enterprise integration of distributed energy resourcessmartgrid.epri.com/doc/epri sg informational...

25
Brian Seal EPRI IntelliGrid Smart Grid Information Sharing Webcast January 22 rd , 2014 Enterprise Integration of Distributed Energy Resources

Upload: trinhngoc

Post on 03-Feb-2018

221 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

Brian Seal

EPRI IntelliGrid Smart Grid Information Sharing Webcast

January 22rd, 2014

Enterprise Integration of Distributed Energy

Resources

Page 2: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

2 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Coordination of Work in this Area

• US Department of Energy DOE SunShot SEGIS-AC

(Solar Energy Grid Integration Systems – Advanced

Concepts)

‒ Field demonstration of smart inverters

• NIST / SGIP Domain Expert Working Group (DEWG) for

Distributed Renewables, Generation and Storage (DRGS)

• International Electrotechnical Commission (IEC) TC57

WG14 and others

• MultiSpeak

• IEC TC57 WG17, DNP3, SunSpec Alliance, IEEE

P2030.5 SEP2.0

Page 3: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

3 © 2014 Electric Power Research Institute, Inc. All rights reserved.

DER Enterprise Integration

DMS

Sensors, Switches, Capacitors, Regulators

MDMS OMS

DERMS

SOLAR BATTERY PEV

Enterprise Integration

GIS

SCADA / Field Networks

Etc.

Applications (centralized)

Communication

Networks (field & facility)

DER (end-device functions)

20

09

- 2

01

2

20

13

- 2

01

4

Page 4: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

4 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Sample of Related Documents

Document Description

EPRI 1020435 Development of a Standard Language for PV and Storage Integration

EPRI 1020906 Standard Language Protocols Whitepaper

EPRI E237894 Common Functions for Smart Inverters, Update DNP3 Standard

IEC 61850-90-7 Information Model for DER + Standard Function Definitions

EPRI 1021674 Specification for Smart Inverter Interactions with the Electric Grid Using

International Electrotechnical Commission 61850

EPRI 1026809 Common Functions for Smart Inverters, Version 2

EPRI 1017909 Advanced Metering Infrastructure (AMI) Considerations for Distributed

Renewables Integration

DNP AN2011-001 DNP3 Profile for Basic Photovoltaic Generation and Storage

DNP AN2013-001 DNP3 Profile for Advanced Photovoltaic Generation and Storage

Multiple DRGS DEWG Documentation (www.sgip.org/distributed-renewables-generation-storage-drgs-dewg)

SunSpec Sunspec Alliance Specifications, Including Modbus mapping

IEEE P2030.5 Draft Standard for Smart Energy Profile 2.0

EPRI 1024360 Integrating Smart Distributed Energy Resources with DMS

EPRI 1026789 Collaborative Initiative to Advance Enterprise Integration of DER

MultiSpeak Draft Version 5.0 Release (Q1, 2014)

EPRI 3002001249 Enterprise Integration Functions for Distributed Energy Resources

Page 5: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

5 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Enterprise Integration Needs From the Fall 2012 Workshop in Washington, DC

• At the Enterprise (e.g. DMS), the

needs for DER involve higher-level

concepts

• Enterprise interactions (between

software apps) need to be less

granular and not dealing with all the

configuration details of the field

interfaces

• Need to think of DER in groups,

aligned with the design and

hierarchical-levels of the power

system

• Don’t need all the functions, many

may be fixed out of the box. Start with

the basics – real and reactive power

1. DER Representation in the System Model

2. Creation of Groups of DER

3. Status Monitoring by Group

4. Real and Reactive Power Dispatch by Group

5. Exchanging DER Group Capability Forecasts

Page 6: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

6 © 2014 Electric Power Research Institute, Inc. All rights reserved.

DER Enterprise Integration

DMS

GIS

Sensors, Switches, Capacitors, Regulators

MDMS OMS

DERMS

SOLAR BATTERY PEV

• Representation of

individual DER in

the system model

Enterprise Integration

• Leveraged prior bodies

of work, identified the

set of DER attributes

needed to support the

remaining steps

• Including DER type,

size, and basic

capabilities

Page 7: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

7 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Simple Radial Feeder Example

Substation 1

DER1

DER2

Page 8: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

8 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Alternate Sub Example

Substation 1

DER1

DER2

Substation 2

Page 9: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

9 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Network Example

Substation 2

Substation 3

Substation 1

Page 10: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

10 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Common Information Model

Page 11: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

11 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Arbitrary Group Creation

An application can create a DER_Group based on any criteria or

combination of criteria:

• All DER on a certain circuit or circuit segment (dynamic entities)

• Those on the same phase

• Those of a certain type

• Those of a certain size

• Those of a certain asset owner

• Those enrolled in a particular program

Can make “groups” of one or many DER

An individual DER can be a member of multiple groups. Useful for aligning

monitoring and control actions with:

•Circuit reconfigurations

•Islanding

A standard method for sharing the group definitions with other applications

Page 12: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

12 © 2014 Electric Power Research Institute, Inc. All rights reserved.

DER Enterprise Integration

DMS

GIS

Sensors, Switches, Capacitors, Regulators

MDMS OMS

DERMS

SOLAR BATTERY PEV

• DER representation

in system model

• Creation of groups

and sharing of group

definitions Enterprise Integration

Page 13: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

13 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Watts Delivered Installed

Maximum

Capability

Installed

Minimum

Capability

Present

Maximum

Capability

Present

Minimum

Capability

Present

Value

Monitoring DER Group Status and Capabilities

Page 14: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

14 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Supporting Sequence Diagrams

Page 15: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

15 © 2014 Electric Power Research Institute, Inc. All rights reserved.

DER Enterprise Integration

DMS

GIS

Sensors, Switches, Capacitors, Regulators

MDMS OMS

DERMS

SOLAR BATTERY PEV

• Monitoring of group

status

• DER representation

in system model

• Creation of groups

and sharing of group

definitions Enterprise Integration

Page 16: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

16 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Watts Delivered Installed

Maximum

Capability

Installed

Minimum

Capability

Present

Maximum

Capability

Present

Minimum

Capability

Present

Value

Requesting Action from a DER Group

Request go-to

some level in

the achievable

range

Page 17: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

17 © 2014 Electric Power Research Institute, Inc. All rights reserved.

DER Enterprise Integration

DMS

GIS

Sensors, Switches, Capacitors, Regulators

MDMS OMS

DERMS

SOLAR BATTERY PEV

• Monitoring of group

status

• DER representation

in system model

• Dispatch of real

and reactive power

• Creation of groups

and sharing of group

definitions Enterprise Integration

Page 18: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

18 © 2014 Electric Power Research Institute, Inc. All rights reserved.

DER Group Capability Forecasts

Page 19: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

19 © 2014 Electric Power Research Institute, Inc. All rights reserved.

DER Group Capability Forecasts

Page 20: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

20 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Storage Group Capability Forecasts

Page 21: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

21 © 2014 Electric Power Research Institute, Inc. All rights reserved.

DER Enterprise Integration

DMS

GIS

Sensors, Switches, Capacitors, Regulators

MDMS OMS

DERMS

SOLAR BATTERY PEV

• Creation of groups

and sharing of group

definitions

• Monitoring of group

status

• DER representation

in system model

• Dispatch of real

and reactive power

• Forecasting of group

capabilities

Enterprise Integration

Page 22: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

22 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Summary of this Work:

EPRI Report 3002001249

EPRI Report: 300200124

Page 23: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

23 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Next Steps – Implement and Test

• Finalize support in CIM and MultiSpeak

• Interest Group

• Define and Document Test Cases

• Update Test Harness

• Conduct Workshop

• Feedback to Standards Organizations

• (future) Add Further Capabilities to Standards

Page 24: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

24 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Discussion

Page 25: Enterprise Integration of Distributed Energy Resourcessmartgrid.epri.com/doc/EPRI SG Informational Webcast - Enterprise... · Brian Seal EPRI IntelliGrid Smart Grid Information Sharing

25 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Together…Shaping the Future of Electricity