ENGINEERING REBUTTAL TESTIMONY

Page 1

DWR-6

Page 2: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

TOPICS OF DISCUSSION

• Responses to previously identified concerns – Large tunnel projects – Levees and proposed CWF construction – Existing/planned facilities and proposed CWF

construction – Water supply from existing diversions and CWF

facilities – Sea Level Rise

Page 2

Page 3: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

CALIFORNIA WATER FIX- OVERALL PROGRAM

Main Tunnels

North Tunnels

Intermediate Forebay

Clifton Court Pumping Plant

Intakes Intakes Intakes

Sacramento

Stockton

Page 3

Page 4: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

TUNNEL PORTIONS OF PROGRAM

Page 4

Page 5: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

MAIN TUNNELS

Photo Courtesy: Port of Miami Tunnel

• 100 year life • Twin bore main tunnels

• 150 ft below grade

• Concrete segmental liner

• Pressurized face Tunnel Boring Machine construction

• 45 ft excavated diameter

• 40 ft finished internal diameter

Page 5

Page 6: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

LARGE DIAMETER TUNNEL BORING MACHINE PROJECTS

42 43.3 45 45.5 46 47.5 49.5 50.6 51.2

57.5 58

0

10

20

30

40

50

60

70

Port

of

Mia

mi

SMAR

TM

alay

sia

CA W

ater

Fix

Thim

ble

Shoa

ls

Hong

Kon

gTM

CLK

East

Wat

ervi

ewAu

ckla

nd N

Z

Mad

rid M

30

Wuh

anM

etro

Chi

na

Spar

vo It

aly

Seat

tle S

R99

Hong

Kon

gTM

CLK

Wes

t

TBM

Dia

met

er (f

t)

Page 6

Page 7: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

REVIEW OF OTHER MEGA-TUNNEL PROJECTS

• The Eurasia Tunnel - Turkey • Lee Tunnel - London • Port Of Miami Tunnel - Florida • East Side Access - New York • Blue Plains Tunnel Project - District of Columbia • Bay Tunnel - San Francisco • Willamette River Combined Sewer Outfall Program -

Portland • Gotthard Base Tunnel - Swiss Alps • SR-99 Alaskan Way Replacement - Seattle

Page 7

Page 8: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

THE EURASIA TUNNEL – TURKEY

Bedrock

Sand & Gravel

Bedrock Seismic Joints

2.1 miles

320 ft

Page 8

Page 9: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

THE EURASIA TUNNEL – TURKEY

Project Information

• Transportation Tunnel 45 ft Internal Diameter (ID) x 2.1 miles

• 320 ft deep

• Completed Dec 2016 – 3 months ahead of schedule

• Challenges − Complex geology, seismic

deformations, and high groundwater pressure

Page 9

Page 10: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

LEE TUNNEL - LONDON Abby Mills Pump

Station

Beckton Sewage Treatment Works

Lee Tunnel

Page 10

Page 11: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

LEE TUNNEL – LONDON

Project Information • 23.6 ft ID x 4.3 mile Combined

Sewer Outfall (CSO) Tunnel

• 160 ft deep

• Completed December 2015 – on schedule – Within budget

• Challenges − Groundwater contamination,

complexity of Tunnel Boring Machine launch, and spoil removal

Page 11

Page 12: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

PORT OF MIAMI TUNNEL - FLORIDA

Watson Island Construction

Eastbound Tunnel

Westbound Tunnel

Dodge Island Construction

Page 12

Page 13: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

PORT OF MIAMI TUNNEL

Project Information • (2) 39 ft ID x 4,200 ft Long Transportation

Tunnels

• 120 ft deep

• Completion May 2014 – On schedule – Within budget

• Challenges − Additional geotechnical investigations

were critical to confirm the ground model

Page 13

Page 14: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

EAST SIDE ACCESS – NEW YORK

Page 14

Page 15: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

EAST SIDE ACCESS – NEW YORK

Project Information • (4) 19 ft Railroad Tunnels

• 60 ft deep

• Completion June 2013

• Challenges − Small work areas, shallow

ground cover, difficult ground conditions, active rail lines directly above tunnels

Page 15

Page 16: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

BLUE PLAINS TUNNEL PROJECT- DISTRICT OF COLUMBIA

Blue Plains Tunnel

Page 16

Page 17: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

BLUE PLAINS TUNNEL PROJECT

Project Information • 23 ft ID x 24,200 ft CSO Tunnel • 160 ft deep • Completed Dec 2015

– 3 months ahead of schedule – Under budget

• Challenges – Institutional resistance to

change, existing infrastructure above tunne, and environmental permitting

Page 17

Page 18: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

BAY TUNNEL – SAN FRANCISCO

Page 18

Page 19: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

BAY TUNNEL – SAN FRANCISCO

Project Information

• 15 ft ID x 5 mile water tunnel • 110 ft deep • Completed Oct, 2014

– on schedule – Within budget

• Challenges − Variable ground, contaminated soil,

disposal of tunnel material, long tunnel drive, and high ground water pressure (3.5 bar)

Page 19

Page 20: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

WILLAMETTE RIVER COMBINED SEWER OUTFALL PROGRAM – PORTLAND

Eastside Tunnel

Westside Tunnel

Swan Island PS

Page 20

Page 21: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

WILLAMETTE RIVER COMBINED SEWER OUTFALL PROGRAM – PORTLAND

Project Information • (1) 14 ft ID x 3.5 mile 120 ft deep and (1)

22 ft ID x 6 mile

• 150 ft deep CSO tunnels

• Construction Complete Feb 2012 – 8 months ahead of schedule

– Under budget

• Challenges

– Schedule, existing infrastructure, groundwater, difficult ground conditions, soil modification, and subcontract changes

Page 21

Page 22: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

GOTTHARD BASE TUNNEL - SWISS ALPS

France

Switzerland

Italy

Gotthard Base Tunnel

Page 22

Page 23: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

GOTTHARD BASE TUNNEL - SWISS ALPS

Project Information

• (2) 30 ft ID x 35 mile rail tunnel

• Up to 6,560 ft deep

• For the 2 main tunnels and the safety, ventilation and cross cuts, a total of 95 miles tunnel was bored

• Completed June 2016

– within schedule (17 years)

• Challenges: Safety, geology

Page 23

Page 24: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

SR-99 ALASKAN WAY REPLACEMENT-SEATTLE

Top of tunnel

Underground View Page 24

Building pile foundations

Viaduct pile foundations

Page 25: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

Project Information

• 53 ft ID x 2 mile transportation tunnel

• Construction schedule

– approximately 2 year delay

• Challenges

– Equipment malfunction, existing pile foundations and other infrastructure, difficult ground

SR-99 ALASKAN WAY TUNNEL-SEATTLE

Page 25

Page 26: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

Aug-

13O

ct-1

3De

c-13

Feb-

14Ap

r-14

Jun-

14Au

g-14

Oct

-14

Dec-

14Fe

b-15

Apr-

15Ju

n-15

Aug-

15O

ct-1

5De

c-15

Feb-

16Ap

r-16

Jun-

16Au

g-16

Oct

-16

Dec-

16Fe

b-17

Dec 2013: Stoppage begins

Access pit constr begins

Arrival at access pit

TBM exits access pit

PM

PM

PM

PM PM = Planned maintenance

SR-99 ALASKAN WAY TUNNELING PROGRESS

Page 26

Line

ar fe

et o

f tun

nel b

ored

Page 27: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

LESSONS LEARNED • Conduct an extensive and thorough geotechnical program

• Utilize TBM technology that is well understood and project-proven

• Select only experienced tunneling contractors

• Implement a comprehensive monitoring and inspection program

• Implement proactive risk management strategy at all stages

Page 27

Page 28: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

RELEVANT EXAMPLES OF PILE DRIVING AND LEVEE/STRUCTURE PERFORMANCE

• Alternative Intake on Victoria Canal • Freeport Intake • Sankey Diversion Facility • Cosumnus Power Plant • Several DWR projects in the Delta- Extensive Experience

Page 28

Page 29: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

ALTERNATIVE INTAKE ON VICTORIA ISLAND

• 2008-2009

• On the Victoria Canal North Bank

• Approx. 390 sheet and concrete piles driven

• Driven by impact hammer for foundation piles

• No observed damage

Page 29

Page 30: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

• 2007-2008

• On the Sac River East Levee Bank

• ~ 800 ft. from the West Levee bank

• Approx. 520 sheet and H piles driven

• Driven by vibratory and impact hammers

• No observed damage

FREEPORT INTAKE ON SACRAMENTO RIVER

Page 30

Page 31: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

SANKEY DIVERSION FACILITY ON SACRAMENTO RIVER

• 2010-2011 • On the Sac River East

Levee Bank • ~550 ft. from the West

Levee Bank • Approx. 270 piles driven • Driven by impact and

vibratory hammers • No observed damage

Page 31

Page 32: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

COSUMNUS POWER PLANT

• 2004

• 1,800 feet from Rancho Seco plant

• Approx. 2,000 piles

• driven by impact hammer

• No observed damages

Page 32

Page 33: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

SHEET AND PILE DRIVING TECHNOLOGIES

• Sheet Piles – Used for coffer dam (in-water) construction – Vibratory hammers (70%) – Impact hammers (30%)

• Foundation Piles – Either Driven piles or Cast-in-drilled hole piles – Type depends on final geotech studies

Page 33

Page 34: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

DWR SHEET AND PILE DRIVING COMMITMENTS (ENVIRONMENTAL COMMITMENTS 3B.2.1.1-2)

• Perform pre-construction surveys to establish baseline conditions

• Collect subsurface data • Perform geotechnical analyses • Select appropriate pile types and installation

methods • Implement monitoring programs during construction

Page 34

Page 35: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

ENCROACHMENT INTO RIVER CHANNEL

• Under jurisdiction of USACE and CVFPB

• Modifications must meet USACE’s 408 requirements

• Safety assurance review by an independent panel of experts

• Must maintain “project’” conditions, purposes or outputs

Page 35

Page 36: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

TRAFFIC ON LEVEES

• Very little project traffic is planned to traverse on levees – SR-160 is constructed on top of a levee

• Suitable for H20 loading • Already experiences extensive traffic

Page 36

Page 37: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

LEVEE ROAD USAGE FOR WATERFIX

BACON ISLAND: 1.6 MILES

MANDEVILLE ISLAND: 4.6 MILES

Page 37

Page 38: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

TRAFFIC ON LEVEES • DWR’s commitments to levees and levee roads

– Preconstruction assessment – Ground stabilization, if needed – Monitoring during construction – Return roadways to preconstruction condition

• Final EIR/EIS Commitments – Mitigation Measures: TRANS-2a, 2b and 2c – Environmental Commitment 3B.2.1.2

• Settlement Monitoring and Response Program

Page 38

Page 39: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

EXISTING WATER DIVERSIONS

• Total number of effected water rights – Temporarily effected: 10 – Permanently effected: 5

• Mitigations for temporarily effected diversions – Prior to construction, extend pipes and adjust pump

locations on landside – Provide new groundwater wells – Provide alternate water supply from a permitted source

Page 39

Page 40: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

EXISTING WATER DIVERSIONS

• Mitigations for permanently effected diversions – Provide temporary mitigation measures until the mitigation

measures below are completed: • Relocate existing diversions outside of the intake structure

footprint • Provide a new turnout from the proposed CWF sedimentation

basins

Page 40

Page 41: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

INTAKE 2 DIVERSIONS

• Diversion S021406 – Falls outside of intake

footprint – Within road relocation – Will not be permanently

affected – Temporary impacts – Maintain quality and

quantity of flow

Page 41

Page 42: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

INTAKE 3 DIVERSIONS

• Diversion S016915 – Falls outside of intake

footprint – Within road relocation – Will not be permanently

affected – Temporary impacts – Maintain quality and

quantity of flow

Page 42

Page 43: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

ISSUE: POTENTIAL IMPACT OF TUNNELING UNDER/NEAR EXISTING INFRASTRUCTURE

• EBMUD’s Concerns – Tunnel construction will undermine, cause settlement and

reduce ground support of aqueduct foundation piles – CWF tunnel profile will intersect with existing and planned

infrastructure

Page 43

Page 44: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

DWR COMMITMENTS TO AVOID IMPACTS TO INFRASTRUCTURE

• Existing DWR Commitments, outlined in: – Appendix 3B, Section 3B.2.1 – Ground treatment plan, ground settlement monitoring, and

response plan

• Additionally, DWR Commits to: – Work collaboratively with EBMUD and other agencies on

these issues during preliminary and final design – Provide contract specs and maintenance requirements to

ensure safe tunneling – Provide appropriate levels of on-site inspection to ensure

successful results

Page 44

Page 45: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

ISSUE: POTENTIAL IMPACT OF TUNNEL SEEPAGE ON EXISTING INFRASTRUCTURE

• Concerns expressed by protestants over potential leakage from tunnels –No estimates of potential leakage rates

presented by protestants –No analysis of potential impacts presented

by protestants

Page 45

Page 46: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

TUNNEL LEAKAGE STUDY – ARUP 2017

• Findings – Current CWF configuration minimizes potential for

tunnel leakage • In most cases, tunnel internal pressure is less than

external water pressures – For 73.5 miles of tunnel:

• leakage rate estimated at 0.7 cfs • Inflow rate estimated at 3.7 cfs • Overall inflow rate: 3.0 cfs

Page 46

Page 47: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

SEATTLE TUNNEL INFLOWS 57-FOOT OUTSIDE DIAMETER TUNNEL

Page 47

Page 48: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

HONG KONG TUNNELS INFLOWS 46-FOOT OUTSIDE DIAMETER TUNNELS

Tuen Mun-Chek Lap Kok Tunnel

Liantang Boundary Control Point Tunnel

Page 48

Page 49: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

DWR COMMITMENTS TO REDUCE TUNNEL LEAKAGE/INFLOW

• Specify high-quality concrete in segments, and ensure results with proper QA/QC

• Provide careful details for inserts and grout holes • Provide high quality segment connections and gasket details • Specify “tight” build tolerances • Provide good field inspection to enforce superior

construction builds

Page 49

Page 50: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

ISSUE: CONCERN OVER POWER LINES CROSSING AQUEDUCT

• Potential for induced current to lead to corrosion • Potential for induced current to lead to shock hazard • Potential for power line to fall and strike aqueduct

Page 50

Page 51: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

DWR COMMITMENTS TO REDUCE POWER LINE RISK POTENTIAL

• Existing DWR Commitments, outlined in: – Appendix 3B, Section 3B.2.3, and Section 3b.4.30 (AMM

30) – Design and construction transmission lines in accordance

with Electrical Power and Transmission Line Design Guidelines

• Additionally, DWR Commits to: – Work collaboratively with EBMUD and other agencies on

these issues during preliminary and final design – Provide contract specs and appropriate levels of on-site

inspection and on-going observation to ensure successful results

Page 51

Page 52: ENGINEERING REBUTTAL TESTIMONY - · PDF file... and high ground water pressure (3.5 bar) ... hammer for foundation piles • ... • Total number of effected water rights – Temporarily

SEA LEVEL RISE FOR FLOOD PROTECTION

• Used 55 inches of SLR at Golden Gate Bridge

• SLR impact decreases farther inland

• 18 inches of SLR added above 200-yr flood level for intakes

• To be reviewed and updated during next engineering phase