ensign installation decommissioning programme · pdf file the ensign gas field was developed...
Post on 12-Apr-2020
5 views
Embed Size (px)
TRANSCRIPT
Ensign Installation
Decommissioning Programme
Ensign Installation Decommissioning Programme Page 2 of 30
DOCUMENT CONTROL
Document ID: SPT-DCM-SNS0104-REP-0004
Document Classification: PUBLIC
Document Ownership: Decommissioning
Date of Document: 30/08/18 Signature Date
Prepared by: S. Axon 02 Oct 2019
Reviewed by: S. Mackenzie 02 Oct 2019
Approved by: M. Fotheringham M. Fotheringham 02 Oct 2019
REVISION RECORD
Revision No. Date of Revision Reason for Issue
A1 15/03/19 Combined DP issued for Review and Comment
A2 24/04/19 Issued to OPRED for Review and Comment
A3 08/10/19 Issued for Statutory Consultation
DISTRIBUTION LIST
Company No. of copies
Offshore Petroleum Regulator for Environment and Decommissioning 1 electronic
GMG, NFFO, NIFPO, SFF 1 electronic
Hull Central Library 1 hardcopy
Ensign Installation Decommissioning Programme Page 3 of 30
TABLE OF CONTENTS INST P/L
1. Executive Summary 7
1.1 Decommissioning Programme 7
1.2 Requirement for Decommissioning Programme 7
1.3 Introduction 7
1.4 Overview of Installation Being Decommissioned 8
1.5 Summary of Proposed Decommissioning Programme 8
1.6 Field Location in UKCS 10
1.7 Industrial Implications 13
2. Description of Items to be decommissioned 14
2.1 Installation: Surface Facilities 14
2.2 Wells 16
2.3 Inventory Estimates 16
3. Removal and Disposal Methods 16
3.1 Topsides 17
3.2 Jacket 19
3.3 Wells 21
3.4 Waste Streams 22
4. Environmental Impact Assessment 23
4.1 Potential Environmental Impacts and their Management 23
5. Interested Party Consultations 26
5.1 Informal Consultations 26
6. Programme Management 27
6.1 Project Management and Verification 27
6.2 Post-Decommissioning Debris Clearance and Verification 27
6.3 Schedule 27
6.4 Costs 27
6.5 Close Out 28
6.6 Post-Decommissioning Liability, Monitoring and Evaluation 28
7. Supporting Documents 29
Appendix A PUBLIC NOTICE & CONSULTEE CORRESPONDENCE 30
Appendix A.1 Public Notices 30
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
Ensign Installation Decommissioning Programme Page 4 of 30
FIGURES AND TABLES
Figure 1.6.1: Field Location in UKCS............................................................................................ 10 Figure 1.6.2: Ensign Prior to Decommissioning ............................................................................ 11 Figure 1.6.3: Overview of Ensign Approaches .............................................................................. 12 Figure 2.1.1: Overview of Ensign decommissioning proposals ..................................................... 15 Figure 2.3.1: Pie chart of estimated installation inventory ............................................................. 16 Figure 3.1.1: Ensign Looking North .............................................................................................. 17 Figure 3.1.2: Ensign Looking West ............................................................................................... 18 Figure 3.2.1: Elevations on West & East Jacket Faces ................................................................. 20 Figure 3.2.2: Elevations on North and South Jacket Faces .......................................................... 21 Figure 6.3.1: Gantt Chart of Project Plan ...................................................................................... 27 Table 1.4.1: Installations Being Decommissioned........................................................................... 8 Table 1.4.2: Installation Section 29 Notice Holders Details ............................................................. 8 Table 1.5.1: Summary of Decommissioning Programme ................................................................ 8 Table 1.6.1: Adjacent Facilities ..................................................................................................... 12 Table 2.1.1: Surface Facilities Information .................................................................................... 14 Table 2.2.1: Well Information ........................................................................................................ 16 Table 3.1.1: Cleaning of topsides for removal ............................................................................... 18 Table 3.1.2: Topside Removal Methods ....................................................................................... 19 Table 3.2.1: Jacket Decommissioning Methods ............................................................................ 19 Table 3.3.1: Well Decommissioning ............................................................................................. 21 Table 3.4.1: Waste Stream Management Method......................................................................... 22 Table 3.4.2: Inventory Disposition ................................................................................................ 22 Table 3.4.3: Re-use, Recycle & Disposal Aspirations for Recovered Material .............................. 22 Table 4.1.1: Environmental Impact Management [2] ..................................................................... 23 Table 5.1.1: Summary of Stakeholder Comments ........................................................................ 26
Ensign Installation Decommissioning Programme Page 5 of 30
TERMS AND ABBREVIATIONS
ABBREVIATION EXPLANATION
CPUK Conoco Phillips UK Limited
CSV Construction Support Vessel
DCA Decommissioning Operations (Master Application Template)
DSV Diving Support Vessel
Ensign Installation comprising small topsides and jacket held in location using 4x piles
ESDV Emergency Shutdown Valve
GMG Global Marine Group
HSE Health and Safety Executive
Installation Installation as defined by the Section 29 Notice, comprising topsides and jacket
“ Inch; 25.4 millimetres
JNCC Joint Nature Conservation Committee
JUWB Jack Up Work Barge
km Kilometre
LAT Lowest Astronomical Tide
LOGGS Lincolnshire Offshore Gas Gathering System
m Metre(s)
MAT, SAT Master Application Template, Supplementary Application Template
MCV Monohull Crane Vessel
MSV Multipurpose Support Vessel
N,S,E,W, ESE North, South, East, West, East-South-East
n/a Not Applicable
NFFO National Federation of Fishermen's Organisations
NIFPO Northern Ireland Fish Producers Organisation
NORM Naturally Occurring Radioactive Material
NPAI Not Permanently Attended Installation
NUI Normally Unattended Installation
OPEP Oil Pollution Emergency Plan
OPRED Offshore Petroleum Regulator for Environment and Decommissioning
OSPAR Oslo-Paris Convention
Piggybacked Smaller pipeline is adjacent and clamped to a larger pipeline throughout its length
Pipeline Pipeline or umbilical
PL Pipeline Identification numbers
PLA Pipeline Operations as defined in MAT Operation Types
Platform Installation, typically comprising topsides and jacket
PON Petroleum Operations Notice
ROVSV Remotely Operated Vehicle Support Vessel
Ensign Installation Decommissioning Programme Page 6 of 30
ABBREVIATION EXPLANATION
SFF Scottish Fishermen’s Federation
SLV Shear Leg Vessel
Spirit Energy Spirit Energy North Sea Limited
SSCV Semi-Submersible Crane Vessel
UK United Kingdom
UKCS United Kingdom Continental Shelf
WGS84 World Geodetic System 1984
Ensign Installation Decommissioning Programme Page 7 of 30
1. EXECUTIVE SUMMARY
1.1 Decommissioning Programme
This document contains one Decommissioning Programme for the set of notices under Section 29 of the Petroleum Act 1998. The Decommissioning Programme is concerned with:
• The Ensign installation, comprising a steel jacket and topsides.
Although decommissioning of the Ensign installations and pipelines is being treated in this document as a standalone project, Spirit Energy will also continue to explore cost saving synergies with other projects.
A separate Decommissioning Programme will be prepared for the Ensign pipelines.
1.2 Requirement for Decommissioning Programme
Installations: In accordance with the Petroleum Act 1998, Spirit Energy North Sea Limited (as operator of the Ensign field, and on behalf of the Section 29 notice holders (Table 1.4.2), is applying to the Offshore Petroleum Regulator for Environment and Decommissioning (OPRED) to obtain approval for decommissioning the installations detailed in Section 2 of this document.
In conjunction with public, stakeholder and regulatory consultation, this Decommissioning Programme is submitted in compliance with national and international regulations and