PRE-FEASIBILITY REPORT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. , ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE - ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND. PROJECT PROPONENT M/S DILIP BUILDCON LTD SRI SUNIL KUMAR RAI AT- HAZARIBAGH ROAD, BAGODAR, NEAR PUJA GUEST HOUSE, GIRIDIH, DIST.- GIRIDIH, STATE- JHARKHAND PAGE- 1 CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, (JHARKHAND). Table of Contents 1. Executive Summary ............................................................................................................................................................... 4 2. INTRODUCTION OF THE...................................................................................................................................................... 5 PROJECT/BACKGROUND INFORMATION .............................................................................................................................. 5 2.1 INENTIFICATION OF THE PROJECT & PROJECT PROPONENT. IN CASE OF MINING PROJECT, A COPY OF MINING LEASE/LETTER OF INTENT SHOULD BE GIVEN. ....................................................................................... 5 2.2 BRIEF DESCRIPTION OF NATURE OF PROJECT: ....................................................................................................................... 7 2.3 NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY AND REGION ................................................................ 7 2.4 DEMAND AND SUPPLY GAP.......................................................................................................................................................... 7 2.5 DOMESTIC/EXPORTS MARKETS ................................................................................................................................................. 7 2.6 EMPLOYMENT GENERATION........................................................................................................................................................ 8 3. PROJECT DESCRIPTION ....................................................................................................................................................... 9 3.1 TYPE OF PROJECT INCLUDING INTERLINKED AND INTERDEPENDENT PROJECTS, IF ANY .................................................. 9 3 3. . 2 2 L LO OC CA AT TI IO ON N ( ( M MA AP P S SH HO OW WI I N NG G G GE EN NE ER RA AL L L LO OC CA AT TI I O ON N, , S SP PE EC CI I F FI I C C L LO OC CA AT TI I O ON N, , A AN ND D P PR RO OJ J E EC CT T S SI I T TE E L LA AY YO OU UT T) ) W WI I T TH H C CO OO OR RD DI I N NA AT TE ES S. ....................................................................................................................................................................... 9 3 3. . 3 3 D DE ET TA AI IL LS S O OF F A AL LT TE ER RN NA AT TE E S SI IT TE ES S C CO ON NS SI I D DE ER RE ED D A AN ND D T TH HE E B BA AS SI I S S O OF F S SE EL LE EC CT TI I N NG G T TH HE E P PR RO OP PO OS SE ED D S SI I T TE E, , P PA AR RI I C CU UL LA AR RL LY Y T TH HE E E EN NV VI I R RO ON NM ME EN NT TA AL L C CO ON NS SI I D DE ER RA AT TI I O ON NS S G GO ON NE E I I N NT TO O S SH HO OU UL LD D B BE E H HI I G GH HT TL LI I G GH HT TE ED D .......... 9 3.4 SIZE AND MAGNITUDE OF OPERATION................................................................................................................................... 10 3 3. . 5 5 P PR RO OJ J E EC CT T D DE ES SC CR RI I P PT TI IO ON N W WI I T TH H P PR RO OC CE ES SS S D DE ET TA AI IL LS S ( ( A A S SC CH HE EM MA AT TI I C C D DI I G GR RA AM M/ /F FL LO OW W C CH HA AR RT T S SH HO OW WI I N NG G T TH HE E P PR RO OJ J E EC CT T L LA AY YO OU UT T, , C CO OM MP PO ON NE EN NT TS S O OF F T TH HE E P PR RO OJ J E EC CT T E ET TC C. . S SH HO OU UL LD D B BE E G GI I V VE EN N....................................................... 10 EXTENT OF MECHANISM .................................................................................................................................................................. 11 STATUTORY PROVISION PRECAUTION DURING BLASTING .......................................................................................................... 11 3.6 RAW MATERIAL REQUIRED ALONG WITH ESTIMATED QUANTITY, LIKELY SOURCE, MARKETING AREA OF FINAL PRODUCTS/S, MODE OF TRANSPORT OF RAW MATERIAL AND FINISHED PRODUCT. ............................................................. 12 3.9 QUANTITY OF WASTES TO BE GENERATED (LIQUID AND SOLID ) AND SCHEME FOR THEIR MANAGEMENT/DISPOSAL ............................................................................................................................................................................................................... 12

Upload: others

Post on 01-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. , ATKADIH STONE

MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE - ATKADIH , P.O.+ P.S.- BAGODER,

THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE- 1

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN

PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008,

(JHARKHAND).

Table of Contents 1. Executive Summary ............................................................................................................................................................... 4

2. INTRODUCTION OF THE ...................................................................................................................................................... 5

PROJECT/BACKGROUND INFORMATION .............................................................................................................................. 5

2.1 INENTIFICATION OF THE PROJECT & PROJECT PROPONENT. IN CASE OF MINING PROJECT, A COPY

OF MINING LEASE/LETTER OF INTENT SHOULD BE GIVEN. ....................................................................................... 5

22..22 BBRRIIEEFF DDEESSCCRRIIPPTTIIOONN OOFF NNAATTUURREE OOFF PPRROOJJEECCTT:: ....................................................................................................................... 7

22..33 NNEEEEDD FFOORR TTHHEE PPRROOJJEECCTT AANNDD IITTSS IIMMPPOORRTTAANNCCEE TTOO TTHHEE CCOOUUNNTTRRYY AANNDD RREEGGIIOONN ................................................................ 7

22..44 DDEEMMAANNDD AANNDD SSUUPPPPLLYY GGAAPP.......................................................................................................................................................... 7

22..55 DDOOMMEESSTTIICC//EEXXPPOORRTTSS MMAARRKKEETTSS ................................................................................................................................................. 7

22..66 EEMMPPLLOOYYMMEENNTT GGEENNEERRAATTIIOONN ........................................................................................................................................................ 8

3. PROJECT DESCRIPTION ....................................................................................................................................................... 9

33..11 TTYYPPEE OOFF PPRROOJJEECCTT IINNCCLLUUDDIINNGG IINNTTEERRLLIINNKKEEDD AANNDD IINNTTEERRDDEEPPEENNDDEENNTT PPRROOJJEECCTTSS,, IIFF AANNYY .................................................. 9

33..22 LLOOCCAATTIIOONN ((MMAAPP SSHHOOWWIINNGG GGEENNEERRAALL LLOOCCAATTIIOONN,, SSPPEECCIIFFIICC LLOOCCAATTIIOONN,, AANNDD PPRROOJJEECCTT SSIITTEE LLAAYYOOUUTT))

WWIITTHH CCOOOORRDDIINNAATTEESS........................................................................................................................................................................ 9

33..33 DDEETTAAIILLSS OOFF AALLTTEERRNNAATTEE SSIITTEESS CCOONNSSIIDDEERREEDD AANNDD TTHHEE BBAASSIISS OOFF SSEELLEECCTTIINNGG TTHHEE PPRROOPPOOSSEEDD SSIITTEE,,

PPAARRIICCUULLAARRLLYY TTHHEE EENNVVIIRROONNMMEENNTTAALL CCOONNSSIIDDEERRAATTIIOONNSS GGOONNEE IINNTTOO SSHHOOUULLDD BBEE HHIIGGHHTTLLIIGGHHTTEEDD .......... 9

33..44 SSIIZZEE AANNDD MMAAGGNNIITTUUDDEE OOFF OOPPEERRAATTIIOONN ................................................................................................................................... 10

33..55 PPRROOJJEECCTT DDEESSCCRRIIPPTTIIOONN WWIITTHH PPRROOCCEESSSS DDEETTAAIILLSS ((AA SSCCHHEEMMAATTIICC DDIIGGRRAAMM//FFLLOOWW CCHHAARRTT SSHHOOWWIINNGG TTHHEE

PPRROOJJEECCTT LLAAYYOOUUTT,, CCOOMMPPOONNEENNTTSS OOFF TTHHEE PPRROOJJEECCTT EETTCC.. SSHHOOUULLDD BBEE GGIIVVEENN ....................................................... 10

EEXXTTEENNTT OOFF MMEECCHHAANNIISSMM .................................................................................................................................................................. 11

SSTTAATTUUTTOORRYY PPRROOVVIISSIIOONN PPRREECCAAUUTTIIOONN DDUURRIINNGG BBLLAASSTTIINNGG .......................................................................................................... 11

33..66 RRAAWW MMAATTEERRIIAALL RREEQQUUIIRREEDD AALLOONNGG WWIITTHH EESSTTIIMMAATTEEDD QQUUAANNTTIITTYY,, LLIIKKEELLYY SSOOUURRCCEE,, MMAARRKKEETTIINNGG AARREEAA OOFF FFIINNAALL

PPRROODDUUCCTTSS//SS,, MMOODDEE OOFF TTRRAANNSSPPOORRTT OOFF RRAAWW MMAATTEERRIIAALL AANNDD FFIINNIISSHHEEDD PPRROODDUUCCTT.. ............................................................. 12

33..99 QQUUAANNTTIITTYY OOFF WWAASSTTEESS TTOO BBEE GGEENNEERRAATTEEDD ((LLIIQQUUIIDD AANNDD SSOOLLIIDD )) AANNDD SSCCHHEEMMEE FFOORR TTHHEEIIRR MMAANNAAGGEEMMEENNTT//DDIISSPPOOSSAALL

............................................................................................................................................................................................................... 12

Page 2: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE-11

CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND

3.10 Schematic representations of the feasibility drawing which give information of EIA purpose ......... 13

4. SITE ANALYSIS ...................................................................................................................................................................... 14

44..11 CCOONNNNEECCTTIIVVIITTYY ............................................................................................................................................................................ 14

44..22 LLAANNDD FFOORRMM,, LLAANNDD UUSSEE AANNDD LLAANNDD OOWWNNEERRSSHHIIPP .................................................................................................................. 14

44..33 TTOOPPOOGGRRAAPPHHYY .............................................................................................................................................................................. 14

44..44 EEXXIISSTTIINNGG LLAANNDD UUSSEE PPAATTTTEERRNN ((AAGGRRIICCUULLTTUURREE,, NNOONN--AAGGRRIICCUULLTTUURREE,, FFOORREESSTT,, WWAATTEERR BBOODDIIEESS ((IINNCCLLUUDDIINNGG AARREEAA

UUNNDDEERR CCRRZZ)))),, SSHHOORRTTEESSTT DDIISSTTAANNCCEESS FFRROOMM TTHHEE PPEERRIIPPHHEERRYY OOFF TTHHEE PPRROOJJEECCTT TTOO PPEERRIIPPHHEERRYY OOFF TTHHEE FFOORREESSTTSS,,

NNAATTIIOONNAALL PPAARRKK,, WWIILLDD LLIIFFEE SSAANNCCTTUUAARRYY,, EECCOO SSEENNSSIITTIIVVEE AARREEAASS,, WWAATTEERR BBOODDIIEESS ((DDIISSTTAANNCCEE FFRROOMM TTHHEE HHFFLL OOFF TTHHEE

RRIIVVEERR)),, CCRRZZ.. IINN CCAASSEE OOFF NNOOTTIIFFIIEEDD IINNDDUUSSTTRRIIAALL AARREEAA,, AA CCOOPPYY OOFF TTHHEE GGAAZZEETTTTEE NNOOTTIIFFIICCAATTIIOONN SSHHOOUULLDD BBEE IINNDDUUSSTTRRIIAALL

AARREEAA;; AA CCOOPPYY OOFF TTHHEE GGAAZZEETTTTEE NNOOTTIIFFIICCAATTIIOONN SSHHOOUULLDD BBEE GGIIVVEENN.. ........................................................................................ 14

44..55 EEXXIISSTTIINNGG IINNFFRRAASSTTRRUUCCTTUURREE .................................................................................................................................................... 15

44..77 CCLLIIMMAATTIICC DDAATTAA FFRROOMM SSEECCOONNDDAARRYY SSOOUURRCCEESS ........................................................................................................................ 15

44..88 SSOOCCIIAALL IINNFFRRAASSTTRRUUCCTTUURREE AAVVAAIILLAABBLLEE ................................................................................................................................... 15

5. PLANNING BRIEF ................................................................................................................................................................. 21

55..11 PPLLAANNNNIINNGG CCOONNCCEEPPTT ((TTYYPPEE OOFF IINNDDUUSSTTRRIIEESS,, FFAACCIILLIITTIIEESS,, TTRRAANNSSPPOORRTTAATTIIOONN EETTCC)) TTOOWWNN AANNDD CCOOUUNNTTRRYY

PPLLAANNNNIINNGG//DDEEVVEELLOOPPMMEENNTT AAUUTTHHOORRIITTYY CCLLAASSSSIIFFIICCAATTIIOONN .......................................................................................................... 21

55..22 PPOOPPUULLAATTIIOONN PPRROOJJEECCTTIIOONNSS ...................................................................................................................................................... 21

55..33 LLAANNDD UUSSEE PPLLAANNNNIINNGG ((BBRREEAAKKUUPP AALLOONNGG WWIITTHH GGRREEEENN BBEELLTT EETTCC..)) .................................................................................... 21

55..44 AASSSSEESSSSMMEENNTT OOFF IINNFFRRAASSTTRRUUCCTTUURREE DDEEMMAANNDD ((PPHHYYSSIICCAALL && SSOOCCIIAALL)) .............................................................................. 22

55..55 AAMMEENNIITTIIEESS// FFAACCIILLIITTIIEESS ........................................................................................................................................................... 22

6. PROPOSED INFRASTRUCTURE ...................................................................................................................................... 23

6.1 INDUSTRIAL AREA (PROCESSING AREA ). ......................................................................................................... 23

6.2 RESIDENTIAL AREA (NON PROCESSING AREA). .......................................................................................... 23

6.3 GREEN BELT ........................................................................................................................................................................ 23

Progressive Afforestation during proposal period: ........................................................................................................ 23

Page 3: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE-11

CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND

6.5 CONNECTIV ITY (TRAFFIC AND TRANSPORTATION ROAD/RAIL/METRO/ WATER WAYS

ETC) .................................................................................................................................................................................................... 24

6.6 SOLID WASTE MANAGEMENT ................................................................................................................................. 24

6.7 POWER REQUIREMENT & SUPPLY I SOURCE . ............................................................................................... 24

7. REHABILITATION AND RESETTLEMENT(R&R PLAN) ....................................................................................... 25

77..11 PPOOLLIICCYY TTOO AADDOOPPTTEEDD ((CCEENNTTRRAALL SSTTAATTEE)) IINN RREESSPPEECCTT OOFF TTHHEE PPRROOJJEECCTT AAFFFFEECCTTEEDD PPEERRSSOONN IINNCCLLUUDDIINNGG HHOOMMEE

OOUUTTSSEEEESS,, LLAANNDD OOUUTTSSEEEESS AANNDD LLAANNDDLLEESSSS LLAABBOOUURR ....................................................................................................................... 25

8. PROJECT SCHEDULE AND COST ESTIMATES .......................................................................................................... 26

88..11 LLIIKKEELLYY DDAATTEE OOFF SSTTAARRTT OOFF CCOONNSSTTRRUUCCTTIIOONN AANNDD LLIIKKEELLYY DDAATTEE OOFF CCOOMMPPLLEETTIIOONN ((TTIIMMEE SSCCHHEEDDUULLEE FFOORR TTHHEE PPRROOJJEECCTT

TTOO BBEE GGIIVVEENN)) ...................................................................................................................................................................................... 26

88..22 EESSTTIIMMAATTEEDD PPRROOJJEECCTT CCOOSSTT AANNDD AALLOONNGG WWIITTHH AANNAALLYYSSIISS IINN TTEERRMMSS OOFF EECCOONNOOMMIICC VVIIAABBIILLIITTYY OOFF TTHHEEMM PPRROOJJEECCTT.. ..... 26

CSR Budget: ...................................................................................................................................................................................... 26

EMP (Environment Management Plan) ............................................................................................................................... 27

9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATION) CONCLUSION ....................................................... 29

Page 4: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE-11

CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND

11.. EEXXEECCUUTTIIVVEE SSUUMMMMAARRYY 1.1 Executive Summary M/s Dilip Buildcon Ltd has applied for Mining Lease of 2.00 acres, who is doing the work of development of

road work (NH & SH) on contract through Government of India. The Company has been allowed to apply the

stone mine for their captive use only. On this ground M/s Dilip Buildcon Ltd has applied the said area in

village –Atkadih, P.O.+P.S.- Bagodar, Dist.- Giridih, Jharkhand, having Lat. 24° 7'25.63"N To 24° 7'19.59"N

and long. 85°43'25.21"E To 85°43'22.79"E Topo sheet no- : 72H/12. Lessee/ Applicant, Sri Sunil Kumar Rai

(Sri Sunil Kumar Rai has been nominated as “Nominated Owner” by M/s Dilip Buildcon Ltd) has applied for

Mining Lease in the Office of D M O Giridih, to DC Giridih.

Applied area for Mining Lease is adjacent/along the village road. 10(Ten) meter width from the road will be left as safety barrier. Accordingly Mine plan has been prepared leaving ten (10) m barrier against the road. The lease area has been divided into two zones, zone ‘A’ & zone ‘B’. In zone ‘A’ mining activities will be carried out and area zone ‘B’ will be used for office, dump yard etc. The Applicant has approached for Mine Plan/ EC. As per recent directives from Director of Mines Jharkhand (Ref. No. 1345 /M dated 08.07.2015) on the basis of Hon’le Jharkhand High Court, Ranchi, (Dated: 29.06.2015), the Lessee has approached for EC and he has been asked to submit the approved mine plan.

The Mine plan has been Prepared considering the “Template for Mine Plan For Minor Mineral” issued from

Special Secretary & Director (Mines), Department of Mines & Geology, Ranchi, Jharkhand vide his letter no -

1653 dated 31-07-2015 addressed to all D.M.O’S & A.M.O’S & also I.B.M. Manual on “Appraisal of Mining

Plan -2014”.

Page 5: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. , ATKADIH STONE

MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE - ATKADIH , P.O.+ P.S.- BAGODER,

THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE- 1

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN

PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008,

(JHARKHAND).

22.. IINNTTRROODDUUCCTTIIOONN OOFF TTHHEE

PPRROOJJEECCTT// BBAACCKKGGRROOUUNNDD IINNFFOORRMMAATTIIOONN 2.1 IDENTIFICATION OF THE PROJECT & PROJECT PROPONENT. IN CASE OF MINING

PROJECT, A COPY OF MINING LEASE/LETTER OF INTENT SHOULD BE GIVEN.

Sl. No.

Parameters Description

1 Name of the project Atkadih Stone Mine,

2 Nature of the project Stone Mining Project,

3 Project Proponent M/S Dilip Buildcon (Sunil Kumar Rai)

4 Lease Period Applicant has applied for Lease in the Office of DMO Giridih for 03 years.

5 Details of the Lease Area

Mines Area 11.86 Acres (4.80 Ha),

Plot No. 191

Khata No. 313

6 Total Lease area 0.80 Ha/ 2.00 Acre

7 Capacity of the project 114048 TPA/ 380.16 TPD

8 Category of the project B2

9 Location of the project Village - Atkadih, P.O.+ P.S.- Bagoder, NO.-139, District -Giridih, State- Jharkhand.

10.

Lease area Coordinate

Sl.no Latitude longitude

A 24° 7'25.53"N 85°43'25.21"E

B 24° 7'19.59"N 85°43'23.31"E

C 24° 7'20.36"N 85°43'22.79"E

D 24° 7'21.16"N 85°43'23.11"E

E 24° 7'21.56"N 85°43'23.72"E

F 24° 7'21.84"N 85°43'23.06"E

G 24° 7'22.17"N 85°43'23.18"E

H 24° 7'22.33"N 85°43'23.58"E

I 24° 7'23.01"N 85°43'23.42"E

J 24° 7'22.90"N 85°43'22.92"E

K 24° 7'25.63"N 85°43'24.09"E

11 Land Type Raity Land,

12 Method of Mining Mechanized Opencast Mining

13 Operational days/year 300 days

14 Life of Mines 3 Years

Page 6: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE-11

CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND

15

Total Water Requirement

Sl. No.

Purpose Water

requirement (KLD)

1 Drinking & domestic ( Man Power x 45 /1000( 15x45/ 1000)

0.67

2 Afforestation/Greenbelt (Area in ha (0.60/2.47) x 1.09 KLD per Ha)

0.26

3 Dust Suppression( Mining road(1 Acre=

4046 sq. M) (0.03X4046)/4/1000 +

kachha Road X 6.5 KLD per

KM)=(0.03+0.015)x 6.5

0.29

Total 1.22

16

Source of water

The Drinking & Domestic water need will be fulfilled by taking water from nearby village like Atkadih tube well & Nearest Khero Nadi 3.25 km in S-E direction. As soon as mine void is formed water for greenbelt and dust suppression will be met from water accumulated in mine void. For the purpose of Dust Suppression & Afforestation water of nearby Ponds and rain water Harvesting will be used.

17 Man power requirement

15 Persons

18 Nearest Railway Station / Airport along with distance in km.

Birsa Munda Airport, Ranchi at about 98 km away from the lease area in SW direction.

Chaube Railway Station-About 15km from the lease area in NE direction

19 Nearest Town, city, District Headquarters along with distance in kms.

Nearest City- Bagoder situated at a distance of 12 km in SE direction

District Headquarter- Giridih , about 59 km(aerial distance) from the lease area in NE direction.

Page 7: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE-11

CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND

20

Ecological Sensitive Areas (Wild life Sanctuaries, National Parks, Biosphere Reserves, Reserve/ Protected Forest etc)

Forest

PF Near Nawadih 3.2 KM East

Jiramo Protected Forest 1.5 KM North

PF near Gandarbera 2 KM S-W

Fairly Dense Mixed Jungle Maily

Sal 2 KM S-E

21 Historical Places None

22 Financial & Social benefit

Employment to local people directly or indirectly

22..22 BBRRIIEEFF DDEESSCCRRIIPPTTIIOONN OOFF NNAATTUURREE OOFF PPRROOJJEECCTT::

The stone mine area located in Atkadih Mouza, Bagoder Post Office, Bagoder Police Station,

Giridih District in Jharkhand. The total mining lease area is 2.00 Acres/0.80 Ha. The mining will be

carried out in the mine lease area by adopting Mechanized Open Cast Mining.

The stone mine shall be developed by Mechanized Open Cast Mining method. The mineral are

hard and compact. So drilling or blasting is required. No blasting in OB is proposed.

22..33 NNEEEEDD FFOORR TTHHEE PPRROOJJEECCTT AANNDD IITTSS IIMMPPOORRTTAANNCCEE TTOO TTHHEE CCOOUUNNTTRRYY AANNDD RREEGGIIOONN

The Project is a mining lease for Stone mine that should be used for infrastructure development. The material is used for building construction and road construction. The impact due to mining on the socio-economic front will be beneficial. About 15 people will directly be benefited by mining through employment. With continuation of mining, other infrastructural developments will increase the socio-economic status of the local inhabitants.

As per EIA notification 2016 the project falls under Below 5 Hectares, comes under Category- B2, the proponent is submitting the proposal to get Clearance for production capacity of 114048 TPA/ 380.16 TPD of Boulder Stone from DEAC, DEIAA, in District for the purpose of grant of quarry lease.

22..44 DDEEMMAANNDD AANNDD SSUUPPPPLLYY GGAAPP

As mentioned above, there is large demand of stone for Building & Road construction of Nearest Market Requirement. It is the essential raw material for construction of House Building, Constructions, road Construction etc. Presently there is a shortage in supply of these materials as Market demand.

Page 8: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE-11

CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND

22..55 DDOOMMEESSTTIICC//EEXXPPOORRTTSS MMAARRKKEETTSS

The proposed mining quantity use for Nearest Market for Building & Road Construction . There is no proposal to export the mineral.

22..66 EEMMPPLLOOYYMMEENNTT GGEENNEERRAATTIIOONN

There will be 15 skilled and unskilled workers required for the mines who will be recruited from neighboring villages on contractual basis.

Table 2-6:- Employment Potential

Serial No. Designation Working forces per day ( 2 shift basis)

1 Manager Mines/Geologist Part Time 0

2 Mining Mate/ Blaster 1

3 Mechanic 1

4 Electrician 1

5 Service Vehicle Operator/ water tanker 1

6 Excavator/JCB Operator 1

7 Dozer operator 0

8 Grader operator 0

9 Dumper Operator/ tractor- trailer 3

10 Drill Operators 1

11 Drill Helper 1

12 Compounder 0

13 Clerk 1

14 Trip Man 0

15 Semi Skilled Worker 1

16 Unskilled workers 3

Total 15

Page 9: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE-11

CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND

33.. PPRROOJJEECCTT DDEESSCCRRIIPPTTIIOONN

33..11 TTYYPPEE OOFF PPRROOJJEECCTT IINNCCLLUUDDIINNGG IINNTTEERRLLIINNKKEEDD AANNDD IINNTTEERRDDEEPPEENNDDEENNTT PPRROOJJEECCTTSS,, IIFF AANNYY

The proposed Boulder Stone mine is of 0.80 Ha. No interlinked projects were associated with this

project.

33..22 LLOOCCAATTIIOONN ((MMAAPP SSHHOOWWIINNGG GGEENNEERRAALL LLOOCCAATTIIOONN,, SSPPEECCIIFFIICC LLOOCCAATTIIOONN,, AANNDD PPRROOJJEECCTT SSIITTEE

LLAAYYOOUUTT)) WWIITTHH CCOOOORRDDIINNAATTEESS..

This is a Mining project and located Atkadih Mouza, Bagoder Post Office, Bagoder Police Station,

Giridih District in Jharkhand over an area of 0.80 Ha. The details of the project co-ordinates are

described below:

Table 3-2:- Project Coordinates

Sl.no Latitude longitude

A 24° 7'25.53"N 85°43'25.21"E

B 24° 7'19.59"N 85°43'23.31"E

C 24° 7'20.36"N 85°43'22.79"E

D 24° 7'21.16"N 85°43'23.11"E

E 24° 7'21.56"N 85°43'23.72"E

F 24° 7'21.84"N 85°43'23.06"E

G 24° 7'22.17"N 85°43'23.18"E

H 24° 7'22.33"N 85°43'23.58"E

I 24° 7'23.01"N 85°43'23.42"E

J 24° 7'22.90"N 85°43'22.92"E

K 24° 7'25.63"N 85°43'24.09"E

33..33 DDEETTAAIILLSS OOFF AALLTTEERRNNAATTEE SSIITTEESS CCOONNSSIIDDEERREEDD AANNDD TTHHEE BBAASSIISS OOFF SSEELLEECCTTIINNGG TTHHEE

PPRROOPPOOSSEEDD SSIITTEE,, PPAARRIICCUULLAARRLLYY TTHHEE EENNVVIIRROONNMMEENNTTAALL CCOONNSSIIDDEERRAATTIIOONNSS GGOONNEE IINNTTOO

SSHHOOUULLDD BBEE HHIIGGHHTTLLIIGGHHTTEEDD::

There is no alternative sites/location are considered as this is a mining project which is site

specific by nature.

Page 10: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE-11

CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND

33..44 SSIIZZEE AANNDD MMAAGGNNIITTUUDDEE OOFF OOPPEERRAATTIIOONN

The proposed mine has lease over an area of 0.80 Ha. and the production rate is 114048 TPA/

380.16 TPD. The lessee follows open cast semi mechanized mining.

33..55 PPRROOJJEECCTT DDEESSCCRRIIPPTTIIOONN WWIITTHH PPRROOCCEESSSS DDEETTAAIILLSS ((AA SSCCHHEEMMAATTIICC DDIIGGRRAAMM//FFLLOOWW CCHHAARRTT

SSHHOOWWIINNGG TTHHEE PPRROOJJEECCTT LLAAYYOOUUTT,, CCOOMMPPOONNEENNTTSS OOFF TTHHEE PPRROOJJEECCTT EETTCC.. SSHHOOUULLDD BBEE

GGIIVVEENN::

METHOD OF MINING:

Strategy of Mining Operation:- Mining operation has been proposed to be mechnised open cast mining, Dumper- Shovel

combination with Wagon drilling and blasting.

No drilling & blasting is proposed during O.B. removal.

Drilling operation will be carried out in zone ‘A’ in stone rock body by compressed air Wagon drill (6 m depth

& 100 mm dia). After control blasting the blasted material will be loaded by 0.9/1.2 cum Excavator into

tippers (25/15Ton) and transported to surface of the M.L area. The O.B. Dump is proposed in south side of

the M.L. area (Zone ‘B’). (Ref plate no – 5 to 9)

The stone rock bench will be kept max.6 m height & 5m, 6m wide alternately to facilitate the movement of

the HEMM. The proposed final bench slope will be restricted to 45o. Due approval from D.G.M.S, The

mining operation will be carried out as per Rule -106 of MMR-1961 is proposed.

Mining operation is proposed in general shift only (8AM to 5 PM).The average number of working days in a year would be 300 days/yr only (excluding holidays), the production will slow down trend during monsoon period. Total 15 unskilled, semi-skilled & high skilled workers will be deployed by the lessee.

RESERVES:-

Mineable Reserve = 52080 cum,

Proposed annual production = 42240 cum/year Av.,

Life of the quarry = 1.23 years.

Page 11: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE-11

CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND

PRODUCTION PARAMETERS

The Mineral production target for five years is given in Table 3.5.1

Table 3.5.1

Year wise Boulder Production Programme

EEXXTTEENNTT OOFF MMEECCHHAANNIISSMM Table 3.5.2:- Details of Extent of Mechanism

No. Type Nos. Size/Capacity Mode 0f Operation

1 Wagon Drill 01 100 mm dia Compressed/air

2 Compressor 01 100 L/s Diesel

3 Excavator/JCB 01 1.2 m3 Diesel

4 Tippers 25/10 tons 03 25 tones Diesel

5 Dozer (Optional) 00 65 H.P Diesel

6 Grader (Optional) 00 175 H.P Diesel

5 Water tanker 01 12000 liters Diesel

6 Diesel Pump 01 5/10 HP Diesel

7 D.G.Set 01 60 KVA Diesel

SSTTAATTUUTTOORRYY PPRROOVVIISSIIOONN PPRREECCAAUUTTIIOONN DDUURRIINNGG BBLLAASSTTIINNGG

1. Blasting permission from DGMS will be taken by lessee. 2. Control blasting will be carried out by using delay detonator during multi rows blasting. 3. No secondary blasting will be carried out. 4. Stemming column will be half of the depth of hole with course sand. 5. Only statutory designated blaster will supervise the blasting operation. 6. All persons within the radius of 300 m from the blasting site will be removed by siren. 7. Blasting operation will be carried out during day time only.

SUMMARY OF PRODUCTION DURING PLAN PERIOD

YEAR PROD.

Cu.m in Situ.

DENSITY TON/CUM

TOTAL PROD. Mt in

Situ

PROD. PER DAY mt in

situ.

Total O.B cum in

Situ.

PROD. CUM in Situ /DAY

PROD. Cft in

Situ/DAY

1ST 42240 2.7 114048 380.16 12768 140.80 4972.30

2ND 0 2.7 0 0 0 0.00 0.00

3RD 0 2.7 0 0 0 0.00 0.00

TOTAL 42240 114048 380.16 12768 140.80 4972.30

Page 12: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE-11

CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND

33..66 RRAAWW MMAATTEERRIIAALL RREEQQUUIIRREEDD AALLOONNGG WWIITTHH EESSTTIIMMAATTEEDD QQUUAANNTTIITTYY,, LLIIKKEELLYY SSOOUURRCCEE,, MMAARRKKEETTIINNGG AARREEAA OOFF

FFIINNAALL PPRROODDUUCCTTSS//SS,, MMOODDEE OOFF TTRRAANNSSPPOORRTT OOFF RRAAWW MMAATTEERRIIAALL AANNDD FFIINNIISSHHEEDD PPRROODDUUCCTT..

No raw material will be required for mining of Stone.

33..77 RREESSOOUURRCCEE OOPPTTIIMMIIZZAATTIIOONN// RREECCYYCCLLIINNGG AANNDD RREEUUSSEE EENNVVIISSAAGGEEDD IINN TTHHEE PPRROOJJEECCTT,, IIFF AANNYY,, SSHHOOUULLDD BBEE

BBRRIIEEFFLLYY OOUUTTLLIINNEEDD

Stone mining there is no need mineral processing to the ROM production. The mined out stone is

directly formed ranging from boulder to aggregates. As per the market requirement only crusher is

used to produce the required size of ballast for customer.

3.8 AVAILABILITY OF WATER ITS SOURCE, ENERGY/ POWER REQUIREMENT AND

SOURCE

WATER REQUIREMENT

Total water requirement in the mine will be about 1.22 KLD for drinking & domestic use, dust

suppression and plantation. Required water will be collected from nearby villages like Atkadih

villages Tube well & Khero Nadi.

PPOOWWEERR

By Own D.G. Set Of 60 KVA.

33..99 QQUUAANNTTIITTYY OOFF WWAASSTTEESS TTOO BBEE GGEENNEERRAATTEEDD ((LLIIQQUUIIDD AANNDD SSOOLLIIDD )) AANNDD SSCCHHEEMMEE FFOORR TTHHEEIIRR

MMAANNAAGGEEMMEENNTT//DDIISSPPOOSSAALL

SOLID WASTE GENERATION& ITS DISPOSAL

During the extraction of Stone, from quarry, there will be 12768 cum overburden removed as

waste material dump of the dump inside the lease area.

Liquid Effluent

No liquid effluent will be generated at the mine site. The domestic wastewater generated will be

sent to septic tanks followed by soak pits.

Page 13: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE-11

CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND

3.10 Schematic representations of the feasibility drawing which give information of EIA purpose

Schematic representations of B2 category (less than 5 Hect. based on EIA notification is

given below:

Category B1 SEIAA , EIA required

Project Concept and site selection

Form 1 M &Pre-Feasibility Project report with proposed

TOR toMoEF (EAC)

Scoping by DEAC( Site visit by sub group of

DEAC, if necessary

Category B 2 DEIAA , EIA not required

Referred to DEAC under communication to the

project proponent.

Rejected Approved Display on the SPCB/UTPCC websites &

project proponent website.

Post EC

monitoring

Submission of half yearly compliance report to DEIAA

Display of compliance report on DEIAA website

Page 14: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE- 1

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN

PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008,

(JHARKHAND).

44.. SSIITTEE AANNAALLYYSSIISS

44..11 CCOONNNNEECCTTIIVVIITTYY

The mine lease area is connected with Road and rail transport. The applied area is connected

with village road 50 m East direction. NH-2 is at 1 Km in South direction.The nearest railway

station is Chaube Railway Station and which is situated at 15 km in NE direction from the mine

lease area. Birsa Munda Airport, Ranchi is the nearest airport in respect of mine lease area

situated at a distance of 98 km in south- West direction.

44..22 LLAANNDD FFOORRMM,, LLAANNDD UUSSEE AANNDD LLAANNDD OOWWNNEERRSSHHIIPP

The mine lease area is 2.00 Acres of Raity land . The details of the land are given in below

Table 4.1:-

Table 4-1:- Details of Land use of the Mine Lease Area

Sl.

No. Plot No. & Village

Area in

hectare Type of land

Ownership /

Occupancy

1 199

Village- Atkadih 0.80 Stone Mine Raity Land

44..33 TTOOPPOOGGRRAAPPHHYY

Based on the topographical map No 72H/12 of Survey of India , hills are widely scattered with

adulatory topography. The general slope of the area is towards east around ML area.

44..44 EEXXIISSTTIINNGG LLAANNDD UUSSEE PPAATTTTEERRNN ((AAGGRRIICCUULLTTUURREE,, NNOONN--AAGGRRIICCUULLTTUURREE,, FFOORREESSTT,, WWAATTEERR BBOODDIIEESS ((IINNCCLLUUDDIINNGG

AARREEAA UUNNDDEERR CCRRZZ)))),, SSHHOORRTTEESSTT DDIISSTTAANNCCEESS FFRROOMM TTHHEE PPEERRIIPPHHEERRYY OOFF TTHHEE PPRROOJJEECCTT TTOO PPEERRIIPPHHEERRYY OOFF TTHHEE

FFOORREESSTTSS,, NNAATTIIOONNAALL PPAARRKK,, WWIILLDD LLIIFFEE SSAANNCCTTUUAARRYY,, EECCOO SSEENNSSIITTIIVVEE AARREEAASS,, WWAATTEERR BBOODDIIEESS ((DDIISSTTAANNCCEE FFRROOMM

TTHHEE HHFFLL OOFF TTHHEE RRIIVVEERR)),, CCRRZZ.. IINN CCAASSEE OOFF NNOOTTIIFFIIEEDD IINNDDUUSSTTRRIIAALL AARREEAA,, AA CCOOPPYY OOFF TTHHEE GGAAZZEETTTTEE

NNOOTTIIFFIICCAATTIIOONN SSHHOOUULLDD BBEE IINNDDUUSSTTRRIIAALL AARREEAA;; AA CCOOPPYY OOFF TTHHEE GGAAZZEETTTTEE NNOOTTIIFFIICCAATTIIOONN SSHHOOUULLDD BBEE GGIIVVEENN..

There are following water body and forest areas are found within study area.

Table 4-4:-Details of Environment Sensitive Area

Page 15: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE-11

CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND

Detail Distance (km) Direction

Wetlands : No wetlands project side area.

Watercourses or other water Body

Khero Nadi (as per toposheet) 3.25 KM S-E

Forest

PF Near Nawadih 3.2 KM East

Jiramo Protected Forest 1.5 KM North

PF near Gandarbera 2 KM S-W

Fairly Dense Mixed Jungle Maily Sal 2 KM S-E

44..55 EEXXIISSTTIINNGG IINNFFRRAASSTTRRUUCCTTUURREE

As such in the stone mining operation there is no approach road from the main connecting road the

proponent developes a private kachha road up the connecting road with the help of waste material

generated from the mine. The distance may vary from 15 m to a few km .

4.6 SOIL CLASSIFICATION

Not Applicable.

44..88 CCLLIIMMAATTIICC DDAATTAA FFRROOMM SSEECCOONNDDAARRYY SSOOUURRCCEESS

The area of operation falling in the western part of the district in Bagodar block experiences

minimum temperature of 10 degree calicoes during winter and maximum temperature is 40 -45

degree Celsius during summer. The average rainfall of the district varies from 1100mm to 1350mm.

44..88 SSOOCCIIAALL IINNFFRRAASSTTRRUUCCTTUURREE AAVVAAIILLAABBLLEE

The mining area is well connected by road to district Headquarter Giridih, which is at 59 km north-

East side from site. All educational, banking, Recreational, Medical facilities and other infrastructure

are available in Shikaripara the nearest town from the mining site.

Medical Facilities

Dispensary and local hospital facilities are available near Bagoder at a distance is 12 km SE

Page 16: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE-11

CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND

direction away from the site and first Aid kit will be available at the site.

Rest Shelter

A temporary Rest shelter is proposed near mine site.

Drinking Water

The Drinking & Domestic water need will be fulfilled by taking water from nearby village like

Atkadih Village & Bore well in Lease Area.

Page 17: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE- 1

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN

PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008,

(JHARKHAND).

55.. PPLLAANNNNIINNGG BBRRIIEEFF

55..11 PPLLAANNNNIINNGG CCOONNCCEEPPTT ((TTYYPPEE OOFF IINNDDUUSSTTRRIIEESS,, FFAACCIILLIITTIIEESS,, TTRRAANNSSPPOORRTTAATTIIOONN EETTCC)) TTOOWWNN AANNDD CCOOUUNNTTRRYY

PPLLAANNNNIINNGG//DDEEVVEELLOOPPMMEENNTT AAUUTTHHOORRIITTYY CCLLAASSSSIIFFIICCAATTIIOONN

The project falls into the category of “Mining Industry”. The raw materials such as Stone available in

this area are granted lease for mining purpose. The required semi- skilled and unskilled laborers are

locally available. For transportation of material/minerals tractor trolleys/tipper trucks/cart will be

deployed.

55..22 PPOOPPUULLAATTIIOONN PPRROOJJEECCTTIIOONNSS

The project will employ most of the workers from nearby villages. Only supervisory staff will be

hired from outside. There will not be any increase in population due to the project.

55..33 LLAANNDD UUSSEE PPLLAANNNNIINNGG ((BBRREEAAKKUUPP AALLOONNGG WWIITTHH GGRREEEENN BBEELLTT EETTCC..))

Approximate land use is as following for life of mine are given in below Table.

Table 5-3:- Details of land Use breakup

Si. No.

Pattern of Utilization

Present/Existing land use pattern in

(acres)

Proposed Land use

for current plan period

(acres)

Land to be used in remaining period of the

life of the mine (acres)

Land used at the

conceptual stage ie end of

mine life in (acres)

Area to be converted in the conceptual period

1 Mining Activities 0.00 1.20 0.00 1.20 Water Body

2 Offices/ Store/ crusher/ Magazine etc.

0.00 0.04 0.00 0.04 Green Belt

3 Dumping 0.00 0.08 0.00 0.08 Green Belt

4 Mining Road 0.00 0.03 0.00 0.03 Approach Road

5 Garland drain 0.00 0.02 0.00 0.02 Garland Drain

6 Green belt/Safety Zone

0.00 0.60 0.00 0.60 Green Belt

7 Stone Stock yards 0.00 0.03 0.00 0.03

8 Utilized 0.00 2.00 0.00 2.00

9 Unutilized 2.00 0.00 2.00 0.00

10 Total 2.00 2.00 2.00 2.00

Page 18: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE-11

CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND

55..44 AASSSSEESSSSMMEENNTT OOFF IINNFFRRAASSTTRRUUCCTTUURREE DDEEMMAANNDD ((PPHHYYSSIICCAALL && SSOOCCIIAALL))

The road facility is already available which shall be used and properly maintained. Preference will

be given to local labor from nearby villages. Other requisite infrastructure as transport of mine

labours is available by way of jeep, two-wheeler.

55..55 AAMMEENNIITTIIEESS// FFAACCIILLIITTIIEESS

The following activities are proposed for the welfare of labours engaged in the extraction of Stone

mining.

Drinking water,

Tankers will be deployed for the supply of drinking water in the project site.

Organizing of Health Camps,

One health camp after every two months shall be held in each of the mining gate.

First Aid kit and provision of anti-snake venom.

Page 19: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE- 1

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN

PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008,

(JHARKHAND).

66.. PPRROOPPOOSSEEDD IINNFFRRAASSTTRRUUCCTTUURREE 6.1 INDUSTRIAL AREA (PROCESSING AREA ).

The boulder generated from the mine is generally various size of 1000 mm to 200 mm the bigger size boulders are manually broken to small size of 400 to 200 mm and it is fed to the ball mill crusher to small size of 50 mm to 5mm. in this process lot of dusts are generated and it is being arrested by providing proper water spray arrangement at suitable location.

6.2 RESIDENTIAL AREA (NON PROCESSING AREA).

Not applicable due to small activities.

6.3 GREEN BELT The common native plant species used to develop green belt in safety zone of all around the mine

lease boundary also in the barren area during conceptual plan period will be Sal, Gulmohar, Neem,

Bargad, Amaltas, Pipal, Teak, Arjuna, Kadamb, Ahhatwar etc.

Progressive Afforestation during proposal period: Table 6-3-1: Year Wise Afforestation Program

Sl.

No.

Year of

Plantation

Target of Plantation Area to be covered in Ha Area of Plantation

1 I Yr 480 0.24 Safety/Barrier Zone

TOTAL 2000 plant

per Ha

480 0.24 Safety/Barrier Zone

Proposed Afforestation Program along the transportation route

Zone Length (m) Description Numbers of Trees

Along approach road 15 200 plant per kilometer

3 x2 =6 (Both sides of kachha raod)

Total 6

Page 20: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE-11

CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND

6.4 SOCIAL INFRASTRUCTURE

Already discussed in point no 4.8 in Chapter 4

6.5 CONNECTIV ITY (TRAFFIC AND TRANSPORTATION ROAD/RAIL/METRO/ WATER

WAYS ETC)

All ready discussed in paragraph 4.1. in Chapter 4 .

6.6 SOLID WASTE MANAGEMENT

Not applicable

6.7 POWER REQUIREMENT & SUPPLY I SOURCE .

By Own D.G. Set Of 60 KVA.

Page 21: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE-11

CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND

77.. RREEHHAABBIILLIITTAATTIIOONN AANNDD

RREESSEETTTTLLEEMMEENNTT((RR&&RR PPLLAANN))

77..11 PPOOLLIICCYY TTOO AADDOOPPTTEEDD ((CCEENNTTRRAALL SSTTAATTEE)) IINN RREESSPPEECCTT OOFF TTHHEE PPRROOJJEECCTT AAFFFFEECCTTEEDD PPEERRSSOONN IINNCCLLUUDDIINNGG HHOOMMEE

OOUUTTSSEEEESS,, LLAANNDD OOUUTTSSEEEESS AANNDD LLAANNDDLLEESSSS LLAABBOOUURR

The mine lease is Raity land and do not have habitation. Hence the mining activity does not involve

any displacement of human settlement. No public buildings, places, monuments etc exist within the

lease area or in the vicinity of the mine lease area. The mining operation will not disturb/ relocate

any village or need re-settlement. Thus no adverse impact is anticipated.

However, after 5 yrs plan period, backfilling may be started or that may be converted into water

reservoir if required. Estimation of area has not been done now. This will be planned later. Under

water pollution prevention plan, garland drain and retaining wall will be constructed all around the

dump, and pits. Sedimentation pond, unlined settling tank will be constructed near the boundary

area to provide a proper channel for water outflow. And secondary settling pond will be connected

to nearest water bodies.

Page 22: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE- 1

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN

PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008,

(JHARKHAND).

88.. PPRROOJJEECCTT SSCCHHEEDDUULLEE AANNDD CCOOSSTT EESSTTIIMMAATTEESS

88..11 LLIIKKEELLYY DDAATTEE OOFF SSTTAARRTT OOFF CCOONNSSTTRRUUCCTTIIOONN AANNDD LLIIKKEELLYY DDAATTEE OOFF CCOOMMPPLLEETTIIOONN ((TTIIMMEE SSCCHHEEDDUULLEE FFOORR

TTHHEE PPRROOJJEECCTT TTOO BBEE GGIIVVEENN))

Mining will be started after getting environmental clearance.

88..22 EESSTTIIMMAATTEEDD PPRROOJJEECCTT CCOOSSTT AANNDD AALLOONNGG WWIITTHH AANNAALLYYSSIISS IINN TTEERRMMSS OOFF EECCOONNOOMMIICC VVIIAABBIILLIITTYY OOFF TTHHEEMM

PPRROOJJEECCTT..

SL. NO. HEADS RS (LAKHS) Yearly

1 Equipment Cost on yearly 493.50 lakhs (All equipments are owned M/S Dilip Buildcon Ltd.)

228.50 (avg.)

2 Cost of infrastructure ( Lum-Shum) 05.00

3 Raity Land agreement 1,11,100/acre per year, 2.22

4 Contingency ( 10 % of the Total Cost) , 23.57

TOTAL (Project Cost) 259.29

6 OPERATIONAL COST per Year. Rs.250 / cum x 02.75 lakh cum)=

105.60

8.3 CSR Budget:

@ 5 /- Per cum CSR Activities Spend for nearest village.

Sl. No. Activity Fund Allotted (In Rs.)Yearly

1. Water Supply including Drinking Water:(30 % )

1. Repair of Hand Pumps/Tube Wells nearest

villages 63,310/-

2. Health ( 20 %)

1. Free Medicine & Health Checkup Camp 42,240/-

3. Social Empowerment (30 %)

1. Provide fees for a period of one year or more to

the poor and meritorious, preferably girl students

of the school in the operational area of the

Company to enable them to get uninterrupted

education. 63,310/-

Page 23: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE-11

CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND

4. Sports and Culture (20 %)

1. Donation for festival & other cultural programs. 42,240/-

TOTAL 2,11,200

8.4 EMP (Environment Management Plan)

Sub-project specific Environmental Management Plan (EMP) has been formulated with an intend to

set out action required to avoid or mitigate all impacts and the responsibility for taking each action.

Responsibility is made legally binding when actions are subsequently specified in contracts.

Environmental Monitoring Plan (EMoP) has been prepared to ensure that the intended

environmental mitigations are realized and these results in desired benefits to the target

population causing minimal deterioration to the environmental parameters. All costs for

implementing the mitigation measures and monitoring plan will be included in the Bill of Quantities

(BOQ) by the contractor as implementation of the EMP will be the responsibility of the contractor.

1. Air Pollution Control Measures

2. Water Pollution control Measures

3. Social Welfare Measures

4. Occupational Health Measures

Table 8.4 :- EMP Cost

SI. No.

Measures

Description of work

Annual recurring cost (in Rs.)

Proposed

1 Pollution Control i) Dust Suppression ii) Garland drain & ground dump

Water sprinkling will be done time to time.( @ 700/- per day for pit area village kachha road ) Garland drain and ground dump will be established according to need @ 25/- Sq.ft, 1.00 ha = 107639.10 Sq Ft., ( 0.008 x 107639.10 = 861.11 sq. ft Garland Drain area)

210000/-

21,530/-

Page 24: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE-11

CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND

2 Pollution Monitoring i) Air pollution ii) Water pollution ii)Noise Polution

Yearly at 1 location for air, 1 location for water and 1 locations for noise

60,000/- 50,000/- 50,000/-

3

Occupational Health

To provide medical facility at the site to the employees( 200 per head monthly medical facility ) 15 man power x 200= 3000

36000/-

4

Green Belt

0.98 Ha areas will be used for

greenbelt development.( @ 100/-

per plant of Green Belt/safety zone

area 480x 100=48000/- )

Plantation along kuchha road will

also be done to achieve 33%

plantation. Kachha road per plant

500 rupee ( applied area to village

road distance 15 m ) 3 Both site

plantation 3 x2=6 plant x 500)

18000/-

6 Others (specify) Provided safety equipment to all staff ( Air mask , Helmet Shoes, Ear plug, & Other Safety Eqp.)

30000/-

Total 4,75,530/-

Page 25: ENVIRONMENTAL CLEARANCE FOR HECT./ ACRE OF M/S DILIP ...environmentclearance.nic.in/writereaddata/District/... · pre e-f eaassiibbiilliittyy reeppoorrtt environmental clearance for

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,

ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -

ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.

BB

22

PROJECT PROPONENT

M/S DILIP BUILDCON LTD

SRI SUNIL KUMAR RAI

AT- HAZARIBAGH ROAD, BAGODAR,

NEAR PUJA GUEST HOUSE, GIRIDIH,

DIST.- GIRIDIH, STATE- JHARKHAND

PAGE-11

CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND

99.. AANNAALLYYSSIISS OOFF PPRROOPPOOSSAALL ((FFIINNAALL

RREECCOOMMMMEENNDDAATTIIOONN)) CCOONNCCLLUUSSIIOONN

The project is of utmost importance to the area/ region for interest of mineral development and

improves the socio-economic conditions of the local habitants. The operation of the proposed

expansion project will bestow various social and economic benefits to the local communities of the

area in addition to the existing benefits due to provide better employment opportunities and

improvement in social infrastructure of the area, apart from increased financial benefits accruing to

state and central agencies by ways of taxes, royalties, etc.