PLAN
Geographical location of the Douala port
Natural challenges
Efficiency enhancement institutions / tools
The sub regional character of the Douala
port
Conclusion
Geographical location of the Douala
port and its potential
Geographical location
Some Specificities about
the Douala PortThe Port has a 50km long access channel; the
upstream of 25km is constantly dredged to maintain
a draft of 7m; (tidal range of 2.8m) It has 13 bonded
ware houses
An annual traffic of 12 million tons
13km of quays; 9 berths for general cargo
A rail and road network to facilitate the movement of
vehicles and goods
Several terminals
Efficiency enhancement
tools and structures
Their objectives are mainly two fold
Reduction in delays in the
passage of goods at the port (the
target is 5 days for import and 2
days for exports)
Drastic reduction of the global
cost for handling of goods either
on import or export
Dredgingthe Perrenial head ache
1. Dredging – the Perrenial head ache The Port of Douala is a river port.
The port is linked to the high seas by a 50km channel that
needs permanent dredging to enable big vessels access
the port
The total amount spent every year for this operation is 23
billion CFAF (an out sourced activity). About 39 million US
dollars
On the binstructions of the gov’t, the Port Authority of
Douala is setting up a subsidiary company to hencforth
carring out the dredging exercise
Studies show that the amount spent per year will drop to
about 4 billion CFAF. About 7 million US dollars
To do this, PAD has acquired some equipments
New Beaver 50 dredger
2. A strong port Community - PORT-
SYNTHESE PORT-SYNTHESE is an umbrella association created in 1994 that brings
together the main actors of the port industry in Douala
The Association has 53 members drawn from:
The different Port authorities (Douala, Kribi, Limbe and Garoua)
The Directorate General of Customs
The Cameroon National Shippers’ Council
The Cameroon Chamber of Commerce, Industry, Mines and Crafts
The National Office for Free Trade zones
The Union of agents and Ship-Owners of Cameroon (UCAM)
Professional Group of Stevedoring companies Cameroon
Freight forwarders
etc
Missions of the Port Community – port
Sythése
Bring members of the port community under
one canopy to continously identify all
encumbrances to the competitiveness and
efficiency of the port in order to provide
lasting and satisfactory solutions to them
Provide a concerted and synergized strategy
for the promotion of the port and its image
3. National Committee for the
Facilitation of trade
This is a consultative organ placed under the tutulage of the Prime Minister and Head of Government
It carries out research to identify stumbling blocks to fluidity in external trade and factors that negativelyimpact costs and time
As such propose corrective measures to the government and other relevant structures in the import – export procedures processes
3. One-stop-shop or Single Window for
external trade operations
Created since 1999, this single window bringsthe following services in one building;
The Port Authority
Customs Administration
Phytosanitary services
Banks
GUCE
DEMATERIALISATION OF KEY
CLEARING PROCEDURES
4. Dematerialization
Accelerate the procedure for the clearance of goods to gain time and reduce cost
quicker transactions and higher efficiency in trading.
It eliminates physical contact betweenactors in the Supply chain and helps to reduce or even eliminate corruption
Concessions of Commercial activities
5. Concessions of Commercial
activities
Targets two main objectives:
Allow the Port Authority to concentrate on regalian activies like the development of port infrastructure, fortification of port security, promotion and marketing of the port etc
Enable private business organisations that winthe concessions to strife for efficiency throughquality investments, profit incentives etc
The Container terminal
Entirely modernized in 2003 thanks to financing
from the Japanses Gov’t
Comprises:
A 700m long quai with a depth of 700m
A RORO ramp (roll on / roll off )
Three gantry cranes of 40T capacity
Warehouses for container stuffing and stripping
24 ha of completely paved earth platform
2 car parks
Conceded activities at the Douala port
The container terminal since 2004 with A.P MOLLER-MAERSK (APM Terminals /Bolloré).
A new concession goes on from January 1st 2020 with TIL (terminal Investment Limited)
The Fruit terminal with TMFD (Terminal Mixte Fruitière de Douala)
The timber terminal with SEPBC
Mooring and towing activity with BOLLUDA
The regional character
of the port and
Facilities to landlocked
countries
6. Facilities to landlocked countries
The port of Douala serves as a « Natural
Port » to landlocked countries like Tchad
and the Republic of Central Africa.
It also serves parts of other countries like
Northern Congo, Eastern Nigeria, and
Democratic Republic of Congo
Facilities to landlocked countries
20 hectares of land for their port operations
50% discount for port charges
50% discount for security charges
75% reduction of different penalties
The objective here is to promote and sustain the
competetiveness of goods from these countries
on the world market and the affordability of
imported goods to their populations
INTERNATIONALSHIP AND
PORT FACILITY SECURITY
CODE ISPS AND ISO
CERTIFICATIONS
ISO Certification and ISPS Code
Since 2016, the port of Douala is certified ISO 9001: 2008 version and since February this year, the 2015 version for Piloting and Management of Ship Call
The Port of Douala is currently preparing itscertification to Marchandise and land tenure and Corporate Social Responsibility
Since the ISPS Code went into use on the 1st of July 2004, the Port Authority of Douala has been committing spirited efforts to domisticate the prescription of this code. The American CoastGuard visits and evaluates the port’s security set up every year.
Master Plan for the development of the
Port for the next 15 years
In the short run, there is
Renovation of warehouses
Construction and modernization of quais to satisfycurrent exigencies
Fortification of security measures in keeping with the prescriptions of the ISPS code
In the long run, the plan envisages:
The construction of a deep sea port around cape Cameroon
Developing the right banks of the Wouri river to accomodate the ever increasing traffic
Conclusion As a port that is located in Cameroon’s economic
capital that has two bouyant industrial zones and a geogrphical position that places it at the service of atleast seven of ten of the country’s ten regions plus five of the countries neighbours amongs them two that are geographically disadvantaged,
The port of Douala has a key role to play as far as the performance quotient and competitivness of Cameroon’s economy and that of the entire Central African sub region is concern.
The Cameroon gov’t is aware of this. That is why the efficiency enhancment institutions and tools that we justexamined have been put in place not only as stimulants of good performance but safety valves for unhealthypractices that can smear the image of the country and negatively impact the economy
Thanks very much for
your kind attention