IPoe EngineeringP0 Box 316, Walnut, MS 38683
(901) 262-2548
-
March9, 2011
Re. Structural inspection at 10254 Shea Woods
It was requested that we inspect the referenced residence where cracks have formed in the
brick veneer sad sheetrock at various locations. The pu±pose for our inspection was to
determine the cause ofthe cracks and develop a repair protocoL
During our inspection on 3/01/11, we observed the following:
1. The residence is supported by a block slab with approximately four feet of
backfill placed under•the slab along the front.
2. There were cracks observed in the brick veneer on either side ofthe front
entrance. (See photos 1 and 2)3. Cracks were observed in the sheetrock adjacent to the entry hail. (See photo 3)4. Cracks were observed tile floors ofthe master bathroom. (See photo 5-7) Cracks
in the sheet rock were observed inside the master bathroom (See photo 4) andmaster bathroom closet. (See photo 8)
5. There were cracks observed in the brick veneer along the south wall ofthe
exercise room. (See photos 9 and 10) Cracks were also observed lathe ceiling ofthe exercise room.
6. Cracks were observed In the brick veneer around the garage. (See photo 13 & 14)7. In the vaulted ceiling ofthe den, cracks were observed. (See photos 11 and 12)
There are 2x8 rafters and ceilingjoists spaced at 16" o.c. over the vaulted area.
(See photo 15)
Based on our visual inspection, it is our opinion that the cracks ii the brick veneer andsheet rock were primarily caused by settlement in the soil supporting the foundation
around the front entrance, south side and around the garage.
It is our opinion that piers/pilings should be installed per the aftached sketch down to a
depth, that each piling will support apoint load of8000 lbs. Acon'tractor experienced in
this type ofrepair should be contacted to provide an estimate.-.
Once the foundation has been stabilized, the cracks in the brick veneer and sheet rock can
be repaired.
MMB000I
There is no immediate danger to the structural integrity ofthe residence but ifthe
foundation is not stabilized, the cracking will most likely continue.
The cracking in the vaulted den was caused by pressure from the chimney that extends
out over the roofframing. The load on the rafters is transferred to the ceiling joists whichin turn cause the sheetrock to deflect slightly causing the cracks to form.
It is our opinion that three, vaulted 2x8 ceilingjoists should be doubled and the top ofthe
joists be plated with 7/16" thick OSB to spread the load Out oVer the joists. We also
recommend that three ofthe rafters be doubled to help support the chimney load. (Seedetail on photo 15)
While we cannot guarantee that no additional minor cosmeti.c cracking will occur in the
future, it is our opinion that once the repairs noted above have been completed, noadditional structural repairs will be needed in the repaired areasas long as surface
drainage is not allowed to flow against the foundation and normal maintenance to the
residence is kept up.
This report is based on a diligent visual inspection ofthe referenced areas. No
geotechnical testing or destmctivc testing were requested or required for this report. A
complete structural assessmeit ofthe residence was not included with this evaluation.
The Engineer shall have no liability to the Homeowners or to others for the acts or
omissions ofthe Contractor or any other Persons-performing work on the project, or
failure ofthe Contractor to carry out the work in accordance with this letter, except where
specifically inspected and approvedby the Engineer and discovery ofdefect is possiblewithin the normal ability or standard ofcare for the industry.
Ifthere are questions regarding this letter, please contact our finn.
Sincerely,
Kevin M. Poe, TN P.E. # 1.9211
President
Poe Engineering, Inc. .k '. _..
. 4T0 12%.e'•eqG
Op ri
MMB0002
MMB0003
Photo 1 Crack in the brick veneer adjacent to the main entrance
Photo 2 Cracks in the brick veneer on right side ofmain entrance.
MMB0004
Photo 3 Cracked in sheet rock at corner ofarched opening along the eniry hail
Photo 4 Crack in sheet rock walls inside master bathroom.
MMB0005
Photo 5 Cracks in tile floor inside master bathroom
Photo 6 Cracks in tile inside master bathroom shower.
MMB0006
Photo 7 Cracks in the tile floors inside master bathroom..
Photo 8 Crack in sheetrock inside master bathroom closet
MMB0007
Photo 9 Crack in brick veneer on south wall of exercise room.
Photo 10 Crack in brick veneer above master bathroom.
MMB0008
Photo 11 Crack in sheetrock ofvaulted ceiling in den.
Photo 12 Sheetrock crack in vaulted ceiling ofden
Photo 13 Cracks in brick veneer on south side ofgarage.
MMB0009
Photo 14 Crack in brick veneer above garage door.
.Photo 15 Attic view ofthe framing supporting vaulted area ofden. Double 2x8's as
shown and add 7/16" OSB to top ofvaultedjoists as shown. Attach OSB
with glue and 8d nails spaced at 6" o.c.
MMBOO1 0
FO(JIDA..TION OFFICE: 901 388 0668
\ : 1(877)388 0668
- (•)j_______
M&R FOUNDATION REPAIR LLC OF MEMPHIS,ThT hereinafter called CONTRACTOR, enters into this agreement with:
hereinafter called OWNER, to perform and provide materials, labor
and equipment for this work ,the structure are located at 10254 SHEA WOODS DR. COLLIERVILLE TN
on this day(ESTIMATE) MAR/29/2011 (JOB) owner initials JOB#
cell 901-870-1975 home other
ori. (.) 1 P__
•
20 EXTERIOR PIERS $ 800.00 PER PIER TOTAL $16,000.0010 INTERIOR PIERS $ 850.00 PER PIER TOTAL $ 8,500.002 OPTIONAL PIERS $ 800.00 PER PIER TOTAL $ 1,600.00
JACK PAD $ PER PIER TOTAL $
SEGMENTAL CONCRETE PUSH PIERS SYSTEMT T L $
HAVE LIFE TIME TRANSFERABLE WARRANTY
SQUARE FEET $ SQUARE FOOT $ DISCOUNT TOTAL $____________
_______LINEAR FEET OF JOIST REPLACEMENT $ LINEAR FOOT TOTAL $____________
_______LINEAR FEET OF BEAM REPLACEMENT $ LINEAR FOOT TOTAL $_____________
_______LINEAR FEET OF SILL REPLACEMENT $ LINEAR FOOT TOTAL $_____________
_______LINEAR FEET OF RIM REPLACEMENT $ LINEAR FOOT TOTAL $____________
OTHER_____________________________________________ TOTAL $____________
WARRANTY.8 MONTHS EXTENDEDWARRANTY___________ TOTAL$_________
CHOOSE: ADJUSTABLE SYSTEM OR BLOCK SYSTEM TOTAL $_____________
LINEAR FEET OF FRENCH DRAINAGE $ LINEAR FOOT TOTAL $
LINEAR FEET OF DOWNSPOUT DRAINAGE$ LINEAR FOOT TOTAL
TOTAL $_____________
ADDENDUM
____________________________________________TOTAL $___________
OWNER AND CONTRACTOR AGREE. TOTAL COST FOR THE REPAIR PLAN IS US$
TO BE PAID AS FOLLOWS 135$ 50 % DUE AT COMMENCEMENT
uss 50 % BALANCE DUE UPON COMPLETION
COMPANY REPRESENTATIVE
MMBOO1 •1
TOLL FREE 18773880668
MEMPHIS 901 388 0668
CU5TOMER NAME: EMAIL:
JOB SITE 10254 SHEAWOODS DR. COLUERVILLE TN
H.PHONE: C.PHONE: 901-870-1975 OThEE:
JOB #: ETIMATOR: MARIO RIVASI E.DATE: MARCHI29I2OII JOB DATE:
SLAB_X_ CV STORY 2 1/4_ BRCK_X_STONE__ WOOD SIDING__(JS -
WORK:
19 18 17
16
15
20
8
ji 1tI lu M i'i i;14
GARAGE
31
7532
LdL
•2$
4/C L
V -
.- ,..-
LiLi 1)
-5/8W•-318 ...-.
LI_ 4!-
: . .
-518 -112 118XE +j
!:_..:.:•
•
.• .. . 19
- -. .
Ti.
-m
-3/8-'
.314 28 +118-
I/l-
136
6 [ I[._1 -T--
j •'24
-
4-1/4 12
314I "22 26
:::
:.
13 7 8
THE MAXIMUM AREA OF INFLUENCE OF EACH PIER IN 2 STORY HOUSES ISO F.
• EXtERIOR PIER WALL CRACK V WINDOWGAP EI.ECTRICIF( I FRENCH DRAINAGE
S INTERIOR PIER SLAG CRACK V DOOR GAP W WATER FE REFERENCE POINT
0 JACKPAD CEIIJNGCRACK VGA? 4/C UNIT -1/4COMPULEVELREADINGS1) OPTIONAL PIER FIRE PLACE : GAS @SUMPEJMP WALLCRACK 2 FLOOR
GEAM UNEVEN DOOR 2 FLOOR
UNEVEN DOOR
MMBOOI 2
C-
MMBOOI3
OfTh(12 ?1H- c 2
14il)Or COt L.
j 02'
•f 5 frAr. A&-)
V -i ))&)II
13: 57 S16532Ø72 TULL GLASS INC PAGE flI I1i
HYLM1DER CONCR1TE CONSTJCIO3
P0B0X375
LA GRANGE, TN 38046
901-496-4131
901-878-1921
JtJN 18,2008
1fii A! m
FOTJNDATIONTJ13OR
4651 SQUA EFEP@$L00PER FOOT $4,651.00
INVOICE TOTAL $465L0O
MMBOOI 4
i@B 1O:1@ 9@18532@72 lULL GLiSS INC PAGE @1/Ri
HYLANDE1t CONCRETE CON$TRUCTJQNP 0 BOX 375
LAGRANG1, TN 88046
901-496-4131
901-878-1921
JUNE 11, 2008
LOP 24 HARTWElL
::)fI,j4
1861 BLOQES@ $1.25 2,826.25
CONCRETE PUMP 350.00
BLOdK LABOR 500.00 1
I VOICE TOTAL $3,176.25
MMBOO15
LNDEr CONCT CONSTRJCTiON
POOX3Th
La CATGE TN 38046
90:t878492i
9OL496.413i
LOT 34
SHEA WOODS DR
FOOTING LABOR
4651 SQUARE FEET@ $O5O PER FOOT
TOTAL INVOICE
1d dovi
M'- /1a
/4O_& 533
$2,325.00
MMBOO1 6
I18J2006 14:40 901-384-6170 PAGE 111
Foundatgon EngineeringManagement, nc.
1138 Hall Dr.
Somerville, TN 38068-4586
Bill To
Invoice
Date Invoice#
6/18/2008 16575
Terms
Due on receipt
Description Amount
Block Foundation Inspection (2 trips)-Lot 34, Hartwell; 10254 Shea Woods 320.00
Drive
***please veriir that the lot number and address are correct and faxbackto (901)384-6170 or return with payment. We must have this information before letter
sent ouL***
Please pay promptly. A late fee will be assessed ifpayment is not 10 al
received within 30 days. $320.00
By payment ofthis invoice you acknowledge that the service provided is for a visual
inspection ofthe foundation consirticlion and does not include the actual design ofthe
foundation ortesling or approval ofthe soilupon which the foundation is built
Phone# Fax#
(901) 386-2275 (901) 384-6170
MMBOOI7
4ciNI i. c&i- m tpP&c-r
•
•
LE'J -I JJ c-i•_-
I9LL54
MMBOO18
.-:. ••••'•':.. :..- .
-
.- -.....
.-
-- ±.__=__..__ -' -- -: .-._. ___ _..... .....
1. :. 7 ":_..
- 4 -
.
..
. :. -Pi--UJE 901 In1
-.
-
'. FXX 901-386 877&.
-
•
. .....•.. . .
. :. ..... .. . . ..
4-_•-
tT1. d. .1 34010 06/17/08 136169
. -- . - -' - -
--.
F I.
P L- 4.f r
-
... f
1 j
--
1-
94?%'t
F -
pc
r- I -
£
T o .. ,.o-
-
...........;•5. . :. •.: :. -; .......;.f:•-
1
ç.. \; .- k iN_1mD.•-
ôt- lOECTjdCJJSTOQIbTJ SL T*.ç..
''--, Jf14 odoil3TE,- - jç, cjpi jjjc QsAtiNT.
'
35 35OjY PSI.. IEJITIiFI OCIC 2: 99 0O c( 7O)O-
93000
EN -1 ENVIIO1 NTM7CTiZRE1 tZ ?'
J /-1i 'O0 oâ --r -ss oo
u?tS FTJE1J4SUICH GE1-. 'i Ôè '--. is
-
st-- 4
-
.
-
-
7
;.1c838737 .fI83 74)83845.
•.. .....
b1':ç)-...I,
F
11T-.ç •
.:
Twke€ i_&-p
k
"4 .IF --I'
II...
F
9 82,:892007&48 31 19~ 34j. ?o3'-, ?89F-
F i L
I
N2NGEI C2 2½IE PO8ED HflASTDAY?O8 1TMQ H ON -B f CE HZT,-
DTThL-?r fr
Fl
I -
- 3t-
- I IF.
--
{' FI L.4 -
-
j Ij1 f-
' '-F r I 4 F
- F- .1- I
It-/ FF4
I.
-
FrT _/ F
'F ç F.
-
1!-
k -, Z -
7I- ,;-ij r'i i$ .
'
•1 F I;-.-
F
I ...I .
-
'cLL I 1
-
, t- -
.
I
I•
'•l '1
c
•
.-•
JpTAEAwTiTY I itJijLES VOlZiOTh ---
;- -
r-
4. ..--
-
-
-j-- -1. I-
l-,_
-
-
--•
- I)
MMBOOI9
f JER] - IIfOICE TpTAL
1361G9 IL
7811 38
-F l ..
-- -
'7 -
71
I-'
-- -
----_ -
.-
-
- -
c- -
-
-- -
P -iOi"E90t -386 9Ii
-
-.
- -
- '--J 901 386
.4
-
S •i i•
I
P-
-
..• ,-1 -
•..:.•••
- '-
. .' -
-
4
-
i
i;
-
ç
3i______ j4_____
; :-- 17-- 4 34O10O01.
______
;' T'- Ibt [is4i P8ic odup'
)6/09 PI/EIL OO qy 7G00 ]L60o',
D6'0.9 RETE1 i1:.j. -
)6/09 if EIV 4?
tj. Z90 a."ç go
)6J0p FUEL JEL SURCIkE, -'-.- 2 00 a 1500 - - -30 00
-
-
k - -' 4 - -
p'- .- 1- -'
-.. -k . .- 4.4 .
........1 e-
-
4 .-.. -c '..
838626 r3 621- - ) ---:i.-
>,.;:' -
-
\4 --
-
4,:'3-'
FNP.NCE CHZR S R3'i?OSTEDHE LAT DAY i.OF E H MOI'. BAL I'ICE.ON THAT'-
.
-
:-
c -
* j' 44-
-
4
I- - )
'J-
.. (-
L - ip-.-
•-
\9
'1- -
-
$4-
- r_4 •
- 1 -\-
.4-.. 4-
3- .. ,, '_- ç .' 4i -' &' 1 A
' --
-
iç c1
' '- - ?-
_
-.' -'
r
-.
-.....i-'
t-- 'i
-
1j-
-
'J -It4
t 4$ 4p
-
--
i y
-
-S
-
P I
39.•'• ç_t t-
-
.D
•.. j1' -U. ._IL1 ?"-
34.4 '4 'c
- -
-'
t-
STATE IIOCAT4 T.c& 9'5QRjEVIITTO MEMHJS 4RE yqix
-
-. T0TALQUANntI-'- SflB KSSA1'CAXtOTAt! o1iAL$PG BOX21217
'
'- '- "--
'3''rM '-1RTMh-Fc L2720Ov i126 -...r -...v- ..-.-p'-. .. .4 ,:- u .
I-
-
-.
3 - S..-
-_
-'
.3 4
3 1 -
TO INUflE PROPEB CREDITT0 (OLJR ACCOUNT
PLEP4SE RETURN THIS tEMiTANCE COPY WITh PATrIET
,I' -j3-
-34010
.
-
-.--_.'.; -, -:--.c .t_ •
.1.r'.'J-.
-.
-
.
.
.. -
MMBOO2O
cq9 otRr
L__ 34010 f 06/09/98 135884
V0ICEWUWBg1I- r1IWIQIGE O 3
- -.
/--!:- •.-Y'-: ;---:
13588_4_ '
L 389 66'
:-:..L--
'.--;:-.•4
-. ...'-'- -: -_-
'-4
)-
a.
-
-
-
-- - - ' ' '-
L&a Z'-
- - '-
;P! Or'E901 385 891k
12
-
-
FAY9Q -386 8776Li L -
.-
________________________
r-
-
-
-
- - - -3__________________________________________________________________________
IC
1
T 4
I. f.. -
-
C-t P -
-
'. -I.
•
,.. 0-.
"r' ..&.!•-
:'-
..
-
:1.
- .. ..-.' .... ..
•
..... \. ..................1.......7. -. •. -....-.' :. -._ .
..•"-.'-. * -- c.,.s.S ................
.-
1--
I
S.
'..(
J 4 h.
-
i_-
/
a.
-
I .
-
-
NET 30 )2YS FROM IahTOICE I5ATEa PaqeNi1nther
L
340L0
I
IE4 ft4CE'rÔTJL ;-TL
I;-2 ...
Cl...-
____________________
::;.: ;..-..: '
:\.. -:::: .
S... S..
MMBOO2I
iOtUA11Tj. SUBj0jAL ti$r *t
-.
...........- .-.....
I
.
£ .
-
L 4 -
4do 0 jj $., 900 OO -2 5 . j6 8 2
34010 J 05/19/08 135151
/ V V
. \A/Q-frr 91J° 1.)f
,••° ObJfl ot fltLCii3tttt V
APPLICATION FOR
f 500 Poplar View l'kwy. BUILDINGCollierville,TN 38017
.
Phone (901)457-2310 PERMIT
~!B.OPER1Y1ITNO ,,y /jF1X 1901) 457-232 V.
______ ______________CONTRACTOR TIC. NO. __________ COLL BUS. LIC.___________
ADDRESS /'/ /-5s 2)e LOT NO. SUB. DI V
NOTE: Fill in the following information as accurately and completely as possible. This application is not acceptable unless all required information is furnished
CHECK ONE: Qew Construction C] Alteration U Change in use UAddition'
U Proposed UseV
O No of Stories c2. U Fire District C] Height in Feet____________________
C] Pool C] Vinyl C] Gunite C] Above Ground C] Fiberglass
Total AreaOccupied by building Percentage of Lot Covered
FEES AREAS GENERAL
3 V L?A/IjOUsó & Occupancy
V 1st Floor
2nd FloorBuilding5 L1_. Plans Review Fee 3rd Floor
$ 01 Pool 4th Floor
An. Garage_______________Demolish
___________________Curb Cut ______________________
Porchs
_______________________Fire Dcv. Fee __________________________
Balconies
_______________________Hist Pres: Fee __________________________
Other
_______________________Alt: Trans: FeeV
V Fire Plan Review FeeV V
TOTAL FEE ___________________Thtal Square Ft.
V Zoning District
'/0' Front Yd. Setback
LVD' Rear Yd. Setback
.5/
Right Side Yd. Setback
.2) /Left Side Setback
___________________Bath or Rest Rms.
- .5 Bed Rooms
Rooms________________________Total4S
-
Water Heater
_______________________Heating
Fireplace/ Chimney
Foundation: C] Joist Slab
$ 1$, 0 1 TOTAL .
V REC.NO. CHECK NO.O 4' ATE PAID _V V
NOTE: Issuance ofPermit SHALLNOT be held to permit or to be an approval of the Violation !f any provision of any Thwn code or State Law.
ESTMATIffBUILhINGVALUE$_
Q(2 _
(not Including property)
In making application for a building permit, the applicant states that the information given is, to the best of his knowledge, true and accurate. It is understood and agreed by the
applicant that any eior, misstatement or misrepresentation of fact, either with or without intention on his part, such as might, if unknown cause a refusal of this application or anyalteration or change in plans made without the approval of the building official subsequent to the issuance of the building permit, shall constitute sufficient grounds for the
revocation of such permit. V
V
V
CALL FOR FOLLOWING INSPECTIONS (when ready): Site Footing, Posthole, Slab, Floor Joist, Framing, Deep Seal, Brick Tie, Strapping, Fire Protection, Rough.lnPlumbing,VRollgh-ln Electrical, Final Plumbing, Final Electrical, Curb Ciii, Sidewalk, Rough-In Gas, Gas Final, Mech. Temp., Mech. Final, Certificate of Occupancy.
V FOR INSPECTIONS CALL: 853-3272.
APPLICANT' 'iime Osiher - Builder.
PERMIT VOID: If construction not begun within six (6) month,Jtorn date permit issu'ed: if more than one (1) year elapses between inspections: if
incorrect information is given on application for permit. 0
€-c fi- 5pc LC r nishReolevationI undationSey Required 8
V
j'Seismic Construètion RequiredPlans Approved By: V
V3res Required
V
44odeI Energy V
Fire Marshall______________________________________________________
Engineering
Planning Dept. iVV
.rI_ CVWVaV
BUILDING PERMIT ISS D
DATE I SIGNED_______________dufldiag Offloizi or Plans Examincr
MMBOO22
VV.Vr:. I .rJ,. T..a-tV,..
a rrn-j -rI f .VTVF £
DATE& TIME_
qt -iALLEDB __
TIME READY .. REC'DYTh- TOWN OF COLLIERVLLE BUILEflNG DEPARTMENT
'> 500 POPLAR VIEW PKWY. BUILDING DEPARTMENT" COLLIERVILLE, TN 38017 PHONE (901) 457-2310
FAX (901) 457-2329
NSPECT1ON TAG
_______•ADIDRESS:_1c4 1Jjd 0
SUBDMSION: .,
Approved; Aefused :. 1e-Insp________________
Site.
Foundation ( )..
Sewer.
______ ______________-______
Roughin Plumbing.
:. .
.
.
Bricc lie ;•r•
5
Ftaming
_________
_____ _____ ___________
S
TopOut-
-
____
Mechanical Temp.. •. .i: .... ....-
-, -
Abugh-inElectrical .
Rough-in Gas________
_______ _________________
-T_______
Temp. Final( ) L_______
--_______
.
-S.-
Final Plumbing_________
.
.
.
Final ElectricalS
.
.
Final Gas________
Mechanical FirI_________
_______
BuiIdingF1naL________
[Of 0ccupanTh________
)<_______
...
_________________
-
_______
-APPROVAL O INSPECTION IN NO WAYAPPROVES ANY
VIOLATION OF CITY OR STATE ORDINANCE OR LAW..
INSPT0R'S slGNATuR":A cQDATE __ 2./'o4
S
_________
TIME_
Ya.f f
S MMBOO23
Town of Collierville Building Department Engineered
Footing/Foundation Form. Letter
Lot ' ] Stibdivision
34 _j HartweH
-
10254 Shea Woods Drive
This Is to certify that this firm made a pro-pour inspection of the foundation system at the above location, andthat, to the best of my knowledge and belief, said foundation has been built in substzritial conformance withthe provisions of the minimum design uiteila of the 1999 Sthndani building Code, Proper grading and drainageis to be constructed and maintained in the immediate area of the foundation.
This project Seismic Design Category = C with Av©.199
Tile following conditions were observed. No subsoil Investigation was made by this firm. Visual observation only.
footing is supported on soil that is believed to be undisturbed and/or copable of supporting the intendedload.OR
0 The footing is supported on properly compacted fill ground or is designed to support the intended load.
The footing is reinforced with lines of # .j.. horizontal reinforcing steel.
Number L rebai-s are placed on .q&.. inth centers.
Tetmite Treatment was performed by Allied
Ll Post-holes or grade beams were Installed per requirements of the Stendard Building Code.
lI The slab subgracle was covered with a vapor barrier.
(1 Welded relnforciing wit-a 6x6 10/10 was placed over the slab area.
OR
0 Fiberrnesh concrete was used.
i Finish floor 10 Indies, minimum, above the exterior perimeter grades.
This Inspection was perfol-med II AM 0 PM on fiL17/20J1
The weather conditions were degrees P +1- and lclear 0 cloudy 0 seining
0 snowing 0 other____________
The concrete slab was poured as a Omonolithic slab LJwith brick iedcie.
Foundation Engineeering Management, Inc.
1138 Hall Drive
Somerville, TN 38O66-456
(901) 386-2275
BuiIdri MOco Murphy 5uitdei P.coffl #: 705
MMBOO24
/
/
', AcFFC
I"I
1. THE SURVEY WAS DONE UNDER THE AUTHORITY OF EASEMENTS SHO'AN ARE FROM THE RE CORDED
TCA 62-18-126; AI5 SUBDIVISION PLATS AND/OR OTHER DOCUMENTS.
/ 2. THE SURVEY IS NOT A GENERAL PROPERTY SURVEY THE SURVEYOR DOES NOT WARRANT THAT NO OTHER
/ /AS DEE I NED UNDER RULE 0820-3-07. EASEMENTS EXIST.
Foundation Suey of Lot 34
ACFFC HARTWELL
SUBDIVISION
/ Collierville, Shelby County, Tennessee
Forms for a concrete foundatIon are located as shown
I hereby that thIs has beenabove. certify survey mode
.5
using the noted recorded plot and. that there are no
visible encroaclenents or projections observed, except DATE: MAY 28, 2008
/Q
/N.'\' N'N
as shown, and that this survey is correct to the bestSCALE r = 30'
35 of my knowledge and belief.PT BOOK 233, PAGE 28
l'rnE:
This survey prepared for Mortgage Loon purposes only.
TI A T5T7IIT TIC1 O_ A C'SC'rr1TA rt11'C T5%Tr'/tw
-
".. XLUr.J1rjX,, 2i1J C UL.1Jj,D, 11Th.
- ?/ ;./P\\ '%,j SURVEYING - PLANNING - ENGINEERING
3460 RIDGE MEADOW PARKWAY
'N. MEMPHIS, TENNESSEE 38115-4000
/° d-\(901)
36o)
/
tJt.1
/S
V FENCE4.0' N.
VDRAWN BY: BLRLE k\drawings\fdn\J)ortwell\hw34.dwg
-
VV
/MITE:
THIS LOT HAS A kIlN. F.F.E. OF 315.0-
-.
/. 30 SETBACK
-
-Y---___
OLD WIRE FENCE
49
-----
LO0)
c'
FENCE
0.9' S.
IRF
,'..
3/26/09 94R AM rA Jn J')
A. U.S. Department of Housingand Urban Development
Settlement Statement
B. Typo of Loan
-
i. jj FHA 2. (1 FMHA 3. (. I Cony. Unins.
4.( JVA 5.f jConv. Ins.
6. FIle Number
20095772
7. Loan Number
2255569
8. Mortgage Ins. Case No.
C. Note: ThIs form Is furnished to give you a statement of actual settiement costs. Amounts paid to and by the settlementegent ore shown. Items marked ("POC) ware paid outside the closing: they era shown here for informationpurposes and are not included in the totals.
0. Name of Borrower: Robert .1. DeiPriore
B. Name of Seller:
F. Name of Lender: First Tennessee Bank National Association, and/or First Horizon, ISAQA, P.O.
Box25222. Ft. Worth, TX 76124
First Tennessee Bank National Association, and/or First Horizon, ISAOA, P.O.Box 25222, Ft. Worth, TX 78124
0. Proporty Location: Lot 34, Hartweii Subdivision
10254 Shea Woods Drive. Coliierviile, TN 38017
H. Settlement Agent: Stewart Title of Memphis, inc. (901) 755-1000
Place of Settlement: 261 Germantown Bend Covo, Cordova, TN 38018
I. Settlement Date: 3/26/2009 Proration Data: 3/26/2009
100. Gross amount due from borrower- 460. -
Gross amount due to seller:
101. Contract saies price 771,404.84 401. Contract sales price 771,404.64102. Pereonai property
_____________
402. Personal property
103. Setliement charges to borrower (line 1400) 9,739.89 403.
______________
104.___________
404.
105.
____________________
106. City/town taxes
__________________
. City/town taxes
______
107. County taxes
____________
. County taxes-
_____________
8. Assessments . Assessments
9. HomeOwner Associati 3/26/2009 10 4/1/2009 9.88 - HomeOwner Associsti 3/26/2009 to 4/1/2009 9.86
0._______________
411._____________________________________
2.
___________
412.
___________
20. Gross amount due from borrower: 181,154.39 420. Gross amount clue to seller: 771,414.50
ijic __ 1/)-*, i
1. Deposit or esmast money 48,804.64 501. Excess daposit(sea instructions)
2. Principal amount of new loan(s) 400,590.00 502. Settlement charges to seliar (line 1400)
______________
7,974.05
3. ExIsting loan(s) taken subject to 503. Existing loan(s) taken sub)ect to
4.
______________
504. Payoff of first mortgage loan First Tennessee Bank
_______________
624,080.04
5. Baiance from HELOC
_____________
219.509,30 505. Payoff of second mortgage loan______________
6. 500. Deposit or earnest money 48,904.64____________________________________________
_____________
507. 2008 cltyTexes 500.84______________________________________ ___________
508. Fob.& March HOA Dues 100.00____________________________________________
_____________
2008 County Taxes 1,600.35
4 sJf$ y'iidj'________________________________
City/town taxes 1/1/2009 to 3/26/2009 115.14 . City/town taxes 1/1/2009 to 3/26/2009 115.14
County taxes 1/1/2009 to 3/26/2009 362.86 . County taxes 1/1/2009 to 3/26/2009 362.86
Assessments . Assessments______________
_____________
514.____________
___________
220. Total paid by!for borrower: 669,481.94 520. Total reduction in amount due seller: 683.637.82
fra/p___ji a/jji
201. Gross amount due from borower(iine 120) 781,154.39 601. Gross amount due to seiier (iine 420) 771,414.50
302. Less amount paid by/for borrower (line 220) 669.481,94 602. Less total reduction In amount due seiier(ilne 520) 683,637.92
303. CASH (X)FROM ØTO BORROWER 111,672.45 603. CASH OFROM (X)TO SELLER 67,776.58
MMBOO26
700. Total sales/broker commission based on : $771,404.64 @ 1.0000% = $7,714.05 Paid From
Borrower's
Funds at
Settlement
_______
Paid From
Seller's
Funds st
Settlement
Division of commission (line 700) as follows:
701. $7,714.05 to Walnut Grove Realtors
•
• Commission paid at settlement $7,714.05_____________
7,714.05
• Administration Fee_____________ _____________
• Administrative Fee
41 44)l
• Loan origination fee
2. Loan discount
3. Appraisal fee
_____________ _____________
_____________
4. Credit report
_____________
_____________ _____________
6. Lender's inspection fee______________ _____________
6. Mortgage insurance application fee_____________ _____________
7. Assumption fee______________ _____________
8. UnderwrIting Fee
9. Tax Service Fee to First Tennessee Bank National Association, snd/o
______________
90.00
_____________
8 0. Flood Certification Fee to First Tennessee Bank 24.00
_____________
Courier Fee
_____________
2. Future Release to First Tennessee Bank
___________
12.00
___________
3. Loan Fee to First Tennessee Bank 500.00______________
814. YIeld Spread Premium____________
i00J' Itemsrecqreffbydepder'to 6epai4ilnavspd4 t#) ,'iplU '$iZ 5'li 4. iY!'____________
901. interest from
902. Mortgage insurance premium for
____________ ____________
903. Hazard insurance premium for 1 year to IJSAA Insurance
_____________
2,329.07
_____________
904. Flood Insurance
_____________
905. VA Funding Fee
______________ ______________
____________
1000 Rti&tVesdep'b1)ed w)tfl' /&? et'L
-
____________
1001. Hazard insurance_____________ _____________
1002. Mortgage Insurance____________ ____________
1003. City property taxes______________ ______________
1004. County property taxes_____________ _____________
1005. Annual assessments (maint.)______________
______________
1005. Flood Insurance_____________ _____________
1007._____________ _____________
1000._____________ _____________
1009. Aggregate Adjustment ____________ ____________
It0O .ffitl charges , 4lWj
1101. Settlement or closing fee to Stewart Title of Memphis, Inc. 300.00______________
1102. Abstract or title search to Stewart Title of Tennessee______________
50.00
1103. Title examinatIon___________
___________
1104. TItle Insurance binder____________
____________
1105. Document preparation to Stewart Title of Memphis, Inc. 300.00____________
1106. Nolary fees____________
____________
1107. Attorney's fees to_____________ _____________
includes above items no.:_____________ _____________
1106. Title Insurance to Stewart Title Guaranty / Stewart Title of Memphis, 2,786.25_____________
includes ebove Items no.: •*Ovner's Coverage Optlonal** _____________ _____________
1109. Lender's coverage $400,590.00 $1,374.50____________
____________
1110. Owner's coverage $771,404.64 $1,411.75____________
1111. ClosIng Fee to StewartTitlo of Memphis, inc._____________
100.00
1112. Document Prep. Fee to StewartTitleof MemphIs, Inc.____________
100.00
1113. ________________________
2Il0 'I ahd trnscacuti rij1\tr /4"&'i': 5"
%I./ 1 .
-___________
1201. RecordIng fees: Deed $13.00 Mortgage $58.00 71.00____________
1202. City/county tax/stamps:
1203. State tax/stamps: Deed $2854.20 Mortgage $458.37 3,312.57____________
1204. Assignment
1205. Preparation of Release Deed _____________
1206. ____________
l3&"l ddItjon00ttIementrtherqF r ttJ!ii.1 q415
1301. Survey
1302. Pest Inspection
1303. ShippIng & Handling to Stewart Title of Memphis. inc. 15.00_____________
1304. Home Warranty
1300. ShIpping & Handling Payoff to Stewart Title of Memphis. Inc._____________
10.00
1400. Total se(tiement charges (entered on lines 103, section J and502, section K) 9,739.eg 7,974.05
MMBOO27
('\_
(
L
ala. PT. TOTAL *31*00 LTIWLATIO
nit... to. PT. TOTAL 0330 CT TIATIM
ALL...... IA. FT. TOTAL. *01000 IMTI0OP TALUS
.fl.....TOTAL*TIA OP 040003 lOLL 00110105
ALE_PIT013' 00 OPSIOIIAS 0? 50433*0* tOLLS!
'H-
'0, COITRICMT (9 2003 CLAtSO MOPS 0550*51
./nrco 0005: 144010 PT POATACS I TOOT, 30510'
I 5*TPO UP, 34050 PT PLAN: T0b01t5 31110 PT
01*450* 5130 £003204
cñ
ci-i<-: 2o
0
0.0*
MMBOO28
-
___ __•
•I11
ii II. _"iiii ___-
liii1..!IuII iiii-II ii'. :L=- uc:ii
lullII Ti___IIiI4ii. :!.UIi!!11111II iiii1i ;''ii
'1 _
j... L__ III'___•tI1i• uII_•I_''••__ ,.-'.,i!uI •'- -
1___-
_________:5Ii.I-.!!'IE3imIIIii
iI in II-- i1 •Jp jJ . I-_______- __- -
IINrnIi.liiOIi-----
F. _____
tIF! IIII i_____ p'
00C.)
I_ /
r
01 '1I-_ I
LLi I I--2
______
'
______
FIRST PLOOR L!CTICAL PLAN
IA II I_
CLASIC HOME DESIGNS, INC. (, Illijiw
L0 1-lb ftjjj
0003M
T
r 1
I I
I I
I
.4
COFD PLOC
A II CLASIC HOME DESIGNS, INC. ( ,
II II '•11-13
w00
1--i
'F =
i
IKlt1Il!CONO PIOO !CT1CAI. PIAN
A II I CLASIC HOME DESIGNS, INC. (
[ =='=, : '11)
$
wa
REAR ELV]jJ
IIRQNT ELEMATIQN
A II CLASIC HOME DESIGNS, INC.HYD. OW. 3440 50. PT.
0 :101 0050500
w00
r
-I
Il1
3tilJl
I A 0 CLASSIC HOME DESIGNS, INC.
[B D.'HON OIU44OO FAX iol-IS4-lflO
C)0
0C.)
C)
I A 0 CLASSIG HOME DESIGNS, INC.
0 I B D______
-
rOt. StATED 1)50 50. 50
41I0'CPA) ¶O -S541O
((_ •-:
CR055 SECTION
AND STAIR DETAIL
5.
50ES / •0_ ;;Dr 1 S C. E.S
w
S
!ROOF PLAN
A II I CLASSIC HOME DESIGNS, INC. ( ¶T
LJi o, 11J
II
w00
FIRST FLOOR 5EI11IC PLAN
A 0 CLASSIC HOME DESIGNS, INC.
II
•1
00c)w
-Th
I •1
'p
'F = = •1
:___1
___
_____
__1LI1
-_
___
__
1TP11 J A II CLASSIC HOME DESIGNS, INC. G IT11j[2 /wui liD IJJJ____
(.
L
AlL_SO. PT. TOTAL *15* 0? LTL*t*TIO
JAW.... 50. PT. TOTAL. *50* OP 00*050
ALL...... 50. PT, TOTAL. *0100? E0Tfl05 POLLS
W_._,OTAL OTtO 00 5020205 lOLL 000004
fl_.._0100052 0? oflTtcfr OP S015DOS SILLS
OitlOTS
\,,,, COPTTZIIT f*J 0005 CLASSIC 0020 DESIGNS
220 50 PT LANI IE'_STOP. 50550 P
O5*TEO, 5350 50 STC232E1
OVEPALLS.
(Inz
Cl)Ci)
Cx)
o
o
Cl)Cl)
0
3d
MMBOO2B
PiiF1'I, .rni - Ill11 II_P.I,, iii
1j
J-"
.
I - - _____II-
__
-
fflWCIi'JIfl!fNI PitIJ_.SL. I-- L
-I-: =.T- yr at
IRIJ 11fLuu
I
IIUUUI.IIIINII___I- iI__ij;
_
------
_
PT PLOCR PLAN
A H CLASSIC HOME DESIGNS, INC. (
: BD. _7 :
T,.
r -J
I ;1_______________
_______
_____________
"
I'I L_.iEEJ_1 } i
II:
LLJ 1
Mn? FLOOR FLECtRIC*L PlAN
I A 0 CLASSIC HOME DESIGNS, INC. (I BD '111-lbTOT. IINT?O 13N0 $0. PT
R2JW /7O?SICA 3OO
I: I
I I
I --i
4
I Ii
I II
SeCOND PLOOR PLAN
A U CLASIC HOME DESIGNS, INC. (
U H II "i-b
00C.,
r
•1
-U
SeCOND PLOOR L!CTRICAL PLAN
I A II I CLASIC HOME DESIGNS, INC.(fl 5IO3:
LLJ
-S-
00q)
REAR ELVJ
I,.RONT ELMATION
A ii
I
CLASIC HOME DESIGNS, INC. (
tb:
rn
-
tx,0
0C,,0
'It
-1 -
C',
-I
o
__
'S) JT7flREm 1' :'-
I:________
::t::1j
LI Jill
1,M'__________
III
,--('I___
11
I A 0 CLASSIC HOME DESIGNS, INC. (
_________
LL. ,/'' 1Mb
(-
.-
C)
c)C)
CR055 SECTION
TAIR DETAIL
I A II CLASSIG HOME DESIGN INC. ( ,
tj ]
/ -. ".
crc..
k
(fm
w000)-4
I ROOF PLAN
I A II CLASSIC HOME DESIGNS, INC.G_0
g,,
oc.
I-
I
wa0Ca
FIRST FLOOR SFIl1IC PLAN
I A U CLASSIC HOME DESIGNS, INC.
(-\ fl; ?-
w00CaC0
1
r--1
I L__L
-
______
LL0 1PO TA II CLAIC HOME DESIGNS, INC. ( 1flTIj
_____
I1 TtI I[JJ