Cabinet Committee on Investment S.No Project Name Ministry-Department 377 54 303 326 55 68 71 73 320 66 272 78 82 262 91 89 115 62 74 90 92 101 110 116 North Karanpura TPP (3*660 MW) NTPC Power Sterlite Energy U-1,2,3,4 4X600 MW Power Mumbai Airport New Terminal Civil Aviation Talwandi Sabo Power Limited Power Adani Mundra TPP Ph III, U-1,2,3 3X600 MW Power Talwandi Sabo U-1,2,3 3X660 MW Power Sipat U-1,2,3, 3X660 MW Power Bara TPS U-1,2,3 3X660 MW Power 4x360 MW Uchhpinda Power Project Power Damodaran Sanjeeviah U-1,2, 2X800 MW Power Lanco Amarkantak Power Ltd Power Vallur TPP U-1,2,3 3X500 MW Power Indira gandhi Aravali/Jhajjar U-1,2,3, 3X500 MW Power Utkal Alumina International Ltd. ( A Subsidiary of Hindalco Industries Ltd.) Mines Nabha U-1,2, 2X700 MW Power Painampuram U-1,2, 2X660 MW Power Jhajjar Power Limited 2X660 MW Power Raghunathpur TPS U-1,2 2X600 MW Power Rajiv Gandhi TPS U-1,2 , 2X600 MW Power North Chennai U-1,2, 2X600 MW Power Anuppur U-1,2, 2X600 MW Power Shree Singaji (Malwa) TPP U-1,2 2X600 MW Power Lanco Anpara U-1&2, 2X600 MW Power Rosa TPP 4X300 MW Power

Upload: na1nana

Post on 30-Jan-2016

307 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Env Clearance List

Cabinet Committee on Investment

S.No Project Name377

54

303

326

55

68

71

73

320

66

272

78

82

262

91

89

115

62

74

90

92

101

110

116

Ministry-Department

North Karanpura TPP (3*660 MW) NTPC 

Power  

Sterlite Energy U-1,2,3,4 4X600 MW  Power  

Mumbai Airport New Terminal  Civil Aviation  

Talwandi Sabo Power Limited  Power  

Adani Mundra TPP Ph III, U-1,2,3 3X600 MW 

Power  

Talwandi Sabo U-1,2,3 3X660 MW  Power  

Sipat U-1,2,3, 3X660 MW  Power  

Bara TPS U-1,2,3 3X660 MW  Power  

4x360 MW Uchhpinda Power Project  Power  

Damodaran Sanjeeviah U-1,2, 2X800 MW 

Power  

Lanco Amarkantak Power Ltd  Power  

Vallur TPP U-1,2,3 3X500 MW  Power  

Indira gandhi Aravali/Jhajjar U-1,2,3, 3X500 MW 

Power  

Utkal Alumina International Ltd. ( A Subsidiary of Hindalco Industries Ltd.) 

Mines  

Nabha U-1,2, 2X700 MW  Power  

Painampuram U-1,2, 2X660 MW  Power  

Jhajjar Power Limited 2X660 MW  Power  

Raghunathpur TPS U-1,2 2X600 MW  Power  

Rajiv Gandhi TPS U-1,2 , 2X600 MW  Power  

North Chennai U-1,2, 2X600 MW  Power  

Anuppur U-1,2, 2X600 MW  Power  

Shree Singaji (Malwa) TPP U-1,2 2X600 MW 

Power  

Lanco Anpara U-1&2, 2X600 MW  Power  

Rosa TPP 4X300 MW  Power  

Page 2: Env Clearance List

80

81

59

61

63

69

70

79

85

96

102

114

86

318

292

174

340

173

77

Vizag TPP U-1,2, 2X540 MW  Power  

Nasik TPP U-1,2,3,4 4X270 MW  Power  

Marwa U-1 and 2, 2X500 MW  Power  

Marwa TPS U-1,2 2X500 MW  Chemicals and Fertilizers - Chemicals and Petrochemicals 

Tuticorin U-1,2 2X500 MW  Power  

Rihand TPP U-5,6 2X500 MW  Power  

Vindhyachal U-11,12 2X500 MW  Power  

Durgapur Steel TPP U-1,2, 2X500 MW  Power  

Mauda U-1,2, 2X500 MW  Power  

Bhusawal U-4,5, 2X500 MW  Power  

Korba West TPP III U-5 & 7, 2X500 MW 

Power  

Harduaganj TPP U-8 & 9, 2X250 MW  Power  

Dadri U-5,6, 2X490 MW  Power  

Coal based Power Project at Tuticorin  Coal  

Lumding-Silchar(482Km) gauge Conversion 

Railways  

Korba West Power Company Limited Phase-1 1x600MW 

Power  

SKS Power Generation (Chhattisgarh) Ltd 

Power  

Jhabua Power Limited Phase-1 1x600 MW 

Power  

Ind Bharat TPP U-1,2 2X350 MW  Power  

Page 3: Env Clearance List

145

341

342

83

94

100

105

379

347

348

103

57

58

64

65

72

84

87

88

95

97

104

106

Forest Clearance for Mining Renewal for 122.18 ha Forest Land-Project of Ambuja Cements at Darlaghat, Tehsil Arki, Dist. Solan, Himachal Pradesh 

Commerce and Industry-DIPP 

DB Power Limited  Power  

Haldia Energy Limited  Power  

Barh TPP, U-1 , 660 MW  Power  

EMCO Warora U-1, 2 , 2X300 MW  Power  

Derang TPP U-1, Jindal, 600 MW  Power  

Mettur Ext U-1, 600 MW  Power  

Raghunathpur TPP U-1 (600 MW) DVC  Power  

Jhabua Power Ltd  Power  

Korba West Power Co. Ltd  Power  

Wardha warora, U-1-4, 4X135  Power  

Ukai TPP, Unit-6, 500 MW  Power  

Bellary TPS, U-2, 500 MW  Power  

Bhilai JV U-1,2 2X 250 MW  Power  

Bokaro TPP A Exp U-1 500 MW  Power  

Nabinagar TPP U-1,2 2X250 MW  Power  

Bongaigaon U-1,2, 2X250 MW  Power  

Kahalgaon U-7, 500 MW  Power  

Farakka U-6, 500 MW  Power  

Anpara D- Unit I & II, 500 MW  Power  

Khaper Kheda U-5, 500 MW  Power  

Satpura U -10, 11, 2X250 MW  Power  

Dr. N. Tata Rao TPP-IV, 500 MW  Power  

Page 4: Env Clearance List

107

108

308

67

366

267

353

378

75

239

358

367

360

234

361

Kothagudam-Stage VI, 500 MW  Power  

Paricha Exts. U-5&6, 2X250 MW  Power  

Bhairabi-Sarang new railway line  Railways  

Muzaffarpur Ext. U-3, 4, 2X195 MW  Power  

Khadia OC  Coal  

Nagai Power Pvt. Ltd.  Power  

Maruti Clean Coal and Power Limited  Power  

BPCL Project - Installation of Integrated Crude and Vacuum distillation units 

Petroleum and Natural Gas  

Bela U-1, 270 MW  Power  

Loktak Downstream HEP  Power  

BSCPL Aurang Tollway Ltd.  Road Transport and Highways  

Moonidih XV Seam UG  Coal  

OCL Iron & Steel Ltd. -Integrated steel manufacturing expansion plant 

Steel  

Essel Ahmedabad Godhra Toll Roads Limited 

Road Transport and Highways  

Ashoka Cuttack Angul Tollway Pvt Ltd  Road Transport and Highways  

Page 5: Env Clearance List

285

363

112

359

313

314

56

93

98

99

109

113

291

117

118

119

120

121

38

152

SHREE SIDHBALI ISPAT LTD.  Steel  

Vandana Ispat Limited  Steel  

Kota TPP U-7 1X195 MW  Power  

Supreme Panvel Indapur Tollways Private Limited 

Road Transport and Highways  

Development of Haldia Dock-II (South) 

Shipping  

Development of Haldia Dock-II (North) 

Shipping  

Parli U-8, 250 MW  Power  

Raichur U-8, , 250 MW  Power  

Paras Ext U-2, 250 MW  Power  

New Parli U-2, 250 MW  Power  

Budge Budge U-3, 1X250 MW  Power  

Suratgarh TPP, U-6 1X250 MW  Power  

Salka Road-Anupur Doubling  Railways  

Bajaj Energy P Ltd Utraula  Power  

Bajaj Energy Pvt Ltd, Kundarki  Power  

Bajaj Energy Pvt Ltd  Power  

Bajaj Energy P Ltd  Power  

Bajaj Energy Pvt Ltd  Power  

Penganga OC  Coal  

MANIKPUR OC  Coal  

Page 6: Env Clearance List

111

25

257

22

23

12

204

21

35

271

9

32

36

11

37

Chabra TPP, U-1 & 2 , 2X250 MW  Power  

Basundhra (W) - OCP  Coal  

IOCL Project - New Marketing Terminal at Eastern Sector Refinery, Paradeep (Orissa) 

Petroleum and Natural Gas  

Dhuptala OC  Coal  

Jamunia UG  Coal  

HBI UG (Hirakhand Bundia)  Coal  

Providing rail connectivity to the existing Tuna Creek -Rail Connectivity Project for Kandla Port 

Shipping  

Jharkhand OC  Coal  

Tetariakhar OCP  Coal  

IOCL Project-POL Tap Off Point (ToP) at Jatni in Odisha 

Petroleum and Natural Gas  

Lajkura  Coal  

Inder UG to OC  Coal  

Ara-Sarubera GoM  Coal  

Samleshwari Expansion OC  Coal  

Ray-Bachara-UG  Coal  

Page 7: Env Clearance List

10

143

153

172

190

193

290

385

195

369

Belpahar OCP  Coal  

Coal To liquids Project - Jindal Synfuels Limited 

Petroleum and Natural Gas  

Raigarh Expansion Project  Steel  

Tilaiya Ultra Mega Power Project  Power  

Essar Steel India Ltd - Hazira, Gujarat  Steel  

JSPL Patratu Steel Project  Steel  

JSW Steel Ltd Jharkahd  Steel  

IOCL Project - Paradip Refinery, Abhyachandrapur 

Petroleum and Natural Gas  

JSPL Angul Steel Project  Steel  

Jindal Steel & Power  Steel  

Page 8: Env Clearance List

243

176

302

210

211

305

311

Exploration and production of Hydrocarbons in Rajasthan (RJ-ON-90/1 block) 

Petroleum and Natural Gas  

Sasan Ultra Mega Power Project (SUMPP) 

Power  

Etalin Hydro Electric Project (3097 MW) 

Power  

Essar Steel India Ltd - Odisha Complex 

Steel  

Essar Steel India Ltd - Odisha Complex 

Steel  

Expansion of Dolvi Steel Plant Capacity from 3 MTPA to 5 MTPA 

Steel  

Akaltara TPP of KSK Mahanadi Power Company Limited 

Power  

Page 9: Env Clearance List

309

161

198

282

263

49

171

383

325

304

Expansion of JSW Vijaynagar Steel Plant capacity from 10 MTPA to 16 MTPA 

Steel  

MUMBAI SEZ LTD  Commerce and Industry - Commerce 

Indiabulls Multi Product SEZ  Commerce and Industry - Commerce 

2X600 MW Tamnar Power Plant  Power  

Aditya Aluminium Smelter of Hindalco Industries Ltd. 

Mines  

2640 MW Mundra TPP Ph I - 4 x 330 MW & II - 2 x 660 MW 

Power  

2000MW coal based Expansion Project at SUMPP site-Sasan Power Limited 

Power  

MRPL Project - Phase - III Refinery Project, Mangalore 

Petroleum and Natural Gas  

Lalitpur Power Generation Co Ltd  Power  

Subansiri Lower HE Project  Power  

Page 10: Env Clearance List

288

264

177

159

317

Prayagraj Power Generation Company Limited 

Power  

Mahan Aluminium Project of Hindalco Industries Limited 

Mines  

Samalkot Power Limited  Power  

Essar Power Jharkhand Ltd  Power  

Electrosteel Steels Limited  Steel  

Page 11: Env Clearance List

60

327

40

247

280

VISA Steel Limited, Chhattisgarh  Steel  

Jindal India Thermal Power  Power  

GSPC Project - Deendayal (West) Field Development Project 

Petroleum and Natural Gas  

Multi-product Special Economic Zone at Mundra, Adani Ports and Special Economic Zone Ltd. 

Commerce and Industry - Commerce 

Coal Mine and Thermal Power Plant  Power  

Page 12: Env Clearance List

52

5

294

328

255

Integrated Stainless Steel  Steel  

R.K.M Powergen Pvt. Ltd.  Power  

SAGAR SUPER THERMAL POWER PROJECT 

Power  

GMR Chhattisgarh Energy Limited  Power  

GAIL Project - Jagdishpur - Haldia Pipeline 

Petroleum and Natural Gas  

Page 13: Env Clearance List

199

45

230

329

6

149

248

330

1320 MW IPP of Jas Infrastructure & Power Limited, Banka 

Power  

Mallavaram-Bhilwara-Bhopal-Vijaipur pipeline 

Petroleum and Natural Gas  

1080 (8 x 135) MW, PITHEAD THERMAL POWER PROJECT 

Power  

Adani Power Rajasthan Ltd  Power  

Nyamjang Chhu HEP  Power  

Rajhamal Coal Bed Methane  Petroleum and Natural Gas  

VISA Power Limited  Power  

Lanco Babandh Power Limited  Power  

Page 14: Env Clearance List

240

31

44

296

51

228

332

333

SKS POWER GENERATION CHHATTISGARH LIMITED 

Power  

Adani Power Maharashtra Ltd  Power  

(2x660 MW) Shree Singaji Thermal Power Project (Stage-II), District Khandwa 

Power  

Monnet Ispat and Energy Limited  Steel  

1.Mehsana-Bhatinda Pipeline 2. Bhatinda-Jammu-Srinagar Pipeline 

Petroleum and Natural Gas  

2X600 MW Stage II - Tamnar Power Plant 

Power  

Navi Mumbai SEZ (NMSEZ)  Commerce and Industry - Commerce 

Adani Power Maharashtra Ltd  Power  

Page 15: Env Clearance List

284

155

334

122

335

156

144

2x600 MW Singhitarai Thermal Power Project 

Power  

VISA Steel Limited,Odisha  Steel  

Pipavav Energy Pvt Ltd  Power  

KVK Nilachal Power Pvt. Ltd.  Power  

Hinduja National Power Corporation Limited 

Power  

1050 MW Maithon Right Bank Thermal Power Project at Maithon 

Power  

Essar Power Gujarat Limited  Power  

Page 16: Env Clearance List

281

188

96

336

189

124

Machhakata Coal Project  Power  

Meenakshi Energy Private Limited  Power  

LNG Terminal at Mundra  Petroleum and Natural Gas  

Coastal Energen Pvt. Ltd  Power  

Essar Steel India Ltd - Vizag Complex  Steel  

Monnet Power Company Limited 1050 MW IPP at Malibrahmani, Angul, Orissa 

Power  

Page 17: Env Clearance List

287

123

154

157

295

301

337

338

261

202

Monnet Power Company Limited 1050 MW IPP at Malibrahmani, Angul, Orissa 

Power  

Bharati Shipyard LImited  Shipping  

Kakinada Regas Project (by Shell)  Petroleum and Natural Gas  

SHREE MAHESHWAR HYDEL POWER PROJECT 

Power  

Petronet LNG Project -Gangavaram LNG Terminal 

Petroleum and Natural Gas  

Attunli Hydro Electric Project (680 MW) 

Power  

NLC Tamil Nadu Power Ltd  Power  

Essar Power M.P Limited  Power  

Vedanta Aluminium Limited- Expansion of Alumina Refinery 

Mines  

540 MW Phase 1 IPP of Corporate Power Limited 

Power  

Page 18: Env Clearance List

300

339

128

170

130

175

299

ANRAK ALUMINIUM LIMITED  Mines  

GMR Kamalanga Energy Limited  Power  

Jiribam-Imphal new line project  Railways  

Butibori Power Project  Power  

Byrnihat-Shillong new line project  Railways  

1x800MW Extn Uni-8 Wanakbori TPS  Power  

Monnet Ispat and Energy Limited  Steel  

Page 19: Env Clearance List

160

371

147

148

150

158

Gupta Energy P Ltd Thermal Power project 660 MW 

Power  

Vishnugad Pipalkoti Hydro Electric project 444 MW 

Power  

Talchir Coal Bed Methane  Petroleum and Natural Gas  

Sohagpur Coal Bed Methane  Petroleum and Natural Gas  

Raniganj Coal Bed Methane  Petroleum and Natural Gas  

2x270 MW GVK Power (Goindwal Sahib) Limited 

Power  

Page 20: Env Clearance List

273

321

131

185

343

344

345

UCM Coal Company Limited -Chendipada & Chendipada-II Coal Mine Project 

Power  

Mega Project, Pulp & Paper. Village Sarapaka, Khammam Distt. AP 

Commerce and Industry-DIPP 

Sivok-Rangpo new line project  Railways  

Six laning of Varanasi-Aurangabad section of NH2 from Km 786.000 to Km 978.000 in the state of Uttar Pradesh and Bihar on Design, Build, Finance, Operate and Transfer Toll basis under NHDP-V 

Road Transport and Highways  

TRIL Infopark Ltd  Commerce and Industry - Commerce 

GMR Rajahmundry Energy Limited  Power  

DB Power Ltd  Power  

Page 21: Env Clearance List

245

319

4

7

Pakri-Barwadih Coal Block  Power  

TPS-II EXPANSION (2 X 250 MW)  Coal  

GAIL Project- KKBMPL  Petroleum and Natural Gas

To augment the iron ore production capacity of Gua Iron Ore Mine of SAIL from 2.4 MT to 10 MT including installation of Beneficiation and Pellet Plant facilities at Gua, Jharkhand. 

Steel  

Page 22: Env Clearance List

146

307

167

384

50

Ib Valley Coal Bed Methane  Petroleum and Natural Gas  

Bhanupalli-Bilaspur-Beri new railway line project 

Railways  

Koderma-Ranchi new line project  Railways  

Pipeline-Kochi-Koottanad-Bangalore-Mangalore Phase II 

Petroleum and Natural Gas  

Surana Power Limited (SPL) – 2 x 210 MW Coal Based Thermal Power Plant 

Power  

Page 23: Env Clearance List

268

349

76

310

365

133

241

Cairn India Project - MDPL Project Phase-II (Salaya to Bhogat Pipeline Project) 

Petroleum and Natural Gas  

TRN Energy Pvt Ltd  Power  

Hazira, Near well no 7, Via Surat, District Hazira 394 270 capacity expansion of existing LNG Terminal 5 MMTPA to 10 MMTPA 

Petroleum and Natural Gas  

Jayaswal Neco Industries Limited  Steel  

Gevra OC  Coal  

Joka-BBD Bag new metro project  Railways  

Talaipalli Coal Block  Power  

Page 24: Env Clearance List

136

42

53

192

236

246

380

47

L&T East West Tollway Ltd  Road Transport and Highways  

Vijaydurg Ports Pvt Ltd  Shipping  

Chandrapura U-7,8 2X250 MW  Power  

Bhupdevpur-Korichapar-Dharamjaigarh 

Coal  

2*300 MW Thermal Power Plant –BHARAT ALUMINUM COMPANY LIMITED 

Power  

JSW Jaigarh Port Ltd.  Shipping  

Mejia TPP (Unit 8) DVC  Power  

Kameng Hydro Electric Project  Power  

Page 25: Env Clearance List

141

260

322

132

139

Andhra Pradesh Paper Mills Limited  Commerce and Industry-DIPP 

Establishment of 400,000 tpa copper Smelter and 250,000 MT pa Phosphoric Acid Plant 

Mines  

Shree Cement Ltd, Farhatabad Project, Distt. Gulbarga, Karnataka 

Commerce and Industry-DIPP 

Neopara-Barasat via Bimanbonder metro project 

Railways  

Beawar Pali Pindwara Tollway  Road Transport and Highways  

Page 26: Env Clearance List

235

168

316

375

169

2

186

ONGC Project - Assam renewal Project ( Group-A) 

Petroleum and Natural Gas  

Tori-Shivpur-Kathutia new line project  Railways  

Tori-Shivpur -Kathautia New BG Rail Line 

Coal  

Six-Laning of Aurangabad-Barwa Adda 

Road Transport and Highways  

0.4 MTPA DRI Plant + 30 MW Power Plant of Corporate Ispat Alloys Limited 

Steel  

HEO HEP - 240 MW  Power  

DAP fertilizer complex of 0.5 million tons per annum by Hindustan Zinc Limited (HZL) 

Chemicals and Fertilizers - Fertilizers 

Page 27: Env Clearance List

266

297

200

137

26

46

3

370

Kattupalli Port  Shipping  

Bhopal Dhule Transmission Company Limited 

Power  

Pune-Satara Toll Road  Road Transport and Highways  

L&T Great Eastern Highways Limited  Road Transport and Highways  

Dipka OC  Coal  

OIL Project - Integrated Crude Oil and Gas Field Development project in Upper Assam districts. 

Petroleum and Natural Gas  

Tato-1 HEP - 186 MW  Power  

Expansion of Malanjkhand Copper Project 

Mines  

Page 28: Env Clearance List

39

125

386

229

351

237

346

126

Alewadi Port  Shipping  

Bangalore-Satyamangla new line via Kanakpura 

Railways  

IOCL Project-Paradip-Raipur-Ranchi Pipeline 

Petroleum and Natural Gas  

Ideal Energy Projects Limited  Power  

Khed Economic Infrastructure Pvt. Ltd. 

Commerce and Industry - Commerce 

4 x 61.50 MW IPP of Abhijeet MADC Nagpur Energy Private Limited 

Power  

Pink City Expressways Ltd (6-laning of Gurgaon- Kotputli- Jaipur section of NH-8) 

Road Transport and Highways  

New Moynagudi-Jogigopa new line project 

Railways  

Page 29: Env Clearance List

209

373

201

197

129

381

352

Elevated four lane link road from Chennai Port and NH4 at Maduravoyal 

Shipping  

New 4-Lane Elevated Road from Chennai Port - Maduravoyal 

Road Transport and Highways  

300 MW Kaizen Power Limited  Power  

OPGS POWER GUJARAT PRIVATE LIMITED 

Power  

Hubli-Ankola new line project  Railways  

IOCL Project - Debottlenecking of the existing Salaya Mathura Pipeline (SMPL) system 

Petroleum and Natural Gas  

Bhushan Steel Ltd,CRNO project  Steel  

Page 30: Env Clearance List

242

289

238

178

179

180

298

Kerandari Coal Block  Power  

Kamineni Steel & Power India Pvt. Ltd. 

Steel  

Development of Rampia Coal Block and Dip Side of Rampia 

Coal  

GreenField Cement Manufacturing Plant-Dalmia Cement Bharat Ltd, 

Commerce and Industry-DIPP 

GreenField Cement Manufacturing Plant- Dalmia Cement Bharat Ltd for establishing Green Field Cement Manufacturing Plant of 4 MTPA Capacity in Satna, District of Madhya Pradesh 

Commerce and Industry-DIPP 

GreenField Cement Manufacturing Plant- Dalmia Cement Bharat Ltd for establishing Green Field Cement Manufacturing plant of 4 MTPA Capacity in Chittorgarh, District of Rajasthan 

Commerce and Industry-DIPP 

Jabalpur Transmission Company Ltd.  Power  

Page 31: Env Clearance List

324

323

278

279

374

354

Shree Cement Ltd, Nawalgarh Project, Tehsil Nawalgarh, Distt Jhunjhunu (Rajasthan) 

Commerce and Industry-DIPP 

Shree Cement Ltd, Kodla Project Dist Gulbarga, Karnataka 

Commerce and Industry-DIPP 

Dighi Port  Shipping  

Dighi Port  Shipping  

Panikholi-Rimoli (Approved Length 106 Km) 

Road Transport and Highways  

Kannur-Vengalam-Kuttipuram section of NH-17 (package-I) from km. 148.00 to km. 230.00 on DBFOT basis 

Road Transport and Highways  

Page 32: Env Clearance List

244

355

48

212

138

356

357

162

Chatti-Bariatu coal block  Power  

Kannur-Vengalam-Kuttipuram section of NH-17 (package-II) from km 230.00 to km 3180.00 on DBFOT basis. 

Road Transport and Highways  

Hassan-Bangalore new line project  Railways  

Lenzing Modi Fibers India Private Limited 

Textiles  

L&T Deccan Tollways Limited  Road Transport and Highways  

IG3 Infra Ltd. (Previously known as Indian Green Grid Group Ltd.) 

Commerce and Industry - Commerce 

Adhunik Power & Natural Resources Limited (APNRL). 

Power  

Angul Sambalpur Toll Road project  Road Transport and Highways  

Page 33: Env Clearance List

254

187

203

350

184

376

127

43

163

306

HPCL Project - Rewari Kanpur Pipeline Project (RKPL) Rajasthan, Haryana and U.P. 

Petroleum and Natural Gas  

GreenFiled Cement manufactureing Plant-Dalmia Bharat Ltd 

Commerce and Industry-DIPP 

Haridaspur - Paradip Rail Link-Rail Connectivity Project for Paradip Port 

Shipping  

Oriental Nagpur Byepass Construction Pvt Ltd (ONBCPL) 

Road Transport and Highways  

Baharampore Farakka Highways Ltd  Road Transport and Highways  

KNT/Kerala Border to Kanuur Section(Approved Length 286.3) 

Road Transport and Highways  

Agartala-Sabroom new line project  Railways  

Pare HydroElectric Project (110MW) NEEPCO LTD. 

Power  

Cuttack Angul Tollway Project  Road Transport and Highways  

Dallirajhra-Jagdalpur new railway line  Railways  

Page 34: Env Clearance List

259

372

183

165

214

1

286

368

382

181

293

362

140

Establishment of 160 MW Coal based Thermal Power Plant, Allied infrastructure and Desalination Plant 

Power  

4 Laning of Faraka-Raiganj  Road Transport and Highways  

Farakka Raiganj Highways Ltd  Road Transport and Highways  

SMC POWER GENERATION LTD  Steel  

Rly. Line Jharsuguda to Bansudhara  Coal  

PAUK HEP - 145 MW  Power  

Salem to Ulundurpet Toll Road  Road Transport and Highways  

Sonepur Bazari OC  Coal  

Four laning of Gwalior-Shivpuri  Road Transport and Highways  

0.4 MTPA DRI Project with 60 MW Power Plant of Abhijeet Infrastructure Limited 

Steel  

jabalpur-Gondia gauge Conversion  Railways  

Hospet Chitradurga Tollways Ltd  Road Transport and Highways  

Four lanning of Sambalpur-Baragarh-Orissa/Chhatisgarh Border section of NH6 from km 0.00 to km 88.00 in the state of Orissa to be executed as BOT (Toll) project on DBFO pattern under NHDP Phase III Project 

Road Transport and Highways  

Page 35: Env Clearance List

142

66

182

191

275

312

207

Four laning of NH-73 from UP/Haryana border, yamunanagar-saha-panchkula in the state of Haryana on DBFOT. 

Road Transport and Highways  

Trichy-Karur Toll Road  Road Transport and Highways  

Dell International Services Business Process Services 

Commerce and Industry - Commerce 

1.2 MTPA Beneficiation & Pelletisation Plant of Abhijeet Integrated Steel Limited (AISL). 

Steel  

Haridaspur-Paradeep new railway line  Railways  

East North Interconnection  Power  

4 lane NH Connectivity to ICTT, Vallarpadam Road Connectivity Project for Cochin Port. 

Shipping  

Page 36: Env Clearance List

265

249

276

164

364

252

194

216

277

208

IOCL Project - Paradip-Haldia-Durgapur LPG Pipeline 

Petroleum and Natural Gas  

HPCL Project - Resitement of Marketing Terminals at Visakhapatnam 

Petroleum and Natural Gas  

Talcher-Bimlagarh new railway line  Railways  

Birmitrapur Barkote Highway project  Road Transport and Highways  

Birmitrapur Barkote Highway Pvt Ltd  Road Transport and Highways  

HPCL Project - Mangalore Hassan Mysore Solur LPG Pipeline Project 

Petroleum and Natural Gas  

Jharsuguda- Barpalli-Sardega Railway Line 

Coal  

Hingula OCP  Coal  

Angul-Sukhinda new line project  Railways  

Ennore Manali Expressway (EMRIP)-Road Connectivity Project for Chennai and Ennore Ports 

Shipping  

Page 37: Env Clearance List

258

151

315

222

219

218

220

27

221

217

253

135

8

250

13

226

GAIL Project -Bawana -Nangal Spurlines (Uttaranchal & Punjab) 

Petroleum and Natural Gas  

BINA OC  Coal  

Jharsuguda-Barpalli-Sardega Railway Line (53 Kms) 

Coal  

Garjanbahal OCP  Coal  

Kaniha OCP  Coal  

MNH Shakti Talabira OCP  Coal  

Ananta Extn. OCP  Coal  

Bharatpur OCP  Coal  

Bharatpur OCP  Coal  

MJSJ Coal Gopalprasad  Coal  

HPCL Project - Construction of New Terminal at Ennore 

Petroleum and Natural Gas  

Deoband-Roorkee new line project  Railways  

Manikpur OC  Coal  

HPCL Project - Uran-Chakan/Shikrapur LPG Pipeline 

Petroleum and Natural Gas  

Jhanjra UG  Coal  

Samaleswari OCP  Coal  

Page 38: Env Clearance List

233

41

134

223

224

274

33

227

205

206

231

16

251

232

ONGC Project - Upgradation of Konaban GGS & Pipeline Grid Project (Tripura Asset) 

Petroleum and Natural Gas  

OIL Project - 1 No. Gas Turbine of 20 MW Capacity for Power Station at Duliajan, Assam 

Petroleum and Natural Gas  

Kitcha-Khatima new line project  Railways  

Orient(U/G) 4  Coal  

Orient(U/G) 1&2,3 &HRC  Coal  

Jharsugda-Rengali doubling  Railways  

Ukni Deep OCP  Coal  

Belpahar OCP  Coal  

Dedicated freight link from Wadala to Kurla-Rail Connectivity Project for Mumbai Port 

Shipping  

Four lane road connectivity to NH17-Road Connectivity Project for Mormugoa Port 

Shipping  

ONGC Project - Construction of 3 ETPs-Mehsana 

Petroleum and Natural Gas  

Urimari OC  Coal  

HPCL Project - Awa-Salawas Pipeline Project (ASPL) 

Petroleum and Natural Gas  

ONGC Project - Sonamura GGS & Pipeline Project (Tripura Asset) 

Petroleum and Natural Gas  

Page 39: Env Clearance List

256

269

270

24

29

215

225

CPCL- New 42 inch Crude oil pipe line From Chennai Port to CPCL refinery at Manali 

Petroleum and Natural Gas  

IOCL Project-Cauvery Basin Refinery (CBR)-Trichy Pipeline 

Petroleum and Natural Gas  

IOCL Project- POL Tap Off Point (ToP) at Korba in Chhattisgarh 

Petroleum and Natural Gas  

HBI UG (Hirakhund Bundia)  Chemicals and Fertilizers - Chemicals and Petrochemicals 

Rohini OC  Coal  

Nataraj(U/G) Mine  Coal  

Lajkura OCP  Coal  

Page 40: Env Clearance List

34

14

15

213

19

20

18

28

30

31

17

283

Bhakra UG  Coal  

Dhanpuri UG  Coal  

Govinda Meera and Kotma (UG mine/depillaring) 

Coal  

Kanika Siding  Coal  

Kedla UG  Coal  

Kedla OC  Coal  

Murlidih OCP  Coal  

Kotma, Govinda and Meera  Coal  

Kapildhara UG  Coal  

Chinda OC  Coal  

Saunda - D  Coal  

Non signing of State Support Agreement 

Road Transport and Highways  

Page 41: Env Clearance List

Status15000 All issues Resolved

Commissioning in 2011-12 12000 All issues Resolved

12000 All issues Resolved

Under Construction. FSA to be signed. In FSA list 9977 All issues Resolved

Commissioning in 2011-12 9900 All issues Resolved

Commissioning in 2013-14(U-1) 2014-15(U-2,3) 9900 All issues Resolved

Commissioning in 2011-12 (U-1,2) 2012-13(U-3) 9900 All issues Resolved

Commissiong Date- 2014-15 9900 All issues Resolved

8981 All issues Resolved

Commissioning in 2014-15 8000 All issues Resolved

7700 All issues Resolved

Commissioning- 2011-12(u-1) 2012-13(u-2) 2013-14 (u-3) 7500 All issues Resolved

Commissioning- 2010-11 (u-1) 2011-12(u-2), 2012-13 (u-3) 7500 All issues Resolved

7009 All issues Resolved

Commissioning- 2013-14(U-1), 2014-15(U-2) 7000 All issues Resolved

Commissioning- 2014-15(u-1) 2014-15(U-2) 6600 All issues Resolved

Year of Commmissioning- U 1 2011-12 U 2 2012-13 6600 All issues Resolved

Commissioning in 2013-14(u-1) 2014-15(u-2) 6000 All issues Resolved

Commissioning date- 2009-10 (U-1) 2010-11(U-2) 6000 All issues Resolved

Commissioning- 2013-14(u-1) 2012-13 (U-2) 6000 All issues Resolved

Commissioning- 2014-15 6000 All issues Resolved

Commissioning- 2013-14 6000 All issues Resolved

Year of commissioning- 2011-12 6000 All issues Resolved

6000 All issues Resolved

Description Of Projects (As furnished by the applicant)

Estimated Investment(in Crores)

Restoration of coal linkage by CIL. MoC already issued a letter to this effect.

Development of new terminal buildings at the existing airport and its upgradation.

4x360 MW domestic coal based power plant being established at Chhattisgarh in two phases, Phase 1 of 360 MW and Phase 2 of 3x360 MW. Financial closure of Phase-I was achieved on 24.06.2009 and Phase 2 on 01.09.2010. The scheduled CODs for the four units are Oct 2013, Jan 2014, Apr 2014 and Jul 2014. The Lead FI is Power Finance Corporation and consortium members are REC, HUDCO, PTC Financial Services, PNB, Bank of Baroda, Indian Bank, Corporation Bank and Vijaya Bank.

Phase II - 1320 MW Coal Based project under implementation. Amount Invested so far Rs. 5837 Crs. More than 75% of the project work is completed and balance work is in progress

1.5 Million MTPA Alumina Refinery Project. 8.5 Million MTPA Bauxite Mine Project

Year of Commissioning U-1 2009-10 U-2 2010-11 U-3 2011-12 U-4 2011-12

Page 42: Env Clearance List

Commissioning- 2013-14 (U-1) 2014-15(U-2) 5400 All issues Resolved

Commissioning- 2013-14 (u-1,2) 2014-15 (u-3,4) 5400 All issues Resolved

Commissioning in 2013-14 5000 All issues Resolved

Commissioning in 2013-14 5000 All issues Resolved

Commissioning in 2013-14(u-1) 2014-15(u-2) 5000 All issues Resolved

Commissionig in 2012-13(U-5) 2013-14(U-6) 5000 All issues Resolved

Commissioning in 2012-13 5000 All issues Resolved

Commissioning- 2011-12(U-2) 2011-12(U-1) 5000 All issues Resolved

Commissioning- 2012-13(U-1) 2012-13 (u-2) 5000 All issues Resolved

Commissioning- 2011-12 5000 All issues Resolved

Commissioning U-5 2012-13 U-7 2010-11 5000 All issues Resolved

Year of Commissioning U-8 2011-12 U-9 2012-13 5000 All issues Resolved

Commissioning- 2009-10(U-5), 2010-11(U-6) 4900 All issues Resolved

4284.55 All issues Resolved

4255 All issues Resolved

3850 All issues Resolved

3787.2 All issues Resolved

3550 All issues Resolved

Commissioning- 2013-14(u-1) 2014-15(U-2) 3500 All issues Resolved

Anticipated date of completion of Unit-I 12/2013 and Unit-II 03/2014

Lumding-Silchar(482Km) Gauge Conversion will provide seamless connectivity to lower Assam and Tripura, Mizoram and Manipur with rest of India and is also vital link for new line projects providing rail connectivity to state capitals in NE region

1x600 MW Coal Based Thermal Power Project being implemented in Villages Bade Bhandar, Chhote Bhandar, Sarvani, Amli Bhouna, Tehsil Pussor, District Raigarh, Chhattisgarh State

600 MW in FSA list approved by CCEA. FSA to be signed. 350 MW linked to coal block. Balance 250 MW scheduled to commission after March 2015 hence not placed in FSA list.

1x600 MW Coal based Thermal Power Plant being implemented in Villages Barela, Gorakhpur, Tehsil Ghansore, District Seoni, Madhya Pradesh State

Page 43: Env Clearance List

3500 All issues Resolved

3440 All issues Resolved

3408 All issues Resolved

Commissioning- 2014-15 3300 All issues Resolved

Commissioning- 2012-13 (U-1) 2013-14 (U-2) 3000 All issues Resolved

Commissioning - 2013-14 3000 All issues Resolved

Commissioning- 2012-13 3000 All issues Resolved

In FSA list approved by CCEA. FSA to be signed. 3000 All issues Resolved

2910 All issues Resolved

2872 All issues Resolved

Commissioning- U-1-3- 2010-11 U-4- 2011-12 2700 All issues Resolved

Project Commissioned 2500 All issues Resolved

Project Commissioned 2500 All issues Resolved

Commissioning in 2009-10 2500 All issues Resolved

Commissioning in 2014-15 2500 All issues Resolved

Commissioning in 2014-15 2500 All issues Resolved

Commissioning- 2014-15 2500 All issues Resolved

Commissioning- 2009-10 2500 All issues Resolved

Commissioning- 2010-11 2500 All issues Resolved

Commissioning- 2014-15 2500 All issues Resolved

Commissioning- 2011-12 2500 All issues Resolved

Commissioning U-10- 2012-13 U-11- 2013-14 2500 All issues Resolved

Commissioning- 2009-10 2500 All issues Resolved

Ref. MoEF File No 8-7/2002-FC Our company, Ambuja Cements Limited, operates two integrated plants viz. Unit-Suli and Unit-Rauri in Himachal Pradesh with combined capacity of 4.44 mtpa. Suli unit is operational since 1993 and Rauri unit since March, 2010. Limestone explored from our nearby captive mines is used as raw material in the plants for cement manufacturing. The clinker produced at these two plants, large quantities are transported to the grinding units at Ropar, Bhatinda, Roorkee, Nalagarh and a little to Dadri for manufacturing cement. The total cement manufacturing of these five grinding units is approximately 7 million tonnes. The investment is Rs.3500 crores or above. We were granted Forest Clearance in 1992, subsequently renewed in 2002 and is due for regular renewal which is being held up for quite some time inspite of our having complied with all the requisite requirements. We applied in time for renewal of the Forest Clearance at the time of mining renew

One unit in FSA list approved by CCEA. FSA to be signed by MoC.

Under construction. FSA to be signed. In FSA list approved by CCEA.

Under Construction. In FSA list approved by CCEA. FSA to be signed.

Under construction. In FSA list approved by CCEA. FSA to be signed

Page 44: Env Clearance List

Year of Commissioning- 2011-12 2500 All issues Resolved

Year of Commissioning- 2012-13 2500 All issues Resolved

2293.48 All issues Resolved

Commissioning in 2013-14(u-1) 2014-15(u-2) 1950 All issues Resolved

Khadia OC 1720.03 All issues Resolved

1523.64 All issues Resolved

1456 All issues Resolved

1419 All issues Resolved

commissioning- 2012-13 1350 All issues Resolved

1350 All issues Resolved

1232 All issues Resolved

Moonidih XV Seam UG 1230 All issues Resolved

1190 All issues Resolved

1155.4 All issues Resolved

Four laning under NHDP Phase-III 1123.69 All issues Resolved

Construction of 51.38 Km new B.G railway line from Bhairabi to Sarang for providing connectivity to state capital of Mizoram.

Promoted by KVK Energy & Infrastructure Pvt. Ltd., Nagai Power Private Limited (NPPL) is a special purpose vehicle (SPV) implementing a 300 MW (2 x 150 MW) Coal based thermal Power Plant in Okkur & Venkidanthangal Village, Nagapattinam District, Tamil Nadu in two phases – viz. Phase I of 150 MW and Phase II of 150 MW. The projects are implemented at a total cost of Rs.1523.64 cr. Phase I will achieve COD by 1st October 2014 and Phase II will achieve COD in about 24 months from the date of initial disbursement

Under Construction. In FSA list approved by CCEA. FSA to be signed.

Installation of new state of the art Integrated Crude and Vacuum distillation units of capacity 6.0 MMTPA with 30 percent design margin as a replacement of old Crude and Vacuum units of BPCL. Overall Progress achieved 26 percent. Engineering, Procurement and construction activities are in progress.

Loktak Downstream HEP (66MW)is a JV project between NHPC (CPSU) and Govt. of Manipur. The estimated cost of the project is Rs. 1350 crores (Dec 12 PL). The project has been accorded environment clearance and Stage-I Forest Clearance.

Four laning under NHDP Phase-IV being constructed by BSCPL Infrastructure Ltd.

4x1000 TPD DRI Induction Furnace 2x12 TPD 14 MW Captive Power Plant (CPP) Planning to expand their existing DRI plant into an Integrated Steel Plant.

Four Laning of Ahmedabad to Godhra section of NH-59 from km.4+200 to km. 122+420 in the state of Gujarat on “DBFOT” basis under NHDP Phase III (Package -1)

Page 45: Env Clearance List

1050 All issues Resolved

1019 All issues Resolved

Year of commissioning- 2009-10 975 All issues Resolved

942.69 All issues Resolved

Development of Haldia Dock-II (South) 886.1 All issues Resolved

Development of Haldia Dock-II (North) 821.4 All issues Resolved

Commissioning in 2013-14 750 All issues Resolved

commissioning- 2010-11 750 All issues Resolved

Commissioning- 2009-10 750 All issues Resolved

Commissioning- 2009-10 750 All issues Resolved

Year of commissioning- 2009-10 750 All issues Resolved

Year of commissioning- 2009-10 750 All issues Resolved

568 All issues Resolved

Year of commissioning -2011-12 450 All issues Resolved

Year of Commissioning- 2011-12 450 All issues Resolved

Year of Commissioning- 2011 450 All issues Resolved

Maqsoodpur , UP Year of commissioning- 2011-12 450 All issues Resolved

Year of Commissioning-2011-12 450 All issues Resolved

339.77 All issues Resolved

MANIKPUR OC - SOUTH EASTERN COALFIELDS LIMITED 321.5 All issues Resolved

Shri Sidhbali Ispat Ltd. an integrated Steel Plant with Captive Power Plant having proposed capacity of 1 Million tone steel (0.3 million tone first phase with 20 MW CPP (12.8 MW CFBC + 7.2 MW WHR) already installed during 2010 and construction of second phase of 0.7 million tone steel and 35 MW Captive Power Plant is on. The total cost of project is Rs.1050 Crore (300 Crores in first phase already commissioned and work of second phase is going on) Captive Power Plant of 20 MW (12.8 MW CFBC and 7.2 MW WHR) was commissioned on 11.10.2010. SLC (Long Term) for linkage approved our case for issuing LOA for 12 MW in its meeting held on 18/01/2007. LOA was issued by WCL and stipulated milestones were achieved within the LOA period. On commissioning of plant (CPP) the capacity was slightly higher, which was accepted by Ministry of Coal in its order dated 5th Aug 2010. Inspite of approval by MOC the officials of WCL was not signing the FSA. The matter was placed in the review committee (SLC-L

Iron and Steel Project. Environmental Clearance obtained. RTC issued by Ministry of Railways. Purchased 245 Acres of land, 5 McM Water Resources approved.

Four laning under NHDP Phase-III being constructed by Supreme Infra. Devl. Projects. Ltd.

Salka Road-Anupur is part of Bilaspur-Katni section and is the only single line portion on this route. This section is very important for movement of coal and steel from Chhatisgarh to North India.

Penganga OC - WCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20/02/2013.

Page 46: Env Clearance List

Year of commissioning U-1 2009-10 U-2 2010-11 250 All issues Resolved

223.06 All issues Resolved

199.75 All issues Resolved

194.11 All issues Resolved

127.52 All issues Resolved

105.78 All issues Resolved

94 All issues Resolved

91.08 All issues Resolved

78.6 All issues Resolved

67 All issues Resolved

43.27 All issues Resolved

38.23 All issues Resolved

37.13 All issues Resolved

27.82 All issues Resolved

18 All issues Resolved

Basundhra (W) - OCP - MCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Evacuation of New Refinery by Rail / Road. 69 percent complete - Terminal Tankage and Piping nearing completion. Approval of DPR for Railway siding pending with Railways.

Dhuptala OC -WCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Jamunia UG -WCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

HBI UG (Hirakhand Bundia) MCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Providing rail connectivity to the existing Tuna Creek-Rail Connectivity Project for Kandla Port

Jharkhand OC -CCL This is a coal mining project submitted for Stage-II Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Tetariakhar OCP - CCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCinvest/2013 dated 20-02-2013

Overall Physical Progress achieved is 5.5 percent. Major construction activities could be taken up after Environment Clearance All major materials received at site. Pipeline laying is in progress. Compliance of conditions imposed in 1st stage Forest Clearance in progress for obtaining 2nd stage Forest Clearance. Delay in 2nd stage Forest clearance in Odisha and Jharkhand. Scheduled completion and Anticipated completion dates to be assessed after receipt of Statutory clearances.

Lajkura - MCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Inder UG to OC-WCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Ara-Sarubera GoM -CCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Samleshwari Expansion OC - MCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Ray-Bachara-UG -CCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20/02/2013.

Page 47: Env Clearance List

14.41 All issues Resolved

77450 Pending

42345 Pending

40000 Pending

37500 Pending

37367 Pending

35000 Pending

29777 Pending

29285 Pending

29285 Pending

Belpahar OCP - MCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

The Coal To Liquids Project is being set up by Jindal Synfuels Limited which involves Gasfication of Coal To Raw SynGas, Purifictaion of Raw Syngas, Conversion of Purified Raw Syngas to Synthetic Crude and finally upgrading the synthetic Crude in Refining Units to get Petroleum Products. The Products will be primarily Diesel and Naphtha. The Project will produce 80,000 barrels per day of Liquids Fuels equivalent to 4 MMTPA of Diesel and Naphtha.

Expansion of existing steel capacity at Raigarh, Chhattisgarh by addition of 7 MTPA Integrated Steel plant with 1320 MW CPP.

Jharkhand Integrated Power limited, a Special Purpose Vehicle (SPV) and a wholly owned subsidiary of Reliance Power is implementing 4000 MW Tilaiya Ultra Mega Power Project (TUMPP) based on Super Critical Technology at Tilaiya Village, Hazaribagh District, Jharkhand. Tilaiya UMPP is fourth in the series of nine UMPPs of 4000 MW capacity each at coal mine pit-head and coastal locations across the country. These projects are being developed under the UMPP policy of Govt. of India. The project was awarded through the International Competitive Bidding (ICB) Process based on lowest levelised tariff for 25 Years. The entire Capacity from the Project has been contracted to 18 distribution companies across 10 States for a term of 25 years. Ministry of Coal, Govt of India, has allocated Kerendari BC coal mines for TUMPP. The project is in development phase land and acquisition is in progress.

Integrated Steel plant in Gujarat comprising of Iron &steel mills, associated downstream facilities, including a cold rolling mill, a galvanising facility, an extra-wide plate mill and a pipe mill. Employment – Direct & Indirect – 30,000.

6 Million Tons per annum integrated steel Plant with 1320 MW CPP 1 Million ton per year capacity Bar Mill and 0.6 Million ton per year capacity wire rod mill are already under production.

10 MTPA Green Field Integrated Steel Plant and 800 MW Captive Power Plant, ML granted by State Goverment. Allocated Iron Ore and Manganese Mine at Ankua and Rohne Coking Coal Block.Purchase 378 Ac private land.

15 MMTPA Refinery to meet projected petroleum deficit in Easteren India. Overall Progress achieved - 93.2 percent. Construction works is in progress.

6 Milion Ton per annnum Steel Plant with 1142 MW CPP in two Phases

6 MTPA Integrated Steel Plant & 900 MW Captive Power Plant (CPP). Major activites of 2 MTPA Steel Plant completed. Major part of land i.e, 4147 Ac out of 4332 Ac acquired. Operations of 1.5 MTPA Plate Mill started. 540 MW CPP commissioned. Work for setting up balance 4 MTPA Steel Plant is in full swing.

Page 48: Env Clearance List

28000 Pending

25000 Pending

24214 Pending

22587 Pending

22587 Pending

Expansion from 3.3 MTPA to 10 MTPA 20000 Pending

16190 Pending

The Rajasthan project (RJ-ON-90/1 block) is a National Asset. The project is a joint venture between Cairn India and ONGC. The Rajasthan block produces about 175,000 barrels of oil per day, thereby contributing about 23 percent to the domestic crude production. Every year this single asset enables reduction in nations crude oil import bill to the extent of about INR 32,000 crore and contributes about INR 13,000 crore to the government. To date, more than 40 discoveries have been made in the Rajasthan block. This world-class asset has the potential to support 300,000 barrels of production per day, which would comprise nearly 35 per cent of the current domestic crude oil production. Consequently, it will add about INR 30,000 crore to government revenues and reduce our nations oil import bill by about about INR 57,000 crore every year. Over 80 percent of the value generated from the asset accrues to the Government Stakeholders namely, Government of India, Government of Rajasthan and ONGC.

• 3,960 MW Sasan UMPP is the largest integrated power plant with captive coal mines. It is also the country’s first domestic coal based Ultra Mega Power Project (UMPP) and will benefit around 35 crore people in seven states procuring power from the Project. • The project is based on supercritical technology which is more efficient and environment friendly. • The project will supply power at lowest levelized tariff of Rs 1.196/kwh for PPA tenure of 25 years, thereby contributing significantly to economic development in the country • Construction of the project is in very advance stage. Power generation from the first unit (660 MW) of the Project commenced in March 2013. Construction of remaining five Units is also progressing fast. • Sasan UMPP has achieved financial closure and tied up long term loan facilities with Indian as well as foreign banks / financial institutions to finance the project on limited recourse basis. The project is largest recipient of foreign currency loan f

Etalin Hydro Electric Project is a Run Of the River Hydro Electric Scheme with an Installed Capacity of 3097 MW. The Project is located on Dri River & Tangon River in Dibang Valley District of Arunachal Pradesh. The project is a Green Field development.

Integrated Steel Plant of 6.0 MTPA at Paradeep,Beneficiation Plant at Dabuna (10.7 MTPA),Slurry Pipeline from Dabuna to Paradeep (253 km , on ROW), Pellet Plant at Paradeep (12 MTPA)

Integrated Steel Plant of 6.0 MTPA at Paradeep, Beneficiation Plant at Dabuna (10.7 MTPA), Slurry Pipeline from Dabuna to Paradeep (253 km , on ROW), Pellet Plant at Paradeep (12 MTPA)

Green Field coal based Power project of capacity of 6 X 600 MW Nariyara Village, Akaltara - Tehsil District Janjgir Champa, Chhattisgarh

Page 49: Env Clearance List

15300 Pending

15000 Pending

14650 Pending

13600 Pending

13195 Pending

13167.46 Pending

13000 Pending

12160.24 Pending

11848 Pending

Hydro project of 2000 MW on Subansiri River 11000 Pending

Expansion of Brown Field steel plant capacity from 10 MTPA to 16 MTPA

Acquired Non Contiguous 4600 Acres of Land sand spent Rs. 1800 Crores. The balance land acquisition will happen only after the new Land Acqusition Bill is passed by the Parliament.

Indiabulls SEZ is a Multi-Product SEZ which is being developed over a notified Industrial Area of 1011.264 Ha at Sinnar in Nashik, Maharashtra. The Land has been leased from Maharashtra Industrial Development Corporation for a period of 95 years. The SEZ is proposed to have Manufacturing Industries from the sectors like Auto and Auto Ancillary, Aviation and Ancillary, Pharmaceuticals(Formulations), Light Engineering and Electronics and Electrical.

2X600 MW Stage I Coal-Based Thermal Power Plant at Tamnar, Dist Raigarh, Chhattisgarh.

3.59 LTPA Aluminium Smelter with 900 MW ( including 1 standby of 150 MW) Captive Power Plant at Lapanga, District Sambalpur. 20 Million Ton Per Annum Talabira II & III Coal Mine associated with the above project. Hindalco ( 15 % share of Coal) has been jointly allocated this Coal Block with Mahanadi Coalfields ( 70 % share) and Neyveli Lignite( 15 % share)in district Jharsuguda and Sambalpur in the state of Odisha.

Adani Power is developing a 4,620 MW TPP at Mundra, Dist Kutchh, Gujarat. The entire capacity has been commissioned and is operational. 2640 MW Mundra TPP Ph I - 4 x 330 MW and II - 2 x 660 MW Commissioning dates - U#1 - 04.08.09 U#2 - 17.03.10 U#3 - 02.08.10 U#4 - 20.12.10 U#5 - 26.12.10 U#6 - 20.07.11 Power Supply from U# 1 - 6 is committed and has commenced under Long Term PPAs of aggregate 2000 MW executed with GUVNL through competitive bidding route.

The 2000 MW coal based thermal power project is being developed by a Group Company of Reliance Power Limited. The project is located adjacent to Sasan UMPP site in the State of Madhya Pradesh and is being implemented by a wholly owned subsidiary of Reliance Power Limited i.e. Sasan Power Limited. The project would employ super critical technology.

To improve distillate yield by elimination of black oil pool, meet Euro-III and Euro-IV specification for the entire diesel pool and increase crude processing capacity from 12 MMTPA to 15 MMTPA. Overall Progress achieved- 98.8 percent. Mechanical completion achieved for all Units except for DCU. Further, CDU and VDU, HGU, DHTU and SRU have been commissioned.

3x660 MW project under construction. No coal linkage granted yet by MoC. This project was discussed in the CCEA meeting held on 21.06.13. Minutes are awaited.

Page 50: Env Clearance List

10780 Pending

10500 Pending

10000 Pending

9700 Pending

9562 Pending

Background (a)3 x 600 MW Thermal Power Project was awarded through Case II bidding process to Jaypee Group. (b)Land Acquisition, Environmental Approval, Coal Supply and Power Evacuation was the responsibility of procurer i.e., UPPCL. (c)LOI issued on 2nd March, 2009 (d)SPA signed on 23rd July, 2009

3.59 LTPA Aluminium Smelter with a 900 MW ( including 1 standby unit of 150 MW) Captive Power Plant. 8.5 MTPA Mahan coal Block jointly allocated with Essar Power, The Ratio for coal is Hindalco 40 % and Essar 60 %.

Samalkot Power Limited (SPL) is implementing a 2,400 MW, combined cycle gas-based thermal power plant at Industrial Development Area of Peddapuram, Samalkot Mandal, East Godavari District, Andhra Pradesh, India. Reliance Infrastructure is the EPC Contractor for the Project. It has tied up with reputed Original Equipment Manufacturers (“OEM”) such as General Electric, USA (for Gas Turbines, Steam Turbines & Generators), CMI-EPTI, USA (for Heat Recovery Steam Generator), Hamon, Belgium (for Cooling Towers), Hyundai Heavy Industries (for transformers) and Xian Electric (for Gas Insulated Switchyard). The Samalkot Project requires about 9.6 million standard cubic meters per day (mmscmd) of Natural gas. The Project was conceived based on supply of gas from the KGD6 block in Krishna Godavari basin. SPL entered into Bulk Power Transmission Agreement (BPTA) with Power Grid Corporation of India Ltd. (PGCIL). As per the BPTA, the EPC contractor (Reliance Infrastructure) would construct

Essar Power Jharkhand Limited (EPJL) is implementing an 1800 MW coal based power project in Latehar, Jharkhand. Phase I (1200 MW) of the project is expected to be commissioned in 2014-15 based on coal sourced from the Chakla mine whereas Phase II of 600 MW is based on Ashok Karkata coal mine. The company has signed PPAs to the tune of 750 MW net for phase I with BSEB, 12% of power generated under variable cost regulated tariff with Govt of Jharkhand and 240 MW with Noida Power Company Ltd from Phase II. The company is also obligated to supply RoFR power worth 13% of installed capacity from Phase I and II to Govt of Jharkhand under regulated tariff.

2.51 MTPA Steel Plant. The project is now ready to commence production from June 2013. Out of capex debt of Rs.824 crores, Rs.602 crores are sanctioned and remained Rs.222 crores loan application are pending with Union Bank- Rs. 150 crore, LIC - Rs. 50 crores and P&S Bank- Rs.35 crores. Due to delay in tying up the shortfall of Rs.222 crores, sanctioned debt of Rs.602 crores is not being released by the consortium of banks.

Page 51: Env Clearance List

9349 Pending

9121 Pending

9000 Pending

9000 Pending

9000 Pending

2.50 million Tonnes Per Annum (TPA) Integrated Steel Plant at Village: Kotmar & Patrapalli of Raigarh Distt., Chhattisgarh as per MoU dated 8th August 2008 between the Government of Chhattisgarh & Government of Chhattisgarh. Date of Financial Closure Awaiting grant of Captive Iron Ore Mining Lease. Expected date of Financial Closure within six months of securing Iron Ore Mine in Chhattisgarh or Odisha. Implementation Status Substantial portion of land already acquired. Environmental Clearance already obtained. Allocation of Water from Sapnai River secured. Schedule date of completion Three years from the date of Financial Closure Anticipated date of Completion Three years from the date of Financial Closure

2x600 MW. Under construction. One unit have coal linkage and other linked to coal block. FSA signed for the linkage unit. For Unit-II mining lease clarification pending with MoC and MoEF st-II clearance pending at State level.

Gujarat State Petroleum Corporation Ltd (GSPC) is the operator of the Deendayal Field (Block KG-OSN/2001/03) situated offshore from the Yanam – Kakinada coast of Andhra Pradesh, India. Field Development Plan (FDP) for DD-West (DDW) field in KG-OSN-2001/3 block was approved by the Management Committee in November 2009. Consequently upon approval of the FDP, GSPC as an Operator has started implementation of the DD-West Field Development Plan. The Deendayal Field Development Project is consisting of Well Head Platform (WHP) including drilling of Development Wells, Process cum Living Quarter Platform (PLQP), laying of offshore subsea pipeline from WHP to Land Fall Point (LFP), laying of onshore pipeline from LFP to Onshore Gas Terminal (OGT) and Onshore Gas Terminal.

The total area of SEZ is 18000 ha. out of which at present 6641.2784 ha. area is notified and 1840 ha. area is under notification. Environmental Impact Assessment including Environment Management Plan & Risk Assessment is carried out for total area of 18000 ha. The Multi product SEZ at Mundra comprising of Road Network, Rail Network, IT-Telecommunication network, Electrical Network, Water supply, conservation & drainage Network, River Training, Desalination Plant with proposed intake & outfall locations, Common Effluent Treatment Plant & Sewage Treatment Plant, Natural Gas line network, Social Infrastructure, Existing Airstrip & Waste Management & Disposal site. The Environmental Clearance for associated Water Front Development Plan have been obtained from MoEF, New Delhi. Environmental Public Hearing was carried out for 18000 ha and completed on 5th October, 2010. Multi-product SEZ will provide plots to various industries and also develop dwelling units, hotels, shopping

Development of Captive Coal Mine and 1200 MW thermal Power Plant in two phases of 600 MW each.

Page 52: Env Clearance List

8986 Pending

8981.04 Pending

8600 Pending

8290 Pending

7596 Pending

Jindal Stainless Limited set up a fully integrated stainless steel plant at Jajpur, Odisha & it is the only integrated stainless steel plant in the country. This plant is capable of producing unique and wide range of products both in terms of grades and dimensions. As a part of forward integration, production facilities for 2,50,000 tpa Ferro Alloys, 4,30,000 tpa Coke Oven, 250MW Captive Power Plant , 1mtpa stainless steel Melt Shop, 1.6mtpa Hot Rolling Mill and 0.95 mtpa Cold Rolling Mill have been set-up and are in operation progressively since September 2005. Production of ferro-chrome, ferro-manganese and silico-manganese is carried out in submerged Arc-Furnaces. And Ultra-high powered Electric arc-furnace is used for melting stainless steel. Refining is carried out in Argon-Oxygen De-carburization Converter and slabs are cast in a vertical- bending continuous casting unit.

4x360 MW domestic coal based power plant being established at Chhattisgarh in two phases, Phase 1 of 360 MW and Phase 2 of 3x360 MW. Financial closure of Phase-I was achieved on 24.06.2009 and Phase 2 on 01.09.2010. The scheduled CODs for the project is Jul 2014. The Lead FI is Power Finance Corporation and consortium members are REC, HUDCO, PTC Financial Services, PNB, Bank of Baroda, Indian Bank, Corporation Bank and Vijaya Bank.

Universal Crescent Power Private Limited is setting up a 1980 MW imported coal fired Power Plant named as Sagar Super Thermal Power Plant at Nayachar Island in Purba Medinipur district, West Bengal along with a captive coal Jetty for unloading and transfer of coal to the Power Project site, in accordance with the Agreement signed with Govt. of West Bengal on 3rd November 2011. The Sagar STPP is being developed in two stages with Stage I comprising of two units, each of 660 MW capacities, deploying state of the art supercritical technology with a provision of expansion of 1 x 660 MW units in Stage II. Presently, we are seeking Environment Clearance and CRZ Clearance from MoEF for Stage I consisting of 2 x 660 MW Units after which the project will be ready to take off. The status of major clearances, tie ups and approvals required for the project is as below 1. Land for the power project has been acquired. 2. Fuel Supply Agreement has been signed. 3. Power Purchase Agreement

2x685 MW under construction. No coal linkage. MoC yet to grant linkage.

Jagdishpur - Haldia Pipeline Project envisages following- Phase-I- 36/24/18/12 inch x 1860 Km, Ph-II- 24/18/12 x 190 Km and Compressor Station at Haldia. Scheduled completion is 36 months from first 3i notification. Present Status- 1. Route Survey completed 2. Office established at Kolkata and Ranchi 3. Long Term gas sourcing agreements finalized Issues- a. 3i notification yet to be published owing to customer tie-up issues. b. Confirmation regarding Fertilizer Plants revival awaited from Department of Fertilizers.

Page 53: Env Clearance List

7400 Pending

7255 Pending

7200 Pending

7020 Pending

7000 Pending

7000 Pending

7000 Pending

6930 Pending

The Company is implementing its 2 x 660 MW coal based Super Critical Power Project near Banka in Bihar. The BTG Order has been placed on DECL, China. The Project has achieved Financial Closure in March 2012 . Overall progress of 28 percent has already been achieved. The project is stalled due to non disbursement. Land has been acquired. All necessary clearances and approvals are in place. Financial Closure achieved. EPC Contract awarded.

Laying,building,operating or expanding MBBVPL along the route of Mallavaram(Andhra Pradesh)-Bhilwara(rajasthan)-Bhopal(Madhya Pradesh) - Vijaipur (Madhya Pradesh)

1080 -8 x 13) MW, PITHEAD THERMAL POWER PROJECT (Commisssioned) -Enhancement of Kapurdi Lignite Mines capacity from 3 MTPA to 7 MTPA till the Jalipa mines becomes operational

2x660 MW. One unit commissioned. Second unit in next 4 months. No linkage. Discussed in the CCEA meeting held on 21.06.13

A run of the river project on river Nyamjang Chhu in Tawang district of Arunachal Pradesh utilizing the gross head of 1057.0 for generation of 780 MW in underground power house by six units of 180 MW each.

The blocks was awarded to EOL in the fourth round of CBM bidding in 2009. EOL has 100% participating interest in the block and entered into a contract with GoI for exploration and production of CBM gas on July 29, 2010. It is located in Rajmahal coal field in Jharkhand and covers an area of 1128 sq. km

1,260 MW coal Based Thermal Power Project, comprising of Unit 1 (600MW, sub-critical) and Unit 2 (600MW sub-critical, reconfigured to 660MW super-critical technology for higher priority for allotment of coal linkage) There is a delay in development of Fatehpur East coal block on account of delay in processing of the forest diversion proposal, conduct of public hearing and processing of the previous approval for mining lease at the State level. Hence,the project COD has be re-aligned so that coal produced from Fatehpur East Coal block is available for captive use in the project.

(2X660) MW, one Unit linked to Linkage and one Unit liked to coal block(Rampia).PL pending at with Orissa state Government last 3 years. Issue of overlapping with MCL to be resolved by MoC.

Page 54: Env Clearance List

6848 Pending

6560 Pending

6500 Pending

6500 Pending

6449 Pending

6300 Pending

6300 Pending

6290 Pending

1200 MW - 4 UNITS 300MW EACH COAL BASED IPP BEING IMPLEMENTED AT BINJKOTE and DARAMURRA VILLAGE, RAIGARH DISTRICT IN CHHATTISGARH. PROMOTED BY SKS ISPAT AND POWER LIMITED - SKS. SITHE GLOBAL BLACKSTONE OF USA IS AN INVESTOR IN THE POWER PROJECT. PROJECT IS UNDER ADVANCE STAGE OF CONSTRUCTION AND SCHEDULED FOR COMMISSIONING OF UNIT -1 BY SEPT 27, 2014, UNIT -2 BY DEC 27, 2014 AND UNIT 3 AND 4 BY DEC 27, 2015. BOILER DRUM FOR UNIT 1 AND 2 ALREADY EREECTED AND PLACED IN POSITION IN MAY 2013. CONSTRUCTION OF ALL THE FACILITIES SUCH AS RAW WATER PIPE LINE and INTAKE SYSTEM, 400 KV TRANSMISSION LINE, RAILWAY SIDING, COAL HANDLING PLANT, ASH HANDLING SYSTEM, WATER SYSTEMS, ETC ARE IN ADVANCE STAGE. RS.2311.17CRORES INCURRED TILL 30.6.2013 MINISTRY OF POWER HAS GRANTED PROVISIONAL MEGA POWER STATUS ON 29.2.2012. SIGNED BPTA AND TSA WITH PGCIL

For the two units (2x660 MW)in phase-II. No linkage Project ,recommended by mop to moc in dec 2011. one unit commissioned in may 2013.

M.P. Power Generating Company Limited (MPPGCL), a state PSU, is implementing 2x660 MW units under stage-II of Shree Singaji Thermal Power Project, District Khandwa, Madhya Pradesh. The project cost is estimated to be Rs 6500 Crores. The project has already achieved Financial Closure and all other pre-requisites i.e. land, water etc, for installation of units are available, except Environmental Clearance (EC). Therefore, placement of order for installation the units is kept under hold.

2.0 MTPA Integrated Steel Plant with 1.20 MTPA Sponge Iron making facility and Power Plant. 0.25 MTPA steel capacities will come in Phase-I remaining in Phase-II. Stage -I &II Forest Clearance obtained on 28.7.2006. Allocation of Utkal B2 Coal Block by Ministry of Coal since 16.8.1999. Prior approval under Section 5(i) for Mining Lease obtained on 20.9.2007.

1.Laying, building, operating or expanding MBPL along the route of Mehsana (Gujarat) - Ajmer (Rajasthan) - Sirsa (Haryana) -Bhatinda (Punjab) 2.Laying, building, operating or expanding BJSPL along the route of Bhatinda (Punjab) – Jammu - Srinagar (Jammu & Kashmir)

2X600 MW Stage II pit-head Coal-Based Thermal Power Plant at Tamnar, Dist Raigarh, Chhattisgarh

NMSEZ has been notified as a Multi product SEZ on 21.11.2007. The SEZ is not operational.

Ph-I 2x660 MW all unit commissioned. Ph-II 3x660 MW 1 unit commissioned. LOA on tapering basis has been issued to only 800 MW (140 MW for second unit of Ph-I and 660 MW of unit 1 of Ph-II. No LOA has been granted for 2X660 MW of Ph-II. FSA signed for 1180 MW. Balance 800 MW tapering linkage available. FSA to be signed.

Page 55: Env Clearance List

6200 Pending

6000 Pending

5795 Pending

5590 Pending

5545 Pending

5500 Pending

5430 Pending

2x600 MW Singhitarai Thermal Power Project is being developed by Athena Chhattisgarh Power Limited, an SPV formed for developing and implementing a coal based Thermal Power Project in Janjgir-Champa District in the State of Chhattisgarh. The project has obtained all the statutory clearances including Environmental clearance. As on date more than 50% of the physical works are completed. The boiler drum for unit 1 has already been erected and major equipment like Stator, Rotor has already reached the Indian Port. Firm Power sale agreements for more than one unit capacity executed. More than Rs. 2700 crs have been spent on the project. The project is financed by 18 banks and financial institutions and more than Rs. 2170 crs have been disbursed by the lenders so far.

1.00 million Tonnes Per Annum (TPA) Integrated Special Steel Plant, 0.8 million TPA Coke Plant, 0.2 million TPA Ferro Chrome Plant and 250 MW Captive Power Plant Phase I The company has already incurred a Capex of approximately Rs.3,200 Crore and already established a 0.5 million TPA Special Steel Plant (comprising of 0.225 million TPA Blast Furnace, 0.3 million TPA Sponge Iron Plant, 0.5 million TPA Special Steel Melt Shop and 0.5 million TPA Special Steel Rolling Mill for Bars and Wire Rods), 0.4 million TPA Coke Plant and 150,000 TPA Ferro Chrome Plant with 75 MW Captive Power Plant and infrastructure for the total capacity of Special Steel, Coke and Ferro Chrome with Captive Power is in place Phase II To expand the aforesaid capacity of Special Steel Plant from 0.5 million TPA to 1 million TPA, Coke from 0.4 million TPA to 0.8 million TPA, Ferro Chrome Plant from 150,000 TPA to 200,000 TPA, Captive Power Plant from 75 MW to 250 MW and construction of railway l

Imported coal based plant. Approval for using sea water pending with State Govt.

KVK Nilachal Power Private Limited (KNPL), an SPV, promoted by KVK Energy & Infrastructure Private Limited (KEIL), is implementing a project to set up 3x350 MW coal based power project in Cuttack District, Odisha in two phases viz. Phase I of 1x350 MW and Phase II of 2x350 MW.

Under construction. In FSA list. CRZ clearance pending with MoEF

Maithon Power Limited (MPL ), a joint venture of The Tata Power Company Limited and Damodar Valley Corporation, has set up 1050 MW thermal power project at Maithon, Dhanbad, Jharkhand. Both the Unit 1 and 2 have commissioned on 1st September, 2011 and 24th July, 2012 respectively.

1200 MW Imported Coal based power project at Salaya, District DevBhumi Dwaraka, Gujarat using Sea water for Cooling Water system and Coal being conveyed from a captive jetty to be built by Essar Bulk Terminal Services Limited for use by Essar Power Gujarat Limited. Although the power project has been completed, the coal conveying system and sea water intake system and coal jetty is pending for completion due to approvals required resulting in additional costs of generation as compared to the envisaged costs in the project.

Page 56: Env Clearance List

5416 Pending

5400 Pending

5200 Pending

5189 Pending

5150 Pending

5093 Pending

1. Brief Description of Project Ministry of Coal allotted Machhakata-Mahanadi Coal Blocks as captive mines jointly to Maharashtra State Power Generation Company Limited i.e.MAHAGENCO and Gujarat State Electricity Corporation Limited i.e.GSECL on 06.02.2006 under Government Dispensation in the ratio of 60 and 40 respectively, to meet fuel requirement of their power plants. MAHAGENCO and GSECL are State Government Companies of Maharashtra and Gujarat respectively. MAHAGENCO and GSECL have formed a Joint Venture company called Mahaguj Collieries Limited i.e. MGCL to carry out development and operation of the mine. MGCL has selected Mine Developer and Operator i.e. MDO through International Competitive Bidding for development and operation of Machhakata coal block. 2.Salient Features Location-Talcher Coalfield, Chendipada, District Angul, Odisha •Annual target- 30 MTPA ROM coal •Life - 33 Years •Block area - 2103.34 Ha. •Geological Proved Reserve - 1400.65 MT •Mineable Coal-

Development, implementation and operation of a 1000 MW coal based power project in Nellore district in two phases- Phase-I-Already Operational capacity of 300 MW, Lead Lender-State Bank of India,and Phase-II-Under construction capacity of 700 MW. Financial Closure Achieved. Lead Lender-Rural Electrification Corporation

LNG Terminal of 5 MMTPA capacity, with provision of expansion to 10 MMTPA, at Mundra in Gujarat. The LNG terminal shall meet the growing demand of natural gas in the country. The Phase 1 capacity of 5 MMTPA shall supply approx 18 MMSCMD of natural gas

4x250 MW imported coal based plant. Approval of land reforms Deptt and Directorate of Town and Country Planning, Govt. of Tamil Nadu pending.

Exisiting facilities - 8 Million tonnes per annum Pellet Plant at Vizag - Andhra Pradesh, 8 Million tones per annum Beneficiation plant at Kirandul - Chhattisgarh, 267 Kms slurry pipeline connecting Pellet Plant to Beneficiation plant. (Rs. 3600 Crores)- To be implemented - Second pipeline connecting Beneficiation plant to Pellet Plant - 463 Kms. (Rs. 1550 Crores)

MONNET POWER COMPANY LIMITED (MPCL), a subsidiary company of Monnet Ispat & Energy Limited, is setting a 1050 MW (2X525MW) MW Coal Based Independent Thermal Power Plant (IPP) in village Malibrahmani, District Angul, Orissa. The Power Plant construction is in advanced stages with major milestones as boiler hydraulic test achieved. Plant is expected to be commissioned by December 2013. The capacity of the power plant will eventually be increased to 1710 MW with the addition of a 660 MW unit.

Page 57: Env Clearance List

5093 Pending

Delay in Implementation of CDR package 5000 Pending

5000 Pending

5000 Pending

5000 Pending

5000 Pending

2x500 MW Under construction. In FSA list. 4909.54 Pending

4860 Pending

4840 Pending

4660 Pending

MONNET POWER COMPANY LIMITED (MPCL), a subsidiary company of Monnet Ispat & Energy Limited, is setting a 1050 MW (2X525MW) MW Coal Based Independent Thermal Power Plant (IPP) in village Malibrahmani, District Angul, Orissa. The Power Plant construction is in advanced stages with major milestones as boiler hydraulic test achieved. The first unit of 525 MW is expected to be commissioned by September 2013 while the second unit of 525 MW will be operational by December 2013. The capacity of the power plant will eventually be increased to 1710 MW with the addition of a 660 MW unit.

Shell through its wholly owned subsidiary Andhra LNG Pvt Ltd is developing an LNG regasification terminal to supply Andhra Pradesh with regasified LNG. The terminal is being developed under the GOI policy permitting 100% FDI (automatic route) and is State of the art, latest generation, floating regasification storage unit (FSRU) with up to 5 mtpa capacity using the most efficient and environmentally friendly regasification process. The project will provide earliest relief to 4,000 MW gas based power plants that are now distressed. It requires no project financing thus saving significant time. It entails FDI of approximately USD 800 mln for FSRU and installations. The engineering and design for all elements of the project is completed, and the FSRU has been selected. A full scale Environmental Impact Assessment (EIA) was submitted to the state Pollution Control Board on 28th March 2013 demonstrating only minimal environmental impact. Several gas sales heads of agreements signed wit

For generation of 400 MW electricity from Hydel means, on river Narmada at Maheshwar, near Indore in Madhya Pradesh.

Setting up LNG Import and Regasification facility terminal. Applied for clearance from Andhra Pradesh Govt. for setting up of LNG terminal at Gangavaram Port, near Vishakhapatnam

Attunli Hydro Electric Project is a Run Of the River Hydro Electric Scheme with an Installed Capacity of 680 MW. The Project is located on Tangon River in Dibang Valley District of Arunachal Pradesh. The project is a Green Field development.

Unit-1 commissioned. St-I clearance for Mahan coal block linked to the project has been issued by MoEF. St-II clearance to be forwarded by State to MoEF

-Expansion of Alumina Refinery from 1 to 6 MTPA and captive Power plant of 75 MW to 285 MW at Lanjigarh, District. Kalahandi in Orissa by M/s Vedanta Aluminium Ltd - Environmental Clearance

The company is in advance stage of commissioning the 2 X 270 MW (phase 1) coal based power project near Chandwa, Jharkhand. About 95% of the work has been completed. Hydro Testing of Boiler has been completed.

Page 58: Env Clearance List

4608 Pending

4540 Pending

4444 Pending

4200 Pending

4083 Pending

4000 Pending

4000 Pending

About Anrak Aluminiums Alumina Refinery project at APIIC Industrial Park, Makavaripalem Mandal, Visakhapatnam District, Andhra Pradesh 1. As part of rapid industrialization in Andhra Pradesh, the State Government had entered into a Memorandum of Understanding with the Govt of Ras Al Khaimah GoRAK on 14.02.2007 for establishment of Alumina Refinery and Smelter with a feed stock from Jeralla Block of bauxite mines located in Visakhapatnam Dist of Andhra Pradesh. As per the terms of MOU, GORAK along with its associates undertook to incorporate an Indian Registered Limited Company to take forward for the implementation of Alumina Refinery and Smelter project. Penna Cement group along GORAK had a 50-50 joint venture cement manufacturing company in the name of Pioneer Cement Industries LLC from 2004 at UAE. In consonance with the MOU a special purpose vehicle was incorporated in March, 2007 in the name of Anrak Aluminium Ltd as a Joint Venture between Penna Cement group, Hyderabad and

3x350 MW TPP. For Unit-I FSA signed. Balance two units in FSA list. CCEA approved the list in its meeting held on 21.06.13

Jiribam-Imphal new line project will provide connectivity to Manipur which is severely affected due to insurgency. Project has been declared as national Project and is being monitored at highest level. To create conducive environment special battalions of CRPF have been deployed.

2 X 300 MW Butibori coal based power project under implementation by Vidarbha Industries Power Limited VIPL a wholly owned subsidiary of Reliance Power Limited is located at Butibori MIDC Industrial Area in Nagpur district of Maharashtra. Long term PPA for 600 MW capacity from both the units of the Power Station has been approved by Maharashtra State Electricity Regulatory Commission for supply of power to Reliance Infrastructure Limited - Mumbai Distribution commencing from 1st April 2014. Ministry of Coal has already approved coal linkage from WCL for both the units with LOA quantity of 1.234 MTPA and 1.1108 MTPA for Unit 1 and Unit 2 respectively. Signing of FSAs is being followed up with CIL / WCL.

Byrnihat shillong project has been taken up to improve network in N.E. region. Project on completion will provide direct rail connectivity to Capital of Meghalaya. Project has also been declared as National Project.

800MW SUPERCRITICAL COAL BASED THERMAL POWER PLANT TO BE IMPLEMENTED BY GUJARAT STATE ELECTRICITY CORPORATION LTD. AT Wanakbori near Sevalia Dist Kheda

1.8 MTPA Integrated Steel Plant. 230 MW Captive Power Plant commissioned in 2010. Grant of PL for iron ore in R.F. Bailadilla, Tehsil Dantewada,District Bastar (Soouth)is recommended by State Govt. Gare Palma IV/5 underground coal mines are oeprational since 2004. Joint survey of the mine by surveyors of Monnet and SECL has been completed on 15/2/2012.

Page 59: Env Clearance List

3955 Pending

3745.08 Pending

3500 Pending

3500 Pending

3500 Pending

3500 Pending

Gupta Energy Pvt is implementing Thermal Power project 660 MW in Two Phases. The First phase 120(2x60)MW is in operation since may 2012. However the coal linkage for Ist phase yet not been allotted even as we had applied in May 2006. Therfore the plant has resorted shut down for want of linkage fuel. The second Pahse 540MW (2x270) is under implementation for which all clearances are obtained however, MoEF has imposed Temporary moratorium in District Chandrapur of Maharashtra State, therefore MoEF has not yet granted Environment Celarance.

THDC. The Project is a run off the river scheme with a gated Diversion Dam of 65 m height, a water conductor system and an underground Power House located 20 km downstream of head works.All clearances are in place, project to be awarded by THDC.

The blocks was awarded to EOL in the fourth round of CBM bidding in 2009. EOL has 100% participating interest in the block and entered into a contract with GoI for exploration and production of CBM gas on July 29, 2010. It is in southern end of the Mahanadi valley Gondwana belt in Orissa and the block covers an area of 557 sq. km covering parts of three district namely Angul, Sambalpur & Deogarh.

The blocks was awarded to EOL in the fourth round of CBM bidding in 2009. EOL has 100% participating interest in the block and entered into a contract with GoI for exploration and production of CBM gas on July 29, 2010. It is situated in the northeastern part of the Sohagpur coalfield and lies in the states of Madhya Pradesh & Chhattisgarh, covering an area of 339 sq. km

EOL entered into a 35 year contract with Government of India for exploration and production of CBM on July 26, 2002 for the East Raniganj block RG (East)-CBM-2001/I and were granted the Petroleum Exploration License (PEL) by the Government of West Bengal on March 29, 2005 and hold 100% participating interest in the block. The field development plan entails drilling of around 365 wells by mid-2014 along with the installation of surface facilities (gas handling, water treatment) and associated pipelines to process and transport more than 3 MMSCMD of gas. Over the life of the field, EOL envisages the drilling of 600 – 650 wells to support the plateau production.

2x270 MW Coal based thermal power project with 25 year of PPA with Punjab State Power Corporation for 100 percent generation. The expenditure incurred so far is Rs. 3196 Crores till end of July 2013. BTG Contractor - BHEL BOP Contractor - Punj Lloyd Source of coal - Captive coal mine at Tokisud North Sub-block, South Karanpura Coal Fields, located in Hazaribagh Dist. Jharkhand. Unit-1 Synchronized to grid on oil firing on 6th July 2013. Project cost break up- Power Plant - Rs. 3200 Crores Coal mine - Rs. 300 Crores

Page 60: Env Clearance List

3500 Pending

ITC Ltd – Paperboards & Specialty Papers Division 3500 Pending

3380 Pending

3379.45 Pending

SEZ notified on 23.1.2009 as sector specific SEZ for IT/ITES. 3348 Pending

No domestic gas available. MOPNG to allocate gas. 3250 Pending

3200 Pending

Ministry of Coal allotted Chendipada and Chendipada-II Coal Blocks as captive mines jointly to UPRVUNL, CMDC and MAHAGENCO on 25/07/2007 under Government Dispensation in the ratio of 50-31.47-18.53 respectively to meet fuel requirement of their power plant. UPRVUNL, CMDC and MAHAGENCO are State Government companies of Uttar Pradesh, Chhattisgarh and Maharashtra respectively. UPRVUNL, CMDC and MAHAGENCO formed Joint Venture Company called UCMCCL to carry out development and operation of the mine. Chendipada and Chendipada II coal block is located in Talcher coalfield in the state of Odisha. It has a mineable reserve of approx. 1474 Million Tonne of coal with peak coal mining capacity is 40 Million Tonnes per Annum. Washery will also be established for beneficiation of coal mined from Chendipada coal block in adherence with guidelines of Ministry of Environment and Forest. Thermal Power projects of more than 8000 MW capacity of Uttar Pradesh, Chhattisgarh and Maharashtra are largely

Sivok-Rangpo project provides connectivity to Sikkim. Being strategically important, project has been declared as national Project. Project has been entrusted to M/s IRCON for fast track implementation.Out of 45 km length, 39Km(86%) is falling in tunnels and 5% on major bridges.

Six laning of Varanasi-Aurangabad section of NH2 from Km 786.000 to Km 978.000 in the state of Uttar Pradesh and Bihar on Design, Build, Finance, Operate and Transfer Toll basis under NHDP-V

One unit linked to coal block (Durgapur Saraya). St-II of Forest clearance has been cleared by State Govt. and sent to MoEF in March, 13. Under consideration of MoEF.

Page 61: Env Clearance List

3193 Pending

3027.59 Pending

3025 Pending

3000 Pending

Ministry of coal allocated the Pakri-Barwadih coal block to NTPC on 11.10.2004, it has Geological reserves of 1436 MT, Production Target - Sep.2013 Annual rated capacity - 15 MTPA, Project Status as on 25.07.13 • Geological Report available. Mining Plan approved by MOC. • Environment Clearance accorded by MOEF. • Stage I & II forest clearances accorded by MOEF. Forest land available. • Mine Developer-cum-Operator appointed and machinery moved to site. • Other major contracts like Coal Handling Plant, Railway Siding, Substation, R&R Colony etc. have been awarded. • All notifications for land acquisition completed. Rehabilitation Action Plan approved by NTPC Board and Govt. of Jharkhand. Payment for 721 acres of land compensation disbursed to project affected families, till date. • Govt. of Jharkhand has approved transfer of 502 acres of Govt. land & 543 acres of jungle-jhari land to NTPC. • Total expenditure of approx Rs. 1000 Cr. incurred so far.

Anticipated dated of completion of Unit-I - 12/2013 and Unit-II is 01/2014

Kochi-Kootanad-Bangalore-Mangalore gas pipeline is being implemented to evacuate gas from the Kochi LNG Terminal The pipeline will also connect the southern states of Kerala, Karnataka and Tamilnadu with the national gas grid at Bangalore, thus the three states will have access to the green fuel and will have access to city gas and CNG. The power situation in these states will also improve with the implementation of gas-based power projects. The project is implemented in 2 phases and covers 7 districts each in the state of Kerala and Tamilnadu and 3 districts in Karnataka. The capacity of line is 25 MMSCMD and the operating pressure is 92Kg/cm2 max.

Steel Authority of India Limited (SAIL), a Maharatna company, is currently implementing Modernisation & Expansion plan to enhance its annual Hot Metal production capacity from the present 13.8 Million Tonnes (MT) to 23.46 MT. Accordingly, the annual requirement of iron ore will also increase to about 39 MT from the present level of 24 MT. SAIL at present is operating nine iron ore mines in the State of Jharkhand, Odisha and Chhattisgarh to meet the requirement of iron ore. To meet the increased requirement of iron ore, SAIL is increasing the capacity of existing mines in Jharkhand and Odisha to their full potential. Gua iron ore mine consisting of four leases, namely Duargaiburu, Jhillingburu I, Jhillingburu II and Topailore, located in the State of Jharkhand, is linked to the eastern sector steel plants of SAIL at Burnpur, Rourkela, Bokaro and Durgapur for supply of iron ore. The project involves an investment of approximately Rs 3000 Crore for augmenting the iron ore production capacity of Gua iron ore mine, installation of a beneficiation plant of 12.5 Million Tonnes Per Annum (MTPA) and a Pellet Plant of 4 MTPA. This pellet plant will also be the first captive pellet plant of SAIL.

Page 62: Env Clearance List

3000 Pending

2966.99 Pending

2957.21 Pending

2915 Pending

2900 Pending

The block was awarded to EOL in the fourth round of CBM bidding in 2009. EOL has 100% participating interest in the block and entered into a contract with GoI for exploration and production of CBM on July 29, 2010. It is located in the IB valley coal field in Gondwana basin which forms the central segment of the western Gondwana basin in the Mahanadi valley belt in Orissa. This block covers an area of 209 sq. km. The block falls in two districts Sundargarh (200 sq.km) & Jharsuguda (9 sq.km)

Construction of 63.1 km new B.G. line from Bhanupalli to Bilaspur.

Construction of 189Km long Koderma-hazaribagh-Barkakana-Ranchi new line on cost sharing basis with Govt. of Jharkhand. Project is important for coal evacuation also.

Laying of 30 inch x 91 km from Alwaye to Koottanad, 24 inch x 347 km from Koottanad to Mangalore, 24 inch x 462 � �km Koottanad to Bangalore. Overall Progress achieved 74 percent. Out of 884 km, RoU handed over for 259 km and mainline welding completed for 43 km. Lowering completed for 17 km.

Surana Power Limited, a subsidiary of Surana Industries Limited, is establishing a coal based thermal power plant of 2 x 210 MW Capacity at Raichur, Karnataka. The project is under construction phase and an overall progress of 55% is achieved so far. However, due to certain constraints in fund flow, the project construction activities have been significantly retarded for the past about Nine (9) months. The project is funded by Consortium of Banks led by IDBI Bank Limited with an original capital cost of Rs. 2400 Crores with an original COD of End April 2013. However, on account of unfavorable market conditions, especially in the Power Sector, combined with delay in implementation on account of irregular fund flow, the COD has been extended upto End December 2014/ First Quarter 2015. Due to the extension of COD, the total capital outlay of the project increased to Rs.2900 Crore (Revised project cost as appraised by Institutions recently). The commercial operation date of the project is planned by End December 2014/First Quarter 2015. The suppliers/ contractors and vendors executing the project are of repute and renowned in the country. The main equipment supplier is BHEL and the balance of plant (BoP) as well as offsite facilities are being executed by various reputed Indian Suppliers and Contractors such as Alstom, Paharpur, McNally Bharat, Macawber, ABB, Gannon Dunkerley& Co Ltd, etc. The Owners Engineer is Tata Consulting Engineers Ltd. (TCE), Bangalore. Following major clearances obtained for the project. • 148 Acres of Land acquired through Karnataka Industrial Area Development Board (KIADB) • Environmental Clearance from Ministry of Environment and Forest (MoEF) • Consent For Establishment (CFE) from Karnataka State Pollution Control Board (KSPCB) • NOC from Airport Authority of India (AAI) for Chimney Construction • Factory clearance from Joint Directorate of Factories & Boilers • Agreement with Krishna Bhagya Jala Nigam Limited (KBJNL) for Water Drawl (Krishna River) and construction of pumphouse • Rail Transport Clearance (RTC) from South Central Railways • Interconnectivity agreement with PGCIL to evacuate power to PGCIL’s New Raichur Substation (765/ 400kV) • Approval under the Section-68 of Electricity Act 2003 from Ministry of Power for installation of dedicated transmission line • PTCC Clearance for Transmission Line • PPA with PTC for Sale of 40% Power • Coal Supply Agreement with Surana Mines & Minerals Limited (SMML)

Page 63: Env Clearance List

2862 Pending

2844 Pending

2800 Pending

2800 Pending

Gevra OC 2675.87 Pending

2619 Pending

2542 Pending

24 inch x 75 km heated Insulated crude oil onshore pipeline from Salaya to Land fall point in Bhogat Sea Coast with crude oil terminal (2.7 BBL storage capacity) at Bhogat and SPM with sub sea pipeline in Jamnagar district to export the crude to coastal oil refineries in other parts of India. Marine facility with sub sea pipelines completed, crude oil storage terminal is in advance stage of completion. Onshore pipeline from Salaya to Bhogat is stalled in Khambhalia taluka due to lock out of legally notified RoU by local leaders of Khambhalia.

Under construction. In FSA list approved by CCEA. FSA to be signed.

MOEF file no : 11-88/2011-IA-III Title: Environment and CRZ clearance for augmentation in capacity of existing LNG Terminal of 5 MMTPA to 10 MMTPA along with pipeline of 13.9 km with suitable tap at S.No. 319, Village - Hazira Tal - Choryasi District- Surat, Gujarat by M/s Hazira LNG Pvt. Ltd. Hazira LNG is a partnership between Shell Gas B.V and Total Gaz Electricité Holdings France. Both the Shareholders represent two of the largest private LNG suppliers in the world. Shell and Total have a shareholding of 74% and 26% respectively in each of the companies that comprise the Hazira LNG Terminal and Port project and are collectively known as Hazira Group Companies (HGC). Environmental approvals for 1.Additional LNG tank of capacity 200,000 Cu meters and supporting infrastructure for regasification. 2. Laying of 13.9 Km pipeline of 36 inch diameter for gas send out

Expansion from 1 to 2 MTPA is on-going and 50 MW CPP likely to be commissioned by December 2014.

Joka-BBD Bag metro project in Koklatta connect central business distt with Joka area via Majerhat. Alignment runs parellel to flyovers and to accomodate metro via duct land in some streches is required from mint press, Kolkatta port trust and swapping of land from MoD.

Ministry of coal allocated the Talaipalli coal block to NTPC on 25.01.2006, it has Geological reserves of 1267 MT, Production Target - Mar.2015 Annual rated capacity - 18 MTPA, Project Status as on 25.07.13 • Block was regionally explored at the time of allocation. Detailed exploration undertaken by NTPC. Total 39855 mt. drilling done. Geological Report prepared. • Mining Plan approved by MOC. • Environment clearance accorded by MOEF. • Stage-I forest clearance accorded. Payment towards NPV and CA charges made. Compliance of stage-I conditions to be submitted after receipt of NOC under FRA (New format) from Raigarh Dist. Admin. • The JV Company between NTPC & SCCL has been appointed as MDO on nomination basis – pricing & other modalities under finalization. • All notifications for mining area land acquisition completed. RAP approved by NTPC Board. Payment for 1278 acres of land compensation disbursed to project affected families, till date. • Total expenditure of approx Rs 300

Page 64: Env Clearance List

2538 Pending

2500 Pending

COmmissionig in 2009-10 (U-7) 2500 Pending

2500 Pending

Set up of 2* 300 MW Thermal Power Plant 2500 Pending

2500 Pending

Tapering linkage. IN FSA list. FSA to be signed 2500 Pending

2496.9 Pending

Four laning of Amravati- Jalgaon Section of NH-6 from KM 166.725 to KM 441.950 in the state of Maharashtra to be executed on DBFOT pattern under NHDP Phase IV

Vijaydurg Port is being implemented through a concession agreement under BOOST signed in 2008 valid for 50 yrs with MMB. The DPR has been submitted to the MMB during Sept 2011. The draft terms of reference for conducting the EIA has been submitted to MOEF during March 2011. The total capacity of the port is 75 MTPA. The project will help the development in the Konkan belt benefitting the states of Maharashtra, Karnataka, Goa and triggering growth in rest of the western region.

Bhupdevpur-Korichapar-Dharamjaigarh (180 Kms) This is a critical evacuation line for enhancing production from the various projects of Mand-Raigarh Coalfields of SECL, Chhatisgarh.

Phase-I of the Port with 2 berths of 550 m long quay, storage space, unloading equipments, conveyors and stacking equipments are commissioned in August 2009 and in operation. Phase-II DPR is ready for implementation. Port Connectivity by 4-lane road to Mumbai-Goa Highway (NH-17) and rail connectivity to Konkan Rail is pending for want to approval.

The Kameng Hydro Electric Project is a 600 MW run of the river scheme, situated in the West Kameng district of Arunachal Pradesh.

Page 65: Env Clearance List

2400 Pending

2400 Pending

2400 Pending

2394 Pending

2388 Pending

International Paper, USA a FDI company entered the Indian market by acquiring The Andhra Pradesh Paper Mills Limited, in short APPM, in the year 2011. The acquisition process was done through the due process of obtaining RBI approval being under the Automatic Approval process under the FDI guidelines. APPM is a public listed company. After acquisition, the Board of APPM resolved to change the name of the two units in terms of their geographical locations, which is Andhra Pradesh Paper Mills Limited Rajahmundry and The Andhra Pradesh Paper Mills Kadiyam. Both these Units had a running 5 year Coal Supply Agreement with Mahanadi Coalfields Limited since 2008. As the coal supply agreement was valid till June,2013 and July, 2013 respectively for the two units, an application was made to the Ministry of Coal in May, 2012 to effect those name change. Inability of the Coal Ministry to approve the name change has led to the situation where both the Units may have to be closed down due to non-supplies of coal to its captive power plants. The agreements lapsed already and renewal could not happen as the Ministry of Coal has been unable to issue a letter to Mahanadi Coalfields Limited so far. The Units jointly employs 2500 direct employees and an equal number of indirect labour, all of whom would be rendered jobless. International Paper has further plans to invest US$ 800 Million in greenfield projects which has been put on hold on account of the lack of certainty of government approvals.

Sterlite Industries plans to expand its copper smelting and refining capacity by 4 lakhs tonnes per annum with allied infrastructure. The facility will also have 2.5 lakh tonne per annum of Phosphoric Acid plant. The project will be set up in Tuticorin, Tamil Nadu. Sterlite is currently operating a 400,000 tonnes per annum Copper Smelter at Tuticorin and with this expansion, the total capacity would be 8 lakh tonnes per annum making it one of the largest single location copper smelter in the world. Land of approximately 320 acres has already been allotted by SIPCOT under 99 year lease. The project would be set up as a Special Economic Zone and the SEZ has already been notified CAPACITY-TONNES PER DAY Existing Post Expansion Copper 1200 2400 Phosphoric Acid 800 1600 Copper Rod 410 1210

6.0MTPA cement plant. 3MTPA in first phase with lime stone mining and Captive Power plant of 80MW. The company is located at village Tigul, B. Sardagi, Balawad & Kiranagi Dist Gulbarga, Karnataka. MOU signed on 8th jun 2012

Neopara-Barasat via Bimanbonder metro project in Kolkatta is being executed by Metro Railway, Kolkatta. Alignment from Jessore Road xing to New Barrackpur is passing within premises of Airport Authority of India. Although alignment was approved in principle, permission for construction is awaited.

4- laning of Beawar –Pali- Pindwara stretch on NH-14 – 244 km long

Page 66: Env Clearance List

2378.86 Pending

2345 Pending

2345 Pending

2340 Pending

2179.39 Pending

2001 Pending

2000 Pending

Revamping and optimazation of 21 Surface Installation to 9 integrated Complex and replacement of existing pipelines and laying of new 467.80 Km of pipelines. Project Progress - 79.24%. ROU is required in forest land to complete the laying of piepline.

Construction of Shivpur-Tori-Kathutia new line which is critical for evacuation of coal during XII plan.

This Rail Line (92.10 Km) was approved in August 2000 and Railways were entrusted for the complete work (from land acquisition, forestry clearance etc. up to commissioning)

Six lane under NHDP Phase-V being constructed by KMC Constructions Ltd.

This is the Phase-I of integrated steel Project.In Phase-I 0.4 MTPA DRI Plant and 30 MW Power Plant with an investment of Rs.595 Cr is already commissioned. The associated coal mining project with an investment of Rs.885 Cr & the 0.4 MTPA Expansion (Phase-II) with an investment of Rs.700 Cr are under implementation.The total cost of the Phase-I+Phase-II+ Mines is Rs.2179.39 Cr. The 0.4 MTPA DRI Plant is currently under shut down due to delay in Working Capital disbursement.The financial closure of DRI & Power Project was achieved on 31-03-2010.

The Heo Hydro Electric Project is a 240 MW ROR Project, and the middle Project of a cascade of 3 HEPs totalling 571 MW developed on the Yarjep River, in the West Siang district of Arunachal Pradesh. The Heo HEP and the two other HEPs (namely Pauk HEP and Tato-1 HEP) are developed as 100% Foreign Direct Investment projects by Velcan Energy Group, a French group listed on Nyse Euronext Paris.

Hindustan Zinc Limited is one of the world’s largest integrated producers of zinc and lead, based in Rajasthan, India. The company has a very strong track record of exploration, growth and sustained performance and is one of the major contributors to the exchequer in terms of royalty and taxes. HZL have plan to set up a DAP fertilizer complex of 0.5 million tons per annum at a capital investment of almost Rs 2,000 Crores. HZL’s captive generation of Sulphuric acid from its smelters is sufficient enough to support the DAP fertilizer complex. HZL also has a small low grade rock phosphate mine with a mining capacity of around two lakh tons per annum. But in order to invest in large DAP fertilizer complex, the company needs to secure sustained supply of better grade rock phosphate. Company has applied for 4 reconnaissance permit in Jaisalmer & Maton to undertake the exploration and mining activity to support this project.

Page 67: Env Clearance List

2000 Pending

2000 Pending

1985 Pending

1968 Pending

1943.66 Pending

1875.5 Pending

1867 Pending

1856.36 Pending

L&T in jv with TIDCO has developed Kattupalli Minor Port near Chennai in Tiruvallur district in Tamil Nadu with an investment of Rs. 2000 Crores. The Port has a Container Terminal of 1.2 million TEU annual capacity which has become operational since Jan 2013. The Port has not been able to attract shipping lines for scheduling vessel calls at Kattupalli Port because of the Customs related issues and the traffic through the port is insignificant. The Port infrastructure is idling despite providing to EXIM community a good and viable alternative to the conjested Chennai Port

Bhopal-Dhule Transmission (BDTCL) project involves establishment of four 765 kV Single Circuit and two 400 kV Double Circuit transmission lines that would strengthen the transmission system in the Indian states of Madhya Pradesh, Maharashtra and Gujarat.

Six Laning of Pune Satara section of NH 4 from km 725.00 to km 865.35 (length - 140.35 km) in the State of Maharashtra to be executed as BOT (TOLL) on DBFO pattern under NHDP Phase V

4 laning of 209 kms stretch on NH-6 from Jalgaon to Maharashtra/Gujarat border

Dipka OC - SECL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Project-I: (i)Laying of a 16” dia, 37 km long Gas Pipeline, from Baghjan to the CGGS near Duliajan (70 % progress till date) (ii)8” dia 45 KM long Crude Oil Pipeline from Baghjan to Secondary Tank Farm (STF) ( 70 % progress till date) (iii)4” dia 23 KM long Crude Oil Pipeline from Baghjan to Makum OCS. (iv)Construction of Oil Collecting Stations (OCSs) at Baghjan & Barekuri. (v)Makum Bowser Unloading Station (BUS) and (vi)Secondary Tank Farm (STF), Naoholia, near Duliajan etc Project-II: (i) Tengakhat – Naharkatia – Jorajan area: Laying of 20.8 Km Gas Pipeline from Chabua FGS to CGGS (in place), 5 nos. Field Gathering Stations (FGS), 2 nos. Gas Compressor Station (GCS) and 1 No. Central Gas Gathering Station (CGGS) near Duliajan (87.05% completed), adjacent to BPCL installation. (ii)Tinsukia – Dhola area : 4 nos. FGSs and 5 nos. GCSs (iii)Dumduma-Pengeri area: 1 no. FGS. (iv)Total of 32 nos. feeder gas lines.

Tato-1 Hydro Electric Project is a 186 MW Run-Off the River Project developed on the Yarjep River, in the West Siang District of Arunachal Pradesh. The Project is developed since 2007 as a 100% Foreign Direct Investment by Velcan Energy Group, a French group listed on Nyse Euronext Paris.

Project approved on 30.09.2011 by CCEA For expansion of 2 Mta opencast to 5 Mta underground.

Page 68: Env Clearance List

1800 Pending

1800 Pending

1793 Pending

1768 Pending

Approved on 2.1.2009, the multi product SEZ is operational. 1704 Pending

1677.85 Pending

Six laning under NHDP Phase-V 1673.7 Pending

1656 Pending

The development of a greenfield container port in Maharashtra. Chaucer Capital from London have been trying to close this project for over 5 years. This project will bring in significant FDI and will be a catalyst for the industrialisation of the region. Chaucer Capital are expecting to create 3,000 jobs during the construction and around 1,000 jobs during the operation phase of the port. Chaucer Capital are requesting the support of the Government of India to have the LOI granted so that the development can proceed.

Bangalore-Satyamangla new line project was sanctioned in 1996-97 but for want of forestry clearance could not take off. On request of Govt. of Karnataka and on their consent to provide land free of cost and share 50% of construction cost, execution in Bangalore-Chamrajnagar section clear of forest areas have been taken up.

Overall Physical Progress achieved is 72.1 percent. All major materials received at site. Pipeline laying is in progress. Compliance of conditions imposed in 1st stage Forest Clearance in progress for obtaining 2nd stage Forest Clearance. Delay in 2nd stage Forest clearance in Odisha and Jharkhand.

1.Installed capacity - 1 x 270 MW. 2.Coal Requirement - 1.3 MMT per year per Unit. 3.Water Requirement - 7.8 MM3 per Year per Unit. 4.Energy available for sale with 85 percent Plant Load Factor- 1829 MU per Year for Phase-I. 5.Date of Commissioning - Phase-1- 18.07.2013-COD. 6.Land Requirement - 141 Hectors 7.Project Implementation-Phase-1-1x270 MW. 8.PROJECT EXECUTION - PHASE-1 - commissioned 9. PROJECT LOCATION - 51 kms from Nagpur on Nagpur - Chandrapur state Highway NH-7. 10. Nearest village-Bela, Tahsil-Umred, District-Nagpur, Maharashtra State. 11. Nearest Railway station- Borkhedi on Nagpur - Mumbai Central Railway at a distance of 11 kms from Project site. 12. Nearest Airport – Nagpur. 13). Nearest Seaport – Mumbai and Vizag. 14. MAIN PLANT i.e boiler turbine generator and esp is supplied, erected and commissioned by bhel. 15. Balance of plant comprising of CHP, AHP, treatme

The AMNEPL Power Plant with four units of 61.50 MW each has been developed under PPP Model with Maharashtra Airport Development Company Limited (a Government of Maharashtra Undertaking) as 26% Partner. The Plant has been commissioned in August 2011. Presently the Power Plant is incurring losses as is operating on costly market coal.

New Moynagudi-Jogigopa (260Km) new line project provides an important alternate route to critical route of New jalpaigudi-Alipurdwar-New Bogaigaon route which is lifeline of N.E.Region. Project is in advance stage and 196km portion has been completed.

Page 69: Env Clearance List

1655 Pending

1655 Pending

1644 Pending

1638 Pending

1600 Pending

1584 Pending

1563 Pending

Elevated four lane link road from Chennai Port and NH4 at Maduravoyal

Chennai Elevated Tollway Ltd. Four laning under NHDP Phase-VII

The company is setting up 1X 300 MW power project, primarily to meet the power requirement of its Ferro Alloy plant. The power plant is being set up in SEZ developed by APIIC at Achutapuram in Vizag district. The project has achieved financial closure in Dec 2012

2X150 MW COAL FIRED POWER STATION AT BHADRESHWAR VILLAGE, KUTCH DISTRICT, GUJARAT. 100 per cent FDI PROJECT, PROMOTED BY OPG POWER VENTURES PLC., UK, A PUBLIC COMPANY LISTED ON LONDON STOCK EXCHANGE. PROJECT BEING SET UP UNDER GROUP CAPTIVE SCHEME OF MINISTRY OF POWER, GOVT. OF INDIA, THUS CONTRIBUTING TO INDIAs INDUSTRIAL AND ECONOMIC GROWTH. HIGHLY ENVIRONMENT FRIENDLY PROJECT, BASED ON AIR COOLED TECHNOLOGY, THUS USING 98 per cent LESSER WATER THAN CONVETIONAL WATER COOLED PROJECT. ENVIRONMENTAL CLEARANCE RECEIVED. BOILER, TURBINE SUPPLY AND ERECTION BY BHEL - BHARAT HEAVY ELECTRICALS LTD CONSTRUCTION IN FULL-SWING - 85 per cent OF CIVIL WORKS AND FOUNDATIONS COMPLETED, 60 per cent OF CHIMNEY AND BOILER RELATED CONSTRUCTION COMPLETED.

Hubli-Ankola new line project connects heartland of Karnataka to Konkan railway on West Coast and provide port connectiviy from Western Ports to mineral rich areas. Secondly are is having very scant rail network density and is required for development of area.

The project envisages debottlenecking of the existing Salaya Mathura Pipeline system, which would eventually lead to capacity enhancement from 21 to 25 MMTPA. This would facilitate meeting the projected enhanced crude oil requirement of Mathura, Panipat and Koyali refineries of IOCL. Project consists of laying of additional 115 kms of 28 inch diameter loop line along Salaya-Viramgam section. Another 606 km loop line of 28 inch diameter is to be laid �along Viramgam-Chaksu section and 46 kms of 24 inch diameter loop line in Chaksu- Mathura Section. Other major facilities include provision of new pumping units at Viramgam, Aburoad and Rajola and appropriate replacement of equipment at other locations. Project completion duration is 30 months after receipt of statutory clearances. (Other clearances received except Forest clearance in Rajasthan and Wildlife clearance in Gujarat). Overall Progress achieved 47.1%. Engineering, Procurement and construction activities in

0.35 MTPA Cold Rolled Closed Annealed Steel (CRCA) and Cold Rolled Non Grain Oriented Steel (CRNO) Integrated Steel Plant Financial Cosure is pending as the company is yet to complete the terms and conditions of action, post which syndication will be initiated.

Page 70: Env Clearance List

1553 Pending

1534 Pending

1507 Pending

1500 Pending

1500 Pending

1500 Pending

1500 Pending

Ministry of coal allocated the Kerandari coal block to NTPC on 25.01.2006, it has Geological reserves of 285 MT, Production Target - Aug.2015 Annual rated capacity - 6 MTPA, Project Status as on 25.07.13 • Geological Report available. Mining Plan approved by MOC. • Environment Clearance accorded by MOEF. • Stage-I forest clearance accorded by MOEF. Stage-II proposal is under process at RCCF, Hazaribagh. • MDO – Under tendering. • All notifications for mining area land acquisition completed. RAP approved by NTPC Board. Payment for 106 acres of land compensation disbursed to Project Affected families, till date. • Govt. of Jharkhand transferred 106 acres of Govt. land to NTPC. • Total expenditure of approx Rs 119 Cr incurred so far.

Manufacture of Steel Billets with 360,000 MTPA and captive power plant of 220MW.

Rampia and Dipside of Rampia Coal Block was allotted jointly to six Companies vide Ministry of Coal letter no 38011/1/2007-CA-I dated 17th January,2008 for providing onshore fuel to their Power Plants. 1) M/s Sterlite Energy Ltd 2) M/s GMR Energy Ltd 3) M/s Arcellor Mittal India Ltd 4) M/s Lanco Group Ltd 5) M/s Nabbharat Power Pvt Ltd 6) M/s Reliance Energy Ltd In terms of compliance of the said letter of MOC, a Joint Venture Company Ms Rampia Coal Mine and Energy Pvt. Limited (RCMEPL) was incorporated on 19th Feb 2008. RCMEPL submitted application for grant of Prospecting License (PL) to Govt of Odisha within the stipulated time of 3 months. Ministry of Coal, Government of India conveyed its prior approval for grant of Prospecting License (PL) in favour of the allottees to Govt. of Odisha vide letter No 13116/29/2009-CA-1 dated 13th Aug 2009. However the production of coal from the Block could not commence due to delay in grant of Prospective License from State.

GreenField Cement Manufacturing Plant-Dalmia Cement Bharat Ltd, Project Cost Rs 1500, for establishing Green Field Cement Manufacturing plant of 4MTPA Capacity in Dist. Gulbarga, Karnataka with captive limestone mine.

GreenField Cement Manufacturing Plant- Dalmia Cement Bharat Ltd for establishing Green Field Cement Manufacturing Plant of 4 MTPA Capacity in Satna, District of Madhya Pradesh with captive mines.

GreenField Cement Manufacturing Plant- Dalmia Cement Bharat Ltd for establishing Green Field Cement Manufacturing plant of 4 MTPA Capacity in Chittorgarh, District of Rajasthan with Captive Mine.

Jabalpur Transmission Company Limited (JTCL) involves 765 kv D/c Transmission line which forms part of system strengthening common for Western &Northern region and is designed to transfer more than 6000 MW from Chhattisgarh & Orissa power plants.

Page 71: Env Clearance List

1500 Pending

1450 Pending

1432 Pending

1432 Pending

Gayatri Projects Ltd. under NHDP Phase-III 1410 Pending

1366 Pending

Integrated Green Field Cement Plant of 3.0 MTPA Capacity along with CPP of 36MW at N V Gothra Tehsil, Nawalgarh Dist JhunJhun, Rajasthan

A Unit of Shree Cement Limited. Kondla project for 3.0MTPA Cement Plant with lime stone mining & Internal Power plant 150MW. LOcated at Village Kodla Benkanhalli, SEdam Dt. Gulbarga, Karnataka. MOU signed on 4th June 2010

Rail Connectivity - The Port enjoys Road connectivity to NH-17 Mumbai-Goa via five state highways. Dighi Port is not connected by Rail at present and has proposed rail linkage from Indapur Station on Konkan Railways to Dighi Port. Due to recent economic and infrastructure developments in the western part of India, especially Gujarat and Maharashtra, there has been remarkable growth, which has consequently let to an increase in freight traffic and has established the need for additional freight corridors and with the construction of Dighi Port, Maharashtra’s first Greenfield Port, being developed as a multipurpose all-weather port this demand has only further accentuated. Existing lines in the project region include the Roha – Thokar line that falls under Konkan Railways. The project stretch will start from the North Bank of Dighi Port, in Agardanda, and will connect with Konkan railways at Indapur and Mangaon, through a ‘Y-section’. The entire project stretch is located in the Raigad d

Road Connectivity - Dighi is located in Raigad district in the state of Maharashtra on the west coast of India on Dighi Bay of Raipuri Creek. The creek forms the harbor basin and the port facilities are being developed at Dighi i.e southern bank and Agardanda i.e northan bank. Nearest railway station is Mangaon on Konkan railway line which is around 55 km from the port. A detailed study has been conducted to identify the most appropriate way for development of road connectivity to Northern and Southern Banks of Dighi Port from NH- 17. The analysis of traffic data and forecasting has been done considering port and SEZ / DMIC cluster developments. The widening / improvement of both link roads have been proposed based on traffic projections and capacity analysis. The two road links to be developed are 1. Augmenting to Two Lane with Paved Shoulders of existing SH-96 & SH-92 link from Indapur to Agardanda for North Bank -Agardanda connectivity and 2. Augmenting to Two Lane with Paved Shou

Four laning under NHDP Phase-IV being executed by North Malabar Expressway Pvt Ltd.

Page 72: Env Clearance List

1314 Pending

1312 Pending

1290 Pending

1285 Pending

1272 Pending

1269 Pending

1263 Pending

1220.32 Pending

Ministry of coal allocated the Chatti-Bariatu coal block to NTPC on 25.01.2006, it has Geological reserves of 194 MT, Production Target - Feb.2015 Annual rated capacity - 7 MTPA, Project Status as on 25.07.13 • Geological Report available. Mining Plan approved by MOC. • Environment clearance accorded by MOEF. • Stage-I & II forest clearances accorded by MOEF. • MDO appointed. • All notifications for mining area land acquisition completed. RAP approved by NTPC Board. Payment for 190 acres of land compensation disbursed to project affected families till date. • Govt. of Jharkhand has approved transfer of 66 acres of Govt. land. • Total expenditure of approx Rs 95 Cr. incurred so far.

Four laning under NHDP Phase-III being executed by South Malabar Expressway Pvt Ltd.

Hassan-Bangalore(166Km) new line project has been taken up to provide alternate and short route for providing connectivity of Bangalore with West Coast of Mangalore.

Lenzing Modi Fibers India Private Ltd. LMI is introducing in India, State of the Art Technology, to manufacture Viscose Fibres. Viscose Fibers is presently being imported by Textile Industries. Viscose Fiber is more absorbent than Cotton. The demand for Viscose is projected at 1 million TPA by 2020, where as production is only 3, 30,000 TPA. Renowned Modi group has signed collaboration, technical, financial and management agreements with Lenzing AG Austria in September 2008. Lenzing is world largest producer of viscose fibers, having plants in Austria, UK,USA, Indonesia and China. The LMI project is on the anvil since 2008. LMI acquired MIDC 90 acres land at Adl. Patalganga, Taluka Panvel, District Raigad, Declared as Industrial and Chemical Zone to manufacture 80,000 TPA viscose fiber plant. Government of Maharashtra has declared the Project as Mega. Maharashtra Pollution Control Board has granted Consent to Establish on October 1, 2005 & revised approval dated July 24,2012

4 laning of NH-9 stretch of 145 kms from Sangareddy to Maharashtra/ Karnataka border

The Sector specific SEZ for Textiles at Uthukuli Village, Perundurai Taluk Erode District, Tamil Nadu was approved on 31st May, 2006 and notified on 9th June, 2008. The project has been granted extension beyond 6th year upto 30th May, 2014 on 12th June, 2013.

2x270MW Ph-I project commissioned. Tapering linkage available. In FSA list approved by CCEA. Forest clearance for the linked Ganeshpur coal block pending with MoEF.

Abhijeet Roads Limited Abhijeet Angul Sambalpur Toll Road Ltd.

Page 73: Env Clearance List

1210.64 Pending

1200 Pending

1186 Pending

Four laning under NHDP Phase-II 1170.52 Pending

1169 Pending

1157.16 Pending

1142 Pending

1128.37 Pending

1123.69 Pending

1105.23 Pending

The 18 inch dia x 441 km long cross country white oil multi-product pipeline of with design capacity of 7.98 MMTPA from Rewari to Kanpur will pass through the states of Haryana, Rajasthan and Uttar Pradesh. The Pipeline is proposed to be laid to transfer BS III MS, BS IV MS, BS III HSD, BS IV HSD and SKO from the existing Tap off location at Rewari of Mundra Delhi Pipeline in Haryana up to Kanpur in Uttar Pradesh. This pipeline will be connected to HPCL’s existing installations at Bharatpur, Mathura and new proposed marketing installation at Kanpur.

To Establish Green Field Cement Manufacturing plant of 4MTPA Capacity with 45 MW CPP in Belguam District of Karnataka.

Haridaspur - Paradip Rail Link-Rail Connectivity Project for Paradip Port

Four-laning of Baharampore - Farakka section of NH34 from Km 191.416 to Km 294.684 in the State of West Bengal under NHDP Phase-III on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis. Package No- NHDP-III/BOT/WB/03

Under NHDP Phase-III being constructed by M/s Transstry-OJSC Consortium

Agartala-Sabroom project provides connectivity to remote areas of Tripura. Project has been declared as National Project and is being monitored at highest level.

The Pare H.E. Project formerly known as Dikrong H.E. Project is situated in the Papum Pare District of Arunachal Pradesh. The Project site is about 15 Km from Doimukh and 5 Km down stream of Hoz Power- House. NEEPCO has taken up this Project to harness the Hydropower potential of the river Dikrong which is a tributary of river Brahmaputra and also utilize the tail race discharge of the Ranganadi H.E. Project stage-I. The project is planed as run of the river scheme. The project envisages construction of a 78m High concrete gravity Dam and 2.81Km long Head Race Tunnel having 7.50m diameter on the right bank of the river Dikrong. The installed capacity of the Project is 110 MW and the catchment area of the Project is 824 Sq. Km with maximum available head will be about 67.36m. CEA has accorded TEC to the project on 24.09.2007, as per which the project will generate annual 506.42 MU of power. The CCEA clearnace of the project was accorded on 4th Dec’2008 at an approved estimated cost of Rs.573.99 crs.IDC and finance Charges of Rs.68.06Crores at June,2007 Price Level.The project is scheduled to be commissioned in 44 months,i.e. by August 2012.

Ashoka Buildcon Ashoka Cuttack Angul Tollway Ltd. MOEF Clearance already obtained.

Construction of 235 km new B.G. line from Dallirajhra to Jagdalpur being partly funded by SAIL & NMDC

Page 74: Env Clearance List

1100 Pending

1078.84 Pending

1078.54 Pending

1078 Pending

1072 Pending

1070 Pending

1061 Pending

Sonepur Bazari OC 1055.05 Pending

1055 Pending

1050 Pending

1038 Pending

Under NHDP Phase-III 1033.66 Pending

1008 Pending

Sterlite Industries plans to set up 160 MW coal based thermal power plant with allied insfrastructure like railway siding and Set up a desalination plant of capacity of 20 million litres per day (20 MLD)

Hindustan Construction Company Ltd. four laning under NHDP Phase-IV

Four-laning of Farakka - Raiganj section of NH34 from Km 295.000 to Km 398.000 in the State of West Bengal under NHDP Phase-III on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis. Package No - NHDP-III/BOT/WB/04

SMC Power Generation Ltd is an Integrated Steel Plant commissioned in the State of Odisha after signing the MOU to set up a Steel Plant of 0.40 MTPA and 83 MW of Power Plant with the State Govt.

Mahanadi coalfields Limited Rly. Line Jharsuguda to Bansudhara (52.4 Km double line)

The Pauk Hydro Electric Project is a 145 MW ROR Project with active storage, and the most upstream Project of a cascade of 3 HEPs totalling 571 MW developed on the Yarjep River, in the West Siang district of Arunachal Pradesh. The Pauk HEP and the two other HEPs (namely Heo HEP and Tato-1 HEP) are developed as 100% Foreign Direct Investment projects by Velcan Energy Group, a French group listed on Nyse Euronext Paris.

Design,Engineering, Finance, Construction, Operation & Maintenance of Salem Ulundurpet section from Km 0.313 to km 136.67 of NH -68 in the state of Tamil Nadu under NHDP Ph - IIIA on BOT Basis

Four lane under NHDP Phae-IV being constructed by Essel Infraprojects Ltd. Banker - Yes Bank

AIL is installing 0.4 MTPA DRI Plant and 60 MW Power plant in Dist. Saraikela - Kharsawan,Jharkhand. The project has achieved financial closure in April 2011. Initial Project cost was Rs 846.33 Cr which was funded by a consortium of nine banks. Due to cost over run and delay in project execution the revised project cost is estimated to be Rs. 1050 Cr. The main reason of delay has been due to slow disbursement by lenders.

Gauge Conversion of 285Km jabalpur-Gondia incl. balaghat-Katangi NG section to BG, developing an alternate route to saturated sections.

The four laning of Sambalpur – Baragarh - Orissa/Chhattisgarh border section of N.H.-6 from Km.0/000 to Km.88/000 in state of Orissa to be executed as BOT (TOLL) on DBFOT pattern under NHDP Phase – III. All the major and minor bridges and culverts are proposed to be widened to four lane widths including 7.30 Km. Baypass of Baragarh town. The project involves new four laning construction of 6 major bridges, 13 minor bridges, 113 culverts, 4 pedestrian / cattle underpass, 4 vehicular underpass and 3 ROB’s.

Page 75: Env Clearance List

1001 Pending

1000 Pending

1000 Pending

1000 Pending

1000 Pending

1000 Pending

914 Pending

(1)Length of four lane Highway-104.77 km,(2)Major Bridges-14 nos,(3) Minor Bridges-34 nos (4)ROB-1 nos (5)Fly over-5 nos (6) VUP-4 nos (7) CUP-4 nos (8)PUP-1 nos (9) Culverts-173 nos (10) Service Road-46.972 km & (11) Toll plaza-2 nos

Design, Engineering, Finance, Construction, Operation and Maintenance of Trichy - Karur section from Km 135.800 to Km 218.028 (Excluding Lalapet ROB) of NH - 67 in the state of Tamil Nadu under NHDP Phase IIIA on Build, Operate and Transfer (BOT) basis

Dell International Services India Private Limited has been granted approval as a Co-Developer for providing infrastructure facilities in the IT/ITES Special Economic Zone of M/s. Coimbatore Hitech Infrastructures Private Limited at Keeranatham Village, Coimbatore North Taluk, Coimbatore, vide your letter No.F.2/110/2005-EPZ dated 12th October, 2007. The construction of Phase I has been completed and most of the permissions have been received. We have also issued appointment letters to many students, however, the joining dates have been moved as we have not received the Consent To Operate (CTO) from the Tamil Nadu Pollution Control Board (TNPCB). All inspections have been completed and the file is ready to be approved. As a result, this has caused considerable delay in our business activities and has consequently affected Dell’s planned business expansion in India and impacted our Global plans. Therefore, we kindly request your urgent intervention to sort this issue with the Sta

The company is setting up 1.2 MTPA Beneficiation and Pelletisation plant at Saraikela-kharsawan, Jharkhand. The project is in progress and financial closure has already been achieved and construction of the Plant has been started. The project cost is Rs 987 cr and has been funded by a consortium of 7 banks.

Construction of haridaspur-Paradeep new line on SPV mode to provide alternate connectivity to Paradeep port.

East North Interconnection (ENICL) Transmission Project involves establishment of two 400kV Double Circuit transmission lines (with a total line length of 450 kms) passing through the Indian states of Assam, West Bengal and Bihar. Its a System Strengthening project which will facilitate bulk transfer from north Eastern States to northern Grid.This project has 18 identified beneficiaries (mainly SEBs in the states of Rajasthan, Punjab, Haryana, Uttaranchal and the city of Delhi), who would be directly benefitted by this project

4 lane NH Connectivity to ICTT, Vallarpadam- Road Connectivity Project for Cochin Port.

Page 76: Env Clearance List

913 Pending

898 Pending

810.78 Pending

778.15 Pending

Four laning under NHDP Phase-IV 778.15 Pending

701 Pending

700 Pending

Hingula OCP (15 MTY) of Mahanadi Coalfields Limited. 653.55 Pending

638.5 Pending

600 Pending

Project involves laying of 710 km long, 12 inch/10 inch dia LPG pipeline from Paradip to Durgapur via Haldia along with the associated facilities for transportation of LPG from Paradip and Haldia to the Bottling Plants at Balasore, Budge-Budge, Kalyani and Durgapur. Overall progress of 29.52 percent has been achieved. All statutory clearances are available except NOC for Forest Clearance for Odisha. Scheduled completion is 30 months after receipt of statutory clearances. Project is delayed due to delay in receipt of NOC for Forest Clearance in Odisha. The project is anticipated for completion by December 2014 subject to the availability of NOC for Forest Clearance in Odisha by September 2013.

Resitement of existing marketing terminal to new location for better safety norm and also to make way for enhancement of refinery capacity. All terminals commissioned by July 2012 except railway siding works at new LPG terminal and new white oil terminal which is expected to be commissioned by Sept. 2013. Assistance from AP Fire Department is sought for approval of occupancy.

Construction of 154 km new railway line primarily for evacuation of minerals and alternate route for ports in Orissa.

Work has been awarded. Gammon Infrastructure Project Ltd. Birmitrapur Barkote Highway Pvt. Ltd.

Laying of 400 km Long cross country LPG Pipeline System from HPCL Mangalore to BPCL Solur with Spur Pipeline from Hassan to HPCL Mysore. The ultimate capacity of pipeline shall be 3.1 MMTPA. Project has achieved physical progress of 22.92 percent as on June 2013. PNGRB Authorisation obtained.Approval of High Level Clearance Committee of Government of Karnataka obtained. Environmental Clearance from MOEF, GOI and PCB, Karnataka obtained. Categorised as Infrastructure Project.Obtained Crossing approvals from Railways, NH, SH,Other Roads, Water Bodies including Rivers. Placed order for coated line pipes, valves, pumps and other items. Pending Issues 1. Approval from Forest Dept for diversion of forest land for laying pipeline. 2. Land acquisition for IP station at Neriya Dakshina Kannada Dist, Karnataka 3. Land acquisition for SV stations 16 Nos. along the route of the pipeline."

Jharsuguda- Barpalli-Sardega Railway Line (53 Kms) This is a critical evacuation line for enhancing production from the various projects of Ib valley coalfields of MCL, Odisha.

Construction of 98.7 Km long Angul-Sukhinda new railway line primarily for movement of mineral ore and export/import traffic.

Ennore Manali Expressway (EMRIP- Road Connectivity Project for Chennai and Ennore Ports.

Page 77: Env Clearance List

540.92 Pending

BINA OC - NORTHERN COALFIELDS LIMITED 535.96 Pending

Jharsuguda-Barpalli-Sardega Railway Line (53 Kms) 469 Pending

466.31 Pending

Kaniha OCP (10 Mty) 457.77 Pending

MNH Shakti Talabira OCP (20 Mty) 447.72 Pending

Ananta Extn. OCP (15 Mty) 446.64 Pending

434.25 Pending

Bharatpur OCP (20 Mty) 434.25 Pending

MJSJ Coal Gopalprasad (15 Mty) 395.87 Pending

394 Pending

336 Pending

321.5 Pending

309.81 Pending

287.17 Pending

Samaleswari OCP (12 Mty) 284.69 Pending

Uttrakhand Spurlines - 16 inch x 64 km, 8 inch x 90.5 km, 4 inch x 20 km Punjab Spurlines - 24 inch x 84 km , 4 inch x 20 km Original completion date - 20.06.2011 Revised completion date - 31.07.2012 Anticipated completion - Dec. 2014

Garjanbahal OCP (10.00 Mty) MAHANADI COALFIELDS LIMITED

Bharatpur OCP - MCL This is a coal mining project submitted for Stage-I Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

New Green field Oil Terminal is constructed at Ennore which is located on the outskirts of the Chennai City, relocating the existing Chennai terminal. At Ennore Port, jetty for handling liquid cargo and allied pipeline has been developed by Ennore Tank Terminal Pvt Ltd. The project is provided with tankage facility of 1,40,000 KL for storage and dispatch of pertroleum products. The terminal is designed to conform to the safety norms advocated by PESO and OISD. Pipeline and Terminal facilities completed on December 2012. Railway siding facilities completed on March 2013. The Terminal has been commissioned on 20 July 2013.

Deoband Roorkee new line project was sanctioned in 2007-08 on 50 50 cost sharing with govt. of Uttarakhand. Detailed estimate was sanctioned in Nov 2008 at Rs 160 crore. Subsequently, revised estimate costing Rs 336 crore was sanctioned primarily due to abnormal increase in land rates. Land rates have now been again revised and on request of railway to absorb increase in land rates, state govt has requested to cap share of state govt to Rs 160 crore.

Manikpur OC - SECL This is a coal mining project submitted for Stage-II Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

12 / 10 inch dia 165 km long LPG Pipeline from BPCL, Uran near Navi Mumbai to HPCL,IOCL,BPCL LPG Plants at Chakan and Shikrapur near Pune Pipeline Procured and Major procurement POs placed. Pipeline laying order ready for finalization.ROU acquisition and crossing approvals in final stages. Forest Approval from RCCF, Bhopal awaited. The proposals at DFO, Alibag & DFO, Pune are pending for the last 1.5 yrs.

Jhanjra UG - ECL This is a coal mining project submitted for Stage-I Forest clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Page 78: Env Clearance List

253.66 Pending

216.88 Pending

208 Pending

203 Pending

203 Pending

201 Pending

185.79 Pending

Belpahar OCP (8 Mty) 181.18 Pending

177 Pending

145 Pending

144 Pending

143.57 Pending

134.43 Pending

128.3 Pending

1.Upgradation of Konaban GGS from 0.50 to 1.50 MMSCMD capacity. 2. Laying of approx. 86 kms of Trunk Pipeline from Agartala Dome to OTPC via Nimbutali with metering facilities at OTPC,pipeline from Sonamura GGS to OTPC and pipeline from Konaban GGS to Nimbutali and laying of 64 Km of Feeder line from Kunjaban to ADB GGS and Sundalbari to Sonamura GGS. Project Progress-86.1 %. ROU is required including in forest land to complete the laying of pipeline.

1 No. Gas Turbine of 20 MW Capacity for Power Station at Duliajan, Assam for captive use in E&P related operations.

Kitcha-katima new line project was sanctioned in 2003-04 on commitment of state govt to provide land for the project free of cost. After repeated follw up land is not being provided and project is a non starter.

Orient(U/G) 4 THE COMBINED COST OF ORIENT (U/G) 1&2, 3, HRC AND ORIENT (U/G) 4 MAHANADI COALFIELDS LIMITED

Orient(U/G) 1&2,3 &HRC The cost includes the cost of Orient (U/G 4) MAHANADI COALFIELDS LIMITED

Doubling of 25.6 km Jharsugda Rengali section to enhance capacity of saturated section.

Ukni Deep OCP-WCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Dedicated freight link from Wadala to Kurla-Rail Connectivity Project for Mumbai Port

Four lane road connectivity to NH17-Road Connectivity Project for Mormugoa Port

To construct 3 ETPs To deal with future water cut and injection water quality requirement. Site survey for the Sobhasan is under progress. For balance two sites Land Acquisition is pending.

Urimari OC - CCL This is a coal mining project submitted for Stage-I Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Laying of 93 km long 10 inch Dia cross country pipeline system of 2.3 MMTPA ultimate capacity from Awa Pumping station of MDPL to Jodhpur Depot. Receipt facility along with 3 nos. x 3500 KL MS Tanks at Jodhpur Depot along with associated civil, mechanical, piping, electrical and instrumentation works at Jodhpur Depot. Actual progress achieved as on 30.06.2013 is 49.79 percent. Statutory approval have been obtained except for MoEF approval for additional storage tanks at Salawas Depot.Construction works under progress.

1. Construction of Sonamura GGS having 0.8 MMSCMD gas processing capacity & Gas metering station at Monarchak. 2.Laying of 10" diaX 10.5 Km gas trunk pipeline from Sonamura to Moarchak 3. Laying of 20" dia X 29.4 Km gas trunk pipeline from Agartala. Project Progress-38.6 %. ROU is required to complete the project.

Page 79: Env Clearance List

126 Pending

108 Pending

108 Pending

105.78 Pending

105.67 Pending

Nataraj(U/G) Mine (0.64 Mty) 92.11 Pending

Lajkura OCP (2.50 Mty) 82.25 Pending

The existing 30 inch crude oil pipe line from Chennai Port to Manali Refinery was laid during the inception of Refinery in 1969. Presently the Refinery capacity has been increased from 2.5 to 10.5 MMTPA. The transfer rate of crude oil is limited due to smaller size of pipe line, deteriorating internal surface and restricted operating pressure. This causes prolonged detention of crude tankers leading to high demurrages. Habitations have come nearer to the pipeline over a period of time and hence the pipeline passes through congested and thickly populated areas. Hence a new 42 inch crude oil pipe line is proposed to be laid under the service road of Ennore Manali Road Improvement Project. The replacement of the old pipeline with a new pipeline in a new, less habitated route is not only an operational necessity for CPCL but also has the most important advantage of enhancing the safety of Crude Oil transportation from chennai Port to Manali Refinery. Scheduled completion is 18 months fr

All statutory clearances are available. The entire Right of Way for laying of pipeline was progressively acquired by September 2012. Mainline laying work was also in progress. About 40 percent of the mailine has been laid. On 2.4.2013, Government of Tamil Nadu issued a letter to various district collectors advising them to ensure- 1. GAIL gives up the present project of laying Kochi-Kootanad-Bangalore-Mangalore Gas Pipeline Project through agriculture land and take steps for laying of pipeline alongside the National Highways. 2. GAIL should also close all the existing trenches excavated for laying of pipeline and handover the lands in its original conditions to the farmers & villagers. 3. To remove the pipes already laid so as to enable the farmers to continue their agricultural activities. This has impacted ongoing activities of CBR-Trichy Pipeline of IndianOil and may also affect projects in other states. A PIL has also been filed in Madras High Court Bench. Hearing is

"Overall Physical Progress achieved is 30 percent. Major construction activities could be taken up after Environment Clearance All major materials received at site. Pipeline laying is in progress. Compliance of conditions imposed in 1st stage Forest Clearance in progress for obtaining 2nd stage Forest Clearance. Delay in 2nd stage Forest clearance in Odisha and Jharkhand." Scheduled completion and Anticipated completion dates to be assessed after receipt of Statutory clearances.

HBI UG (Hirakhund Bundia) -MCL This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Rohini OC - CCL This is a coal mining project submitted for Stage-I Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Page 80: Env Clearance List

55.28 Pending

54.7 Pending

22.52 Pending

Kanika Siding Single Spur 20 Pending

19.86 Pending

19.86 Pending

19.84 Pending

19.14 Pending

17.98 Pending

17.79 Pending

16.29 Pending

0 Pending

Bhakra UG - WCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Dhanpuri UG - SECL This is a coal mining project submitted for Stage-I Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Govinda Meera and Kotma (UG mine/depillaring)- SECL This is a coal mining project submitted for Stage-I Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Kedla UG - CCL This is a coal mining project submitted for Stage-II Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Kedla OC - CCL This is a coal mining project submitted for Stage-II Forest Clearance This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Murlidih OCP - BCCL This is a coal mining project submitted for Stage-I Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Kotma, Govinda and Meera - SECL This is a coal mining project submitted for Stage-I Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Kapildhara UG - SECL This is a coal mining project submitted for Stage-II Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Chinda OC - WCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Saunda - D - CCL This is a coal mining project submitted for Stage-I Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

State Governments of Uttar Pradesh, Tamil Nadu, Gujarat and Delhi have not signed the State Support Agreement. For smooth implementation of the extensive programme for development of National Highways through PPP, the Ministry of Road Transport & Highways enters into a State Support Agreement with various state Governments for safeguarding the interest of Concessionaires for all future programmes of National Highways in respect of issues concerning the State Governments regarding Land Acquisition, Utility shifting, restriction on competing roads/additional toll ways, maintenance of Law & Order, removal of encroachments etc. with an objective to provide umbrella uniform terms and conditions also to build up the confidence of private investor into the Highway project.