Generation and Transmission Development in the Southeastern United States. Entergy Transmission Planning Summit New Orleans, LA July 10, 2003. SERC Generation Development Survey. Fifth annual survey Survey request sent in late January Information requested from Transmission Providers - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

1

Entergy Transmission Planning Summit

New Orleans, LA

July 10, 2003

Generation and Transmission Development

in the Southeastern United States

Page 2: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

2

Page 3: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

3

SERC Generation Development Survey

• Fifth annual survey• Survey request sent in late January • Information requested from Transmission Providers• All results received by early March

Leading the Industry!!!Leading the Industry!!!

Page 4: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

4

• Collects 10 years of planned generation development• Categorizes facilities by interconnection status

– Interconnection service requested– Interconnection agreement signed

• Sub-categories indicate the amount of generation designated as a network resource

• Reports aggregate, not plant specific, generation plant capabilities

• Final results reported on Regional and subregional basis

SERC Generation Development Survey

Page 5: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

5

Current Status of Generation Plant Development

* In-Service Year of Added Generation (MW)

2003200

42005

2006

2007

2008

1) Interconnection Service Requested, Only

1993 4741 12447 9351 4514 675

> Designated as Network Resource or has obtained Firm PTP Transmission service

1952 360 1951 6121 2102 505

2) Interconnection Agreement Signed/Filed

20223 7002 8372 1184 1600 0

> Designated as Network Resource or has obtained Firm PTP Transmission service

5997 2143 1773 75 0 0

SERC Generation Development Survey

Page 6: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

6

2002 Survey Projected Interconnected Generating Plant Capability in Commercial Operation Prior to June 1, 2002:

(Summer Net Plant Capability in MW)202,388 MW

Total Actual Interconnected Generating Plant Capability in Commercial Operation Prior to December 31, 2002:

(Summer Net Plant Capability in MW)200,744 MW

Total Merchant Generating Plant Capability in Commercial Operation Prior to December 31, 2002 :

(Summer Net Plant Capability in MW)

26,399 MW

SERC Generation Development Survey

Page 7: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

7

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

Year

Meg

awat

ts

IS Requested IS Requested-DNR IA Signed IA Signed-DNR

Projected Capacity Additions- Cumulative, by Category -

Page 8: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

8

0

5000

10000

15000

20000

25000

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Year

Meg

awat

ts

Entergy Southern TVA VACAR

Projected Capacity Additions- Annual, by Subregion -

Page 9: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

9

0

5000

10000

15000

20000

25000

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012Year

Meg

awat

ts

IS Requested DNR IA Signed DNRIS Requested w/out DNR IA Signed w/out DNR

Projected Capacity Additions- Annual, by Category -

Page 10: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

10

Projected Capacity Additions- Cumulative Additions, Only -

0

50000

100000

150000

200000

250000

300000

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

Year

Me

ga

wa

tts

2001 Total 2002 Total 2003 Total

Page 11: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

11

Total Projected Generating PlantCapability Additions by July 1, 2010:

(Summer Net Plant Capability in MW)205,837 MW

Total Projected Generating PlantCapability Additions by July 1, 2010:

(Summer Net Plant Capability in MW)243,669 MW

2002 Survey Results

2001 Survey Results

Total Projected Generating PlantCapability Additions by July 1, 2010:

(Summer Net Plant Capability in MW)

72,897 MW

2003 Survey Results

Survey Result Comparisons- Cumulative Additions, Only -

Page 12: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

12

Projected Total Capacity- Existing Capacity plus Cumulative Additions -

150000

200000

250000

300000

350000

400000

450000

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

Year

Me

ga

wa

tts

2001 Total 2002 Total 2003 Total

Page 13: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

13

Survey Result Comparisons - Existing Capacity plus Cumulative Additions -

Total Projected Generating PlantCapability in July 1, 2010:

(Summer Net Plant Capability in MW)373,010 MW

Total Projected Generating PlantCapability in July 1, 2010:

(Summer Net Plant Capability in MW)422,988 MW

2002 Survey Results

2001 Survey Results

Total Projected Generating PlantCapability in July 1, 2010:

(Summer Net Plant Capability in MW)

274,011 MW

2003 Survey Results

Page 14: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

14

150,000

170,000

190,000

210,000

230,000

250,000

270,000

290,000

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

Year

Meg

aw

att

s

2003 Total SERC Projected Peak Load

Load Trend vs. Projected Total Capacity

Page 15: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

15

Page 16: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

16

• Total projected generation capacity for Summer ’03 (222,960 MW) exceeds projected Summer ’03 load (157,941 MW) by 65,000 MW

• Total connected generation capacity at the end of last year exceeds projections for SERC Regional load in 2012

– Projected capacity additions indicate sufficient generating resources over the long-term planning horizon

SERC Generation Development Survey

Page 17: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

17

• SERC Generation Development survey accurately projects actual generation development for the following year

• Survey reflects recent decline in proposed generation capacity additions– Survey projects generation capacity additions of 73,000 MW over

the next 10 years– Projected capacity additions for the same period have declined by

61% in the past year

• Network resource additions continue to be a small percentage of the projected capacity additions in the Region

SERC Generation Development Survey

Page 18: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

18

SERC Transmission Development Survey

• Second annual survey• Survey request sent in late January • Information requested from Transmission Providers• All results received by early March

Leading the Industry!!!Leading the Industry!!!

Page 19: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

19

• Requests total planned transmission expenditures– 5 years of cost data– 100 kV and above

• Requests aggregate data for transmission projects, only– New lines– New substations– Line rebuilds– Substation rebuilds– Line reconductoring projects

• Excludes distribution station costs• Results available on a Regional and subregional basis

SERC Transmission Development Survey

Page 20: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

20

Transmission Development Expenditures

- Projected 2002 versus Actual 2002 -

$0

$200

$400

$600

$800

$1,000

$1,200

$1,400

$1,600

SERC Entergy Southern TVA VACAR

Millio

ns

Year

2002 Projected 2002 Actual

Page 21: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

21

Transmission Development Expenditures

- Projected 2002 versus Projected 2003 -

$0

$200

$400

$600

$800

$1,000

$1,200

$1,400

$1,600

2002 2003 2004 2005 2006 2007

Millio

ns

Year

2002 Projected 2003 Projected

Page 22: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

22

Survey Result Comparisons- Total Projected Expenditures -

Total Projected Transmission ExpendituresOver the Subsequent Five Years : $6.932 Billion

$6.265 Billion

2003 Survey Results

2002 Survey Results

Total Projected Transmission ExpendituresOver the Subsequent Five Years :

Page 23: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

23

$0

$1,000

$2,000

$3,000

$4,000

$5,000

$6,000

$7,000

$8,000

0 1 2 3 4 5 6

Mill

ion

s

Year

2002 Cumulative Total 2003 Cumulative Total

Survey Result Comparisons- Cumulative Annual Expenditures -

Page 24: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

24

Total Projected Transmission ExpendituresOver the Subsequent Five Years : $6,265 Million

$191 Million

2003 Survey Results

2003 Survey Results

Of the Total Projected Expenditures Over the Subsequent Five Years, Amount

Attributed to Direct Interconnection of Generation :

SERC Transmission Development Survey

Page 25: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003
Page 26: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003
Page 27: Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

27

• Actual spending in 2002 fell short of projected spending acquired from last year’s survey– Cancellation of generation may have contributed to a portion of the

decline– Shortfall was minimal, indicating real spending has been occurring on the

SERC transmission systems

• Projected spending for next five years (beginning in 2003) is slightly below five-year projected spending from 2002

• 2003 survey projected spending correlates well with 2002 actual spending

SERC Transmission Development Survey