enterprise resource planning (erp) education …thesis.binus.ac.id/doc/cover/2009-1-00245-ka...
TRANSCRIPT
ANALISA DAN PERANCANGAN
ENTERPRISE RESOURCE PLANNING (ERP) EDUCATION
DENGAN METODE
BUSINESS PROCESS MANAGEMENT (BPM)
(STUDI KASUS PADA AREA ALUMNI DAN EXTERNAL RELATIONSHIP
SERVICES BINUS UNIVERSITY)
SKRIPSI
Oleh
Rusliane 0900804852
Merlinda Handayani 0900821190
Universitas Bina Nusantara
Jakarta
2009
ii
ANALISA DAN PERANCANGAN
ENTERPRISE RESOURCE PLANNING (ERP) EDUCATION
DENGAN METODE
BUSINESS PROCESS MANAGEMENT (BPM)
(STUDI KASUS PADA AREA ALUMNI DAN EXTERNAL RELATIONSHIP
SERVICES BINUS UNIVERSITY)
SKRIPSI
diajukan sebagai salah satu syarat
untuk gelar kesarjanaan pada
Jurusan Komputer Akuntansi
Jenjang Pendidikan Strata-1
Oleh
Rusliane 0900804852
Merlinda Handayani 0900821190
Universitas Bina Nusantara
Jakarta
2009
ANALISA DAN PERANCANGAN
ENTERPRISE RESOURCE PLANNING (ERP) EDUCATION
DENGAN METODE
BUSINESS PROCESS MANAGEMENT (BPM)
(STUDI KASUS PADA AREA ALUMNI DAN EXTERNAL RELATIONSHIP
SERVICES BINUS UNIVERSITY)
SKRIPSI
Disusun oleh :
Rusliane_ Merlinda Handayani
0900804852 0900821190
Disetujui oleh :
Pembimbing
Prof. Dr. Harjanto Prabowo
Kddsn : D1390
Universitas Bina Nusantara
Jakarta
2009
v
PRAKATA
Puji dan syukur penulis panjatkan kepada Tuhan Yang Maha Esa karena
atas berkat dengan rahmat-Nya skripsi yang berjudul “Analisa dan Perancangan
Enterprise Resource Planning (ERP) Education Dengan Metode Business Process
Management (BPM) Pada Area Alumni dan External Relationship Services BINUS
University” yang merupakan salah satu syarat untuk mendapatkan gelar sarjana strata-1
jurusan Komputerisasi Akuntansi Universitas Bina Nusantara dapat diselesaikan dengan
tepat waktu.
Penulis menyadari bahwa dalam penyusunan skripsi, penulis mendapatkan
banyak bantuan yang diterima baik berupa dukungan materi maupun dukungan moral.
Untuk itu pada kesempatan ini penulis ingin menyampaikan rasa terima kasih yang
sebesar-besarnya kepada :
1. Bapak Prof. Dr. Gerardus Polla, M.APP.SC. selaku Rektor Universitas Bina
Nusantara.
2. Bapak Ir. Sablin Yusuf, M.Sc., M.Comp.Sc selaku Dekan Fakultas Ilmu Komputer.
3. Ibu Yanti, S.Kom, MM selaku ketua jurusan Komputerisasi Akuntansi.
4. Bapak Prof. Dr. Harjanto Prabowo, selaku dosen pembimbing yang telah membantu
dalam penyusunan skripsi ini.
5. Ibu Meyliana S.Kom, MM, selaku nara sumber yang telah banyak membantu dan
mengarahkan baik dalam teknis maupun penulisan skripsi ini.
vi
6. Pimpinan dan seluruh karyawan untuk unit BAC, BCC, BEC dan BICAR di BINUS
University yang telah memberikan waktu, kesempatan, serta bantuan dalam
memperoleh data dan informasi yang dibutuhkan dalam penyusunan skripsi ini.
7. Seluruh staf dan karyawan ATL (Applied Technology Laboratory) yang telah
memberi bantuan dalam penyusunan skripsi ini.
8. Orang tua, saudara-saudara, rekan-rekan mahasiswa serta semua pihak yang telah
memberikan dukungan dan bantuan secara moril maupun materi sehingga penulis
dapat menyelesaikan skripsi ini.
9. Semua teman-teman yang mengambil skripsi dengan topik ERP Education dan ERP
Hospital yang telah memberi dukungan, saran dan kritik yang membangun dalam
penyusunan skripsi, serta semua pihak yang tidak dapat disebutkan satu per satu.
Karena keterbatasan pengetahuan yang kami miliki, kami menyadari bahwa
skripsi ini masih jauh dari sempurna dan tentu tidak terlepas dari kesalahan-kesalahan
yang tidak disengaja. Oleh karena itu, kami mohon maaf dan pengertian yang sedalam-
dalamnya mengingat penulis masih dalam tahap belajar. Akhir kata, dengan segala
kerendahan hati kami mengharapkan skripsi ini dapat bermanfaat bagi semua pihak yang
membaca.
Jakarta, Januari 2009
Penulis
vii
DAFTAR ISI
Halaman Judul Luar
Halaman Judul Dalam
Halaman Persetujuan Hard Cover
Halaman Pernyataan Dewan Penguji
Abstrak............................................................................................................................ iv
Prakata...............................................................................................................................v
Daftar Isi ........................................................................................................................ vii
Daftar Tabel .................................................................................................................. xiii
Daftar Gambar.............................................................................................................. xvii
Daftar Lampiran..............................................................................................................xx
BAB 1 PENDAHULUAN
1.1 Latar Belakang ......................................................................................... 1
1.2 Ruang Lingkup......................................................................................... 3
1.3 Tujuan dan Manfaat ................................................................................. 4
1.4 Metodologi ............................................................................................... 4
1.5 Sistematika Penulisan .............................................................................. 6
BAB 2 LANDASAN TEORI
2.1 Teori-teori Dasar/Umum...........................................................................8
2.1.1 Pengertian Data .............................................................................8
2.1.2 Pengertian Informasi .....................................................................8
2.1.3 Pengertian Sistem..........................................................................9
viii
2.1.4 Pengertian Analisis Sistem ...........................................................9
2.1.5 Pengertian Perancangan Sistem ..................................................10
2.1.6 Pengertian Sistem Informasi .......................................................11
2.1.7 Sumber Daya Sistem Informasi ..................................................11
2.1.8 Pengertian Analisis Sistem Informasi .........................................13
2.1.9 Pengertian Sistem Informasi Manajemen ...................................13
2.1.10 Pengertian Sistem Informasi Manajemen Pendidikan ................13
2..2 Teori-teori Khusus yang Berhubungan Dengan Topik yang Dibahas ... 14
2.2.1 Pengertian Enterprise Resource Planning (ERP) ..................... 14
2.2.2 Manfaat Enterprise Resource Planning (ERP) ........................ 14
2.2.3 Pengertian Pendidikan .............................................................. 16
2.2.4 Pengertian Best Practice ............................................................ 16
2.2.5 Pengertian Proses Bisnis ............................................................ 16
2.2.6 Pengertian Business Process Management (BPM).................... 18
2.2.7 Business Process Management (BPM) Framework .................. 19
2.2.8 Business Process Management (BPM) Success Stool ............... 23
2.2.9 Business Process Management (BPM) Maturity Model............ 25
2.2.10 Business Process Modeling Notation (BPMN).......................... 26
2.2.11 Balance Scorecard ..................................................................... 27
2.2.12 Key Performance Indicator (KPI) ............................................. 27
2.2.13 Integrated Enterprise Ecosystem Portal .................................... 28
2.2.14 Alumni ....................................................................................... 29
2.2.15 Kolaborasi .................................................................................. 29
2.2.16 Karir ........................................................................................... 29
ix
2.2.17 Entrepreneurship/Kewirausahaan.............................................. 29
2.2.18 Entrepreneur .............................................................................. 30
BAB 3 ORGANIZATION-BPM FOUNDATION
3.1 Organization Foundation....................................................................... 31
• Aspek Internal Organisasi................................................................ 31
• Aspek Eksternal Organisasi ............................................................. 34
• Visi dan Misi Organisasi.................................................................. 37
• Tujuan Organisasi ............................................................................ 39
• Sasaran Organisasi ........................................................................... 40
• Struktur Organisasi .......................................................................... 41
• Nama Unit dan Deskripsi Umum..................................................... 42
• Strategi Untuk Mencapai Tujuan dan Sasaran................................. 46
• Strategi Implementasi Organisasi .................................................... 47
• Strategi Pembeda Utama.................................................................. 59
3.2 Process Foundation ............................................................................... 61
• Arsitektur Awal Proyek ................................................................... 63
• Gambaran Proses Organisasi ........................................................... 64
• Daftar Proses End-to-end ................................................................. 65
3.3 Technology Foundation ......................................................................... 66
• Gambaran dan Blue Print Arsitektur TI........................................... 66
• Penentuan Peralatan dan Teknologi yang Dibutuhkan .................... 67
• Identifikasi Sistem yang Sedang Berjalan ....................................... 68
• Canonical Data and Data Source Dictionary.................................. 68
x
• Portofolio Fungsionalitas Bisnis Awal ............................................ 79
• Penentuan Tim Proyek Teknis yang Dibutuhkan ............................ 83
3.4 BPM Foundation ................................................................................... 88
• Definisi Pihak yang Berkepentingan (Stakeholder)
dalam Proyek ................................................................................... 88
• Harapan Pihak yang Berkepentingan (Stakeholder) yang
Disetujui dan Didokumentasikan..................................................... 91
• Process Selection Matrix (PSM)...................................................... 92
• Daftar Proses Bisnis yang Teridentifikasi dan Metrik Awal
(PWM) ............................................................................................. 93
• Proses yang Diprioritaskan untuk Tahap Elaborasi ......................... 94
• Project Management (Initial Draft of the Project Plan).................. 94
BAB 4 ELABORATION-CONTINUOUS IMPROVEMENT PHASE
4.1 Elaboration Phase ............................................................................... 103
• Approriate Metrics to Establish a Beseline for Future
Improvement .................................................................................. 103
• Root Cause Analysis ...................................................................... 140
• People Capability Matrix............................................................... 141
• Available Information .................................................................... 146
• Improvement Priorities .................................................................. 147
4.2 Improvement Phase.............................................................................. 148
• Redesigning Process Models ......................................................... 148
• Simulation Models and ABC Details ............................................. 149
xi
• Future ABC .................................................................................... 156
• People Capability and Capacity Planning .................................... 180
• Feasibility Validation and Gap Analysis Report ........................... 183
• An Update Business Case .............................................................. 185
4.3 People and Technology Development Phase ....................................... 187
• Dissection & Amalgamation of New Process Info Activities ......... 187
• Redesigning Role Descriptors and Goals ...................................... 189
• Performance Management and Measurement for
Approriate Roles ............................................................................ 197
• People Core Capability Gap Analysis ........................................... 200
• Business Process Orchectration (BPMN) ..................................... 205
• Business Application Connectivity................................................. 209
• Hubungan antara BPM, ESB dan SOA.......................................... 210
• User Interface ................................................................................ 211
• Software Test Script and Result ..................................................... 216
4.4 Deployment Phase ............................................................................... 219
• Improved or New Process that Work Satisfactorily....................... 219
• Trained and Motivated Staff .......................................................... 220
4.5 Monitor and Benefit Realization Phase ............................................... 222
• Benefit Summary Plan.................................................................... 222
• Benefit Realization Register........................................................... 235
• Benefit Milestone Matrix................................................................ 237
• Benefit Delivery Matrix.................................................................. 240
xii
4.6 Continuous Improvement Phase .......................................................... 242
• Mechanism to Manage Business Process and Identify
and Realize Oppurtunities for Process Improvement .................... 242
4.7 Embedding BPM with the Organization .............................................. 243
• Characterictic ................................................................................ 243
• Integrated Enterprise Ecosystem ................................................... 244
BAB 5 SIMPULAN DAN SARAN
5.1 Simpulan .............................................................................................. 246
5.2 Saran .................................................................................................... 247
DAFTAR PUSTAKA
RIWAYAT HIDUP
LAMPIRAN-LAMPIRAN
SURAT KETERANGAN SURVEI
xiii
DAFTAR TABEL
Tabel 3.1 Aspek Internal Organisasi................................................................... 31
Tabel 3.2 Aspek Eksternal Organisasi ................................................................ 34
Tabel 3.3 Operational Excellence....................................................................... 48
Tabel 3.4 Timeline Schedule ............................................................................... 63
Tabel 3.5 Penentuan Peralatan dan Teknologi yang Dibutuhkan ....................... 67
Tabel 3.6 Portofolio Fungsionalitas Bisnis Awal ............................................... 79
Tabel 3.7 Process Worth Matrix (PWM)............................................................ 93
Tabel 4.1 Matrix Analysis ................................................................................. 105
Tabel 4.2 Activity-based Costing (ABC) untuk Proses Pembuatan Kerja
Sama Pada Unit BCC - Current ........................................................ 117
Tabel 4.3 Perkiraan Jumlah Transaksi untuk Proses Pembuatan
Kerjasama Unit BCC ........................................................................ 120
Tabel 4.4 Activity-based Costing (ABC) untuk Proses Registrasi pada Unit
BEC - Current .................................................................................. 122
Tabel 4.5 Perkiraan Jumlah Transaksi untuk Registrasi pada Unit BEC.......... 125
Tabel 4.6 Activity-based Costing (ABC) untuk Proses Pendaftaran
Membership pada Unit BAC -Current.............................................. 127
Tabel 4.7 Perkiraan Jumlah Transaksi untuk Pendaftaran Membership
pada unit BAC................................................................................... 129
Tabel 4.8 Activity-based Costing (ABC) untuk Proses Perekrutan pada Unit
BEC – Current .................................................................................. 131
Tabel 4.9 Perkiraan Jumlah Transaksi untuk Perekrutan pada Unit BEC ........ 133
xiv
Tabel 4.10 Activity-based Costing (ABC) untuk Proses Donasi pada
Unit BAC .......................................................................................... 136
Tabel 4.11 Perkiraan Jumlah Transaksi untuk Proses Donasi pada Unit BAC .. 138
Tabel 4.12 People Capability Matrix Unit BAC ................................................ 142
Table 4.13 People Capability Matrix Unit BCC................................................. 143
Tabel 4.14 People Capability Matrix Unit BEC................................................. 144
Tabel 4.15 People Capability Matrix Unit BICAR ............................................ 145
Tabel 4.16 Perbandingan Penggunaan Waktu Sebelum dan Sesudah
Penggunaan Aplikasi Baru dalam Proses Pembuatan Kerjasama
pada unit BCC................................................................................... 149
Tabel 4.17 Perbandingan Penggunaan Waktu Sebelum dan Sesudah
Penggunaan Fungsi Registrasi pada website BEC............................ 149
Tabel 4.18 Perbandingan Penggunaan Waktu Sebelum dan Sesudah
Penggunaan Fitur Membership pada website Alumni ...................... 150
Table 4.19 Perbandingan Penggunaan Waktu Sebelum dan Sesudah
Penggunaan Fungsi Perekrutan pada website BEC........................... 151
Tabel 4.20 Perbandingan Penggunaan Waktu Sebelum dan Sesudah
Penggunaan Fitur Donasi pada website BAC ................................... 151
Tabel 4.21 Perbandingan Penggunaan Biaya Sebelum dan Sesudah
Penggunaan Aplikasi Baru dalam Proses Pembuatan
Kerjasama pada Unit BCC................................................................ 152
Tabel 4.22 Perbandingan Penggunaan Biaya Sebelum dan Sesudah
Penggunaan Fungsi Registrasi pada website BEC............................ 153
xv
Tabel 4.23 Perbandingan Penggunaan Biaya Sebelum dan Sesudah
Penggunaan Fitur Membership pada website BAC .......................... 153
Table 4.24 Perbandingan Penggunaan Biaya Sebelum dan Sesudah
Penggunaan Fungsi Perekrutan pada website BEC........................... 154
Tabel 4.25 Perbandingan Penggunaan Biaya Sebelum dan Sesudah
Penggunaan Fitur Donasi pada website BAC ................................... 155
Tabel 4.26 Activity-based Costing (ABC) untuk Proses Pembuatan Kerjasama
pada website BEC – Future .............................................................. 156
Tabel 4.27 Perkiraan Jumlah Transaksi untuk Proses Pembuatan Kerjasama
pada Unit BCC.................................................................................. 159
Tabel 4.28 Activity-based Costing (ABC) untuk proses Registrasi melalui
website BEC – Future ....................................................................... 162
Tabel 4.29 Perkiraan Jumlah Transaksi untuk Registrasi pada Unit BEC.......... 164
Tabel 4.30 Activity-based Costing (ABC) untuk Proses Pendaftaran
Membership pada website BAC – Future ......................................... 167
Tabel 4.31 Perkiraan Jumlah Transaksi untuk Proses Pendaftaran Membership
pada unit BAC................................................................................... 169
Tabel 4.32 Activity-based Costing (ABC) untuk Proses Perekrutan melalui
website BEC – Future ....................................................................... 171
Tabel 4.33 Perkiraan Jumlah Transaksi untuk Perekrutan pada Unit BEC ........ 174
Tabel 4.34 Activity-based Costing (ABC) untuk Penambahan Fitur Donasi
pada website BAC – Future .............................................................. 176
Tabel 4.35 Perkiraan Jumlah Transaksi untuk Donasi pada Unit BEC .............. 178
Tabel 4.36 People Capability Matrix Unit BCC setelah Improvement .............. 180
xvi
Tabel 4.37 People Capability Matrix Unit BEC setelah Improvement............... 180
Tabel 4.38 People Capability Matrix Unit BAC setelah Improvement .............. 181
Tabel 4.39 Gap Analysis untuk People Capability Matrix BCC ........................ 182
Tabel 4.40 Gap Analysis untuk People Capability Matrix BEC ........................ 182
Tabel 4.41 Gap Analysis untuk People Capability Matrix BAC........................ 183
Tabel 4.42 RASCI Model Unit BEC .................................................................. 191
Tabel 4.43 RASCI Model Unit BCC .................................................................. 194
Tabel 4.44 RASCI Model Unit BAC .................................................................. 195
Tabel 4.45 KPI BEC ........................................................................................... 197
Tabel 4.46 KPI BCC ........................................................................................... 198
Tabel 4.47 KPI BAC........................................................................................... 199
Tabel 4.48 People Core Capability Gap Analysis pada Aplikasi Baru
untuk Unit BCC ................................................................................ 200
Tabel 4.49 People Core Capability Gap Analysis pada Registrasi untuk
Unit BEC........................................................................................... 201
Tabel 4.50 People Core Capability Gap Analysis pada Membership untuk
Unit BAC .......................................................................................... 203
Tabel 4.51 People Core Capability Gap Analysis pada Perkerutan untuk
Unit BEC........................................................................................... 203
Tabel 4.52 People Core Capability Gap Analysis pada Donasi untuk
Unit BAC .......................................................................................... 205
Tabel 4.53 Potential Benefits and Plan (Benefit Summary Plan) ....................... 222
xvii
DAFTAR GAMBAR
Gambar 2.1 BPM Implementation Framework ...................................................... 19
Gambar 2.2 BPM Success Stool ............................................................................. 23
Gambar 2.3 BPM Maturity Model .......................................................................... 25
Gambar 2.4 Integrated Enterprise Ecosystem Portal ............................................. 28
Gambar 3.1 Struktur Organisasi BINUS University .............................................. 41
Gambar 3.2 Struktur Organisasi Unit BAC ............................................................ 42
Gambar 3.3 Struktur Organisasi Unit BEC ............................................................ 43
Gambar 3.4 Struktur Organisasi Unit BICAR ........................................................ 44
Gambar 3.5 Struktur Organisasi Unit BCC ............................................................ 45
Gambar 3.6 Building Block pada Balanced Score Card......................................... 47
Gambar 3.7 Proses Model....................................................................................... 61
Gambar 3.8 Education Value Chain ....................................................................... 61
Gambar 3.9 Organization Process View................................................................. 64
Gambar 3.10 Overview dan Blueprint Arsitektur TI ................................................ 66
Gambar 3.11 Canonical Data ................................................................................... 68
Gambar 3.12 ERD Front Contents ........................................................................... 69
Gambar 3.13 ERD MU1 ........................................................................................... 70
Gambar 3.14 ERD MU2 ........................................................................................... 71
Gambar 3.15 ERD Testi............................................................................................ 72
Gambar 3.16 ERD Industri nw ................................................................................. 72
Gambar 3.17 ERD E-Mags ....................................................................................... 73
Gambar 3.18 ERD Events and Acts .......................................................................... 73
xviii
Gambar 3.19 ERD News ........................................................................................... 74
Gambar 3.20 ERD Business nw ................................................................................ 74
Gambar 3.21 ERD Success Prof ............................................................................... 75
Gambar 3.22 ERD Service Sol.................................................................................. 76
Gambar 3.23 ERD Sharing ....................................................................................... 77
Gambar 3.24 ERD Hits ............................................................................................. 77
Gambar 3.25 ERD Email .......................................................................................... 78
Gambar 3.26 ERD Member ...................................................................................... 78
Gambar 3.27 Process Selection Matrix (PSM)......................................................... 92
Gambar 3.28 Gantt Chart ......................................................................................... 95
Gambar 4.1 Knowledge and Information Need Map ............................................ 146
Gambar 4.2 BEC Pyramid of Performance Target .............................................. 197
Gambar 4.3 BCC Pyramid of Performance Target .............................................. 198
Gambar 4.4 BAC Pyramid of Performance Target .............................................. 199
Gambar 4.5 BPMN BCC (Aplikasi Pembuatan Kerjasama) ................................ 206
Gambar 4.6 BPMN BEC (Registrasi)................................................................... 207
Gambar 4.7 BPMN BAC (Membership Alumni) ................................................. 207
Gambar 4.8 BPMN BEC (Perekrutan) ................................................................. 208
Gambar 4.9 BPMN BAC (Donasi) ....................................................................... 208
Gambar 4.10 Business Application Connectivity.................................................... 209
Gambar 4.11 Hubungan BPM, ESB dan SOA ....................................................... 210
Gambar 4.12 Rancangan User Interface Proposal Aplikasi Baru BCC ................. 211
Gambar 4.13 Rancangan User Interface untuk Registrasi di BEC......................... 212
Gambar 4.14 Rancangan User Interface untuk Membership di BAC .................... 213
xix
Gambar 4.15 Rancangan User Interface untuk Perekrutan di BEC ....................... 214
Gambar 4.16 Rancangan User Interface Donasi .................................................... 215
Gambar 4.17 Benefit Milestone Matrix Unit BCC (Aplikasi) ................................ 237
Gambar 4.18 Benefit Milestone Matrix Unit BEC (Registrasi dan Perekrutan) ..... 238
Gambar 4.19 Benefit Milestone Matrix Unit BEC
(Membersip Alumni dan Donasi)...................................................... 239
Gambar 4.20 Benefit Delivery Matrix BCC (Aplikasi) .......................................... 240
Gambar 4.21 Benefit Delivery Matrix BEC (Registrasi) ........................................ 240
Gambar 4.22 Benefit Delivery Matrix BAC (Alumni Membership)....................... 241
Gambar 4.23 Benefit Delivery Matrix BEC (Perekrutan)....................................... 241
Gambar 4.24 Benefit Delivery Matrix (Donasi)...................................................... 242
Gambar 4.25 Integrated Enterprise Ecosystem ...................................................... 244
xx
DAFTAR LAMPIRAN
Lampiran 1. List Wawancara................................................................................. L1
Lampiran 2. Arsitektur yang Disetujui dan Didokumentasikan (Narasi).............. L12
Lampiran 3. Surat Survei....................................................................................... L30