FACT SHEET The Los Angeles International Airport (LAX) Airfield and Terminal Modernization Project will focus on airfield, terminal and landside improvements, while staying within the airport’s existing footprint. The Project would elevate the passenger experience, improve the community experience, enhance safety and increase business opportunities. What are the proposed improvements? Airfield Improvements Terminal Improvements Landside Improvements Reconfigures taxiways and runway exits to meet current FAA design standards Improves runway exit configurations to enhance pilot visibility Extends Taxiway D westerly for operational efficiency and to meet FAA standards Improves Taxiways C& D for access to new terminal facilities Reduces wait times on tarmac; reduces aircraft idling, decreasing emissions Terminal 9: 12-gate facility Concourse 0: 11-gate facility (9 new gates) Provides full-service international capabilities Replaces west remote gates Provides a better guest experience (extra seating, check-in areas, security screening, charging stations, etc.) Improves Central Terminal Area access and reduces congestion on nearby public roads Creates direct access for Terminal 9 Adds a new Automated People Mover Train Station at Terminal 9 which will link to regional mass transit Reduces congestion on neighborhood streets and provides more user-friendly airport access

Upload: others

Post on 31-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Environmental Review Process and Estimated Schedule ...€¦ · involvement effort for the LAX Airfield and Terminal Modernization Project to communicate information about the Project

FACT SHEET

Get Involved

Los Angeles World Airports has initiated a public involvement effort for the LAX Airfield and Terminal Modernization Project to communicate information about the Project and provide opportunities for public input during the environmental review process.

All Project details will be available via the Project website. Use the website to:

• Learn about upcoming workshops/meetings • Comment on environmental documents• Request a presentation • Subscribe to the Project mailing list

Project Website: WWW.LAWA.ORG/ATMP

Stay Informed

CEQA Timeline

NEPA Timeline

Environmental Review Process and Est imated Schedule

The LAX Airfield and Terminal Modernization Project requires federal and local approval, as well as environmental clearance as outlined by the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA).

@ L A I n t e r n a t i o n a l A i r p o r t

@ f l y L A X a i r p o r t

@ f l y L A X a i r p o r t

As a covered entity under Title II of the Americans with Disabilities Act, the City of Los Angeles does not discriminate on the basis of disability and, upon request, will provide reasonable accommodation to ensure equal access to its programs, services and activities. Alternative formats in large print, braille, audio, and other formats (if possible), will be provided on request.

The Los Angeles International Airport (LAX) Airfield and Terminal Modernization Project will focus on airfield, terminal and landside improvements, while staying within the airport’s existing footprint. The Project would elevate the passenger experience, improve the community experience, enhance safety and increase business opportunities.

CEQA Timeline

Notice of Preparation/Initial

Study, ScopingMeetings

Public Comment Period Closes

Q2 May 6

2019 2019

What are the proposed improvements?

Air f ield Improvements

Terminal Improvements

Landside Improvements

Reconfigures taxiways and runway exits to meet current FAA design standards• Improves runway exit

configurations to enhance pilot visibility

• Extends Taxiway D westerly for operational efficiency and to meet FAA standards

• Improves Taxiways C& D for access to new terminal facilities

Reduces wait times on tarmac; reduces aircraft idling, decreasing emissions

• Terminal 9: 12-gate facility• Concourse 0: 11-gate

facility (9 new gates)• Provides full-service

international capabilities• Replaces west remote gatesProvides a better guest experience (extra seating, check-in areas, security screening, charging stations, etc.)

• Improves Central Terminal Area access and reduces congestion on nearby public roads

• Creates direct access for Terminal 9

• Adds a new Automated People Mover Train Station at Terminal 9 which will link to regional mass transit

Reduces congestion on neighborhood streets and provides more user-friendly airport access

Draft Environmental

Impact Report (EIR) Released

Q1

2020

Final EIR Released

Q3

2020

Certification of EIR/Project

Approval

Q4

2020

Scoping Meetings

Public Comment Period Closes

Q2 Q2

2019 2019

Draft Environmental

Assessment (EA) Released

Q2

2020

Final EA Released

Q4

2020

FAA Record of Decision

Q4

2020

Page 2: Environmental Review Process and Estimated Schedule ...€¦ · involvement effort for the LAX Airfield and Terminal Modernization Project to communicate information about the Project

Why are we proposing i t?

As part of LAX’s continuing commitment to maintain a gold-standard airport, the Airfield and Terminal Modernization Project will provide for a combination of airfield, terminal and landside improvements that will address safety, sustainability and reliability in the following ways.

Proposed Project Improvements

ENHANCES SAFETY & CARRIER EXPERIENCE

• Increases operational efficiency which reduces delays and enhances safety

• Reduces wait times on the tarmac• Removes remote gates—less busing• Improves taxiways• Enhances aircraft movement

IMPROVES PASSENGER EXPERIENCE

• Provides a better passenger experience than remote gates—more seating and concessions not currently available at remote gates

• Reduces wait times on the tarmac• Transitions seamlessly between

international and domestic flights

IMPROVES COMMUNITY EXPERIENCE

• Reduces traffic congestion on neighborhood streets

• Promotes sustainable practices—minimum LEED Silver Certification for new buildings

• Reduces wait times on tarmac; reduces aircraft idling, decreasing emissions

• Provides an additional connection to the Automated People Mover train which will link to regional mass transit

INCREASES BUSINESS OPPORTUNITIES

• Promotes local jobs during construction and operations

• Provides additional concessions (restaurants & shops)

• Increases business opportunities for local and small businesses

CONCOURSE 0 TERMINAL 9Conceptual View Conceptual View

Page 3: Environmental Review Process and Estimated Schedule ...€¦ · involvement effort for the LAX Airfield and Terminal Modernization Project to communicate information about the Project

FACT SHEET

Get Involved

Los Angeles World Airports has initiated a public involvement effort for the LAX Airfield and Terminal Modernization Project to communicate information about the Project and provide opportunities for public input during the environmental review process.

All Project details will be available via the Project website. Use the website to:

• Learn about upcoming workshops/meetings • Comment on environmental documents• Request a presentation • Subscribe to the Project mailing list

Project Website: WWW.LAWA.ORG/ATMP

Stay Informed

CEQA Timeline

NEPA Timeline

Environmental Review Process and Est imated Schedule

The LAX Airfield and Terminal Modernization Project requires federal and local approval, as well as environmental clearance as outlined by the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA).

@ L A I n t e r n a t i o n a l A i r p o r t

@ f l y L A X a i r p o r t

@ f l y L A X a i r p o r t

As a covered entity under Title II of the Americans with Disabilities Act, the City of Los Angeles does not discriminate on the basis of disability and, upon request, will provide reasonable accommodation to ensure equal access to its programs, services and activities. Alternative formats in large print, braille, audio, and other formats (if possible), will be provided on request.

The Los Angeles International Airport (LAX) Airfield and Terminal Modernization Project will focus on airfield, terminal and landside improvements, while staying within the airport’s existing footprint. The Project would elevate the passenger experience, improve the community experience, enhance safety and increase business opportunities.

CEQA Timeline

Notice of Preparation/Initial

Study, ScopingMeetings

Public Comment Period Closes

Q2 May 6

2019 2019

What are the proposed improvements?

Air f ield Improvements

Terminal Improvements

Landside Improvements

Reconfigures taxiways and runway exits to meet current FAA design standards• Improves runway exit

configurations to enhance pilot visibility

• Extends Taxiway D westerly for operational efficiency and to meet FAA standards

• Improves Taxiways C& D for access to new terminal facilities

Reduces wait times on tarmac; reduces aircraft idling, decreasing emissions

• Terminal 9: 12-gate facility• Concourse 0: 11-gate

facility (9 new gates)• Provides full-service

international capabilities• Replaces west remote gatesProvides a better guest experience (extra seating, check-in areas, security screening, charging stations, etc.)

• Improves Central Terminal Area access and reduces congestion on nearby public roads

• Creates direct access for Terminal 9

• Adds a new Automated People Mover Train Station at Terminal 9 which will link to regional mass transit

Reduces congestion on neighborhood streets and provides more user-friendly airport access

Draft Environmental

Impact Report (EIR) Released

Q1

2020

Final EIR Released

Q3

2020

Certification of EIR/Project

Approval

Q4

2020

Scoping Meetings

Public Comment Period Closes

Q2 Q2

2019 2019

Draft Environmental

Assessment (EA) Released

Q2

2020

Final EA Released

Q4

2020

FAA Record of Decision

Q4

2020