Cabinet Committee on Investment
S.No Project Name377
54
303
326
55
68
71
73
320
66
272
78
82
262
91
89
115
62
74
90
92
101
110
116
Ministry-Department
North Karanpura TPP (3*660 MW) NTPC
Power
Sterlite Energy U-1,2,3,4 4X600 MW Power
Mumbai Airport New Terminal Civil Aviation
Talwandi Sabo Power Limited Power
Adani Mundra TPP Ph III, U-1,2,3 3X600 MW
Power
Talwandi Sabo U-1,2,3 3X660 MW Power
Sipat U-1,2,3, 3X660 MW Power
Bara TPS U-1,2,3 3X660 MW Power
4x360 MW Uchhpinda Power Project Power
Damodaran Sanjeeviah U-1,2, 2X800 MW
Power
Lanco Amarkantak Power Ltd Power
Vallur TPP U-1,2,3 3X500 MW Power
Indira gandhi Aravali/Jhajjar U-1,2,3, 3X500 MW
Power
Utkal Alumina International Ltd. ( A Subsidiary of Hindalco Industries Ltd.)
Mines
Nabha U-1,2, 2X700 MW Power
Painampuram U-1,2, 2X660 MW Power
Jhajjar Power Limited 2X660 MW Power
Raghunathpur TPS U-1,2 2X600 MW Power
Rajiv Gandhi TPS U-1,2 , 2X600 MW Power
North Chennai U-1,2, 2X600 MW Power
Anuppur U-1,2, 2X600 MW Power
Shree Singaji (Malwa) TPP U-1,2 2X600 MW
Power
Lanco Anpara U-1&2, 2X600 MW Power
Rosa TPP 4X300 MW Power
80
81
59
61
63
69
70
79
85
96
102
114
86
318
292
174
340
173
77
Vizag TPP U-1,2, 2X540 MW Power
Nasik TPP U-1,2,3,4 4X270 MW Power
Marwa U-1 and 2, 2X500 MW Power
Marwa TPS U-1,2 2X500 MW Chemicals and Fertilizers - Chemicals and Petrochemicals
Tuticorin U-1,2 2X500 MW Power
Rihand TPP U-5,6 2X500 MW Power
Vindhyachal U-11,12 2X500 MW Power
Durgapur Steel TPP U-1,2, 2X500 MW Power
Mauda U-1,2, 2X500 MW Power
Bhusawal U-4,5, 2X500 MW Power
Korba West TPP III U-5 & 7, 2X500 MW
Power
Harduaganj TPP U-8 & 9, 2X250 MW Power
Dadri U-5,6, 2X490 MW Power
Coal based Power Project at Tuticorin Coal
Lumding-Silchar(482Km) gauge Conversion
Railways
Korba West Power Company Limited Phase-1 1x600MW
Power
SKS Power Generation (Chhattisgarh) Ltd
Power
Jhabua Power Limited Phase-1 1x600 MW
Power
Ind Bharat TPP U-1,2 2X350 MW Power
145
341
342
83
94
100
105
379
347
348
103
57
58
64
65
72
84
87
88
95
97
104
106
Forest Clearance for Mining Renewal for 122.18 ha Forest Land-Project of Ambuja Cements at Darlaghat, Tehsil Arki, Dist. Solan, Himachal Pradesh
Commerce and Industry-DIPP
DB Power Limited Power
Haldia Energy Limited Power
Barh TPP, U-1 , 660 MW Power
EMCO Warora U-1, 2 , 2X300 MW Power
Derang TPP U-1, Jindal, 600 MW Power
Mettur Ext U-1, 600 MW Power
Raghunathpur TPP U-1 (600 MW) DVC Power
Jhabua Power Ltd Power
Korba West Power Co. Ltd Power
Wardha warora, U-1-4, 4X135 Power
Ukai TPP, Unit-6, 500 MW Power
Bellary TPS, U-2, 500 MW Power
Bhilai JV U-1,2 2X 250 MW Power
Bokaro TPP A Exp U-1 500 MW Power
Nabinagar TPP U-1,2 2X250 MW Power
Bongaigaon U-1,2, 2X250 MW Power
Kahalgaon U-7, 500 MW Power
Farakka U-6, 500 MW Power
Anpara D- Unit I & II, 500 MW Power
Khaper Kheda U-5, 500 MW Power
Satpura U -10, 11, 2X250 MW Power
Dr. N. Tata Rao TPP-IV, 500 MW Power
107
108
308
67
366
267
353
378
75
239
358
367
360
234
361
Kothagudam-Stage VI, 500 MW Power
Paricha Exts. U-5&6, 2X250 MW Power
Bhairabi-Sarang new railway line Railways
Muzaffarpur Ext. U-3, 4, 2X195 MW Power
Khadia OC Coal
Nagai Power Pvt. Ltd. Power
Maruti Clean Coal and Power Limited Power
BPCL Project - Installation of Integrated Crude and Vacuum distillation units
Petroleum and Natural Gas
Bela U-1, 270 MW Power
Loktak Downstream HEP Power
BSCPL Aurang Tollway Ltd. Road Transport and Highways
Moonidih XV Seam UG Coal
OCL Iron & Steel Ltd. -Integrated steel manufacturing expansion plant
Steel
Essel Ahmedabad Godhra Toll Roads Limited
Road Transport and Highways
Ashoka Cuttack Angul Tollway Pvt Ltd Road Transport and Highways
285
363
112
359
313
314
56
93
98
99
109
113
291
117
118
119
120
121
38
152
SHREE SIDHBALI ISPAT LTD. Steel
Vandana Ispat Limited Steel
Kota TPP U-7 1X195 MW Power
Supreme Panvel Indapur Tollways Private Limited
Road Transport and Highways
Development of Haldia Dock-II (South)
Shipping
Development of Haldia Dock-II (North)
Shipping
Parli U-8, 250 MW Power
Raichur U-8, , 250 MW Power
Paras Ext U-2, 250 MW Power
New Parli U-2, 250 MW Power
Budge Budge U-3, 1X250 MW Power
Suratgarh TPP, U-6 1X250 MW Power
Salka Road-Anupur Doubling Railways
Bajaj Energy P Ltd Utraula Power
Bajaj Energy Pvt Ltd, Kundarki Power
Bajaj Energy Pvt Ltd Power
Bajaj Energy P Ltd Power
Bajaj Energy Pvt Ltd Power
Penganga OC Coal
MANIKPUR OC Coal
111
25
257
22
23
12
204
21
35
271
9
32
36
11
37
Chabra TPP, U-1 & 2 , 2X250 MW Power
Basundhra (W) - OCP Coal
IOCL Project - New Marketing Terminal at Eastern Sector Refinery, Paradeep (Orissa)
Petroleum and Natural Gas
Dhuptala OC Coal
Jamunia UG Coal
HBI UG (Hirakhand Bundia) Coal
Providing rail connectivity to the existing Tuna Creek -Rail Connectivity Project for Kandla Port
Shipping
Jharkhand OC Coal
Tetariakhar OCP Coal
IOCL Project-POL Tap Off Point (ToP) at Jatni in Odisha
Petroleum and Natural Gas
Lajkura Coal
Inder UG to OC Coal
Ara-Sarubera GoM Coal
Samleshwari Expansion OC Coal
Ray-Bachara-UG Coal
10
143
153
172
190
193
290
385
195
369
Belpahar OCP Coal
Coal To liquids Project - Jindal Synfuels Limited
Petroleum and Natural Gas
Raigarh Expansion Project Steel
Tilaiya Ultra Mega Power Project Power
Essar Steel India Ltd - Hazira, Gujarat Steel
JSPL Patratu Steel Project Steel
JSW Steel Ltd Jharkahd Steel
IOCL Project - Paradip Refinery, Abhyachandrapur
Petroleum and Natural Gas
JSPL Angul Steel Project Steel
Jindal Steel & Power Steel
243
176
302
210
211
305
311
Exploration and production of Hydrocarbons in Rajasthan (RJ-ON-90/1 block)
Petroleum and Natural Gas
Sasan Ultra Mega Power Project (SUMPP)
Power
Etalin Hydro Electric Project (3097 MW)
Power
Essar Steel India Ltd - Odisha Complex
Steel
Essar Steel India Ltd - Odisha Complex
Steel
Expansion of Dolvi Steel Plant Capacity from 3 MTPA to 5 MTPA
Steel
Akaltara TPP of KSK Mahanadi Power Company Limited
Power
309
161
198
282
263
49
171
383
325
304
Expansion of JSW Vijaynagar Steel Plant capacity from 10 MTPA to 16 MTPA
Steel
MUMBAI SEZ LTD Commerce and Industry - Commerce
Indiabulls Multi Product SEZ Commerce and Industry - Commerce
2X600 MW Tamnar Power Plant Power
Aditya Aluminium Smelter of Hindalco Industries Ltd.
Mines
2640 MW Mundra TPP Ph I - 4 x 330 MW & II - 2 x 660 MW
Power
2000MW coal based Expansion Project at SUMPP site-Sasan Power Limited
Power
MRPL Project - Phase - III Refinery Project, Mangalore
Petroleum and Natural Gas
Lalitpur Power Generation Co Ltd Power
Subansiri Lower HE Project Power
288
264
177
159
317
Prayagraj Power Generation Company Limited
Power
Mahan Aluminium Project of Hindalco Industries Limited
Mines
Samalkot Power Limited Power
Essar Power Jharkhand Ltd Power
Electrosteel Steels Limited Steel
60
327
40
247
280
VISA Steel Limited, Chhattisgarh Steel
Jindal India Thermal Power Power
GSPC Project - Deendayal (West) Field Development Project
Petroleum and Natural Gas
Multi-product Special Economic Zone at Mundra, Adani Ports and Special Economic Zone Ltd.
Commerce and Industry - Commerce
Coal Mine and Thermal Power Plant Power
52
5
294
328
255
Integrated Stainless Steel Steel
R.K.M Powergen Pvt. Ltd. Power
SAGAR SUPER THERMAL POWER PROJECT
Power
GMR Chhattisgarh Energy Limited Power
GAIL Project - Jagdishpur - Haldia Pipeline
Petroleum and Natural Gas
199
45
230
329
6
149
248
330
1320 MW IPP of Jas Infrastructure & Power Limited, Banka
Power
Mallavaram-Bhilwara-Bhopal-Vijaipur pipeline
Petroleum and Natural Gas
1080 (8 x 135) MW, PITHEAD THERMAL POWER PROJECT
Power
Adani Power Rajasthan Ltd Power
Nyamjang Chhu HEP Power
Rajhamal Coal Bed Methane Petroleum and Natural Gas
VISA Power Limited Power
Lanco Babandh Power Limited Power
240
31
44
296
51
228
332
333
SKS POWER GENERATION CHHATTISGARH LIMITED
Power
Adani Power Maharashtra Ltd Power
(2x660 MW) Shree Singaji Thermal Power Project (Stage-II), District Khandwa
Power
Monnet Ispat and Energy Limited Steel
1.Mehsana-Bhatinda Pipeline 2. Bhatinda-Jammu-Srinagar Pipeline
Petroleum and Natural Gas
2X600 MW Stage II - Tamnar Power Plant
Power
Navi Mumbai SEZ (NMSEZ) Commerce and Industry - Commerce
Adani Power Maharashtra Ltd Power
284
155
334
122
335
156
144
2x600 MW Singhitarai Thermal Power Project
Power
VISA Steel Limited,Odisha Steel
Pipavav Energy Pvt Ltd Power
KVK Nilachal Power Pvt. Ltd. Power
Hinduja National Power Corporation Limited
Power
1050 MW Maithon Right Bank Thermal Power Project at Maithon
Power
Essar Power Gujarat Limited Power
281
188
96
336
189
124
Machhakata Coal Project Power
Meenakshi Energy Private Limited Power
LNG Terminal at Mundra Petroleum and Natural Gas
Coastal Energen Pvt. Ltd Power
Essar Steel India Ltd - Vizag Complex Steel
Monnet Power Company Limited 1050 MW IPP at Malibrahmani, Angul, Orissa
Power
287
123
154
157
295
301
337
338
261
202
Monnet Power Company Limited 1050 MW IPP at Malibrahmani, Angul, Orissa
Power
Bharati Shipyard LImited Shipping
Kakinada Regas Project (by Shell) Petroleum and Natural Gas
SHREE MAHESHWAR HYDEL POWER PROJECT
Power
Petronet LNG Project -Gangavaram LNG Terminal
Petroleum and Natural Gas
Attunli Hydro Electric Project (680 MW)
Power
NLC Tamil Nadu Power Ltd Power
Essar Power M.P Limited Power
Vedanta Aluminium Limited- Expansion of Alumina Refinery
Mines
540 MW Phase 1 IPP of Corporate Power Limited
Power
300
339
128
170
130
175
299
ANRAK ALUMINIUM LIMITED Mines
GMR Kamalanga Energy Limited Power
Jiribam-Imphal new line project Railways
Butibori Power Project Power
Byrnihat-Shillong new line project Railways
1x800MW Extn Uni-8 Wanakbori TPS Power
Monnet Ispat and Energy Limited Steel
160
371
147
148
150
158
Gupta Energy P Ltd Thermal Power project 660 MW
Power
Vishnugad Pipalkoti Hydro Electric project 444 MW
Power
Talchir Coal Bed Methane Petroleum and Natural Gas
Sohagpur Coal Bed Methane Petroleum and Natural Gas
Raniganj Coal Bed Methane Petroleum and Natural Gas
2x270 MW GVK Power (Goindwal Sahib) Limited
Power
273
321
131
185
343
344
345
UCM Coal Company Limited -Chendipada & Chendipada-II Coal Mine Project
Power
Mega Project, Pulp & Paper. Village Sarapaka, Khammam Distt. AP
Commerce and Industry-DIPP
Sivok-Rangpo new line project Railways
Six laning of Varanasi-Aurangabad section of NH2 from Km 786.000 to Km 978.000 in the state of Uttar Pradesh and Bihar on Design, Build, Finance, Operate and Transfer Toll basis under NHDP-V
Road Transport and Highways
TRIL Infopark Ltd Commerce and Industry - Commerce
GMR Rajahmundry Energy Limited Power
DB Power Ltd Power
245
319
4
7
Pakri-Barwadih Coal Block Power
TPS-II EXPANSION (2 X 250 MW) Coal
GAIL Project- KKBMPL Petroleum and Natural Gas
To augment the iron ore production capacity of Gua Iron Ore Mine of SAIL from 2.4 MT to 10 MT including installation of Beneficiation and Pellet Plant facilities at Gua, Jharkhand.
Steel
146
307
167
384
50
Ib Valley Coal Bed Methane Petroleum and Natural Gas
Bhanupalli-Bilaspur-Beri new railway line project
Railways
Koderma-Ranchi new line project Railways
Pipeline-Kochi-Koottanad-Bangalore-Mangalore Phase II
Petroleum and Natural Gas
Surana Power Limited (SPL) – 2 x 210 MW Coal Based Thermal Power Plant
Power
268
349
76
310
365
133
241
Cairn India Project - MDPL Project Phase-II (Salaya to Bhogat Pipeline Project)
Petroleum and Natural Gas
TRN Energy Pvt Ltd Power
Hazira, Near well no 7, Via Surat, District Hazira 394 270 capacity expansion of existing LNG Terminal 5 MMTPA to 10 MMTPA
Petroleum and Natural Gas
Jayaswal Neco Industries Limited Steel
Gevra OC Coal
Joka-BBD Bag new metro project Railways
Talaipalli Coal Block Power
136
42
53
192
236
246
380
47
L&T East West Tollway Ltd Road Transport and Highways
Vijaydurg Ports Pvt Ltd Shipping
Chandrapura U-7,8 2X250 MW Power
Bhupdevpur-Korichapar-Dharamjaigarh
Coal
2*300 MW Thermal Power Plant –BHARAT ALUMINUM COMPANY LIMITED
Power
JSW Jaigarh Port Ltd. Shipping
Mejia TPP (Unit 8) DVC Power
Kameng Hydro Electric Project Power
141
260
322
132
139
Andhra Pradesh Paper Mills Limited Commerce and Industry-DIPP
Establishment of 400,000 tpa copper Smelter and 250,000 MT pa Phosphoric Acid Plant
Mines
Shree Cement Ltd, Farhatabad Project, Distt. Gulbarga, Karnataka
Commerce and Industry-DIPP
Neopara-Barasat via Bimanbonder metro project
Railways
Beawar Pali Pindwara Tollway Road Transport and Highways
235
168
316
375
169
2
186
ONGC Project - Assam renewal Project ( Group-A)
Petroleum and Natural Gas
Tori-Shivpur-Kathutia new line project Railways
Tori-Shivpur -Kathautia New BG Rail Line
Coal
Six-Laning of Aurangabad-Barwa Adda
Road Transport and Highways
0.4 MTPA DRI Plant + 30 MW Power Plant of Corporate Ispat Alloys Limited
Steel
HEO HEP - 240 MW Power
DAP fertilizer complex of 0.5 million tons per annum by Hindustan Zinc Limited (HZL)
Chemicals and Fertilizers - Fertilizers
266
297
200
137
26
46
3
370
Kattupalli Port Shipping
Bhopal Dhule Transmission Company Limited
Power
Pune-Satara Toll Road Road Transport and Highways
L&T Great Eastern Highways Limited Road Transport and Highways
Dipka OC Coal
OIL Project - Integrated Crude Oil and Gas Field Development project in Upper Assam districts.
Petroleum and Natural Gas
Tato-1 HEP - 186 MW Power
Expansion of Malanjkhand Copper Project
Mines
39
125
386
229
351
237
346
126
Alewadi Port Shipping
Bangalore-Satyamangla new line via Kanakpura
Railways
IOCL Project-Paradip-Raipur-Ranchi Pipeline
Petroleum and Natural Gas
Ideal Energy Projects Limited Power
Khed Economic Infrastructure Pvt. Ltd.
Commerce and Industry - Commerce
4 x 61.50 MW IPP of Abhijeet MADC Nagpur Energy Private Limited
Power
Pink City Expressways Ltd (6-laning of Gurgaon- Kotputli- Jaipur section of NH-8)
Road Transport and Highways
New Moynagudi-Jogigopa new line project
Railways
209
373
201
197
129
381
352
Elevated four lane link road from Chennai Port and NH4 at Maduravoyal
Shipping
New 4-Lane Elevated Road from Chennai Port - Maduravoyal
Road Transport and Highways
300 MW Kaizen Power Limited Power
OPGS POWER GUJARAT PRIVATE LIMITED
Power
Hubli-Ankola new line project Railways
IOCL Project - Debottlenecking of the existing Salaya Mathura Pipeline (SMPL) system
Petroleum and Natural Gas
Bhushan Steel Ltd,CRNO project Steel
242
289
238
178
179
180
298
Kerandari Coal Block Power
Kamineni Steel & Power India Pvt. Ltd.
Steel
Development of Rampia Coal Block and Dip Side of Rampia
Coal
GreenField Cement Manufacturing Plant-Dalmia Cement Bharat Ltd,
Commerce and Industry-DIPP
GreenField Cement Manufacturing Plant- Dalmia Cement Bharat Ltd for establishing Green Field Cement Manufacturing Plant of 4 MTPA Capacity in Satna, District of Madhya Pradesh
Commerce and Industry-DIPP
GreenField Cement Manufacturing Plant- Dalmia Cement Bharat Ltd for establishing Green Field Cement Manufacturing plant of 4 MTPA Capacity in Chittorgarh, District of Rajasthan
Commerce and Industry-DIPP
Jabalpur Transmission Company Ltd. Power
324
323
278
279
374
354
Shree Cement Ltd, Nawalgarh Project, Tehsil Nawalgarh, Distt Jhunjhunu (Rajasthan)
Commerce and Industry-DIPP
Shree Cement Ltd, Kodla Project Dist Gulbarga, Karnataka
Commerce and Industry-DIPP
Dighi Port Shipping
Dighi Port Shipping
Panikholi-Rimoli (Approved Length 106 Km)
Road Transport and Highways
Kannur-Vengalam-Kuttipuram section of NH-17 (package-I) from km. 148.00 to km. 230.00 on DBFOT basis
Road Transport and Highways
244
355
48
212
138
356
357
162
Chatti-Bariatu coal block Power
Kannur-Vengalam-Kuttipuram section of NH-17 (package-II) from km 230.00 to km 3180.00 on DBFOT basis.
Road Transport and Highways
Hassan-Bangalore new line project Railways
Lenzing Modi Fibers India Private Limited
Textiles
L&T Deccan Tollways Limited Road Transport and Highways
IG3 Infra Ltd. (Previously known as Indian Green Grid Group Ltd.)
Commerce and Industry - Commerce
Adhunik Power & Natural Resources Limited (APNRL).
Power
Angul Sambalpur Toll Road project Road Transport and Highways
254
187
203
350
184
376
127
43
163
306
HPCL Project - Rewari Kanpur Pipeline Project (RKPL) Rajasthan, Haryana and U.P.
Petroleum and Natural Gas
GreenFiled Cement manufactureing Plant-Dalmia Bharat Ltd
Commerce and Industry-DIPP
Haridaspur - Paradip Rail Link-Rail Connectivity Project for Paradip Port
Shipping
Oriental Nagpur Byepass Construction Pvt Ltd (ONBCPL)
Road Transport and Highways
Baharampore Farakka Highways Ltd Road Transport and Highways
KNT/Kerala Border to Kanuur Section(Approved Length 286.3)
Road Transport and Highways
Agartala-Sabroom new line project Railways
Pare HydroElectric Project (110MW) NEEPCO LTD.
Power
Cuttack Angul Tollway Project Road Transport and Highways
Dallirajhra-Jagdalpur new railway line Railways
259
372
183
165
214
1
286
368
382
181
293
362
140
Establishment of 160 MW Coal based Thermal Power Plant, Allied infrastructure and Desalination Plant
Power
4 Laning of Faraka-Raiganj Road Transport and Highways
Farakka Raiganj Highways Ltd Road Transport and Highways
SMC POWER GENERATION LTD Steel
Rly. Line Jharsuguda to Bansudhara Coal
PAUK HEP - 145 MW Power
Salem to Ulundurpet Toll Road Road Transport and Highways
Sonepur Bazari OC Coal
Four laning of Gwalior-Shivpuri Road Transport and Highways
0.4 MTPA DRI Project with 60 MW Power Plant of Abhijeet Infrastructure Limited
Steel
jabalpur-Gondia gauge Conversion Railways
Hospet Chitradurga Tollways Ltd Road Transport and Highways
Four lanning of Sambalpur-Baragarh-Orissa/Chhatisgarh Border section of NH6 from km 0.00 to km 88.00 in the state of Orissa to be executed as BOT (Toll) project on DBFO pattern under NHDP Phase III Project
Road Transport and Highways
142
66
182
191
275
312
207
Four laning of NH-73 from UP/Haryana border, yamunanagar-saha-panchkula in the state of Haryana on DBFOT.
Road Transport and Highways
Trichy-Karur Toll Road Road Transport and Highways
Dell International Services Business Process Services
Commerce and Industry - Commerce
1.2 MTPA Beneficiation & Pelletisation Plant of Abhijeet Integrated Steel Limited (AISL).
Steel
Haridaspur-Paradeep new railway line Railways
East North Interconnection Power
4 lane NH Connectivity to ICTT, Vallarpadam Road Connectivity Project for Cochin Port.
Shipping
265
249
276
164
364
252
194
216
277
208
IOCL Project - Paradip-Haldia-Durgapur LPG Pipeline
Petroleum and Natural Gas
HPCL Project - Resitement of Marketing Terminals at Visakhapatnam
Petroleum and Natural Gas
Talcher-Bimlagarh new railway line Railways
Birmitrapur Barkote Highway project Road Transport and Highways
Birmitrapur Barkote Highway Pvt Ltd Road Transport and Highways
HPCL Project - Mangalore Hassan Mysore Solur LPG Pipeline Project
Petroleum and Natural Gas
Jharsuguda- Barpalli-Sardega Railway Line
Coal
Hingula OCP Coal
Angul-Sukhinda new line project Railways
Ennore Manali Expressway (EMRIP)-Road Connectivity Project for Chennai and Ennore Ports
Shipping
258
151
315
222
219
218
220
27
221
217
253
135
8
250
13
226
GAIL Project -Bawana -Nangal Spurlines (Uttaranchal & Punjab)
Petroleum and Natural Gas
BINA OC Coal
Jharsuguda-Barpalli-Sardega Railway Line (53 Kms)
Coal
Garjanbahal OCP Coal
Kaniha OCP Coal
MNH Shakti Talabira OCP Coal
Ananta Extn. OCP Coal
Bharatpur OCP Coal
Bharatpur OCP Coal
MJSJ Coal Gopalprasad Coal
HPCL Project - Construction of New Terminal at Ennore
Petroleum and Natural Gas
Deoband-Roorkee new line project Railways
Manikpur OC Coal
HPCL Project - Uran-Chakan/Shikrapur LPG Pipeline
Petroleum and Natural Gas
Jhanjra UG Coal
Samaleswari OCP Coal
233
41
134
223
224
274
33
227
205
206
231
16
251
232
ONGC Project - Upgradation of Konaban GGS & Pipeline Grid Project (Tripura Asset)
Petroleum and Natural Gas
OIL Project - 1 No. Gas Turbine of 20 MW Capacity for Power Station at Duliajan, Assam
Petroleum and Natural Gas
Kitcha-Khatima new line project Railways
Orient(U/G) 4 Coal
Orient(U/G) 1&2,3 &HRC Coal
Jharsugda-Rengali doubling Railways
Ukni Deep OCP Coal
Belpahar OCP Coal
Dedicated freight link from Wadala to Kurla-Rail Connectivity Project for Mumbai Port
Shipping
Four lane road connectivity to NH17-Road Connectivity Project for Mormugoa Port
Shipping
ONGC Project - Construction of 3 ETPs-Mehsana
Petroleum and Natural Gas
Urimari OC Coal
HPCL Project - Awa-Salawas Pipeline Project (ASPL)
Petroleum and Natural Gas
ONGC Project - Sonamura GGS & Pipeline Project (Tripura Asset)
Petroleum and Natural Gas
256
269
270
24
29
215
225
CPCL- New 42 inch Crude oil pipe line From Chennai Port to CPCL refinery at Manali
Petroleum and Natural Gas
IOCL Project-Cauvery Basin Refinery (CBR)-Trichy Pipeline
Petroleum and Natural Gas
IOCL Project- POL Tap Off Point (ToP) at Korba in Chhattisgarh
Petroleum and Natural Gas
HBI UG (Hirakhund Bundia) Chemicals and Fertilizers - Chemicals and Petrochemicals
Rohini OC Coal
Nataraj(U/G) Mine Coal
Lajkura OCP Coal
34
14
15
213
19
20
18
28
30
31
17
283
Bhakra UG Coal
Dhanpuri UG Coal
Govinda Meera and Kotma (UG mine/depillaring)
Coal
Kanika Siding Coal
Kedla UG Coal
Kedla OC Coal
Murlidih OCP Coal
Kotma, Govinda and Meera Coal
Kapildhara UG Coal
Chinda OC Coal
Saunda - D Coal
Non signing of State Support Agreement
Road Transport and Highways
Status15000 All issues Resolved
Commissioning in 2011-12 12000 All issues Resolved
12000 All issues Resolved
Under Construction. FSA to be signed. In FSA list 9977 All issues Resolved
Commissioning in 2011-12 9900 All issues Resolved
Commissioning in 2013-14(U-1) 2014-15(U-2,3) 9900 All issues Resolved
Commissioning in 2011-12 (U-1,2) 2012-13(U-3) 9900 All issues Resolved
Commissiong Date- 2014-15 9900 All issues Resolved
8981 All issues Resolved
Commissioning in 2014-15 8000 All issues Resolved
7700 All issues Resolved
Commissioning- 2011-12(u-1) 2012-13(u-2) 2013-14 (u-3) 7500 All issues Resolved
Commissioning- 2010-11 (u-1) 2011-12(u-2), 2012-13 (u-3) 7500 All issues Resolved
7009 All issues Resolved
Commissioning- 2013-14(U-1), 2014-15(U-2) 7000 All issues Resolved
Commissioning- 2014-15(u-1) 2014-15(U-2) 6600 All issues Resolved
Year of Commmissioning- U 1 2011-12 U 2 2012-13 6600 All issues Resolved
Commissioning in 2013-14(u-1) 2014-15(u-2) 6000 All issues Resolved
Commissioning date- 2009-10 (U-1) 2010-11(U-2) 6000 All issues Resolved
Commissioning- 2013-14(u-1) 2012-13 (U-2) 6000 All issues Resolved
Commissioning- 2014-15 6000 All issues Resolved
Commissioning- 2013-14 6000 All issues Resolved
Year of commissioning- 2011-12 6000 All issues Resolved
6000 All issues Resolved
Description Of Projects (As furnished by the applicant)
Estimated Investment(in Crores)
Restoration of coal linkage by CIL. MoC already issued a letter to this effect.
Development of new terminal buildings at the existing airport and its upgradation.
4x360 MW domestic coal based power plant being established at Chhattisgarh in two phases, Phase 1 of 360 MW and Phase 2 of 3x360 MW. Financial closure of Phase-I was achieved on 24.06.2009 and Phase 2 on 01.09.2010. The scheduled CODs for the four units are Oct 2013, Jan 2014, Apr 2014 and Jul 2014. The Lead FI is Power Finance Corporation and consortium members are REC, HUDCO, PTC Financial Services, PNB, Bank of Baroda, Indian Bank, Corporation Bank and Vijaya Bank.
Phase II - 1320 MW Coal Based project under implementation. Amount Invested so far Rs. 5837 Crs. More than 75% of the project work is completed and balance work is in progress
1.5 Million MTPA Alumina Refinery Project. 8.5 Million MTPA Bauxite Mine Project
Year of Commissioning U-1 2009-10 U-2 2010-11 U-3 2011-12 U-4 2011-12
Commissioning- 2013-14 (U-1) 2014-15(U-2) 5400 All issues Resolved
Commissioning- 2013-14 (u-1,2) 2014-15 (u-3,4) 5400 All issues Resolved
Commissioning in 2013-14 5000 All issues Resolved
Commissioning in 2013-14 5000 All issues Resolved
Commissioning in 2013-14(u-1) 2014-15(u-2) 5000 All issues Resolved
Commissionig in 2012-13(U-5) 2013-14(U-6) 5000 All issues Resolved
Commissioning in 2012-13 5000 All issues Resolved
Commissioning- 2011-12(U-2) 2011-12(U-1) 5000 All issues Resolved
Commissioning- 2012-13(U-1) 2012-13 (u-2) 5000 All issues Resolved
Commissioning- 2011-12 5000 All issues Resolved
Commissioning U-5 2012-13 U-7 2010-11 5000 All issues Resolved
Year of Commissioning U-8 2011-12 U-9 2012-13 5000 All issues Resolved
Commissioning- 2009-10(U-5), 2010-11(U-6) 4900 All issues Resolved
4284.55 All issues Resolved
4255 All issues Resolved
3850 All issues Resolved
3787.2 All issues Resolved
3550 All issues Resolved
Commissioning- 2013-14(u-1) 2014-15(U-2) 3500 All issues Resolved
Anticipated date of completion of Unit-I 12/2013 and Unit-II 03/2014
Lumding-Silchar(482Km) Gauge Conversion will provide seamless connectivity to lower Assam and Tripura, Mizoram and Manipur with rest of India and is also vital link for new line projects providing rail connectivity to state capitals in NE region
1x600 MW Coal Based Thermal Power Project being implemented in Villages Bade Bhandar, Chhote Bhandar, Sarvani, Amli Bhouna, Tehsil Pussor, District Raigarh, Chhattisgarh State
600 MW in FSA list approved by CCEA. FSA to be signed. 350 MW linked to coal block. Balance 250 MW scheduled to commission after March 2015 hence not placed in FSA list.
1x600 MW Coal based Thermal Power Plant being implemented in Villages Barela, Gorakhpur, Tehsil Ghansore, District Seoni, Madhya Pradesh State
3500 All issues Resolved
3440 All issues Resolved
3408 All issues Resolved
Commissioning- 2014-15 3300 All issues Resolved
Commissioning- 2012-13 (U-1) 2013-14 (U-2) 3000 All issues Resolved
Commissioning - 2013-14 3000 All issues Resolved
Commissioning- 2012-13 3000 All issues Resolved
In FSA list approved by CCEA. FSA to be signed. 3000 All issues Resolved
2910 All issues Resolved
2872 All issues Resolved
Commissioning- U-1-3- 2010-11 U-4- 2011-12 2700 All issues Resolved
Project Commissioned 2500 All issues Resolved
Project Commissioned 2500 All issues Resolved
Commissioning in 2009-10 2500 All issues Resolved
Commissioning in 2014-15 2500 All issues Resolved
Commissioning in 2014-15 2500 All issues Resolved
Commissioning- 2014-15 2500 All issues Resolved
Commissioning- 2009-10 2500 All issues Resolved
Commissioning- 2010-11 2500 All issues Resolved
Commissioning- 2014-15 2500 All issues Resolved
Commissioning- 2011-12 2500 All issues Resolved
Commissioning U-10- 2012-13 U-11- 2013-14 2500 All issues Resolved
Commissioning- 2009-10 2500 All issues Resolved
Ref. MoEF File No 8-7/2002-FC Our company, Ambuja Cements Limited, operates two integrated plants viz. Unit-Suli and Unit-Rauri in Himachal Pradesh with combined capacity of 4.44 mtpa. Suli unit is operational since 1993 and Rauri unit since March, 2010. Limestone explored from our nearby captive mines is used as raw material in the plants for cement manufacturing. The clinker produced at these two plants, large quantities are transported to the grinding units at Ropar, Bhatinda, Roorkee, Nalagarh and a little to Dadri for manufacturing cement. The total cement manufacturing of these five grinding units is approximately 7 million tonnes. The investment is Rs.3500 crores or above. We were granted Forest Clearance in 1992, subsequently renewed in 2002 and is due for regular renewal which is being held up for quite some time inspite of our having complied with all the requisite requirements. We applied in time for renewal of the Forest Clearance at the time of mining renew
One unit in FSA list approved by CCEA. FSA to be signed by MoC.
Under construction. FSA to be signed. In FSA list approved by CCEA.
Under Construction. In FSA list approved by CCEA. FSA to be signed.
Under construction. In FSA list approved by CCEA. FSA to be signed
Year of Commissioning- 2011-12 2500 All issues Resolved
Year of Commissioning- 2012-13 2500 All issues Resolved
2293.48 All issues Resolved
Commissioning in 2013-14(u-1) 2014-15(u-2) 1950 All issues Resolved
Khadia OC 1720.03 All issues Resolved
1523.64 All issues Resolved
1456 All issues Resolved
1419 All issues Resolved
commissioning- 2012-13 1350 All issues Resolved
1350 All issues Resolved
1232 All issues Resolved
Moonidih XV Seam UG 1230 All issues Resolved
1190 All issues Resolved
1155.4 All issues Resolved
Four laning under NHDP Phase-III 1123.69 All issues Resolved
Construction of 51.38 Km new B.G railway line from Bhairabi to Sarang for providing connectivity to state capital of Mizoram.
Promoted by KVK Energy & Infrastructure Pvt. Ltd., Nagai Power Private Limited (NPPL) is a special purpose vehicle (SPV) implementing a 300 MW (2 x 150 MW) Coal based thermal Power Plant in Okkur & Venkidanthangal Village, Nagapattinam District, Tamil Nadu in two phases – viz. Phase I of 150 MW and Phase II of 150 MW. The projects are implemented at a total cost of Rs.1523.64 cr. Phase I will achieve COD by 1st October 2014 and Phase II will achieve COD in about 24 months from the date of initial disbursement
Under Construction. In FSA list approved by CCEA. FSA to be signed.
Installation of new state of the art Integrated Crude and Vacuum distillation units of capacity 6.0 MMTPA with 30 percent design margin as a replacement of old Crude and Vacuum units of BPCL. Overall Progress achieved 26 percent. Engineering, Procurement and construction activities are in progress.
Loktak Downstream HEP (66MW)is a JV project between NHPC (CPSU) and Govt. of Manipur. The estimated cost of the project is Rs. 1350 crores (Dec 12 PL). The project has been accorded environment clearance and Stage-I Forest Clearance.
Four laning under NHDP Phase-IV being constructed by BSCPL Infrastructure Ltd.
4x1000 TPD DRI Induction Furnace 2x12 TPD 14 MW Captive Power Plant (CPP) Planning to expand their existing DRI plant into an Integrated Steel Plant.
Four Laning of Ahmedabad to Godhra section of NH-59 from km.4+200 to km. 122+420 in the state of Gujarat on “DBFOT” basis under NHDP Phase III (Package -1)
1050 All issues Resolved
1019 All issues Resolved
Year of commissioning- 2009-10 975 All issues Resolved
942.69 All issues Resolved
Development of Haldia Dock-II (South) 886.1 All issues Resolved
Development of Haldia Dock-II (North) 821.4 All issues Resolved
Commissioning in 2013-14 750 All issues Resolved
commissioning- 2010-11 750 All issues Resolved
Commissioning- 2009-10 750 All issues Resolved
Commissioning- 2009-10 750 All issues Resolved
Year of commissioning- 2009-10 750 All issues Resolved
Year of commissioning- 2009-10 750 All issues Resolved
568 All issues Resolved
Year of commissioning -2011-12 450 All issues Resolved
Year of Commissioning- 2011-12 450 All issues Resolved
Year of Commissioning- 2011 450 All issues Resolved
Maqsoodpur , UP Year of commissioning- 2011-12 450 All issues Resolved
Year of Commissioning-2011-12 450 All issues Resolved
339.77 All issues Resolved
MANIKPUR OC - SOUTH EASTERN COALFIELDS LIMITED 321.5 All issues Resolved
Shri Sidhbali Ispat Ltd. an integrated Steel Plant with Captive Power Plant having proposed capacity of 1 Million tone steel (0.3 million tone first phase with 20 MW CPP (12.8 MW CFBC + 7.2 MW WHR) already installed during 2010 and construction of second phase of 0.7 million tone steel and 35 MW Captive Power Plant is on. The total cost of project is Rs.1050 Crore (300 Crores in first phase already commissioned and work of second phase is going on) Captive Power Plant of 20 MW (12.8 MW CFBC and 7.2 MW WHR) was commissioned on 11.10.2010. SLC (Long Term) for linkage approved our case for issuing LOA for 12 MW in its meeting held on 18/01/2007. LOA was issued by WCL and stipulated milestones were achieved within the LOA period. On commissioning of plant (CPP) the capacity was slightly higher, which was accepted by Ministry of Coal in its order dated 5th Aug 2010. Inspite of approval by MOC the officials of WCL was not signing the FSA. The matter was placed in the review committee (SLC-L
Iron and Steel Project. Environmental Clearance obtained. RTC issued by Ministry of Railways. Purchased 245 Acres of land, 5 McM Water Resources approved.
Four laning under NHDP Phase-III being constructed by Supreme Infra. Devl. Projects. Ltd.
Salka Road-Anupur is part of Bilaspur-Katni section and is the only single line portion on this route. This section is very important for movement of coal and steel from Chhatisgarh to North India.
Penganga OC - WCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20/02/2013.
Year of commissioning U-1 2009-10 U-2 2010-11 250 All issues Resolved
223.06 All issues Resolved
199.75 All issues Resolved
194.11 All issues Resolved
127.52 All issues Resolved
105.78 All issues Resolved
94 All issues Resolved
91.08 All issues Resolved
78.6 All issues Resolved
67 All issues Resolved
43.27 All issues Resolved
38.23 All issues Resolved
37.13 All issues Resolved
27.82 All issues Resolved
18 All issues Resolved
Basundhra (W) - OCP - MCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
Evacuation of New Refinery by Rail / Road. 69 percent complete - Terminal Tankage and Piping nearing completion. Approval of DPR for Railway siding pending with Railways.
Dhuptala OC -WCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
Jamunia UG -WCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
HBI UG (Hirakhand Bundia) MCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
Providing rail connectivity to the existing Tuna Creek-Rail Connectivity Project for Kandla Port
Jharkhand OC -CCL This is a coal mining project submitted for Stage-II Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
Tetariakhar OCP - CCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCinvest/2013 dated 20-02-2013
Overall Physical Progress achieved is 5.5 percent. Major construction activities could be taken up after Environment Clearance All major materials received at site. Pipeline laying is in progress. Compliance of conditions imposed in 1st stage Forest Clearance in progress for obtaining 2nd stage Forest Clearance. Delay in 2nd stage Forest clearance in Odisha and Jharkhand. Scheduled completion and Anticipated completion dates to be assessed after receipt of Statutory clearances.
Lajkura - MCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
Inder UG to OC-WCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
Ara-Sarubera GoM -CCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
Samleshwari Expansion OC - MCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
Ray-Bachara-UG -CCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20/02/2013.
14.41 All issues Resolved
77450 Pending
42345 Pending
40000 Pending
37500 Pending
37367 Pending
35000 Pending
29777 Pending
29285 Pending
29285 Pending
Belpahar OCP - MCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
The Coal To Liquids Project is being set up by Jindal Synfuels Limited which involves Gasfication of Coal To Raw SynGas, Purifictaion of Raw Syngas, Conversion of Purified Raw Syngas to Synthetic Crude and finally upgrading the synthetic Crude in Refining Units to get Petroleum Products. The Products will be primarily Diesel and Naphtha. The Project will produce 80,000 barrels per day of Liquids Fuels equivalent to 4 MMTPA of Diesel and Naphtha.
Expansion of existing steel capacity at Raigarh, Chhattisgarh by addition of 7 MTPA Integrated Steel plant with 1320 MW CPP.
Jharkhand Integrated Power limited, a Special Purpose Vehicle (SPV) and a wholly owned subsidiary of Reliance Power is implementing 4000 MW Tilaiya Ultra Mega Power Project (TUMPP) based on Super Critical Technology at Tilaiya Village, Hazaribagh District, Jharkhand. Tilaiya UMPP is fourth in the series of nine UMPPs of 4000 MW capacity each at coal mine pit-head and coastal locations across the country. These projects are being developed under the UMPP policy of Govt. of India. The project was awarded through the International Competitive Bidding (ICB) Process based on lowest levelised tariff for 25 Years. The entire Capacity from the Project has been contracted to 18 distribution companies across 10 States for a term of 25 years. Ministry of Coal, Govt of India, has allocated Kerendari BC coal mines for TUMPP. The project is in development phase land and acquisition is in progress.
Integrated Steel plant in Gujarat comprising of Iron &steel mills, associated downstream facilities, including a cold rolling mill, a galvanising facility, an extra-wide plate mill and a pipe mill. Employment – Direct & Indirect – 30,000.
6 Million Tons per annum integrated steel Plant with 1320 MW CPP 1 Million ton per year capacity Bar Mill and 0.6 Million ton per year capacity wire rod mill are already under production.
10 MTPA Green Field Integrated Steel Plant and 800 MW Captive Power Plant, ML granted by State Goverment. Allocated Iron Ore and Manganese Mine at Ankua and Rohne Coking Coal Block.Purchase 378 Ac private land.
15 MMTPA Refinery to meet projected petroleum deficit in Easteren India. Overall Progress achieved - 93.2 percent. Construction works is in progress.
6 Milion Ton per annnum Steel Plant with 1142 MW CPP in two Phases
6 MTPA Integrated Steel Plant & 900 MW Captive Power Plant (CPP). Major activites of 2 MTPA Steel Plant completed. Major part of land i.e, 4147 Ac out of 4332 Ac acquired. Operations of 1.5 MTPA Plate Mill started. 540 MW CPP commissioned. Work for setting up balance 4 MTPA Steel Plant is in full swing.
28000 Pending
25000 Pending
24214 Pending
22587 Pending
22587 Pending
Expansion from 3.3 MTPA to 10 MTPA 20000 Pending
16190 Pending
The Rajasthan project (RJ-ON-90/1 block) is a National Asset. The project is a joint venture between Cairn India and ONGC. The Rajasthan block produces about 175,000 barrels of oil per day, thereby contributing about 23 percent to the domestic crude production. Every year this single asset enables reduction in nations crude oil import bill to the extent of about INR 32,000 crore and contributes about INR 13,000 crore to the government. To date, more than 40 discoveries have been made in the Rajasthan block. This world-class asset has the potential to support 300,000 barrels of production per day, which would comprise nearly 35 per cent of the current domestic crude oil production. Consequently, it will add about INR 30,000 crore to government revenues and reduce our nations oil import bill by about about INR 57,000 crore every year. Over 80 percent of the value generated from the asset accrues to the Government Stakeholders namely, Government of India, Government of Rajasthan and ONGC.
• 3,960 MW Sasan UMPP is the largest integrated power plant with captive coal mines. It is also the country’s first domestic coal based Ultra Mega Power Project (UMPP) and will benefit around 35 crore people in seven states procuring power from the Project. • The project is based on supercritical technology which is more efficient and environment friendly. • The project will supply power at lowest levelized tariff of Rs 1.196/kwh for PPA tenure of 25 years, thereby contributing significantly to economic development in the country • Construction of the project is in very advance stage. Power generation from the first unit (660 MW) of the Project commenced in March 2013. Construction of remaining five Units is also progressing fast. • Sasan UMPP has achieved financial closure and tied up long term loan facilities with Indian as well as foreign banks / financial institutions to finance the project on limited recourse basis. The project is largest recipient of foreign currency loan f
Etalin Hydro Electric Project is a Run Of the River Hydro Electric Scheme with an Installed Capacity of 3097 MW. The Project is located on Dri River & Tangon River in Dibang Valley District of Arunachal Pradesh. The project is a Green Field development.
Integrated Steel Plant of 6.0 MTPA at Paradeep,Beneficiation Plant at Dabuna (10.7 MTPA),Slurry Pipeline from Dabuna to Paradeep (253 km , on ROW), Pellet Plant at Paradeep (12 MTPA)
Integrated Steel Plant of 6.0 MTPA at Paradeep, Beneficiation Plant at Dabuna (10.7 MTPA), Slurry Pipeline from Dabuna to Paradeep (253 km , on ROW), Pellet Plant at Paradeep (12 MTPA)
Green Field coal based Power project of capacity of 6 X 600 MW Nariyara Village, Akaltara - Tehsil District Janjgir Champa, Chhattisgarh
15300 Pending
15000 Pending
14650 Pending
13600 Pending
13195 Pending
13167.46 Pending
13000 Pending
12160.24 Pending
11848 Pending
Hydro project of 2000 MW on Subansiri River 11000 Pending
Expansion of Brown Field steel plant capacity from 10 MTPA to 16 MTPA
Acquired Non Contiguous 4600 Acres of Land sand spent Rs. 1800 Crores. The balance land acquisition will happen only after the new Land Acqusition Bill is passed by the Parliament.
Indiabulls SEZ is a Multi-Product SEZ which is being developed over a notified Industrial Area of 1011.264 Ha at Sinnar in Nashik, Maharashtra. The Land has been leased from Maharashtra Industrial Development Corporation for a period of 95 years. The SEZ is proposed to have Manufacturing Industries from the sectors like Auto and Auto Ancillary, Aviation and Ancillary, Pharmaceuticals(Formulations), Light Engineering and Electronics and Electrical.
2X600 MW Stage I Coal-Based Thermal Power Plant at Tamnar, Dist Raigarh, Chhattisgarh.
3.59 LTPA Aluminium Smelter with 900 MW ( including 1 standby of 150 MW) Captive Power Plant at Lapanga, District Sambalpur. 20 Million Ton Per Annum Talabira II & III Coal Mine associated with the above project. Hindalco ( 15 % share of Coal) has been jointly allocated this Coal Block with Mahanadi Coalfields ( 70 % share) and Neyveli Lignite( 15 % share)in district Jharsuguda and Sambalpur in the state of Odisha.
Adani Power is developing a 4,620 MW TPP at Mundra, Dist Kutchh, Gujarat. The entire capacity has been commissioned and is operational. 2640 MW Mundra TPP Ph I - 4 x 330 MW and II - 2 x 660 MW Commissioning dates - U#1 - 04.08.09 U#2 - 17.03.10 U#3 - 02.08.10 U#4 - 20.12.10 U#5 - 26.12.10 U#6 - 20.07.11 Power Supply from U# 1 - 6 is committed and has commenced under Long Term PPAs of aggregate 2000 MW executed with GUVNL through competitive bidding route.
The 2000 MW coal based thermal power project is being developed by a Group Company of Reliance Power Limited. The project is located adjacent to Sasan UMPP site in the State of Madhya Pradesh and is being implemented by a wholly owned subsidiary of Reliance Power Limited i.e. Sasan Power Limited. The project would employ super critical technology.
To improve distillate yield by elimination of black oil pool, meet Euro-III and Euro-IV specification for the entire diesel pool and increase crude processing capacity from 12 MMTPA to 15 MMTPA. Overall Progress achieved- 98.8 percent. Mechanical completion achieved for all Units except for DCU. Further, CDU and VDU, HGU, DHTU and SRU have been commissioned.
3x660 MW project under construction. No coal linkage granted yet by MoC. This project was discussed in the CCEA meeting held on 21.06.13. Minutes are awaited.
10780 Pending
10500 Pending
10000 Pending
9700 Pending
9562 Pending
Background (a)3 x 600 MW Thermal Power Project was awarded through Case II bidding process to Jaypee Group. (b)Land Acquisition, Environmental Approval, Coal Supply and Power Evacuation was the responsibility of procurer i.e., UPPCL. (c)LOI issued on 2nd March, 2009 (d)SPA signed on 23rd July, 2009
3.59 LTPA Aluminium Smelter with a 900 MW ( including 1 standby unit of 150 MW) Captive Power Plant. 8.5 MTPA Mahan coal Block jointly allocated with Essar Power, The Ratio for coal is Hindalco 40 % and Essar 60 %.
Samalkot Power Limited (SPL) is implementing a 2,400 MW, combined cycle gas-based thermal power plant at Industrial Development Area of Peddapuram, Samalkot Mandal, East Godavari District, Andhra Pradesh, India. Reliance Infrastructure is the EPC Contractor for the Project. It has tied up with reputed Original Equipment Manufacturers (“OEM”) such as General Electric, USA (for Gas Turbines, Steam Turbines & Generators), CMI-EPTI, USA (for Heat Recovery Steam Generator), Hamon, Belgium (for Cooling Towers), Hyundai Heavy Industries (for transformers) and Xian Electric (for Gas Insulated Switchyard). The Samalkot Project requires about 9.6 million standard cubic meters per day (mmscmd) of Natural gas. The Project was conceived based on supply of gas from the KGD6 block in Krishna Godavari basin. SPL entered into Bulk Power Transmission Agreement (BPTA) with Power Grid Corporation of India Ltd. (PGCIL). As per the BPTA, the EPC contractor (Reliance Infrastructure) would construct
Essar Power Jharkhand Limited (EPJL) is implementing an 1800 MW coal based power project in Latehar, Jharkhand. Phase I (1200 MW) of the project is expected to be commissioned in 2014-15 based on coal sourced from the Chakla mine whereas Phase II of 600 MW is based on Ashok Karkata coal mine. The company has signed PPAs to the tune of 750 MW net for phase I with BSEB, 12% of power generated under variable cost regulated tariff with Govt of Jharkhand and 240 MW with Noida Power Company Ltd from Phase II. The company is also obligated to supply RoFR power worth 13% of installed capacity from Phase I and II to Govt of Jharkhand under regulated tariff.
2.51 MTPA Steel Plant. The project is now ready to commence production from June 2013. Out of capex debt of Rs.824 crores, Rs.602 crores are sanctioned and remained Rs.222 crores loan application are pending with Union Bank- Rs. 150 crore, LIC - Rs. 50 crores and P&S Bank- Rs.35 crores. Due to delay in tying up the shortfall of Rs.222 crores, sanctioned debt of Rs.602 crores is not being released by the consortium of banks.
9349 Pending
9121 Pending
9000 Pending
9000 Pending
9000 Pending
2.50 million Tonnes Per Annum (TPA) Integrated Steel Plant at Village: Kotmar & Patrapalli of Raigarh Distt., Chhattisgarh as per MoU dated 8th August 2008 between the Government of Chhattisgarh & Government of Chhattisgarh. Date of Financial Closure Awaiting grant of Captive Iron Ore Mining Lease. Expected date of Financial Closure within six months of securing Iron Ore Mine in Chhattisgarh or Odisha. Implementation Status Substantial portion of land already acquired. Environmental Clearance already obtained. Allocation of Water from Sapnai River secured. Schedule date of completion Three years from the date of Financial Closure Anticipated date of Completion Three years from the date of Financial Closure
2x600 MW. Under construction. One unit have coal linkage and other linked to coal block. FSA signed for the linkage unit. For Unit-II mining lease clarification pending with MoC and MoEF st-II clearance pending at State level.
Gujarat State Petroleum Corporation Ltd (GSPC) is the operator of the Deendayal Field (Block KG-OSN/2001/03) situated offshore from the Yanam – Kakinada coast of Andhra Pradesh, India. Field Development Plan (FDP) for DD-West (DDW) field in KG-OSN-2001/3 block was approved by the Management Committee in November 2009. Consequently upon approval of the FDP, GSPC as an Operator has started implementation of the DD-West Field Development Plan. The Deendayal Field Development Project is consisting of Well Head Platform (WHP) including drilling of Development Wells, Process cum Living Quarter Platform (PLQP), laying of offshore subsea pipeline from WHP to Land Fall Point (LFP), laying of onshore pipeline from LFP to Onshore Gas Terminal (OGT) and Onshore Gas Terminal.
The total area of SEZ is 18000 ha. out of which at present 6641.2784 ha. area is notified and 1840 ha. area is under notification. Environmental Impact Assessment including Environment Management Plan & Risk Assessment is carried out for total area of 18000 ha. The Multi product SEZ at Mundra comprising of Road Network, Rail Network, IT-Telecommunication network, Electrical Network, Water supply, conservation & drainage Network, River Training, Desalination Plant with proposed intake & outfall locations, Common Effluent Treatment Plant & Sewage Treatment Plant, Natural Gas line network, Social Infrastructure, Existing Airstrip & Waste Management & Disposal site. The Environmental Clearance for associated Water Front Development Plan have been obtained from MoEF, New Delhi. Environmental Public Hearing was carried out for 18000 ha and completed on 5th October, 2010. Multi-product SEZ will provide plots to various industries and also develop dwelling units, hotels, shopping
Development of Captive Coal Mine and 1200 MW thermal Power Plant in two phases of 600 MW each.
8986 Pending
8981.04 Pending
8600 Pending
8290 Pending
7596 Pending
Jindal Stainless Limited set up a fully integrated stainless steel plant at Jajpur, Odisha & it is the only integrated stainless steel plant in the country. This plant is capable of producing unique and wide range of products both in terms of grades and dimensions. As a part of forward integration, production facilities for 2,50,000 tpa Ferro Alloys, 4,30,000 tpa Coke Oven, 250MW Captive Power Plant , 1mtpa stainless steel Melt Shop, 1.6mtpa Hot Rolling Mill and 0.95 mtpa Cold Rolling Mill have been set-up and are in operation progressively since September 2005. Production of ferro-chrome, ferro-manganese and silico-manganese is carried out in submerged Arc-Furnaces. And Ultra-high powered Electric arc-furnace is used for melting stainless steel. Refining is carried out in Argon-Oxygen De-carburization Converter and slabs are cast in a vertical- bending continuous casting unit.
4x360 MW domestic coal based power plant being established at Chhattisgarh in two phases, Phase 1 of 360 MW and Phase 2 of 3x360 MW. Financial closure of Phase-I was achieved on 24.06.2009 and Phase 2 on 01.09.2010. The scheduled CODs for the project is Jul 2014. The Lead FI is Power Finance Corporation and consortium members are REC, HUDCO, PTC Financial Services, PNB, Bank of Baroda, Indian Bank, Corporation Bank and Vijaya Bank.
Universal Crescent Power Private Limited is setting up a 1980 MW imported coal fired Power Plant named as Sagar Super Thermal Power Plant at Nayachar Island in Purba Medinipur district, West Bengal along with a captive coal Jetty for unloading and transfer of coal to the Power Project site, in accordance with the Agreement signed with Govt. of West Bengal on 3rd November 2011. The Sagar STPP is being developed in two stages with Stage I comprising of two units, each of 660 MW capacities, deploying state of the art supercritical technology with a provision of expansion of 1 x 660 MW units in Stage II. Presently, we are seeking Environment Clearance and CRZ Clearance from MoEF for Stage I consisting of 2 x 660 MW Units after which the project will be ready to take off. The status of major clearances, tie ups and approvals required for the project is as below 1. Land for the power project has been acquired. 2. Fuel Supply Agreement has been signed. 3. Power Purchase Agreement
2x685 MW under construction. No coal linkage. MoC yet to grant linkage.
Jagdishpur - Haldia Pipeline Project envisages following- Phase-I- 36/24/18/12 inch x 1860 Km, Ph-II- 24/18/12 x 190 Km and Compressor Station at Haldia. Scheduled completion is 36 months from first 3i notification. Present Status- 1. Route Survey completed 2. Office established at Kolkata and Ranchi 3. Long Term gas sourcing agreements finalized Issues- a. 3i notification yet to be published owing to customer tie-up issues. b. Confirmation regarding Fertilizer Plants revival awaited from Department of Fertilizers.
7400 Pending
7255 Pending
7200 Pending
7020 Pending
7000 Pending
7000 Pending
7000 Pending
6930 Pending
The Company is implementing its 2 x 660 MW coal based Super Critical Power Project near Banka in Bihar. The BTG Order has been placed on DECL, China. The Project has achieved Financial Closure in March 2012 . Overall progress of 28 percent has already been achieved. The project is stalled due to non disbursement. Land has been acquired. All necessary clearances and approvals are in place. Financial Closure achieved. EPC Contract awarded.
Laying,building,operating or expanding MBBVPL along the route of Mallavaram(Andhra Pradesh)-Bhilwara(rajasthan)-Bhopal(Madhya Pradesh) - Vijaipur (Madhya Pradesh)
1080 -8 x 13) MW, PITHEAD THERMAL POWER PROJECT (Commisssioned) -Enhancement of Kapurdi Lignite Mines capacity from 3 MTPA to 7 MTPA till the Jalipa mines becomes operational
2x660 MW. One unit commissioned. Second unit in next 4 months. No linkage. Discussed in the CCEA meeting held on 21.06.13
A run of the river project on river Nyamjang Chhu in Tawang district of Arunachal Pradesh utilizing the gross head of 1057.0 for generation of 780 MW in underground power house by six units of 180 MW each.
The blocks was awarded to EOL in the fourth round of CBM bidding in 2009. EOL has 100% participating interest in the block and entered into a contract with GoI for exploration and production of CBM gas on July 29, 2010. It is located in Rajmahal coal field in Jharkhand and covers an area of 1128 sq. km
1,260 MW coal Based Thermal Power Project, comprising of Unit 1 (600MW, sub-critical) and Unit 2 (600MW sub-critical, reconfigured to 660MW super-critical technology for higher priority for allotment of coal linkage) There is a delay in development of Fatehpur East coal block on account of delay in processing of the forest diversion proposal, conduct of public hearing and processing of the previous approval for mining lease at the State level. Hence,the project COD has be re-aligned so that coal produced from Fatehpur East Coal block is available for captive use in the project.
(2X660) MW, one Unit linked to Linkage and one Unit liked to coal block(Rampia).PL pending at with Orissa state Government last 3 years. Issue of overlapping with MCL to be resolved by MoC.
6848 Pending
6560 Pending
6500 Pending
6500 Pending
6449 Pending
6300 Pending
6300 Pending
6290 Pending
1200 MW - 4 UNITS 300MW EACH COAL BASED IPP BEING IMPLEMENTED AT BINJKOTE and DARAMURRA VILLAGE, RAIGARH DISTRICT IN CHHATTISGARH. PROMOTED BY SKS ISPAT AND POWER LIMITED - SKS. SITHE GLOBAL BLACKSTONE OF USA IS AN INVESTOR IN THE POWER PROJECT. PROJECT IS UNDER ADVANCE STAGE OF CONSTRUCTION AND SCHEDULED FOR COMMISSIONING OF UNIT -1 BY SEPT 27, 2014, UNIT -2 BY DEC 27, 2014 AND UNIT 3 AND 4 BY DEC 27, 2015. BOILER DRUM FOR UNIT 1 AND 2 ALREADY EREECTED AND PLACED IN POSITION IN MAY 2013. CONSTRUCTION OF ALL THE FACILITIES SUCH AS RAW WATER PIPE LINE and INTAKE SYSTEM, 400 KV TRANSMISSION LINE, RAILWAY SIDING, COAL HANDLING PLANT, ASH HANDLING SYSTEM, WATER SYSTEMS, ETC ARE IN ADVANCE STAGE. RS.2311.17CRORES INCURRED TILL 30.6.2013 MINISTRY OF POWER HAS GRANTED PROVISIONAL MEGA POWER STATUS ON 29.2.2012. SIGNED BPTA AND TSA WITH PGCIL
For the two units (2x660 MW)in phase-II. No linkage Project ,recommended by mop to moc in dec 2011. one unit commissioned in may 2013.
M.P. Power Generating Company Limited (MPPGCL), a state PSU, is implementing 2x660 MW units under stage-II of Shree Singaji Thermal Power Project, District Khandwa, Madhya Pradesh. The project cost is estimated to be Rs 6500 Crores. The project has already achieved Financial Closure and all other pre-requisites i.e. land, water etc, for installation of units are available, except Environmental Clearance (EC). Therefore, placement of order for installation the units is kept under hold.
2.0 MTPA Integrated Steel Plant with 1.20 MTPA Sponge Iron making facility and Power Plant. 0.25 MTPA steel capacities will come in Phase-I remaining in Phase-II. Stage -I &II Forest Clearance obtained on 28.7.2006. Allocation of Utkal B2 Coal Block by Ministry of Coal since 16.8.1999. Prior approval under Section 5(i) for Mining Lease obtained on 20.9.2007.
1.Laying, building, operating or expanding MBPL along the route of Mehsana (Gujarat) - Ajmer (Rajasthan) - Sirsa (Haryana) -Bhatinda (Punjab) 2.Laying, building, operating or expanding BJSPL along the route of Bhatinda (Punjab) – Jammu - Srinagar (Jammu & Kashmir)
2X600 MW Stage II pit-head Coal-Based Thermal Power Plant at Tamnar, Dist Raigarh, Chhattisgarh
NMSEZ has been notified as a Multi product SEZ on 21.11.2007. The SEZ is not operational.
Ph-I 2x660 MW all unit commissioned. Ph-II 3x660 MW 1 unit commissioned. LOA on tapering basis has been issued to only 800 MW (140 MW for second unit of Ph-I and 660 MW of unit 1 of Ph-II. No LOA has been granted for 2X660 MW of Ph-II. FSA signed for 1180 MW. Balance 800 MW tapering linkage available. FSA to be signed.
6200 Pending
6000 Pending
5795 Pending
5590 Pending
5545 Pending
5500 Pending
5430 Pending
2x600 MW Singhitarai Thermal Power Project is being developed by Athena Chhattisgarh Power Limited, an SPV formed for developing and implementing a coal based Thermal Power Project in Janjgir-Champa District in the State of Chhattisgarh. The project has obtained all the statutory clearances including Environmental clearance. As on date more than 50% of the physical works are completed. The boiler drum for unit 1 has already been erected and major equipment like Stator, Rotor has already reached the Indian Port. Firm Power sale agreements for more than one unit capacity executed. More than Rs. 2700 crs have been spent on the project. The project is financed by 18 banks and financial institutions and more than Rs. 2170 crs have been disbursed by the lenders so far.
1.00 million Tonnes Per Annum (TPA) Integrated Special Steel Plant, 0.8 million TPA Coke Plant, 0.2 million TPA Ferro Chrome Plant and 250 MW Captive Power Plant Phase I The company has already incurred a Capex of approximately Rs.3,200 Crore and already established a 0.5 million TPA Special Steel Plant (comprising of 0.225 million TPA Blast Furnace, 0.3 million TPA Sponge Iron Plant, 0.5 million TPA Special Steel Melt Shop and 0.5 million TPA Special Steel Rolling Mill for Bars and Wire Rods), 0.4 million TPA Coke Plant and 150,000 TPA Ferro Chrome Plant with 75 MW Captive Power Plant and infrastructure for the total capacity of Special Steel, Coke and Ferro Chrome with Captive Power is in place Phase II To expand the aforesaid capacity of Special Steel Plant from 0.5 million TPA to 1 million TPA, Coke from 0.4 million TPA to 0.8 million TPA, Ferro Chrome Plant from 150,000 TPA to 200,000 TPA, Captive Power Plant from 75 MW to 250 MW and construction of railway l
Imported coal based plant. Approval for using sea water pending with State Govt.
KVK Nilachal Power Private Limited (KNPL), an SPV, promoted by KVK Energy & Infrastructure Private Limited (KEIL), is implementing a project to set up 3x350 MW coal based power project in Cuttack District, Odisha in two phases viz. Phase I of 1x350 MW and Phase II of 2x350 MW.
Under construction. In FSA list. CRZ clearance pending with MoEF
Maithon Power Limited (MPL ), a joint venture of The Tata Power Company Limited and Damodar Valley Corporation, has set up 1050 MW thermal power project at Maithon, Dhanbad, Jharkhand. Both the Unit 1 and 2 have commissioned on 1st September, 2011 and 24th July, 2012 respectively.
1200 MW Imported Coal based power project at Salaya, District DevBhumi Dwaraka, Gujarat using Sea water for Cooling Water system and Coal being conveyed from a captive jetty to be built by Essar Bulk Terminal Services Limited for use by Essar Power Gujarat Limited. Although the power project has been completed, the coal conveying system and sea water intake system and coal jetty is pending for completion due to approvals required resulting in additional costs of generation as compared to the envisaged costs in the project.
5416 Pending
5400 Pending
5200 Pending
5189 Pending
5150 Pending
5093 Pending
1. Brief Description of Project Ministry of Coal allotted Machhakata-Mahanadi Coal Blocks as captive mines jointly to Maharashtra State Power Generation Company Limited i.e.MAHAGENCO and Gujarat State Electricity Corporation Limited i.e.GSECL on 06.02.2006 under Government Dispensation in the ratio of 60 and 40 respectively, to meet fuel requirement of their power plants. MAHAGENCO and GSECL are State Government Companies of Maharashtra and Gujarat respectively. MAHAGENCO and GSECL have formed a Joint Venture company called Mahaguj Collieries Limited i.e. MGCL to carry out development and operation of the mine. MGCL has selected Mine Developer and Operator i.e. MDO through International Competitive Bidding for development and operation of Machhakata coal block. 2.Salient Features Location-Talcher Coalfield, Chendipada, District Angul, Odisha •Annual target- 30 MTPA ROM coal •Life - 33 Years •Block area - 2103.34 Ha. •Geological Proved Reserve - 1400.65 MT •Mineable Coal-
Development, implementation and operation of a 1000 MW coal based power project in Nellore district in two phases- Phase-I-Already Operational capacity of 300 MW, Lead Lender-State Bank of India,and Phase-II-Under construction capacity of 700 MW. Financial Closure Achieved. Lead Lender-Rural Electrification Corporation
LNG Terminal of 5 MMTPA capacity, with provision of expansion to 10 MMTPA, at Mundra in Gujarat. The LNG terminal shall meet the growing demand of natural gas in the country. The Phase 1 capacity of 5 MMTPA shall supply approx 18 MMSCMD of natural gas
4x250 MW imported coal based plant. Approval of land reforms Deptt and Directorate of Town and Country Planning, Govt. of Tamil Nadu pending.
Exisiting facilities - 8 Million tonnes per annum Pellet Plant at Vizag - Andhra Pradesh, 8 Million tones per annum Beneficiation plant at Kirandul - Chhattisgarh, 267 Kms slurry pipeline connecting Pellet Plant to Beneficiation plant. (Rs. 3600 Crores)- To be implemented - Second pipeline connecting Beneficiation plant to Pellet Plant - 463 Kms. (Rs. 1550 Crores)
MONNET POWER COMPANY LIMITED (MPCL), a subsidiary company of Monnet Ispat & Energy Limited, is setting a 1050 MW (2X525MW) MW Coal Based Independent Thermal Power Plant (IPP) in village Malibrahmani, District Angul, Orissa. The Power Plant construction is in advanced stages with major milestones as boiler hydraulic test achieved. Plant is expected to be commissioned by December 2013. The capacity of the power plant will eventually be increased to 1710 MW with the addition of a 660 MW unit.
5093 Pending
Delay in Implementation of CDR package 5000 Pending
5000 Pending
5000 Pending
5000 Pending
5000 Pending
2x500 MW Under construction. In FSA list. 4909.54 Pending
4860 Pending
4840 Pending
4660 Pending
MONNET POWER COMPANY LIMITED (MPCL), a subsidiary company of Monnet Ispat & Energy Limited, is setting a 1050 MW (2X525MW) MW Coal Based Independent Thermal Power Plant (IPP) in village Malibrahmani, District Angul, Orissa. The Power Plant construction is in advanced stages with major milestones as boiler hydraulic test achieved. The first unit of 525 MW is expected to be commissioned by September 2013 while the second unit of 525 MW will be operational by December 2013. The capacity of the power plant will eventually be increased to 1710 MW with the addition of a 660 MW unit.
Shell through its wholly owned subsidiary Andhra LNG Pvt Ltd is developing an LNG regasification terminal to supply Andhra Pradesh with regasified LNG. The terminal is being developed under the GOI policy permitting 100% FDI (automatic route) and is State of the art, latest generation, floating regasification storage unit (FSRU) with up to 5 mtpa capacity using the most efficient and environmentally friendly regasification process. The project will provide earliest relief to 4,000 MW gas based power plants that are now distressed. It requires no project financing thus saving significant time. It entails FDI of approximately USD 800 mln for FSRU and installations. The engineering and design for all elements of the project is completed, and the FSRU has been selected. A full scale Environmental Impact Assessment (EIA) was submitted to the state Pollution Control Board on 28th March 2013 demonstrating only minimal environmental impact. Several gas sales heads of agreements signed wit
For generation of 400 MW electricity from Hydel means, on river Narmada at Maheshwar, near Indore in Madhya Pradesh.
Setting up LNG Import and Regasification facility terminal. Applied for clearance from Andhra Pradesh Govt. for setting up of LNG terminal at Gangavaram Port, near Vishakhapatnam
Attunli Hydro Electric Project is a Run Of the River Hydro Electric Scheme with an Installed Capacity of 680 MW. The Project is located on Tangon River in Dibang Valley District of Arunachal Pradesh. The project is a Green Field development.
Unit-1 commissioned. St-I clearance for Mahan coal block linked to the project has been issued by MoEF. St-II clearance to be forwarded by State to MoEF
-Expansion of Alumina Refinery from 1 to 6 MTPA and captive Power plant of 75 MW to 285 MW at Lanjigarh, District. Kalahandi in Orissa by M/s Vedanta Aluminium Ltd - Environmental Clearance
The company is in advance stage of commissioning the 2 X 270 MW (phase 1) coal based power project near Chandwa, Jharkhand. About 95% of the work has been completed. Hydro Testing of Boiler has been completed.
4608 Pending
4540 Pending
4444 Pending
4200 Pending
4083 Pending
4000 Pending
4000 Pending
About Anrak Aluminiums Alumina Refinery project at APIIC Industrial Park, Makavaripalem Mandal, Visakhapatnam District, Andhra Pradesh 1. As part of rapid industrialization in Andhra Pradesh, the State Government had entered into a Memorandum of Understanding with the Govt of Ras Al Khaimah GoRAK on 14.02.2007 for establishment of Alumina Refinery and Smelter with a feed stock from Jeralla Block of bauxite mines located in Visakhapatnam Dist of Andhra Pradesh. As per the terms of MOU, GORAK along with its associates undertook to incorporate an Indian Registered Limited Company to take forward for the implementation of Alumina Refinery and Smelter project. Penna Cement group along GORAK had a 50-50 joint venture cement manufacturing company in the name of Pioneer Cement Industries LLC from 2004 at UAE. In consonance with the MOU a special purpose vehicle was incorporated in March, 2007 in the name of Anrak Aluminium Ltd as a Joint Venture between Penna Cement group, Hyderabad and
3x350 MW TPP. For Unit-I FSA signed. Balance two units in FSA list. CCEA approved the list in its meeting held on 21.06.13
Jiribam-Imphal new line project will provide connectivity to Manipur which is severely affected due to insurgency. Project has been declared as national Project and is being monitored at highest level. To create conducive environment special battalions of CRPF have been deployed.
2 X 300 MW Butibori coal based power project under implementation by Vidarbha Industries Power Limited VIPL a wholly owned subsidiary of Reliance Power Limited is located at Butibori MIDC Industrial Area in Nagpur district of Maharashtra. Long term PPA for 600 MW capacity from both the units of the Power Station has been approved by Maharashtra State Electricity Regulatory Commission for supply of power to Reliance Infrastructure Limited - Mumbai Distribution commencing from 1st April 2014. Ministry of Coal has already approved coal linkage from WCL for both the units with LOA quantity of 1.234 MTPA and 1.1108 MTPA for Unit 1 and Unit 2 respectively. Signing of FSAs is being followed up with CIL / WCL.
Byrnihat shillong project has been taken up to improve network in N.E. region. Project on completion will provide direct rail connectivity to Capital of Meghalaya. Project has also been declared as National Project.
800MW SUPERCRITICAL COAL BASED THERMAL POWER PLANT TO BE IMPLEMENTED BY GUJARAT STATE ELECTRICITY CORPORATION LTD. AT Wanakbori near Sevalia Dist Kheda
1.8 MTPA Integrated Steel Plant. 230 MW Captive Power Plant commissioned in 2010. Grant of PL for iron ore in R.F. Bailadilla, Tehsil Dantewada,District Bastar (Soouth)is recommended by State Govt. Gare Palma IV/5 underground coal mines are oeprational since 2004. Joint survey of the mine by surveyors of Monnet and SECL has been completed on 15/2/2012.
3955 Pending
3745.08 Pending
3500 Pending
3500 Pending
3500 Pending
3500 Pending
Gupta Energy Pvt is implementing Thermal Power project 660 MW in Two Phases. The First phase 120(2x60)MW is in operation since may 2012. However the coal linkage for Ist phase yet not been allotted even as we had applied in May 2006. Therfore the plant has resorted shut down for want of linkage fuel. The second Pahse 540MW (2x270) is under implementation for which all clearances are obtained however, MoEF has imposed Temporary moratorium in District Chandrapur of Maharashtra State, therefore MoEF has not yet granted Environment Celarance.
THDC. The Project is a run off the river scheme with a gated Diversion Dam of 65 m height, a water conductor system and an underground Power House located 20 km downstream of head works.All clearances are in place, project to be awarded by THDC.
The blocks was awarded to EOL in the fourth round of CBM bidding in 2009. EOL has 100% participating interest in the block and entered into a contract with GoI for exploration and production of CBM gas on July 29, 2010. It is in southern end of the Mahanadi valley Gondwana belt in Orissa and the block covers an area of 557 sq. km covering parts of three district namely Angul, Sambalpur & Deogarh.
The blocks was awarded to EOL in the fourth round of CBM bidding in 2009. EOL has 100% participating interest in the block and entered into a contract with GoI for exploration and production of CBM gas on July 29, 2010. It is situated in the northeastern part of the Sohagpur coalfield and lies in the states of Madhya Pradesh & Chhattisgarh, covering an area of 339 sq. km
EOL entered into a 35 year contract with Government of India for exploration and production of CBM on July 26, 2002 for the East Raniganj block RG (East)-CBM-2001/I and were granted the Petroleum Exploration License (PEL) by the Government of West Bengal on March 29, 2005 and hold 100% participating interest in the block. The field development plan entails drilling of around 365 wells by mid-2014 along with the installation of surface facilities (gas handling, water treatment) and associated pipelines to process and transport more than 3 MMSCMD of gas. Over the life of the field, EOL envisages the drilling of 600 – 650 wells to support the plateau production.
2x270 MW Coal based thermal power project with 25 year of PPA with Punjab State Power Corporation for 100 percent generation. The expenditure incurred so far is Rs. 3196 Crores till end of July 2013. BTG Contractor - BHEL BOP Contractor - Punj Lloyd Source of coal - Captive coal mine at Tokisud North Sub-block, South Karanpura Coal Fields, located in Hazaribagh Dist. Jharkhand. Unit-1 Synchronized to grid on oil firing on 6th July 2013. Project cost break up- Power Plant - Rs. 3200 Crores Coal mine - Rs. 300 Crores
3500 Pending
ITC Ltd – Paperboards & Specialty Papers Division 3500 Pending
3380 Pending
3379.45 Pending
SEZ notified on 23.1.2009 as sector specific SEZ for IT/ITES. 3348 Pending
No domestic gas available. MOPNG to allocate gas. 3250 Pending
3200 Pending
Ministry of Coal allotted Chendipada and Chendipada-II Coal Blocks as captive mines jointly to UPRVUNL, CMDC and MAHAGENCO on 25/07/2007 under Government Dispensation in the ratio of 50-31.47-18.53 respectively to meet fuel requirement of their power plant. UPRVUNL, CMDC and MAHAGENCO are State Government companies of Uttar Pradesh, Chhattisgarh and Maharashtra respectively. UPRVUNL, CMDC and MAHAGENCO formed Joint Venture Company called UCMCCL to carry out development and operation of the mine. Chendipada and Chendipada II coal block is located in Talcher coalfield in the state of Odisha. It has a mineable reserve of approx. 1474 Million Tonne of coal with peak coal mining capacity is 40 Million Tonnes per Annum. Washery will also be established for beneficiation of coal mined from Chendipada coal block in adherence with guidelines of Ministry of Environment and Forest. Thermal Power projects of more than 8000 MW capacity of Uttar Pradesh, Chhattisgarh and Maharashtra are largely
Sivok-Rangpo project provides connectivity to Sikkim. Being strategically important, project has been declared as national Project. Project has been entrusted to M/s IRCON for fast track implementation.Out of 45 km length, 39Km(86%) is falling in tunnels and 5% on major bridges.
Six laning of Varanasi-Aurangabad section of NH2 from Km 786.000 to Km 978.000 in the state of Uttar Pradesh and Bihar on Design, Build, Finance, Operate and Transfer Toll basis under NHDP-V
One unit linked to coal block (Durgapur Saraya). St-II of Forest clearance has been cleared by State Govt. and sent to MoEF in March, 13. Under consideration of MoEF.
3193 Pending
3027.59 Pending
3025 Pending
3000 Pending
Ministry of coal allocated the Pakri-Barwadih coal block to NTPC on 11.10.2004, it has Geological reserves of 1436 MT, Production Target - Sep.2013 Annual rated capacity - 15 MTPA, Project Status as on 25.07.13 • Geological Report available. Mining Plan approved by MOC. • Environment Clearance accorded by MOEF. • Stage I & II forest clearances accorded by MOEF. Forest land available. • Mine Developer-cum-Operator appointed and machinery moved to site. • Other major contracts like Coal Handling Plant, Railway Siding, Substation, R&R Colony etc. have been awarded. • All notifications for land acquisition completed. Rehabilitation Action Plan approved by NTPC Board and Govt. of Jharkhand. Payment for 721 acres of land compensation disbursed to project affected families, till date. • Govt. of Jharkhand has approved transfer of 502 acres of Govt. land & 543 acres of jungle-jhari land to NTPC. • Total expenditure of approx Rs. 1000 Cr. incurred so far.
Anticipated dated of completion of Unit-I - 12/2013 and Unit-II is 01/2014
Kochi-Kootanad-Bangalore-Mangalore gas pipeline is being implemented to evacuate gas from the Kochi LNG Terminal The pipeline will also connect the southern states of Kerala, Karnataka and Tamilnadu with the national gas grid at Bangalore, thus the three states will have access to the green fuel and will have access to city gas and CNG. The power situation in these states will also improve with the implementation of gas-based power projects. The project is implemented in 2 phases and covers 7 districts each in the state of Kerala and Tamilnadu and 3 districts in Karnataka. The capacity of line is 25 MMSCMD and the operating pressure is 92Kg/cm2 max.
Steel Authority of India Limited (SAIL), a Maharatna company, is currently implementing Modernisation & Expansion plan to enhance its annual Hot Metal production capacity from the present 13.8 Million Tonnes (MT) to 23.46 MT. Accordingly, the annual requirement of iron ore will also increase to about 39 MT from the present level of 24 MT. SAIL at present is operating nine iron ore mines in the State of Jharkhand, Odisha and Chhattisgarh to meet the requirement of iron ore. To meet the increased requirement of iron ore, SAIL is increasing the capacity of existing mines in Jharkhand and Odisha to their full potential. Gua iron ore mine consisting of four leases, namely Duargaiburu, Jhillingburu I, Jhillingburu II and Topailore, located in the State of Jharkhand, is linked to the eastern sector steel plants of SAIL at Burnpur, Rourkela, Bokaro and Durgapur for supply of iron ore. The project involves an investment of approximately Rs 3000 Crore for augmenting the iron ore production capacity of Gua iron ore mine, installation of a beneficiation plant of 12.5 Million Tonnes Per Annum (MTPA) and a Pellet Plant of 4 MTPA. This pellet plant will also be the first captive pellet plant of SAIL.
3000 Pending
2966.99 Pending
2957.21 Pending
2915 Pending
2900 Pending
The block was awarded to EOL in the fourth round of CBM bidding in 2009. EOL has 100% participating interest in the block and entered into a contract with GoI for exploration and production of CBM on July 29, 2010. It is located in the IB valley coal field in Gondwana basin which forms the central segment of the western Gondwana basin in the Mahanadi valley belt in Orissa. This block covers an area of 209 sq. km. The block falls in two districts Sundargarh (200 sq.km) & Jharsuguda (9 sq.km)
Construction of 63.1 km new B.G. line from Bhanupalli to Bilaspur.
Construction of 189Km long Koderma-hazaribagh-Barkakana-Ranchi new line on cost sharing basis with Govt. of Jharkhand. Project is important for coal evacuation also.
Laying of 30 inch x 91 km from Alwaye to Koottanad, 24 inch x 347 km from Koottanad to Mangalore, 24 inch x 462 � �km Koottanad to Bangalore. Overall Progress achieved 74 percent. Out of 884 km, RoU handed over for 259 km and mainline welding completed for 43 km. Lowering completed for 17 km.
Surana Power Limited, a subsidiary of Surana Industries Limited, is establishing a coal based thermal power plant of 2 x 210 MW Capacity at Raichur, Karnataka. The project is under construction phase and an overall progress of 55% is achieved so far. However, due to certain constraints in fund flow, the project construction activities have been significantly retarded for the past about Nine (9) months. The project is funded by Consortium of Banks led by IDBI Bank Limited with an original capital cost of Rs. 2400 Crores with an original COD of End April 2013. However, on account of unfavorable market conditions, especially in the Power Sector, combined with delay in implementation on account of irregular fund flow, the COD has been extended upto End December 2014/ First Quarter 2015. Due to the extension of COD, the total capital outlay of the project increased to Rs.2900 Crore (Revised project cost as appraised by Institutions recently). The commercial operation date of the project is planned by End December 2014/First Quarter 2015. The suppliers/ contractors and vendors executing the project are of repute and renowned in the country. The main equipment supplier is BHEL and the balance of plant (BoP) as well as offsite facilities are being executed by various reputed Indian Suppliers and Contractors such as Alstom, Paharpur, McNally Bharat, Macawber, ABB, Gannon Dunkerley& Co Ltd, etc. The Owners Engineer is Tata Consulting Engineers Ltd. (TCE), Bangalore. Following major clearances obtained for the project. • 148 Acres of Land acquired through Karnataka Industrial Area Development Board (KIADB) • Environmental Clearance from Ministry of Environment and Forest (MoEF) • Consent For Establishment (CFE) from Karnataka State Pollution Control Board (KSPCB) • NOC from Airport Authority of India (AAI) for Chimney Construction • Factory clearance from Joint Directorate of Factories & Boilers • Agreement with Krishna Bhagya Jala Nigam Limited (KBJNL) for Water Drawl (Krishna River) and construction of pumphouse • Rail Transport Clearance (RTC) from South Central Railways • Interconnectivity agreement with PGCIL to evacuate power to PGCIL’s New Raichur Substation (765/ 400kV) • Approval under the Section-68 of Electricity Act 2003 from Ministry of Power for installation of dedicated transmission line • PTCC Clearance for Transmission Line • PPA with PTC for Sale of 40% Power • Coal Supply Agreement with Surana Mines & Minerals Limited (SMML)
2862 Pending
2844 Pending
2800 Pending
2800 Pending
Gevra OC 2675.87 Pending
2619 Pending
2542 Pending
24 inch x 75 km heated Insulated crude oil onshore pipeline from Salaya to Land fall point in Bhogat Sea Coast with crude oil terminal (2.7 BBL storage capacity) at Bhogat and SPM with sub sea pipeline in Jamnagar district to export the crude to coastal oil refineries in other parts of India. Marine facility with sub sea pipelines completed, crude oil storage terminal is in advance stage of completion. Onshore pipeline from Salaya to Bhogat is stalled in Khambhalia taluka due to lock out of legally notified RoU by local leaders of Khambhalia.
Under construction. In FSA list approved by CCEA. FSA to be signed.
MOEF file no : 11-88/2011-IA-III Title: Environment and CRZ clearance for augmentation in capacity of existing LNG Terminal of 5 MMTPA to 10 MMTPA along with pipeline of 13.9 km with suitable tap at S.No. 319, Village - Hazira Tal - Choryasi District- Surat, Gujarat by M/s Hazira LNG Pvt. Ltd. Hazira LNG is a partnership between Shell Gas B.V and Total Gaz Electricité Holdings France. Both the Shareholders represent two of the largest private LNG suppliers in the world. Shell and Total have a shareholding of 74% and 26% respectively in each of the companies that comprise the Hazira LNG Terminal and Port project and are collectively known as Hazira Group Companies (HGC). Environmental approvals for 1.Additional LNG tank of capacity 200,000 Cu meters and supporting infrastructure for regasification. 2. Laying of 13.9 Km pipeline of 36 inch diameter for gas send out
Expansion from 1 to 2 MTPA is on-going and 50 MW CPP likely to be commissioned by December 2014.
Joka-BBD Bag metro project in Koklatta connect central business distt with Joka area via Majerhat. Alignment runs parellel to flyovers and to accomodate metro via duct land in some streches is required from mint press, Kolkatta port trust and swapping of land from MoD.
Ministry of coal allocated the Talaipalli coal block to NTPC on 25.01.2006, it has Geological reserves of 1267 MT, Production Target - Mar.2015 Annual rated capacity - 18 MTPA, Project Status as on 25.07.13 • Block was regionally explored at the time of allocation. Detailed exploration undertaken by NTPC. Total 39855 mt. drilling done. Geological Report prepared. • Mining Plan approved by MOC. • Environment clearance accorded by MOEF. • Stage-I forest clearance accorded. Payment towards NPV and CA charges made. Compliance of stage-I conditions to be submitted after receipt of NOC under FRA (New format) from Raigarh Dist. Admin. • The JV Company between NTPC & SCCL has been appointed as MDO on nomination basis – pricing & other modalities under finalization. • All notifications for mining area land acquisition completed. RAP approved by NTPC Board. Payment for 1278 acres of land compensation disbursed to project affected families, till date. • Total expenditure of approx Rs 300
2538 Pending
2500 Pending
COmmissionig in 2009-10 (U-7) 2500 Pending
2500 Pending
Set up of 2* 300 MW Thermal Power Plant 2500 Pending
2500 Pending
Tapering linkage. IN FSA list. FSA to be signed 2500 Pending
2496.9 Pending
Four laning of Amravati- Jalgaon Section of NH-6 from KM 166.725 to KM 441.950 in the state of Maharashtra to be executed on DBFOT pattern under NHDP Phase IV
Vijaydurg Port is being implemented through a concession agreement under BOOST signed in 2008 valid for 50 yrs with MMB. The DPR has been submitted to the MMB during Sept 2011. The draft terms of reference for conducting the EIA has been submitted to MOEF during March 2011. The total capacity of the port is 75 MTPA. The project will help the development in the Konkan belt benefitting the states of Maharashtra, Karnataka, Goa and triggering growth in rest of the western region.
Bhupdevpur-Korichapar-Dharamjaigarh (180 Kms) This is a critical evacuation line for enhancing production from the various projects of Mand-Raigarh Coalfields of SECL, Chhatisgarh.
Phase-I of the Port with 2 berths of 550 m long quay, storage space, unloading equipments, conveyors and stacking equipments are commissioned in August 2009 and in operation. Phase-II DPR is ready for implementation. Port Connectivity by 4-lane road to Mumbai-Goa Highway (NH-17) and rail connectivity to Konkan Rail is pending for want to approval.
The Kameng Hydro Electric Project is a 600 MW run of the river scheme, situated in the West Kameng district of Arunachal Pradesh.
2400 Pending
2400 Pending
2400 Pending
2394 Pending
2388 Pending
International Paper, USA a FDI company entered the Indian market by acquiring The Andhra Pradesh Paper Mills Limited, in short APPM, in the year 2011. The acquisition process was done through the due process of obtaining RBI approval being under the Automatic Approval process under the FDI guidelines. APPM is a public listed company. After acquisition, the Board of APPM resolved to change the name of the two units in terms of their geographical locations, which is Andhra Pradesh Paper Mills Limited Rajahmundry and The Andhra Pradesh Paper Mills Kadiyam. Both these Units had a running 5 year Coal Supply Agreement with Mahanadi Coalfields Limited since 2008. As the coal supply agreement was valid till June,2013 and July, 2013 respectively for the two units, an application was made to the Ministry of Coal in May, 2012 to effect those name change. Inability of the Coal Ministry to approve the name change has led to the situation where both the Units may have to be closed down due to non-supplies of coal to its captive power plants. The agreements lapsed already and renewal could not happen as the Ministry of Coal has been unable to issue a letter to Mahanadi Coalfields Limited so far. The Units jointly employs 2500 direct employees and an equal number of indirect labour, all of whom would be rendered jobless. International Paper has further plans to invest US$ 800 Million in greenfield projects which has been put on hold on account of the lack of certainty of government approvals.
Sterlite Industries plans to expand its copper smelting and refining capacity by 4 lakhs tonnes per annum with allied infrastructure. The facility will also have 2.5 lakh tonne per annum of Phosphoric Acid plant. The project will be set up in Tuticorin, Tamil Nadu. Sterlite is currently operating a 400,000 tonnes per annum Copper Smelter at Tuticorin and with this expansion, the total capacity would be 8 lakh tonnes per annum making it one of the largest single location copper smelter in the world. Land of approximately 320 acres has already been allotted by SIPCOT under 99 year lease. The project would be set up as a Special Economic Zone and the SEZ has already been notified CAPACITY-TONNES PER DAY Existing Post Expansion Copper 1200 2400 Phosphoric Acid 800 1600 Copper Rod 410 1210
6.0MTPA cement plant. 3MTPA in first phase with lime stone mining and Captive Power plant of 80MW. The company is located at village Tigul, B. Sardagi, Balawad & Kiranagi Dist Gulbarga, Karnataka. MOU signed on 8th jun 2012
Neopara-Barasat via Bimanbonder metro project in Kolkatta is being executed by Metro Railway, Kolkatta. Alignment from Jessore Road xing to New Barrackpur is passing within premises of Airport Authority of India. Although alignment was approved in principle, permission for construction is awaited.
4- laning of Beawar –Pali- Pindwara stretch on NH-14 – 244 km long
2378.86 Pending
2345 Pending
2345 Pending
2340 Pending
2179.39 Pending
2001 Pending
2000 Pending
Revamping and optimazation of 21 Surface Installation to 9 integrated Complex and replacement of existing pipelines and laying of new 467.80 Km of pipelines. Project Progress - 79.24%. ROU is required in forest land to complete the laying of piepline.
Construction of Shivpur-Tori-Kathutia new line which is critical for evacuation of coal during XII plan.
This Rail Line (92.10 Km) was approved in August 2000 and Railways were entrusted for the complete work (from land acquisition, forestry clearance etc. up to commissioning)
Six lane under NHDP Phase-V being constructed by KMC Constructions Ltd.
This is the Phase-I of integrated steel Project.In Phase-I 0.4 MTPA DRI Plant and 30 MW Power Plant with an investment of Rs.595 Cr is already commissioned. The associated coal mining project with an investment of Rs.885 Cr & the 0.4 MTPA Expansion (Phase-II) with an investment of Rs.700 Cr are under implementation.The total cost of the Phase-I+Phase-II+ Mines is Rs.2179.39 Cr. The 0.4 MTPA DRI Plant is currently under shut down due to delay in Working Capital disbursement.The financial closure of DRI & Power Project was achieved on 31-03-2010.
The Heo Hydro Electric Project is a 240 MW ROR Project, and the middle Project of a cascade of 3 HEPs totalling 571 MW developed on the Yarjep River, in the West Siang district of Arunachal Pradesh. The Heo HEP and the two other HEPs (namely Pauk HEP and Tato-1 HEP) are developed as 100% Foreign Direct Investment projects by Velcan Energy Group, a French group listed on Nyse Euronext Paris.
Hindustan Zinc Limited is one of the world’s largest integrated producers of zinc and lead, based in Rajasthan, India. The company has a very strong track record of exploration, growth and sustained performance and is one of the major contributors to the exchequer in terms of royalty and taxes. HZL have plan to set up a DAP fertilizer complex of 0.5 million tons per annum at a capital investment of almost Rs 2,000 Crores. HZL’s captive generation of Sulphuric acid from its smelters is sufficient enough to support the DAP fertilizer complex. HZL also has a small low grade rock phosphate mine with a mining capacity of around two lakh tons per annum. But in order to invest in large DAP fertilizer complex, the company needs to secure sustained supply of better grade rock phosphate. Company has applied for 4 reconnaissance permit in Jaisalmer & Maton to undertake the exploration and mining activity to support this project.
2000 Pending
2000 Pending
1985 Pending
1968 Pending
1943.66 Pending
1875.5 Pending
1867 Pending
1856.36 Pending
L&T in jv with TIDCO has developed Kattupalli Minor Port near Chennai in Tiruvallur district in Tamil Nadu with an investment of Rs. 2000 Crores. The Port has a Container Terminal of 1.2 million TEU annual capacity which has become operational since Jan 2013. The Port has not been able to attract shipping lines for scheduling vessel calls at Kattupalli Port because of the Customs related issues and the traffic through the port is insignificant. The Port infrastructure is idling despite providing to EXIM community a good and viable alternative to the conjested Chennai Port
Bhopal-Dhule Transmission (BDTCL) project involves establishment of four 765 kV Single Circuit and two 400 kV Double Circuit transmission lines that would strengthen the transmission system in the Indian states of Madhya Pradesh, Maharashtra and Gujarat.
Six Laning of Pune Satara section of NH 4 from km 725.00 to km 865.35 (length - 140.35 km) in the State of Maharashtra to be executed as BOT (TOLL) on DBFO pattern under NHDP Phase V
4 laning of 209 kms stretch on NH-6 from Jalgaon to Maharashtra/Gujarat border
Dipka OC - SECL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
Project-I: (i)Laying of a 16” dia, 37 km long Gas Pipeline, from Baghjan to the CGGS near Duliajan (70 % progress till date) (ii)8” dia 45 KM long Crude Oil Pipeline from Baghjan to Secondary Tank Farm (STF) ( 70 % progress till date) (iii)4” dia 23 KM long Crude Oil Pipeline from Baghjan to Makum OCS. (iv)Construction of Oil Collecting Stations (OCSs) at Baghjan & Barekuri. (v)Makum Bowser Unloading Station (BUS) and (vi)Secondary Tank Farm (STF), Naoholia, near Duliajan etc Project-II: (i) Tengakhat – Naharkatia – Jorajan area: Laying of 20.8 Km Gas Pipeline from Chabua FGS to CGGS (in place), 5 nos. Field Gathering Stations (FGS), 2 nos. Gas Compressor Station (GCS) and 1 No. Central Gas Gathering Station (CGGS) near Duliajan (87.05% completed), adjacent to BPCL installation. (ii)Tinsukia – Dhola area : 4 nos. FGSs and 5 nos. GCSs (iii)Dumduma-Pengeri area: 1 no. FGS. (iv)Total of 32 nos. feeder gas lines.
Tato-1 Hydro Electric Project is a 186 MW Run-Off the River Project developed on the Yarjep River, in the West Siang District of Arunachal Pradesh. The Project is developed since 2007 as a 100% Foreign Direct Investment by Velcan Energy Group, a French group listed on Nyse Euronext Paris.
Project approved on 30.09.2011 by CCEA For expansion of 2 Mta opencast to 5 Mta underground.
1800 Pending
1800 Pending
1793 Pending
1768 Pending
Approved on 2.1.2009, the multi product SEZ is operational. 1704 Pending
1677.85 Pending
Six laning under NHDP Phase-V 1673.7 Pending
1656 Pending
The development of a greenfield container port in Maharashtra. Chaucer Capital from London have been trying to close this project for over 5 years. This project will bring in significant FDI and will be a catalyst for the industrialisation of the region. Chaucer Capital are expecting to create 3,000 jobs during the construction and around 1,000 jobs during the operation phase of the port. Chaucer Capital are requesting the support of the Government of India to have the LOI granted so that the development can proceed.
Bangalore-Satyamangla new line project was sanctioned in 1996-97 but for want of forestry clearance could not take off. On request of Govt. of Karnataka and on their consent to provide land free of cost and share 50% of construction cost, execution in Bangalore-Chamrajnagar section clear of forest areas have been taken up.
Overall Physical Progress achieved is 72.1 percent. All major materials received at site. Pipeline laying is in progress. Compliance of conditions imposed in 1st stage Forest Clearance in progress for obtaining 2nd stage Forest Clearance. Delay in 2nd stage Forest clearance in Odisha and Jharkhand.
1.Installed capacity - 1 x 270 MW. 2.Coal Requirement - 1.3 MMT per year per Unit. 3.Water Requirement - 7.8 MM3 per Year per Unit. 4.Energy available for sale with 85 percent Plant Load Factor- 1829 MU per Year for Phase-I. 5.Date of Commissioning - Phase-1- 18.07.2013-COD. 6.Land Requirement - 141 Hectors 7.Project Implementation-Phase-1-1x270 MW. 8.PROJECT EXECUTION - PHASE-1 - commissioned 9. PROJECT LOCATION - 51 kms from Nagpur on Nagpur - Chandrapur state Highway NH-7. 10. Nearest village-Bela, Tahsil-Umred, District-Nagpur, Maharashtra State. 11. Nearest Railway station- Borkhedi on Nagpur - Mumbai Central Railway at a distance of 11 kms from Project site. 12. Nearest Airport – Nagpur. 13). Nearest Seaport – Mumbai and Vizag. 14. MAIN PLANT i.e boiler turbine generator and esp is supplied, erected and commissioned by bhel. 15. Balance of plant comprising of CHP, AHP, treatme
The AMNEPL Power Plant with four units of 61.50 MW each has been developed under PPP Model with Maharashtra Airport Development Company Limited (a Government of Maharashtra Undertaking) as 26% Partner. The Plant has been commissioned in August 2011. Presently the Power Plant is incurring losses as is operating on costly market coal.
New Moynagudi-Jogigopa (260Km) new line project provides an important alternate route to critical route of New jalpaigudi-Alipurdwar-New Bogaigaon route which is lifeline of N.E.Region. Project is in advance stage and 196km portion has been completed.
1655 Pending
1655 Pending
1644 Pending
1638 Pending
1600 Pending
1584 Pending
1563 Pending
Elevated four lane link road from Chennai Port and NH4 at Maduravoyal
Chennai Elevated Tollway Ltd. Four laning under NHDP Phase-VII
The company is setting up 1X 300 MW power project, primarily to meet the power requirement of its Ferro Alloy plant. The power plant is being set up in SEZ developed by APIIC at Achutapuram in Vizag district. The project has achieved financial closure in Dec 2012
2X150 MW COAL FIRED POWER STATION AT BHADRESHWAR VILLAGE, KUTCH DISTRICT, GUJARAT. 100 per cent FDI PROJECT, PROMOTED BY OPG POWER VENTURES PLC., UK, A PUBLIC COMPANY LISTED ON LONDON STOCK EXCHANGE. PROJECT BEING SET UP UNDER GROUP CAPTIVE SCHEME OF MINISTRY OF POWER, GOVT. OF INDIA, THUS CONTRIBUTING TO INDIAs INDUSTRIAL AND ECONOMIC GROWTH. HIGHLY ENVIRONMENT FRIENDLY PROJECT, BASED ON AIR COOLED TECHNOLOGY, THUS USING 98 per cent LESSER WATER THAN CONVETIONAL WATER COOLED PROJECT. ENVIRONMENTAL CLEARANCE RECEIVED. BOILER, TURBINE SUPPLY AND ERECTION BY BHEL - BHARAT HEAVY ELECTRICALS LTD CONSTRUCTION IN FULL-SWING - 85 per cent OF CIVIL WORKS AND FOUNDATIONS COMPLETED, 60 per cent OF CHIMNEY AND BOILER RELATED CONSTRUCTION COMPLETED.
Hubli-Ankola new line project connects heartland of Karnataka to Konkan railway on West Coast and provide port connectiviy from Western Ports to mineral rich areas. Secondly are is having very scant rail network density and is required for development of area.
The project envisages debottlenecking of the existing Salaya Mathura Pipeline system, which would eventually lead to capacity enhancement from 21 to 25 MMTPA. This would facilitate meeting the projected enhanced crude oil requirement of Mathura, Panipat and Koyali refineries of IOCL. Project consists of laying of additional 115 kms of 28 inch diameter loop line along Salaya-Viramgam section. Another 606 km loop line of 28 inch diameter is to be laid �along Viramgam-Chaksu section and 46 kms of 24 inch diameter loop line in Chaksu- Mathura Section. Other major facilities include provision of new pumping units at Viramgam, Aburoad and Rajola and appropriate replacement of equipment at other locations. Project completion duration is 30 months after receipt of statutory clearances. (Other clearances received except Forest clearance in Rajasthan and Wildlife clearance in Gujarat). Overall Progress achieved 47.1%. Engineering, Procurement and construction activities in
0.35 MTPA Cold Rolled Closed Annealed Steel (CRCA) and Cold Rolled Non Grain Oriented Steel (CRNO) Integrated Steel Plant Financial Cosure is pending as the company is yet to complete the terms and conditions of action, post which syndication will be initiated.
1553 Pending
1534 Pending
1507 Pending
1500 Pending
1500 Pending
1500 Pending
1500 Pending
Ministry of coal allocated the Kerandari coal block to NTPC on 25.01.2006, it has Geological reserves of 285 MT, Production Target - Aug.2015 Annual rated capacity - 6 MTPA, Project Status as on 25.07.13 • Geological Report available. Mining Plan approved by MOC. • Environment Clearance accorded by MOEF. • Stage-I forest clearance accorded by MOEF. Stage-II proposal is under process at RCCF, Hazaribagh. • MDO – Under tendering. • All notifications for mining area land acquisition completed. RAP approved by NTPC Board. Payment for 106 acres of land compensation disbursed to Project Affected families, till date. • Govt. of Jharkhand transferred 106 acres of Govt. land to NTPC. • Total expenditure of approx Rs 119 Cr incurred so far.
Manufacture of Steel Billets with 360,000 MTPA and captive power plant of 220MW.
Rampia and Dipside of Rampia Coal Block was allotted jointly to six Companies vide Ministry of Coal letter no 38011/1/2007-CA-I dated 17th January,2008 for providing onshore fuel to their Power Plants. 1) M/s Sterlite Energy Ltd 2) M/s GMR Energy Ltd 3) M/s Arcellor Mittal India Ltd 4) M/s Lanco Group Ltd 5) M/s Nabbharat Power Pvt Ltd 6) M/s Reliance Energy Ltd In terms of compliance of the said letter of MOC, a Joint Venture Company Ms Rampia Coal Mine and Energy Pvt. Limited (RCMEPL) was incorporated on 19th Feb 2008. RCMEPL submitted application for grant of Prospecting License (PL) to Govt of Odisha within the stipulated time of 3 months. Ministry of Coal, Government of India conveyed its prior approval for grant of Prospecting License (PL) in favour of the allottees to Govt. of Odisha vide letter No 13116/29/2009-CA-1 dated 13th Aug 2009. However the production of coal from the Block could not commence due to delay in grant of Prospective License from State.
GreenField Cement Manufacturing Plant-Dalmia Cement Bharat Ltd, Project Cost Rs 1500, for establishing Green Field Cement Manufacturing plant of 4MTPA Capacity in Dist. Gulbarga, Karnataka with captive limestone mine.
GreenField Cement Manufacturing Plant- Dalmia Cement Bharat Ltd for establishing Green Field Cement Manufacturing Plant of 4 MTPA Capacity in Satna, District of Madhya Pradesh with captive mines.
GreenField Cement Manufacturing Plant- Dalmia Cement Bharat Ltd for establishing Green Field Cement Manufacturing plant of 4 MTPA Capacity in Chittorgarh, District of Rajasthan with Captive Mine.
Jabalpur Transmission Company Limited (JTCL) involves 765 kv D/c Transmission line which forms part of system strengthening common for Western &Northern region and is designed to transfer more than 6000 MW from Chhattisgarh & Orissa power plants.
1500 Pending
1450 Pending
1432 Pending
1432 Pending
Gayatri Projects Ltd. under NHDP Phase-III 1410 Pending
1366 Pending
Integrated Green Field Cement Plant of 3.0 MTPA Capacity along with CPP of 36MW at N V Gothra Tehsil, Nawalgarh Dist JhunJhun, Rajasthan
A Unit of Shree Cement Limited. Kondla project for 3.0MTPA Cement Plant with lime stone mining & Internal Power plant 150MW. LOcated at Village Kodla Benkanhalli, SEdam Dt. Gulbarga, Karnataka. MOU signed on 4th June 2010
Rail Connectivity - The Port enjoys Road connectivity to NH-17 Mumbai-Goa via five state highways. Dighi Port is not connected by Rail at present and has proposed rail linkage from Indapur Station on Konkan Railways to Dighi Port. Due to recent economic and infrastructure developments in the western part of India, especially Gujarat and Maharashtra, there has been remarkable growth, which has consequently let to an increase in freight traffic and has established the need for additional freight corridors and with the construction of Dighi Port, Maharashtra’s first Greenfield Port, being developed as a multipurpose all-weather port this demand has only further accentuated. Existing lines in the project region include the Roha – Thokar line that falls under Konkan Railways. The project stretch will start from the North Bank of Dighi Port, in Agardanda, and will connect with Konkan railways at Indapur and Mangaon, through a ‘Y-section’. The entire project stretch is located in the Raigad d
Road Connectivity - Dighi is located in Raigad district in the state of Maharashtra on the west coast of India on Dighi Bay of Raipuri Creek. The creek forms the harbor basin and the port facilities are being developed at Dighi i.e southern bank and Agardanda i.e northan bank. Nearest railway station is Mangaon on Konkan railway line which is around 55 km from the port. A detailed study has been conducted to identify the most appropriate way for development of road connectivity to Northern and Southern Banks of Dighi Port from NH- 17. The analysis of traffic data and forecasting has been done considering port and SEZ / DMIC cluster developments. The widening / improvement of both link roads have been proposed based on traffic projections and capacity analysis. The two road links to be developed are 1. Augmenting to Two Lane with Paved Shoulders of existing SH-96 & SH-92 link from Indapur to Agardanda for North Bank -Agardanda connectivity and 2. Augmenting to Two Lane with Paved Shou
Four laning under NHDP Phase-IV being executed by North Malabar Expressway Pvt Ltd.
1314 Pending
1312 Pending
1290 Pending
1285 Pending
1272 Pending
1269 Pending
1263 Pending
1220.32 Pending
Ministry of coal allocated the Chatti-Bariatu coal block to NTPC on 25.01.2006, it has Geological reserves of 194 MT, Production Target - Feb.2015 Annual rated capacity - 7 MTPA, Project Status as on 25.07.13 • Geological Report available. Mining Plan approved by MOC. • Environment clearance accorded by MOEF. • Stage-I & II forest clearances accorded by MOEF. • MDO appointed. • All notifications for mining area land acquisition completed. RAP approved by NTPC Board. Payment for 190 acres of land compensation disbursed to project affected families till date. • Govt. of Jharkhand has approved transfer of 66 acres of Govt. land. • Total expenditure of approx Rs 95 Cr. incurred so far.
Four laning under NHDP Phase-III being executed by South Malabar Expressway Pvt Ltd.
Hassan-Bangalore(166Km) new line project has been taken up to provide alternate and short route for providing connectivity of Bangalore with West Coast of Mangalore.
Lenzing Modi Fibers India Private Ltd. LMI is introducing in India, State of the Art Technology, to manufacture Viscose Fibres. Viscose Fibers is presently being imported by Textile Industries. Viscose Fiber is more absorbent than Cotton. The demand for Viscose is projected at 1 million TPA by 2020, where as production is only 3, 30,000 TPA. Renowned Modi group has signed collaboration, technical, financial and management agreements with Lenzing AG Austria in September 2008. Lenzing is world largest producer of viscose fibers, having plants in Austria, UK,USA, Indonesia and China. The LMI project is on the anvil since 2008. LMI acquired MIDC 90 acres land at Adl. Patalganga, Taluka Panvel, District Raigad, Declared as Industrial and Chemical Zone to manufacture 80,000 TPA viscose fiber plant. Government of Maharashtra has declared the Project as Mega. Maharashtra Pollution Control Board has granted Consent to Establish on October 1, 2005 & revised approval dated July 24,2012
4 laning of NH-9 stretch of 145 kms from Sangareddy to Maharashtra/ Karnataka border
The Sector specific SEZ for Textiles at Uthukuli Village, Perundurai Taluk Erode District, Tamil Nadu was approved on 31st May, 2006 and notified on 9th June, 2008. The project has been granted extension beyond 6th year upto 30th May, 2014 on 12th June, 2013.
2x270MW Ph-I project commissioned. Tapering linkage available. In FSA list approved by CCEA. Forest clearance for the linked Ganeshpur coal block pending with MoEF.
Abhijeet Roads Limited Abhijeet Angul Sambalpur Toll Road Ltd.
1210.64 Pending
1200 Pending
1186 Pending
Four laning under NHDP Phase-II 1170.52 Pending
1169 Pending
1157.16 Pending
1142 Pending
1128.37 Pending
1123.69 Pending
1105.23 Pending
The 18 inch dia x 441 km long cross country white oil multi-product pipeline of with design capacity of 7.98 MMTPA from Rewari to Kanpur will pass through the states of Haryana, Rajasthan and Uttar Pradesh. The Pipeline is proposed to be laid to transfer BS III MS, BS IV MS, BS III HSD, BS IV HSD and SKO from the existing Tap off location at Rewari of Mundra Delhi Pipeline in Haryana up to Kanpur in Uttar Pradesh. This pipeline will be connected to HPCL’s existing installations at Bharatpur, Mathura and new proposed marketing installation at Kanpur.
To Establish Green Field Cement Manufacturing plant of 4MTPA Capacity with 45 MW CPP in Belguam District of Karnataka.
Haridaspur - Paradip Rail Link-Rail Connectivity Project for Paradip Port
Four-laning of Baharampore - Farakka section of NH34 from Km 191.416 to Km 294.684 in the State of West Bengal under NHDP Phase-III on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis. Package No- NHDP-III/BOT/WB/03
Under NHDP Phase-III being constructed by M/s Transstry-OJSC Consortium
Agartala-Sabroom project provides connectivity to remote areas of Tripura. Project has been declared as National Project and is being monitored at highest level.
The Pare H.E. Project formerly known as Dikrong H.E. Project is situated in the Papum Pare District of Arunachal Pradesh. The Project site is about 15 Km from Doimukh and 5 Km down stream of Hoz Power- House. NEEPCO has taken up this Project to harness the Hydropower potential of the river Dikrong which is a tributary of river Brahmaputra and also utilize the tail race discharge of the Ranganadi H.E. Project stage-I. The project is planed as run of the river scheme. The project envisages construction of a 78m High concrete gravity Dam and 2.81Km long Head Race Tunnel having 7.50m diameter on the right bank of the river Dikrong. The installed capacity of the Project is 110 MW and the catchment area of the Project is 824 Sq. Km with maximum available head will be about 67.36m. CEA has accorded TEC to the project on 24.09.2007, as per which the project will generate annual 506.42 MU of power. The CCEA clearnace of the project was accorded on 4th Dec’2008 at an approved estimated cost of Rs.573.99 crs.IDC and finance Charges of Rs.68.06Crores at June,2007 Price Level.The project is scheduled to be commissioned in 44 months,i.e. by August 2012.
Ashoka Buildcon Ashoka Cuttack Angul Tollway Ltd. MOEF Clearance already obtained.
Construction of 235 km new B.G. line from Dallirajhra to Jagdalpur being partly funded by SAIL & NMDC
1100 Pending
1078.84 Pending
1078.54 Pending
1078 Pending
1072 Pending
1070 Pending
1061 Pending
Sonepur Bazari OC 1055.05 Pending
1055 Pending
1050 Pending
1038 Pending
Under NHDP Phase-III 1033.66 Pending
1008 Pending
Sterlite Industries plans to set up 160 MW coal based thermal power plant with allied insfrastructure like railway siding and Set up a desalination plant of capacity of 20 million litres per day (20 MLD)
Hindustan Construction Company Ltd. four laning under NHDP Phase-IV
Four-laning of Farakka - Raiganj section of NH34 from Km 295.000 to Km 398.000 in the State of West Bengal under NHDP Phase-III on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis. Package No - NHDP-III/BOT/WB/04
SMC Power Generation Ltd is an Integrated Steel Plant commissioned in the State of Odisha after signing the MOU to set up a Steel Plant of 0.40 MTPA and 83 MW of Power Plant with the State Govt.
Mahanadi coalfields Limited Rly. Line Jharsuguda to Bansudhara (52.4 Km double line)
The Pauk Hydro Electric Project is a 145 MW ROR Project with active storage, and the most upstream Project of a cascade of 3 HEPs totalling 571 MW developed on the Yarjep River, in the West Siang district of Arunachal Pradesh. The Pauk HEP and the two other HEPs (namely Heo HEP and Tato-1 HEP) are developed as 100% Foreign Direct Investment projects by Velcan Energy Group, a French group listed on Nyse Euronext Paris.
Design,Engineering, Finance, Construction, Operation & Maintenance of Salem Ulundurpet section from Km 0.313 to km 136.67 of NH -68 in the state of Tamil Nadu under NHDP Ph - IIIA on BOT Basis
Four lane under NHDP Phae-IV being constructed by Essel Infraprojects Ltd. Banker - Yes Bank
AIL is installing 0.4 MTPA DRI Plant and 60 MW Power plant in Dist. Saraikela - Kharsawan,Jharkhand. The project has achieved financial closure in April 2011. Initial Project cost was Rs 846.33 Cr which was funded by a consortium of nine banks. Due to cost over run and delay in project execution the revised project cost is estimated to be Rs. 1050 Cr. The main reason of delay has been due to slow disbursement by lenders.
Gauge Conversion of 285Km jabalpur-Gondia incl. balaghat-Katangi NG section to BG, developing an alternate route to saturated sections.
The four laning of Sambalpur – Baragarh - Orissa/Chhattisgarh border section of N.H.-6 from Km.0/000 to Km.88/000 in state of Orissa to be executed as BOT (TOLL) on DBFOT pattern under NHDP Phase – III. All the major and minor bridges and culverts are proposed to be widened to four lane widths including 7.30 Km. Baypass of Baragarh town. The project involves new four laning construction of 6 major bridges, 13 minor bridges, 113 culverts, 4 pedestrian / cattle underpass, 4 vehicular underpass and 3 ROB’s.
1001 Pending
1000 Pending
1000 Pending
1000 Pending
1000 Pending
1000 Pending
914 Pending
(1)Length of four lane Highway-104.77 km,(2)Major Bridges-14 nos,(3) Minor Bridges-34 nos (4)ROB-1 nos (5)Fly over-5 nos (6) VUP-4 nos (7) CUP-4 nos (8)PUP-1 nos (9) Culverts-173 nos (10) Service Road-46.972 km & (11) Toll plaza-2 nos
Design, Engineering, Finance, Construction, Operation and Maintenance of Trichy - Karur section from Km 135.800 to Km 218.028 (Excluding Lalapet ROB) of NH - 67 in the state of Tamil Nadu under NHDP Phase IIIA on Build, Operate and Transfer (BOT) basis
Dell International Services India Private Limited has been granted approval as a Co-Developer for providing infrastructure facilities in the IT/ITES Special Economic Zone of M/s. Coimbatore Hitech Infrastructures Private Limited at Keeranatham Village, Coimbatore North Taluk, Coimbatore, vide your letter No.F.2/110/2005-EPZ dated 12th October, 2007. The construction of Phase I has been completed and most of the permissions have been received. We have also issued appointment letters to many students, however, the joining dates have been moved as we have not received the Consent To Operate (CTO) from the Tamil Nadu Pollution Control Board (TNPCB). All inspections have been completed and the file is ready to be approved. As a result, this has caused considerable delay in our business activities and has consequently affected Dell’s planned business expansion in India and impacted our Global plans. Therefore, we kindly request your urgent intervention to sort this issue with the Sta
The company is setting up 1.2 MTPA Beneficiation and Pelletisation plant at Saraikela-kharsawan, Jharkhand. The project is in progress and financial closure has already been achieved and construction of the Plant has been started. The project cost is Rs 987 cr and has been funded by a consortium of 7 banks.
Construction of haridaspur-Paradeep new line on SPV mode to provide alternate connectivity to Paradeep port.
East North Interconnection (ENICL) Transmission Project involves establishment of two 400kV Double Circuit transmission lines (with a total line length of 450 kms) passing through the Indian states of Assam, West Bengal and Bihar. Its a System Strengthening project which will facilitate bulk transfer from north Eastern States to northern Grid.This project has 18 identified beneficiaries (mainly SEBs in the states of Rajasthan, Punjab, Haryana, Uttaranchal and the city of Delhi), who would be directly benefitted by this project
4 lane NH Connectivity to ICTT, Vallarpadam- Road Connectivity Project for Cochin Port.
913 Pending
898 Pending
810.78 Pending
778.15 Pending
Four laning under NHDP Phase-IV 778.15 Pending
701 Pending
700 Pending
Hingula OCP (15 MTY) of Mahanadi Coalfields Limited. 653.55 Pending
638.5 Pending
600 Pending
Project involves laying of 710 km long, 12 inch/10 inch dia LPG pipeline from Paradip to Durgapur via Haldia along with the associated facilities for transportation of LPG from Paradip and Haldia to the Bottling Plants at Balasore, Budge-Budge, Kalyani and Durgapur. Overall progress of 29.52 percent has been achieved. All statutory clearances are available except NOC for Forest Clearance for Odisha. Scheduled completion is 30 months after receipt of statutory clearances. Project is delayed due to delay in receipt of NOC for Forest Clearance in Odisha. The project is anticipated for completion by December 2014 subject to the availability of NOC for Forest Clearance in Odisha by September 2013.
Resitement of existing marketing terminal to new location for better safety norm and also to make way for enhancement of refinery capacity. All terminals commissioned by July 2012 except railway siding works at new LPG terminal and new white oil terminal which is expected to be commissioned by Sept. 2013. Assistance from AP Fire Department is sought for approval of occupancy.
Construction of 154 km new railway line primarily for evacuation of minerals and alternate route for ports in Orissa.
Work has been awarded. Gammon Infrastructure Project Ltd. Birmitrapur Barkote Highway Pvt. Ltd.
Laying of 400 km Long cross country LPG Pipeline System from HPCL Mangalore to BPCL Solur with Spur Pipeline from Hassan to HPCL Mysore. The ultimate capacity of pipeline shall be 3.1 MMTPA. Project has achieved physical progress of 22.92 percent as on June 2013. PNGRB Authorisation obtained.Approval of High Level Clearance Committee of Government of Karnataka obtained. Environmental Clearance from MOEF, GOI and PCB, Karnataka obtained. Categorised as Infrastructure Project.Obtained Crossing approvals from Railways, NH, SH,Other Roads, Water Bodies including Rivers. Placed order for coated line pipes, valves, pumps and other items. Pending Issues 1. Approval from Forest Dept for diversion of forest land for laying pipeline. 2. Land acquisition for IP station at Neriya Dakshina Kannada Dist, Karnataka 3. Land acquisition for SV stations 16 Nos. along the route of the pipeline."
Jharsuguda- Barpalli-Sardega Railway Line (53 Kms) This is a critical evacuation line for enhancing production from the various projects of Ib valley coalfields of MCL, Odisha.
Construction of 98.7 Km long Angul-Sukhinda new railway line primarily for movement of mineral ore and export/import traffic.
Ennore Manali Expressway (EMRIP- Road Connectivity Project for Chennai and Ennore Ports.
540.92 Pending
BINA OC - NORTHERN COALFIELDS LIMITED 535.96 Pending
Jharsuguda-Barpalli-Sardega Railway Line (53 Kms) 469 Pending
466.31 Pending
Kaniha OCP (10 Mty) 457.77 Pending
MNH Shakti Talabira OCP (20 Mty) 447.72 Pending
Ananta Extn. OCP (15 Mty) 446.64 Pending
434.25 Pending
Bharatpur OCP (20 Mty) 434.25 Pending
MJSJ Coal Gopalprasad (15 Mty) 395.87 Pending
394 Pending
336 Pending
321.5 Pending
309.81 Pending
287.17 Pending
Samaleswari OCP (12 Mty) 284.69 Pending
Uttrakhand Spurlines - 16 inch x 64 km, 8 inch x 90.5 km, 4 inch x 20 km Punjab Spurlines - 24 inch x 84 km , 4 inch x 20 km Original completion date - 20.06.2011 Revised completion date - 31.07.2012 Anticipated completion - Dec. 2014
Garjanbahal OCP (10.00 Mty) MAHANADI COALFIELDS LIMITED
Bharatpur OCP - MCL This is a coal mining project submitted for Stage-I Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
New Green field Oil Terminal is constructed at Ennore which is located on the outskirts of the Chennai City, relocating the existing Chennai terminal. At Ennore Port, jetty for handling liquid cargo and allied pipeline has been developed by Ennore Tank Terminal Pvt Ltd. The project is provided with tankage facility of 1,40,000 KL for storage and dispatch of pertroleum products. The terminal is designed to conform to the safety norms advocated by PESO and OISD. Pipeline and Terminal facilities completed on December 2012. Railway siding facilities completed on March 2013. The Terminal has been commissioned on 20 July 2013.
Deoband Roorkee new line project was sanctioned in 2007-08 on 50 50 cost sharing with govt. of Uttarakhand. Detailed estimate was sanctioned in Nov 2008 at Rs 160 crore. Subsequently, revised estimate costing Rs 336 crore was sanctioned primarily due to abnormal increase in land rates. Land rates have now been again revised and on request of railway to absorb increase in land rates, state govt has requested to cap share of state govt to Rs 160 crore.
Manikpur OC - SECL This is a coal mining project submitted for Stage-II Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
12 / 10 inch dia 165 km long LPG Pipeline from BPCL, Uran near Navi Mumbai to HPCL,IOCL,BPCL LPG Plants at Chakan and Shikrapur near Pune Pipeline Procured and Major procurement POs placed. Pipeline laying order ready for finalization.ROU acquisition and crossing approvals in final stages. Forest Approval from RCCF, Bhopal awaited. The proposals at DFO, Alibag & DFO, Pune are pending for the last 1.5 yrs.
Jhanjra UG - ECL This is a coal mining project submitted for Stage-I Forest clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
253.66 Pending
216.88 Pending
208 Pending
203 Pending
203 Pending
201 Pending
185.79 Pending
Belpahar OCP (8 Mty) 181.18 Pending
177 Pending
145 Pending
144 Pending
143.57 Pending
134.43 Pending
128.3 Pending
1.Upgradation of Konaban GGS from 0.50 to 1.50 MMSCMD capacity. 2. Laying of approx. 86 kms of Trunk Pipeline from Agartala Dome to OTPC via Nimbutali with metering facilities at OTPC,pipeline from Sonamura GGS to OTPC and pipeline from Konaban GGS to Nimbutali and laying of 64 Km of Feeder line from Kunjaban to ADB GGS and Sundalbari to Sonamura GGS. Project Progress-86.1 %. ROU is required including in forest land to complete the laying of pipeline.
1 No. Gas Turbine of 20 MW Capacity for Power Station at Duliajan, Assam for captive use in E&P related operations.
Kitcha-katima new line project was sanctioned in 2003-04 on commitment of state govt to provide land for the project free of cost. After repeated follw up land is not being provided and project is a non starter.
Orient(U/G) 4 THE COMBINED COST OF ORIENT (U/G) 1&2, 3, HRC AND ORIENT (U/G) 4 MAHANADI COALFIELDS LIMITED
Orient(U/G) 1&2,3 &HRC The cost includes the cost of Orient (U/G 4) MAHANADI COALFIELDS LIMITED
Doubling of 25.6 km Jharsugda Rengali section to enhance capacity of saturated section.
Ukni Deep OCP-WCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
Dedicated freight link from Wadala to Kurla-Rail Connectivity Project for Mumbai Port
Four lane road connectivity to NH17-Road Connectivity Project for Mormugoa Port
To construct 3 ETPs To deal with future water cut and injection water quality requirement. Site survey for the Sobhasan is under progress. For balance two sites Land Acquisition is pending.
Urimari OC - CCL This is a coal mining project submitted for Stage-I Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
Laying of 93 km long 10 inch Dia cross country pipeline system of 2.3 MMTPA ultimate capacity from Awa Pumping station of MDPL to Jodhpur Depot. Receipt facility along with 3 nos. x 3500 KL MS Tanks at Jodhpur Depot along with associated civil, mechanical, piping, electrical and instrumentation works at Jodhpur Depot. Actual progress achieved as on 30.06.2013 is 49.79 percent. Statutory approval have been obtained except for MoEF approval for additional storage tanks at Salawas Depot.Construction works under progress.
1. Construction of Sonamura GGS having 0.8 MMSCMD gas processing capacity & Gas metering station at Monarchak. 2.Laying of 10" diaX 10.5 Km gas trunk pipeline from Sonamura to Moarchak 3. Laying of 20" dia X 29.4 Km gas trunk pipeline from Agartala. Project Progress-38.6 %. ROU is required to complete the project.
126 Pending
108 Pending
108 Pending
105.78 Pending
105.67 Pending
Nataraj(U/G) Mine (0.64 Mty) 92.11 Pending
Lajkura OCP (2.50 Mty) 82.25 Pending
The existing 30 inch crude oil pipe line from Chennai Port to Manali Refinery was laid during the inception of Refinery in 1969. Presently the Refinery capacity has been increased from 2.5 to 10.5 MMTPA. The transfer rate of crude oil is limited due to smaller size of pipe line, deteriorating internal surface and restricted operating pressure. This causes prolonged detention of crude tankers leading to high demurrages. Habitations have come nearer to the pipeline over a period of time and hence the pipeline passes through congested and thickly populated areas. Hence a new 42 inch crude oil pipe line is proposed to be laid under the service road of Ennore Manali Road Improvement Project. The replacement of the old pipeline with a new pipeline in a new, less habitated route is not only an operational necessity for CPCL but also has the most important advantage of enhancing the safety of Crude Oil transportation from chennai Port to Manali Refinery. Scheduled completion is 18 months fr
All statutory clearances are available. The entire Right of Way for laying of pipeline was progressively acquired by September 2012. Mainline laying work was also in progress. About 40 percent of the mailine has been laid. On 2.4.2013, Government of Tamil Nadu issued a letter to various district collectors advising them to ensure- 1. GAIL gives up the present project of laying Kochi-Kootanad-Bangalore-Mangalore Gas Pipeline Project through agriculture land and take steps for laying of pipeline alongside the National Highways. 2. GAIL should also close all the existing trenches excavated for laying of pipeline and handover the lands in its original conditions to the farmers & villagers. 3. To remove the pipes already laid so as to enable the farmers to continue their agricultural activities. This has impacted ongoing activities of CBR-Trichy Pipeline of IndianOil and may also affect projects in other states. A PIL has also been filed in Madras High Court Bench. Hearing is
"Overall Physical Progress achieved is 30 percent. Major construction activities could be taken up after Environment Clearance All major materials received at site. Pipeline laying is in progress. Compliance of conditions imposed in 1st stage Forest Clearance in progress for obtaining 2nd stage Forest Clearance. Delay in 2nd stage Forest clearance in Odisha and Jharkhand." Scheduled completion and Anticipated completion dates to be assessed after receipt of Statutory clearances.
HBI UG (Hirakhund Bundia) -MCL This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
Rohini OC - CCL This is a coal mining project submitted for Stage-I Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
55.28 Pending
54.7 Pending
22.52 Pending
Kanika Siding Single Spur 20 Pending
19.86 Pending
19.86 Pending
19.84 Pending
19.14 Pending
17.98 Pending
17.79 Pending
16.29 Pending
0 Pending
Bhakra UG - WCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
Dhanpuri UG - SECL This is a coal mining project submitted for Stage-I Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
Govinda Meera and Kotma (UG mine/depillaring)- SECL This is a coal mining project submitted for Stage-I Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
Kedla UG - CCL This is a coal mining project submitted for Stage-II Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
Kedla OC - CCL This is a coal mining project submitted for Stage-II Forest Clearance This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
Murlidih OCP - BCCL This is a coal mining project submitted for Stage-I Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
Kotma, Govinda and Meera - SECL This is a coal mining project submitted for Stage-I Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
Kapildhara UG - SECL This is a coal mining project submitted for Stage-II Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
Chinda OC - WCL This is a coal mining project submitted for Environment Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
Saunda - D - CCL This is a coal mining project submitted for Stage-I Forest Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013
State Governments of Uttar Pradesh, Tamil Nadu, Gujarat and Delhi have not signed the State Support Agreement. For smooth implementation of the extensive programme for development of National Highways through PPP, the Ministry of Road Transport & Highways enters into a State Support Agreement with various state Governments for safeguarding the interest of Concessionaires for all future programmes of National Highways in respect of issues concerning the State Governments regarding Land Acquisition, Utility shifting, restriction on competing roads/additional toll ways, maintenance of Law & Order, removal of encroachments etc. with an objective to provide umbrella uniform terms and conditions also to build up the confidence of private investor into the Highway project.