Engineering Integrity SPI Upgrade
Hazid Technologies Ltd Creative Quarter, Nottingham, UK
UK based team of process engineers, computer scientists
Founders: a history of innovation
PDMS Specification, 1st 3D modelling software
Zyqad/Aspen Basic Engineering, 1st commercial FEED system
1st commercial computer assisted Hazops software
Intergraph resells SmartPlant Engineering Integrity and SmartPlant Process Safety
About Hazid Technologies
Brownfield
Making the most of your digital asset
Engineering Information
Hub
Intelligent P&IDs
AutoCAD Datasheets
Greenfield
Copyright Hazid Technologies Ltd 2015
Instrumentation, Electrical Excel, databases
Manage Errors & Actions
Governance Processes
Manage Exceptions
Manage Actions
Engineering Integrity
Management Oversight
New Service - Aurelia: Legacy Document Conversion
P&IDs Datasheets Loop diagrams
SP Engineering Integrity – Data Import Upgrades
Correct
Complete
Consistent
SmartPlant Instrumentation
SmartPlant Electrical
Datasheets, lists etc
SmartPlant 3D
SmartPlant P&ID
SmartPlant Instrumentation
SmartPlant Electrical
SmartPlant P&ID Datasheets
SmartPlant Instrumentation
SmartPlant Electrical
SmartPlant P&ID Datasheets
SP Engineering Integrity – Data validation upgrade
Cause & Effects charts incorporate any SPI Loops, DCS etc
SP Engineering Integrity – SAFE charts upgrade
SP Engineering Integrity – Reporting Upgrades
SP Engineering Integrity – SPI Analysis
Analyses complete plant including reference data in one click
0.0126 sec/tag (2 million complete tags in 7 hours)
Can create validation lists (Approved Manufacturer etc.)
Links through full Loop to Instrument to panel etc.
Displays enhanced Loop drawings with results
Tring compare against individual properties
Checks consistency across SPI,SPID,SPEL,3D
SmartPlant Instrumentation
SmartPlant P&ID
Engineering Integrity for SPI – Example checks
10
Index Validation of tag naming convention Check instrument types Check tags and CS Tags Specs Specs have forms Check on UOM’s Check on all required fields Wiring Check spare terminals in cabinets Check wiring types Check manufacturer and models Check min fields required Drawing have correct info All signals have a complete connected loop
Alarm setting and range based on 1” schedule 40 pipe to which it is attached
Engineering Integrity for SPI – Example Checks
PA-100
The isolation boundary is marked by the highlighted P&IDs
Design pressure of the vessel is 50 barg and less than the alarm set point so is unprotected (units converted)
This analysis was carried out automatically by Engineering Integrity
Engineering Integrity for SPI – Cross Platform Checks
Rule Building
Rule Builder
• Designed for Engineers
• No programming involved
• Fast to develop
• Easy to check
Libraries and projects
Rule libraries
Industries..
Project(s)
FEED, Detail ..
Projects …
Clients, Contractors
Create/modify rules
Fluids
Viewer Run checks
Manage change
Manage actions
SmartPlant P&IDs
SmartPlant Instrumentation
Other engineering data
Delivered with Specific SPI libraries
More complete delivered rule library
Automatic fix and push back of issues detected
Better property visualisation
Reduce Table sizes
Import of only selected Areas/Units
Automatic generation of Enhance reports
Real world improvements
Next release…