Enhanced Multiple Element Contingency Screening and Cascading
Analysis for NERC Compliance
Chengyue Guo
Chuck Lawrence
MIPSYCON
November 5th , 2014
![Page 2: Enhanced Multiple Element Contingency Screening and ... · •Generator low voltage (0.9 pu) •Load low voltage (0.8 pu) 7 Study Methodology ... o Microsoft® VB.NET o Tailored to](https://reader035.vdocuments.mx/reader035/viewer/2022070822/5f29747edeedb36ecb58881c/html5/thumbnails/2.jpg)
2
ATC - Who we are
• Founded in 2001
• Multi-state transmission-only utility
• Over 9,500 miles of transmission line and 530 substations
• Voltages from 69 kV to 345 kV
![Page 3: Enhanced Multiple Element Contingency Screening and ... · •Generator low voltage (0.9 pu) •Load low voltage (0.8 pu) 7 Study Methodology ... o Microsoft® VB.NET o Tailored to](https://reader035.vdocuments.mx/reader035/viewer/2022070822/5f29747edeedb36ecb58881c/html5/thumbnails/3.jpg)
3
Business Triggers
• Improve compliance support documentation
• Enhance ATC cascading methodology
• Simulate a larger number of multiple element contingencies
• Automate post-processing of simulation results
![Page 4: Enhanced Multiple Element Contingency Screening and ... · •Generator low voltage (0.9 pu) •Load low voltage (0.8 pu) 7 Study Methodology ... o Microsoft® VB.NET o Tailored to](https://reader035.vdocuments.mx/reader035/viewer/2022070822/5f29747edeedb36ecb58881c/html5/thumbnails/4.jpg)
Total Load At Risk
• Consequential load loss (NERC term)
• Subsequent cascading load loss
• Expected load shed
4
![Page 5: Enhanced Multiple Element Contingency Screening and ... · •Generator low voltage (0.9 pu) •Load low voltage (0.8 pu) 7 Study Methodology ... o Microsoft® VB.NET o Tailored to](https://reader035.vdocuments.mx/reader035/viewer/2022070822/5f29747edeedb36ecb58881c/html5/thumbnails/5.jpg)
• Used to classify “More Severe” contingencies
• Used to better define when NERC Cascading may occur (cascading versus Cascading)
5
Total Load At Risk
![Page 6: Enhanced Multiple Element Contingency Screening and ... · •Generator low voltage (0.9 pu) •Load low voltage (0.8 pu) 7 Study Methodology ... o Microsoft® VB.NET o Tailored to](https://reader035.vdocuments.mx/reader035/viewer/2022070822/5f29747edeedb36ecb58881c/html5/thumbnails/6.jpg)
6
ATC Enhanced Cascading Tripping Criteria
• Overhead conductor loading
– 345kV (110%)
– 115kV ,138kV, 161kV, 230kV (105%)
– 69kV (100%)
• Transformer loading (30 min)
• Underground/Submarine cable loading (125%)
• Generator low voltage (0.9 pu)
• Load low voltage (0.8 pu)
![Page 7: Enhanced Multiple Element Contingency Screening and ... · •Generator low voltage (0.9 pu) •Load low voltage (0.8 pu) 7 Study Methodology ... o Microsoft® VB.NET o Tailored to](https://reader035.vdocuments.mx/reader035/viewer/2022070822/5f29747edeedb36ecb58881c/html5/thumbnails/7.jpg)
7
Study Methodology
Steady-state screening analysis – Screening analysis without mitigation
(Stage 1)
– Screening analysis with mitigation
(Stage 2)
Steady-state cascading analysis – (Stage 3)
![Page 8: Enhanced Multiple Element Contingency Screening and ... · •Generator low voltage (0.9 pu) •Load low voltage (0.8 pu) 7 Study Methodology ... o Microsoft® VB.NET o Tailored to](https://reader035.vdocuments.mx/reader035/viewer/2022070822/5f29747edeedb36ecb58881c/html5/thumbnails/8.jpg)
8
Screening Analysis – Stage 1
Identifies contingencies:
• Potential Voltage Instability
–> Stage 3
• Exceeding system tripping criteria
–> Stage 3
• Exceeding system normal limits
–> Stage 2
![Page 9: Enhanced Multiple Element Contingency Screening and ... · •Generator low voltage (0.9 pu) •Load low voltage (0.8 pu) 7 Study Methodology ... o Microsoft® VB.NET o Tailored to](https://reader035.vdocuments.mx/reader035/viewer/2022070822/5f29747edeedb36ecb58881c/html5/thumbnails/9.jpg)
9
Screening Analysis – Stage 2
Identifies contingencies :
• Exceeding emergency limits, but do not exceed tripping criteria
- Two step mitigation analysis
• Exceeding normal limits, but do not exceed emergency limits
- One step mitigation analysis
![Page 10: Enhanced Multiple Element Contingency Screening and ... · •Generator low voltage (0.9 pu) •Load low voltage (0.8 pu) 7 Study Methodology ... o Microsoft® VB.NET o Tailored to](https://reader035.vdocuments.mx/reader035/viewer/2022070822/5f29747edeedb36ecb58881c/html5/thumbnails/10.jpg)
Feasible Mitigations
• Capacitor and inductor switching
• Transformer LTC adjustment
• Phase shifter adjustment
• Generator voltage schedule
• System reconfiguration
• Generation redispatch
• Load curtailment
10
![Page 11: Enhanced Multiple Element Contingency Screening and ... · •Generator low voltage (0.9 pu) •Load low voltage (0.8 pu) 7 Study Methodology ... o Microsoft® VB.NET o Tailored to](https://reader035.vdocuments.mx/reader035/viewer/2022070822/5f29747edeedb36ecb58881c/html5/thumbnails/11.jpg)
11
Cascading Analysis – Stage 3
•Cascading Tier Analysis o Simulation stop criteria
No more tripping
Number of BES lines tripped threshold exceeded
Total load at Risk threshold exceeded
Unmitigated voltage instability
•Post Cascading Mitigation Analysis
o Same as Stage 2 process
![Page 12: Enhanced Multiple Element Contingency Screening and ... · •Generator low voltage (0.9 pu) •Load low voltage (0.8 pu) 7 Study Methodology ... o Microsoft® VB.NET o Tailored to](https://reader035.vdocuments.mx/reader035/viewer/2022070822/5f29747edeedb36ecb58881c/html5/thumbnails/12.jpg)
Working with V&R
• Screening and Cascading Analysis scripts
o POM/OPM
o Microsoft® VB.NET
o Tailored to ATC’s process
o Easy to use with different input options
o Results tabulated in spreadsheets
o Adaptable to various compliance studies
12
![Page 13: Enhanced Multiple Element Contingency Screening and ... · •Generator low voltage (0.9 pu) •Load low voltage (0.8 pu) 7 Study Methodology ... o Microsoft® VB.NET o Tailored to](https://reader035.vdocuments.mx/reader035/viewer/2022070822/5f29747edeedb36ecb58881c/html5/thumbnails/13.jpg)
13
Typical Running Time
• Screening Analysis - Stage 1 ~250,000 contingencies
~25 hours
• Screening Analysis - Stage 2 ~14,000 contingencies
~10 hours
• Cascading Analysis - Stage 3 ~800 contingencies
~2 hours
![Page 14: Enhanced Multiple Element Contingency Screening and ... · •Generator low voltage (0.9 pu) •Load low voltage (0.8 pu) 7 Study Methodology ... o Microsoft® VB.NET o Tailored to](https://reader035.vdocuments.mx/reader035/viewer/2022070822/5f29747edeedb36ecb58881c/html5/thumbnails/14.jpg)
14
Future Improvements
Add consideration of :
•Circuit terminal equipment tripping criteria
•Generator high voltage tripping criteria
•Special Protection Schemes
•Loadability relay actions
•Element tripping sequence
•Breaker-to-breaker tripping
![Page 15: Enhanced Multiple Element Contingency Screening and ... · •Generator low voltage (0.9 pu) •Load low voltage (0.8 pu) 7 Study Methodology ... o Microsoft® VB.NET o Tailored to](https://reader035.vdocuments.mx/reader035/viewer/2022070822/5f29747edeedb36ecb58881c/html5/thumbnails/15.jpg)
15
• Questions?