presentation  will  be  attached  to  the  schedule.    There  will  be  15minutes  per  EOI  presentation  and  10  slides  (or  equivalent  if  using  Prezi  or  other  media).    An  expert  industry  panel  is  to  follow  up  with  questions  to  the  SPV  and  will  submit  a  mark.