engineering report mark kosters. big changes with engineering starting at the beginning of 2015 lots...

22
Engineering Report Mark Kosters

Upload: christine-harvey

Post on 13-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

Engineering ReportMark Kosters

Page 2: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

Big changes with Engineering starting at the beginning of 2015

• Lots of requests for development/operations support

• Engineering has grown by 13.5 FTEs in 2015– 5 operations– 3 developers– 1 UX– 4 SI– ½ PM

• We are doing well on hiring people but it is taking some time

2

Page 3: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

Staffing Summary

• Operations– Ten engineers + two managers ( +3 since last meeting)– Two slots open

• Development– Twelve engineers + UX expert + manager (+2 since last

meeting)– FULL

• Software Integration – Nine engineers + manager (+1 since last meeting)– FULL

• Project Management – One PM and one PT PM (+1/2 since last meeting)– FULL

• CTO– Moi3

Page 4: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

Open Positions

• Looking for two good people– Systems Administrator– Security Engineer

4

Page 5: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

Accomplishments sinceARIN 35

• Transfers

– 8.4 (Inter-RIR) is underway

– 8.2 (Mergers & Acquisitions) released

• RDAP deployed into production (ACSP

2009.21)

• Completed a lot more ACSPs

5

Page 6: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

Accomplishments - ACSP’s• Add Links to Whois Query Responses (ACSP 2011.29)

• Show abuse contacts in Whois results by default (2014.25)

• Change Whois Output for Certain /8 Records (ACSP 2013.4)

• Add ASN activity to ARIN-issued report (2014.27)

• Add Two-factor Authentication for web accounts (2013.8)

• Send email notifications for ticketed request updates (2012.1)

• Highlight unpaid invoices in red only when past due (2012.2)

• Send initial POC validation messages to all email addresses

associated with that POC (2013.27)

• Whois-RWS and RDAP now offered over SSL (2014.1, 2014.29)

6

Page 7: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

Accomplishments Cont…

• Fixed PGP to be RFC 3156 compliant• Two new public-facing services sites turned up

– Seattle– San Jose (really Santa Clara)

• Fault tolerance improvements– Redundancy/failover for internal network

• Corporate help desk and IT support• ARIN member meeting support• Care and feeding of servers & network• OT&E

7

Page 8: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

OT&E (Operational Test & Evaluation)

• Lots of people test in production– Is not the best place to test– Things do get stuck – may impact others– Operational Test & Evaluation

• Goodness of OT&E– Place to test code– Place to test process– All services now under ote.arin.net except email– Need to register to participate– https://www.arin.net/resources/ote.html

8

Page 9: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

9

New Features

• Two-Factor Authentication– Two people signed up within 30 minutes of

deployment on a Saturday afternoon– 53 people are now using it

• RDAP– More IPv6 than IPv4– 121,002 queries over IPv6 since rollout– 12,170 queries over IPv4

Page 10: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

ARIN Online Usage

• 104,312 accounts activated since inception through Q3 of 2015

10

2008200920102011201220132014

2015*

Number of Accounts Activated

5000 10000 15000 20000

* Through Q3 of 2015

Page 11: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

Active Usage of ARIN Online

11

0 1 2 - 5 6 - 10 11 - 15

>160

10000

20000

30000

40000

50000

Logins

# o

f U

sers

Times logged in

• Logins from inception through Q3 of 2015

• One user logged in 1,205,887 times!

Page 12: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

Reg-RWS Transactions(cumulative)

12

ARIN 29 ARIN 30 ARIN 31 ARIN 32 ARIN 33 ARIN 34 ARIN 35 ARIN 360

1,000,000

2,000,000

3,000,000

4,000,000

5,000,000

6,000,000

408,383595,858

846,9431,066,037

1,311,4031,498,204

1,749,3832,006,440

40,374320,197

841,105

3,524,124

4,296,734

4,715,231

5,034,717

5,662,477Template REST

Page 13: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

DNSSEC

ARIN 36

Number of Orgs with DNSSEC

123

Total Number of Delegations 583,442

DNSSEC Secured Zones 586

Percentage Secured 0.1 %

13

Page 14: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

RPKI Usage

ARIN XXX

ARIN XXXI

ARIN XXXII ARIN33 ARIN34 ARIN

35ARIN

36

RPAs Signed 27 72 130 162 208 289 358

Certified Orgs 47 68 108 153 187 220

ROAs 19 60 106 162 239 308 338

Covered Resources 30 82 147 258 332 430 482

Up/Down Delegated 0 0 0 1 2

14

Page 15: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

Whois Queries Per Second

15

2007-01 2007-08 2008-03 2008-10 2009-05 2009-12 2010-07 2011-02 2011-09 2012-04 2012-11 2013-06 2014-01 2014-08 2015-030

500

1000

1500

2000

2500

3000

3500

4000

RESTfulPort 43

Page 16: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

Whois via IPv6

16

Percentage of traffic over IPv6

2009-01

2009-04

2009-07

2009-10

2010-01

2010-04

2010-07

2010-10

2011-01

2011-04

2011-07

2011-10

2012-01

2012-04

2012-07

2012-10

2013-01

2013-04

2013-07

2013-10

2014-01

2014-04

2014-07

2014-10

2015-01

2015-04

2015-070.00%

5.00%

10.00%

15.00%

20.00%

25.00%

V6 Percentage

Page 17: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

IRR Maintainers

2011 2012 2013 2014 20150

500

1000

1500

2000

2500

17261850 1951

21022322

Maintainers

Maintainers

17

2015 Data through Q3

Page 18: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

IRR Route / Route6

2011 2012 2013 2014 2015100

1000

10000

100000

18636 19969 21204 23535 27255

242

527698

10721385

18

2015 data through Q3

Page 19: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

IRR InetNum / Inet6Num

2011 2012 2013 2014 2015

InetNum 419 481 531 621 731

Inet6Num 13 25 38 51 77

31.6227766016838

316.227766016838

InetNum

Inet6Num

19

2015 data through Q3

Page 20: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

20

IRR object breakout by Organization

Number of Organizations

Number of Objects

34 100-1000

5 90-99

6 80-89

1 70-79

16 60-69

14 50-59

362 10-49

522 5-9

Page 21: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

What we are working on through 2016 Q1• Complete automation on transfers • Rollout “SWIP Easy” – a web-based tool to

send in reassignment information • Work on various ACSPs• Work on fully redundant services (like Reg-

RWS) to allow for rolling deployments• Security audit• Technical backlog

– Moving from Java6 to Java8• Essentially done on directory service side• Starting ARIN Online next year

21

Page 22: Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering

22

Comments?