entso-e action plan to improve iec 61850 iec 61850...

28
Amsterdam, The Netherlands, 27 September 2017 Grégory Huon, Elia & ENTSO-E AhG IEC 61850 convenor IEC 61850 Europe Conference 2017 ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 DATA MODELS AND ENGINEERING PROCESS

Upload: others

Post on 16-Oct-2020

13 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

Amsterdam, The Netherlands, 27 September 2017

Grégory Huon, Elia & ENTSO-E AhG IEC 61850 convenor

IEC 61850 Europe Conference2017

ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 DATA MODELS AND ENGINEERING PROCESS

Page 2: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

INTRODUCTION

Page 3: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

ENTSO-E at a glance

Page 3

Page 4: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

ENTSO-E organizational structure / Standardisation (1/2)

Page 4

Research, Development & Innovation Committee

(RDIC)

Page 5: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

Page 5

Subdomains of TC57 Working Groups

Power system IED communication and associated data models – IEC

61850 (Substation automation)IEC TC 57 - WG 10

Energy management system application program interface (EMS - API) -

IEC CIM 61970 for grid exchangesIEC TC 57 - WG 13

System interfaces for distribution management (SIDM) – IEC CIM 61968

(TSO to DSO interfaces)

IEC TC 57 - WG 14

Data and communication security IEC TC 57 - WG 15

Deregulated energy market communications - IEC CIM 62325 for market

exchangesIEC TC 57 - WG 16

ENTSO-E since 2009 contributes in both CIM 61970 & 62325 series, for grid and market exchanges respectively.

ENTSO-E organizational structure / Standardisation (2/2)

Page 6: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

HISTORIC

Page 7: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

Page 7

Observations:

• Multi-vendor systems very scarce 10 years after 1st standard publication

• Implementation complexity

Recommendations:

• Improve interoperability, over life cycle of the systems of Assets

• Mask complexity by ergonomic tools

Stakeholders:

• standardization bodies : IEC, … ; Suppliers ; Conformance testing companies: UCA Iug, … ; Users (associations): ENTSO-E, …

Historic - April 2012: ENTSO-E statement on IEC 61850 standard

Page 8: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

Page 8

ENTSO-E work structure around IEC 61850

Do

ne

On

go

ing

https://www.entsoe.eu/about-entso-e/research-and-development/standardisation/

ISTool

Engineering ProcessIEC DC

Page 9: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

ENTSO-E WORK PLAN

Page 10: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

The three components of IEC 61850 – Interoperability ambition

Page 10

Com

munic

ation

Sem

antic D

ata

M

odels

Engin

eering

Page 11: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

Mapping of ENTSO-E activities

Page 11

Page 12: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

SEMANTIC DATA MODELS

Page 13: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

Improvement @ information level / ISTool

Page 13

Page 14: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

Objectives of the Interoperability Specification Tool

Page 14

Tool for DSAS(*) (sub)functions and signals collection @ ENTSO-E level= profile builder (it is not a specification/configuration tool)

Future proof (e.g. integration of settings parameter, CIM, interfaces with system specificationand configuration tools, …)

Basis for gap analysis between IEC 61850 and user requirements

Facilitator between IEC 61850 complex world (through IEC 61850 UML model) and utility world, finally enabling multi-vendor interoperability over system life cycle in an efficient andsustainable way

(*) Digital Substation Automation Systems

Page 15: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

ENTSO-E profile will be a superset of requirements

Page 15

Page 16: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

Interoperability Specification Tool – The ENTSO-E profile builder

Page 16

Page 17: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

Pilot project on distance protection

Page 17

Several methods to build up theprofile

• Conventional schemes decomposition

• Start from existing IEC 61850 modelling

• From scratch

Page 18: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

Pilot project on distance protection – Gap identification

Page 18

2 types of GAP were identified:

• No IEC 61850 LN in the model

• Not enough granularity in themodel

Page 19: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

Pilot project on distance protection achieved

Page 19

Page 20: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

ENGINEERING PROCESS

Page 21: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

Improvement @ engineering level

Page 21

ENTSO-E issued in September 2016 new requirements to further enhance the engineering using IEC 61850

• Input & data flow modeling

• Introduction of virtual IED for vendor independent design (transparent purchasing process)

• Include key primary system data for efficient system engineering

• Include telecommunication network description

Page 22: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

ENTSO-E issued a Document for Comment (DC) to IEC

Page 22

Page 23: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

Engineering process / ENTSO-E requirements

Page 23

Virtual IED(Optional)

IST SST(**)Bay Template Substation Specification

Functionwith Subfct

Grouped in templates(Optional)

Profile builder Template or Project specification/configuration

(**) SST of the future, with ENTSO-E requirements supported

(*)

(*) (*)

(*)

(*)

(*)

(*)

(*)

(*)

(*)

(*) (*)

(*) (*)

(*)

(*) instantiated

(*)

(*)

(*)

Page 24: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

ENTSO-E engineering process – (Some) next steps

Page 24

ISTool SSTool

ENTSO-E test case @ UCA Iug IOP 201715-19th October 2017

Transparent & efficient purchasing/engineering process

Page 25: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

PLANNING

Page 26: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

Enforced cooperation ENTSO-E with IEC TC57 WG10

Page 26

ENTSO-E profile challenge

Engineering processENTSO-E requirements

UCA Iug IOP – Feedback loop

Page 27: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces

Global planning & enablers in preparation

Page 27

Enablers in preparation to make thisroadmap happen:

• Enforcement resources (and commitment) at ENTSO-E (members) side

• (Some) ENTSO-E members participation in EC funded Osmose project, with key market playersinvolved

Page 28: ENTSO-E ACTION PLAN TO IMPROVE IEC 61850 IEC 61850 …digitalsubstation.com/wp-content/uploads/2017/10/... · Future proof (e.g. integration of settings parameter, CIM, interfaces