ENGINEERING WORK REQUEST LOG (2011 - 2014) 08/02/2022 PROJECT ENGINEERING SUPV: N. McFARLANE Page 1 of 10 Request No Requester Dept. Project Title Request Type Budget Type Priority Assignee Status Reference High High Med Med Low Med Med Med Med Low Med Low Med Med Low Low Med Med Med Med Med Med Med Med Low Low Med Low Low Med Med Med Med Med Low Budget No. / Cost Centre Date Requested Date Required Date Assigned Date Completed

Upload: necols2801

Post on 21-Oct-2015

19 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Engineering Work Requests

ENGINEERING WORK REQUEST LOG (2011 - 2014)

04/17/2023 PROJECT ENGINEERING SUPV: N. McFARLANE Page 1 of 9

Request No Requester Dept. Project Title Budget Type Priority Assignee Status Reference

High

High

Med

Med

Low

Med

Med

Med

Med

Low

Med

Low

Med

Med

Low

Low

Med

Med

Med

Med

Med

Med

Med

Med

Low

Low

Med

Low

Low

Med

Med

Med

Med

Med

Low

Low

Low

Low

Med

Med

Low

Med

Med

Request Type

Budget No. / Cost Centre

Date Requested

Date Required

Date Assigned

Date Completed

Page 2: Engineering Work Requests

ENGINEERING WORK REQUEST LOG (2011 - 2014)

04/17/2023 PROJECT ENGINEERING SUPV: N. McFARLANE Page 2 of 9

Request No Requester Dept. Project Title Budget Type Priority Assignee Status ReferenceRequest Type

Budget No. / Cost Centre

Date Requested

Date Required

Date Assigned

Date Completed

Med

Med

Med

Med

Med

Low

Med

Low

Low

Low

Med

Med

Low

Med

Med

Low

Med

Med

Med

Med

Med

Med

Low

Low

Med

Low

Low

Med

Low

Med

Low

High

Low

Low

Med

Low

Med

Low

Low

High

Low

Low

Low

Med

Med

K53
Andrea V. Ellis: Reassigned - Leon McNeil
N57
Andrea V. Ellis: Tank has been commissioned, however, power mixer still outstanding
N69
Andrea V. Ellis: All Pumps received, to be installed by maintenance dept.
K86
Andrea V. Ellis: Project has been reassigned to Maintenance Dept.
K91
Andrea V. Ellis: Project has been reassigned to Maintenance Dept.
Page 3: Engineering Work Requests

ENGINEERING WORK REQUEST LOG (2011 - 2014)

04/17/2023 PROJECT ENGINEERING SUPV: N. McFARLANE Page 3 of 9

Request No Requester Dept. Project Title Budget Type Priority Assignee Status ReferenceRequest Type

Budget No. / Cost Centre

Date Requested

Date Required

Date Assigned

Date Completed

Med

Med

High

Med

Low

Med

Low

Med

High

Low

Low

Low

Low

Low

Low

Med

Med

Med

Med

Med

High

Med

Med

High

High

High

High

Med

Med

High

High

Med

Med

Med

Med

High

Med

Med

Med

Med

EWR 2013-008

EWR 2013-009 High

High

EWR 2013-010 Low

EWR 2013- 010

Page 4: Engineering Work Requests

ENGINEERING WORK REQUEST LOG (2011 - 2014)

04/17/2023 PROJECT ENGINEERING SUPV: N. McFARLANE Page 4 of 9

Request No Requester Dept. Project Title Budget Type Priority Assignee Status ReferenceRequest Type

Budget No. / Cost Centre

Date Requested

Date Required

Date Assigned

Date Completed

EWR 2013-011 Med

EWR 2013-012 Med

EWR 2013-013

EWR 2013-014 High

EWR 2013-015 Low

EWR 2013-016 Low

High

High

High

Low

High

High

High

EWR 2014 - 001

EWR 2014- 002

EWR 2014 - 003

EWR 2014 - 004

EWR 2014 - 005

EWR 2014 - 006

EWR 2014- 007

Page 5: Engineering Work Requests

ENGINEERING WORK REQUEST LOG - 2011

04/17/2023 PROJECT ENGINEERING SUPV: N. McFARLANE Page 5 of 9

Request No Requester Dept. Project Title Budget Type Priority Assignee Status Reference

EWR2011-001 Gladstone Ivey S.E.Q.S. Expense High 8-Nov-11 Michael McGhie Completed

EWR2011-002 Donavon Forbes Logistics Loading Bay Enclosures Expense High Michael McGhie Completed

EWR2011-003 Howard Powell Logistics Concreting of Roadway Mobay ILR Capital 211-26 Med Donald Johnson Completed

EWR2011-004 Gladstone Ivey S.E.Q.S. Expense Med Michael McGhie Pending

EWR2011-005 DeLeon Burke Procurement Expense Low Michael McGhie In Progress

EWR2011-006 Karen Muir S.E.Q.S. Chemical Storage Bund Walls Expense Med Donald Johnson In Progress

EWR2011-007 Telroy Morgan Production D-24 Plinth Repairs Expense Med 21-Nov-11 Michael McGhie Completed

EWR2011-008 Robert Blake S.E.Q.S. Expense Med 10-Nov-11 ASAP Michael McGhie 15-Nov-11 In Progress

EWR2011-009 Roland Cole TSD Expense Med Michael McGhie In Progress

EWR2011-010 Roland Cole TSD D-6 Replacement Capital Low Adrian Brown Completed

EWR2011-011 Jennifer Walker TSD Expense 632500, Med Narda Banton 3-Jun-12 Completed

EWR2011-012 Roland Cole TSD Separator Sluice Gate Installation Expense Low Adrian Brown In Progress

EWR2011-013 Logistics Expense Med Adrian Brown 10-Jan-12 31-Jul-12 Completed

EWR2011-014 Logistics Relocation of 6" Diesel Line Expense Med Adrian Brown 10-Jan-12 31-Dec-12 Completed

EWR2011-015 Logistics Expense Low Adrian Brown In Progress

EWR2011-016 Logistics Expense Low Adrian Brown In Progress

EWR2011-017 Logistics Expense Med Adrian Brown 10-Jan-12 31-Jul-12 Completed

EWR2011-018 Logistics Expense Med Adrian Brown 10-Jan-12 31-Oct-12 Completed

EWR2011-019 Winston Henry Production Expense Med Michael McGhie Completed

EWR2011-020 Neville McFarlane TSD Expense Med Michael McGhie Completed

EWR2011-021 Andrea Bent H.R.D. Expense Med Michael McGhie Completed

EWR2011-022 Telroy Morgan Production Tank Foundation Repairs Expense Med Donald Johnson In Progress

EWR2011-023 Rendolph Yearde TSD Expense Med Michael McGhie Completed

EWR2011-024 Donavon Forbes Logistics Loading Bay Enclosures - Part II Expense Med Michael McGhie In Progress

EWR2011-025 Lincoln Sharrier TSD Workshop Equipment Shed Expense Low Evon Thompson Pending

EWR2011-026 Lincoln Sharrier TSD B1E Boiler Hoist Installation Expense Low Narda Banton In Progress

EWR2011-027 Andrea Reid ULSD Additive installation ?? Med Narda Banton In Progress

EWR2011-028 Howard Powell Logistics Additive for COOL Petroleum ?? Low Narda Banton In Progress

Request Type

Budget No. / Cost Centre

Date Requeste

d

Date Required

Date Assigned

Date Completed

Refurbishing of Laboratory Changeroom

Construction Management

Construction Management

Construction Management

Old ESSO Lube Lab Renovation / Restoration

Construction Management

Container Office - for Procurement Group & Payroll Staff

Construction Management

Construction Management

Repairs to P-26 & P-27 Firewater Sump Intake.

Construction Management

Unit Piperack Concrete Repairs - March 2012

Construction Management

Project Management

Corroded Piping Replacement - March 2011/12 TurnAround

Construction Management

Project Management

Howard Powell / Phillip Howell

Jet Fuel Filter Separator - Mobay Terminal

Project Management

Howard Powell / Phillip Howell

Project Management

Howard Powell / Phillip Howell

TK-3 and TK-4 Pipeline Modifications and construction of sumps for drainage of tankfield - Mobay Terminal

Project Management

Howard Powell / Phillip Howell

Modifications to Berth 3 Piping - Mobay

Project Management

Howard Powell / Phillip Howell

Pipeline Modifications for TK-5 and TK-11 - Kingston ILR

Project Management

Howard Powell / Phillip Howell

Procurement of replacement end caps and air eliminators for filter separators - Mobay Terminal

Project Management

Reconfiguration of Accounts Department Offices

Construction Management

Reconfiguration of Old Process Engineering Offices

Construction Management

Rehabilitation of Corporate Office Exterior

Construction Management

Construction Management

Renovation of Workshop Technician Changerooms

Construction Management

Construction Management

Construction Management

Construction Management

Strategic Planning

Project Management

Project Management

Page 6: Engineering Work Requests

ENGINEERING WORK REQUEST LOG - 2011

04/17/2023 PROJECT ENGINEERING SUPV: N. McFARLANE Page 6 of 9

Request No Requester Dept. Project Title Budget Type Priority Assignee Status ReferenceRequest Type

Budget No. / Cost Centre

Date Requeste

d

Date Required

Date Assigned

Date Completed

EWR2011-029 Howard Powell Logistics Additive for TOTAL Diesel ?? Low Narda Banton In Progress

EWR2011-030 Donavon Forbes Logistics Expense Med Evon Thompson In Progress

EWR2011-031 Telroy Morgan Production Installation LPG PROVER & METER Capital 2638 Med Richard Smith In Progress

EWR2011-032 Michael Hewett Logistics Tank No 1 & 2 Piping Capital 2814 Med Richard Smith In Progress

EWR2011-033 Telroy Morgan Production Run - Down Slop Metering Capital 2918 Med Richard Smith In Progress

EWR2011-034 Telroy Morgan Production Tank 110 repairs Capital 210-08 Med Richard Smith In Progress

EWR2011-035 Telroy Morgan Production New Softener Capital 211-13 Low Richard Smith Completed

EWR2011-036 Leon Jarrett S.E.Q.S. Capital SP26-02 Low Richard Smith In Progress

EWR2011-037 Michael Hewett Logistics Tank 11 Repairs Capital 2901 Low Adrian Brown Completed

EWR2011-038 Michael Hewett Logistics Tank 12 Repairs Capital 2901 Low Adrian Brown Pending

EWR2011-039 Brian Case TSD Capital 210-02 Med Adrian Brown Completed

EWR2011-040 Michael Hewett Logistics JEP HFO Fuel Supply Project Capital 210-20 Med Adrian Brown In Progress

EWR2011-041 Brian Case TSD Tank No. 108 Modifications Capital 210-08 Low Adrian Brown 14-Oct-11 Completed

EWR2011-042 Andrea Reid Land Reclamation Capital 2811 Med Donald Johnson In Progress

EWR2011-043 Howard Powell Logistics Capital 210-07 Med Donald Johnson In Progress

EWR2011-044 Telroy Morgan Production Tank No. 200 Repairs Capital 210-08 Med Donald Johnson In Progress

EWR2011-045 Leon Jarrett S.E.Q.S. New Petroleum Laboratory Capital 210-21 Med Donald Johnson In Progress

EWR2011-046 Howard Powell Logistics Capital 211-18 Med Donald Johnson In Progress

EWR2011-047 Brian Case TSD Tank No. 109 Repairs Capital 210-08 Med Richard Smith In Progress

EWR2011-048 Andrea Bent H.R.D. Canteen Refurbishment Capital 210-29 Med Michael McGhie In Progress

EWR2011-049 Andrea Bent H.R.D. Sports Club Facility Capital 211-25 Low Michael McGhie Cancelled

EWR2011-050 Andrea Bent H.R.D. Renovate ESSO Offices Capital SP210-01 Med Michael McGhie In Progress

EWR2011-051 Telroy Morgan Production Naphtha Prefilter Installation Capital 2712 Low Narda Banton In Progress

EWR2011-052 Telroy Morgan Production Kero & ADO Coalescer Capital 2713 Low Narda Banton In Progress

EWR2011-053 Telroy Morgan Production Cooling Tower Hydrocyclone Capital 2818 Low Narda Banton In Progress

EWR2011-054 Brian Case TSD Tank 112 Repairs Capital 2901 Med Narda Banton In Progress

EWR2011-055 Brian Case TSD E-4 Replacement Capital 2919 Med Narda Banton In Progress

EWR2011-056 Kelvin Salmon Production Oil Well Recovery Facility Capital 211-15 Low Narda Banton Pending

EWR2011-057 Telroy Morgan Production Capital 2908 Med Donald Leslie In Progress

EWR2011-058 Brian Case TSD Replacement of F-201 Barrel Capital 210-01 Med Donald Leslie In Progress

Project Management

Rehabilitation of drainage covers & Channel around KILR Loading Bays

Construction Management

Project Management

Project Management

Project Management

Project Management

Project Management

Rehabilitation of the Former ESSO Kingston Terminal - Piping Installation

Construction Management

Project Management

Project Management

Drum Replacement (D-3, D-5, D-11, D-13, D-50)

Project Management

Project Management

Project Management

Strategic Planning

Project Management

New Office Building - Montego Bay Terminal

Project Management

Project Management

Project Management

KILR Bund Wall and Drainage System

Project Management

Project Management

Project Management

Construction Management

Construction Management

Project Management

Project Management

Project Management

Project Management

Project Management

Project Management

Replacement T-2 De-Ethanizer Tower

Project Management

Project Management

Page 7: Engineering Work Requests

ENGINEERING WORK REQUEST LOG - 2011

04/17/2023 PROJECT ENGINEERING SUPV: N. McFARLANE Page 7 of 9

Request No Requester Dept. Project Title Budget Type Priority Assignee Status ReferenceRequest Type

Budget No. / Cost Centre

Date Requeste

d

Date Required

Date Assigned

Date Completed

EWR2011-059 Brian Case TSD Tank No. 107 Repairs Capital 210-08 Low Donald Leslie In Progress

EWR2011-060 Michael Hewett Logistics Capital 210-19 Med Donald Leslie In Progress

EWR2011-061 Winston Watson TSD Capital 2914 Med Damian Blake In Progress

EWR2011-062 Winston Watson TSD Capital 2920 Med Damian Blake In Progress

EWR2011-063 Telroy Morgan Production Power Factor Improvement Capital 210-04 Med Damian Blake In Progress

EWR2011-064 Winston Watson TSD New Electrical Power Facility Capital 211-19 Med Lloyd O'Meally In Progress

EWR2011-065 Robert Blake S.E.Q.S. Upgrade Firewater System P27/27A Capital 0 Med 29-Oct-11 30-Sep-12 Donald Leslie In Progress

EWR2011-066 Brian Case TSD Capital 2607 Low Donald Leslie In Progress

EWR2011-067 Telroy Morgan Production Stadis Additive Injection Facility Capital 2705 Low T.B.D. Pending

EWR2011-068 Leon Jarrett S.E.Q.S. Capital 2710 Med Donald Leslie In Progress

EWR2011-069 Telroy Morgan Production Tank 202 Repairs Capital 2813 Low Jason Wong Completed

EWR2011-070 Telroy Morgan Production Stripping Steam Control Valves Capital 2906 Low Jason Wong Completed

EWR2011-071 Brian Case TSD Tank 109 Repairs Capital 210-08 Med Richard Smith In Progress

EWR2011-072 Howard Powell Logistics Capital 211-12 Low T.B.D. Pending

EWR2011-073 Neville McFarlane TSD Engineering Various 0 Med Lloyd O'Meally In Progress

EWR2011-074 Kelvin Salmon Production Capital 0 Low Narda Banton Pending

EWR2011-075 Phillip Campbell S.E.Q.S. Total Facilities Lighting Engineering Capital 0 Med 31-Oct-11 Lloyd O'Meally In Progress

EWR2011-076 Donald Johnson TSD Engineering Project Support 0 Low 14-Nov-11 Damian Blake In Progress

EWR2011-077 Donald Johnson TSD Engineering Project Support 0 Low 14-Nov-11 Damian Blake In Progress

EWR2011-078 Norbert Clayton S.E.Q.S. KILR Bladder Tank Shed Capital 211-21 Med 10-Nov-11 Donald Leslie In Progress

EWR2011-079 Richard Smith TSD Engineering Project Support 0 Low 8-Nov-11 Donald Johnson Completed

EWR2011-080 Adrian Brown TSD P-21A Electrical Installation Engineering Project Support I/O# 2022281 Med Lloyd O'Meally In Progress

EWR2011-081 Narda Banton TSD E-4 Replacement - Electricals Engineering Project Support Budget# 2919 Low Lloyd O'Meally In Progress

EWR2011-082 Narda Banton TSD Coalescer Electricals Engineering Project Support I/O# 201695 Low Lloyd O'Meally Completed

EWR2011-083 Narda Banton TSD Tank 112 Repairs - Electricals Engineering Project Support I/O# 202700 Med Lloyd O'Meally In Progress

EWR2011-084 Donald Leslie TSD Engineering Project Support I/O# 202680 Low Lloyd O'Meally In Progress

EWR2011-085 Jason Wong TSD P-9A Electricals Engineering Project Support Low Lloyd O'Meally Completed

EWR2011-086 Jason Wong TSD Tank 202 Repairs - Electricals Engineering Project Support Low Lloyd O'Meally Completed

EWR2011-087 Donald Leslie TSD Engineering Project Support Med Damian Blake In Progress

EWR2011-088 Kelvin Salmon Production Slop & Rundown Meter - Electrical Engineering Med 15-Nov-11 30-Mar-12 Lloyd O'Meally In Progress

Project Management

New 60,000 Bbl Ethanol Storage Tank

Project Management

Medium Voltage Transfer Switch Replacement

Project Management

Replace 2.3KV Starters in Sub-station #1

Project Management

Project Management

Project Management

Project Management

Phase II Sidestream Pump replacement

Project Management

Project Management

Installation of sprinkler & foam dispensing facilities for the Kingston & Mobay Loading Racks

Project Management

Project Management

Construction Management

KILR top to bottom Loading Conversion - Bay 6

Project Management

Projects Group - Electrical Engineering Support

Kerosene Drainage and Product Recovery

Project Management

New Office Building - Montego Bay Terminal - Electrical

New Petroleum Laboratory - Electrical

Additional Softener Facility - Concrete Works

New 60,000 Bbl Ethanol Storage Tank - Electricals

Fire Detection and Protection System - Electricals

K86
Andrea V. Ellis: Project has been reassigned to Maintenance Dept.
K91
Andrea V. Ellis: Project has been reassigned to Maintenance Dept.
Page 8: Engineering Work Requests

ENGINEERING WORK REQUEST LOG - 2011

04/17/2023 PROJECT ENGINEERING SUPV: N. McFARLANE Page 8 of 9

Request No Requester Dept. Project Title Budget Type Priority Assignee Status ReferenceRequest Type

Budget No. / Cost Centre

Date Requeste

d

Date Required

Date Assigned

Date Completed

EWR2011-089 Donald Leslie TSD T-2 Replacement Engineering Project Support Budget# 2908 Med Lloyd O'Meally In Progress

EWR2011-090 Donald Leslie TSD F201 Replacement Engineering Project Support Med Lloyd O'Meally In Progress

EWR2011-091 Hugh Hines Logistics Kerosene Shed Repairs Med 16-Nov-11 28-Feb-12 Michael McGhie In Progress

EWR2011-092 Nicole Smith S.E.Q.S. MILR Bladder Tank Shed Med 2-Nov-11 28-Feb-12 Donald Leslie In Progress

EWR2011-093 Leighton O'Sullivan TSD Expense ?? Low 25-Nov-11 28-Jan-12 Michael McGhie Pending

EWR2011-094 Robert Blake S.E.Q.S. ESSO Pump Rehabilitation Engineering Capital ?? Med 24-Nov-11 30-Jun-12 Michael McGhie Pending

EWR2011-095 Karen Muir S.E.Q.S. Lube Oil Storage Shed Capital ?? Low 16-Dec-11 31-Jan-12 Michael McGhie Pending

EWR2011-096 Nicole Smith S.E.Q.S. Groundwater Monitoring Well Engineering Capital ?? Med 2-Feb-12 10-Feb-12 Donald Johnson Pending

EWR2011-097 Yehert Miller TSD T(3,4,6) Platform Modification Engineering Expense ?? Low 6-Feb-12 30-Apr-12 Donald Johnson In Progress

EWR2011-098 Karen Muir S.E.Q.S. Engineering Project Support 0 Low 30-Jan-12 29-Feb-12 Michael McGhie In Progress

EWR2011-099 Karen Muir S.E.Q.S. Estimate Project Support 0 Low 30-Jan-12 Michael McGhie In Progress

EWR2011-100 Karen Muir S.E.Q.S. Estimate Project Support 0 Low 30-Jan-12 Michael McGhie In Progress

EWR2011-101 Karen Muir S.E.Q.S. Condition Survey Engineering Capital ?? Low 30-Jan-12 Donald Johnson Completed

EWR2011-102 Leighton O'Sullivan TSD P-402B Concrete Rehabilitation Expense 632500 Low 14-Feb-12 20-Feb-12 Michael McGhie Completed

EWR2011-103 Donavon Forbes Logistics Capital ?? Low Lloyd O'Meally In Progress

EWR2011-104 Sheldon Smith TSD Engineering Capital Med 5-Mar-12 31-May-12 Donald Johnson Completed

EWR 2012-001 Neville McFarlane Asphalt Export Capital Med T.B.D. Cancelled

EWR 2012-002 Courtney Walsh Production Capital Med 30-Mar-12 Adrian Brown In Progress

EWR 2012-003 Jodi Morris Production Expense Med 11-Apr-12 25-Apr-12 Adrian Brown 13-Apr-12 In Progress

EWR 2012-004 Donavon Forbes Logistics KILR Lighting Capital Med 13-Mar-12 Lloyd O'Meally 13-Apr-12 In Progress

EWR 2012-005 Jodi Morris Production Asphalt Export Capital 212-21 Med 5-Jun-12 Adrian Brown In Progress

EWR 2012-006 Jodie-Ann Barber Production Engineering ?? Med 8-Jun-12 T.B.D. Pending

EWR 2012-007 Donald Johnson Engineering Capital ?? Med 20-Jun-12 2-Jul-12 Lloyd O'Meally 18-Jun-12 In Progress

EWR 2012-008 Marlon Maragh H.R.D. Replacement of Bearings Container Capital ?? Med 19-Sep-12 30-Nov-12 Michael McGhie 22-Oct-12 Completed

EWR 2012-009 Fabian Campbell Tank No. 103 Drain Line Repair Expense Med 28-Jun-12 Michael McGhie In Progress

EWR 2012-010 Jodi Morris Production Engineering Med 29-Jun-12 13-Jul-12 T.B.D. Pending

EWR 2012-011 Stephen Gabbadon Production Desalter Effluent Cooler Engineering Med 2-Jul-12 13-Jul-12 Adrian Brown In Progress

EWR 2012-012 Akishma Fishmer H.R.D. Expense Med 1-Dec-12 T.B.D. Pending

EWR 2012-013 Jodi Morris Production Engineering Med 12-Dec-12 31-Mar-13 T.B.D. In Progress

EWR 2013-001 Everton Menzie Logistics Expense IO#100580 Med 8-Feb-13 1-Jun-13 Michael McGhie 11-Feb-13 In Progress

Budget# 210-01

Construction Management

Warehouse Open Area Modidfication

Construction Management

Construction Management

Identify Boundaries - Waste Water Treatment Plant

Cost Estimate - Rehabilitation of Antilles Dry Cargo Dock

Estimate - Relocation of Oil Spill Shed

Construction Management

Refinery Lighting Installation - North of Tank No. 1 & 2

Construction Management

TR-4 Substation Transformer Replacement

Budget# 210-23

Strategic Planning

Project Management

Tk 108, 109, Tk 110 Utilization Modification

Project Management

Replacement of API Separator Sluice gate & Bypass Valve

Project Management

Project Management

Project Management

Treatment for Marine Fuels for H2S specification

Strategic Planning

Prefabricated Office Building - Electricals

Construction Management

Reliability & Maintenance

Construction Management

Regeneration Auxilliary Piping for Gas Scrubbing and Corrosion Ctrl

Retrofit Container for Records Storage

Construction Management

Achieve Kero & ADO Appearance Specification

Naphtha Separator T-5 Workmans Platform

Construction Management

Page 9: Engineering Work Requests

ENGINEERING WORK REQUEST LOG - 2011

04/17/2023 PROJECT ENGINEERING SUPV: N. McFARLANE Page 9 of 9

Request No Requester Dept. Project Title Budget Type Priority Assignee Status ReferenceRequest Type

Budget No. / Cost Centre

Date Requeste

d

Date Required

Date Assigned

Date Completed

EWR 2013-002 Alexander Reid Montego Bay Duplex Shower Stall Expense Med 4-Apr-13 30-Jun-13 Michael McGhie Completed

EWR 2013-003 Donald Johnson Guard House KILR Bill of Quantities Med 17-Jun-13 O'Hara Harris 19-Jun-13 Completed

Expense Med Michael McGhie 28-Jun-13 Pending

EWR 2013-005 Donald Leslie Capital Med O'Hara Harris In Progress

EWR 2013-006 Michael McGhie Rehabilitation of Esso Warehouse Bill of Quantities N/A Med O'Hara Harris 20-Jun-13 Completed

EWR 2013-007 Donald Johnson Montego Bay LPG Facility Bill of Quantities Capital High O'Hara Harris 2-Jun-13 Completed

Lloyd O'Meally H.R.D. Engineering Capital Med Pending

Richard Smith Installation of LPG Meter and Prover Engineering Capital Med In Progress

Production Engineering Narda Banton Pending

Donald Johnson Tank No. 200 Repairs Capital Med Michael McGhie Completed

E.K.T Sewerage Disposal Med Donald Leslie In Progress

Reliability & Maintenance

Construction Management

Strategic Planning

EWR 2013 -004

Alex Brown/Kenric Spence

Reliability & Maintenance

Rehabilitation of the Nebaaska Boiler

Strategic Planning

New 60,000 Bbl Ethanol Storage Tank

Construction Management

Strategic Planning

Strategic Planning

Corporate Office & New Petroleum Laboratory Power Supply

Strategic Planning

Achieve Kero & ADO appearance specification

Strategic Planning

Construction Management

Construction Management