engineering company presentation. introduzione tcs was born in 1995. it has been founded by a group...

14
ENGINEERING ENGINEERING Company Presentation

Upload: theresa-blink

Post on 15-Dec-2015

219 views

Category:

Documents


0 download

TRANSCRIPT

ENGINEERINGENGINEERING

Company Presentation

INTRODUZIONEINTRODUZIONE

TCSTCS was born in 1995. It has been founded by a group of experienced professionals in order to was born in 1995. It has been founded by a group of experienced professionals in order to furnish engineering services, supervision and technical consultancy in the petrochemical field.furnish engineering services, supervision and technical consultancy in the petrochemical field. TCS TCS also furnishes consultancy in the plant design and in the construction of treatment plants, industrial also furnishes consultancy in the plant design and in the construction of treatment plants, industrial and civil infrastructures. and civil infrastructures.

FIELDS:FIELDS:PLANT DESIGN ACTIVITYPLANT DESIGN ACTIVITY

Basic and detailed engineering with PDMS modellingBasic and detailed engineering with PDMS modelling

Engineering for Engineering for the petrochemical, chemical and chemical / petrochemical fieldthe petrochemical, chemical and chemical / petrochemical field and engineering for and engineering for the energetic productionthe energetic production

Engineering for industrial and drinkingEngineering for industrial and drinking water treatment including the developing of pipelines, water treatment including the developing of pipelines, supports, isometrics and relative material list supports, isometrics and relative material list

Skid machine development for gas and steam turbines and centrifugal compressorsSkid machine development for gas and steam turbines and centrifugal compressors

Piping on machine board and interconnection piping with the development of foundation drawings, Piping on machine board and interconnection piping with the development of foundation drawings, structural steel work, structures, machine basements, pipelines, supports, isometricsstructural steel work, structures, machine basements, pipelines, supports, isometrics

Primary sector Gas & Petroleum, Fluids & Gas Transportation Systems, Fluids & Gas Storage Primary sector Gas & Petroleum, Fluids & Gas Transportation Systems, Fluids & Gas Storage System System

Platforms & Offshore piping system Platforms & Offshore piping system

Civil & Industrial InfrastructuresCivil & Industrial Infrastructures

MECHANICAL ACTIVITYMECHANICAL ACTIVITY

Spray test modulable equipmentSpray test modulable equipment

ELECTRO-INSTRUMENTAL ACTIVITYELECTRO-INSTRUMENTAL ACTIVITY

Electrical Connections and process connection for the instrumentation of gas turbines and Electrical Connections and process connection for the instrumentation of gas turbines and centrifugal compressorscentrifugal compressors

Material list, data sheet, Instrumentation list and certification Material list, data sheet, Instrumentation list and certification

Control Panel Layout / MarshallingControl Panel Layout / Marshalling

Control Valves (CV), Control Safety Valves (CSV) and Flow Orifices (FE / FO) Calculation SheetsControl Valves (CV), Control Safety Valves (CSV) and Flow Orifices (FE / FO) Calculation Sheets

Intrinsically Safe LoopIntrinsically Safe Loop

TCSTCS can provide the following can provide the following services:services:

MAIN PIPE PROJECTMAIN PIPE PROJECT Engineering activities provided Engineering activities provided

by TCS include feasibility by TCS include feasibility studies, basic and detailed studies, basic and detailed projects, assistance and projects, assistance and supervision during the supervision during the realization of works of realization of works of construction on main pipes and construction on main pipes and relative plants.relative plants.

General plant Lay-OutGeneral plant Lay-Out Development of pipeline maps Development of pipeline maps

on the base of P&ID.on the base of P&ID. Isometric of work.Isometric of work. Supports.Supports. Materials list.Materials list. Stress Analysis.Stress Analysis.

WASTE MATERIAL WASTE MATERIAL INCINERATION PLANTSINCINERATION PLANTS

TCSTCS develops, also develops, also cooperating with other cooperating with other Companies, basic and detailed Companies, basic and detailed planning of plants aimed at the planning of plants aimed at the environment preservation by environment preservation by the use of the thermo-the use of the thermo-destruction of Urban Waste destruction of Urban Waste Material, by the energetic Material, by the energetic return and the treatment of return and the treatment of smokes and ashes. smokes and ashes.

ACTIVITY IN 3DACTIVITY IN 3D PDMS PDMS : PLANT DESIGN MANAGEMENT SYSTEM: PLANT DESIGN MANAGEMENT SYSTEM

Modelling of pipeline, structures, equipment, civil.Modelling of pipeline, structures, equipment, civil. Drawing 2D draft.Drawing 2D draft. Development of pipeline maps.Development of pipeline maps. Isometrics.Isometrics. Material list.Material list. Valve list.Valve list. Stress Analysis.Stress Analysis.

ENGINEERING SERVICES FOR THE PETROLEUM, CHEMICAL / ENGINEERING SERVICES FOR THE PETROLEUM, CHEMICAL / PETROCHEMICAL AND ENERGETIC PRODUCTION FIELDSPETROCHEMICAL AND ENERGETIC PRODUCTION FIELDS

Civil and industrial steel work structures.Civil and industrial steel work structures. Assembly drawing.Assembly drawing. Feasibility studies.Feasibility studies. Work drawing and assembling marks.Work drawing and assembling marks. Structural calculation sheets.Structural calculation sheets. Material list.Material list.

STEEL WORK STRUCTURESSTEEL WORK STRUCTURES

Development of streets, Development of streets, underground fire-fighting pipe underground fire-fighting pipe network, foundations for pumps, network, foundations for pumps, tanks, skid and supports, sleepers, tanks, skid and supports, sleepers, material list.material list.

Assembly drawing.Assembly drawing. Reinforcement developing.Reinforcement developing. Reinforced concrete (R.C.C.) sizing.Reinforced concrete (R.C.C.) sizing.

CIVIL WORKSCIVIL WORKS

Developing of Skid machine for gas Developing of Skid machine for gas and steam turbines, centrifugal and steam turbines, centrifugal compressors.compressors.

Starting from the job offer, Starting from the job offer, development of the following development of the following drawings:drawings:

- Foundations- Foundations- Steel work (metallic basements - Steel work (metallic basements and structures) and structures) - Pipelines - Pipelines - Isometrics- Isometrics- Sleepers - Sleepers

NUOVO PIGNONE G.E. ENGINEERING NUOVO PIGNONE G.E. ENGINEERING

Construction Works.Construction Works. Metallic Structures.Metallic Structures. PipelinesPipelines ApparatusApparatus Inquiry Quotation for Electro-Inquiry Quotation for Electro-

mechanical devices.mechanical devices. Material list subdivided into spool Material list subdivided into spool

(see below)(see below)

PREVENTING ACTIVITY FOR PLANT DESIGN, MECHANICAL AND PREVENTING ACTIVITY FOR PLANT DESIGN, MECHANICAL AND ELECTRO INSTRUMENTAL ELECTRO INSTRUMENTAL

Interconnecting Wiring Diagram.Interconnecting Wiring Diagram. Electrical Outlines.Electrical Outlines. Cable Tray Route / Cable routing.Cable Tray Route / Cable routing. Primary Hook-up, Electrical & Pneumatic Hook-up.Primary Hook-up, Electrical & Pneumatic Hook-up. Instrumentation and Junction Box Layout.Instrumentation and Junction Box Layout. Material List and technical specification.Material List and technical specification. Instrument Data Sheet.Instrument Data Sheet. I / O List.I / O List. Pressure Safety Valve / CV / FE Calculation Sheets.Pressure Safety Valve / CV / FE Calculation Sheets. Intrinsically Safe Loop.Intrinsically Safe Loop. Architecture Field Bus / Profibus.Architecture Field Bus / Profibus. Automation logic diagram.Automation logic diagram. Control Panel Layout.Control Panel Layout. Low Voltage Engineering and accordance with Law 46/90.Low Voltage Engineering and accordance with Law 46/90.

ELECTRIC INSTRUMENTALELECTRIC INSTRUMENTAL

REFERENCE LIST

DANIELI ENGINEERING IMPIANTO KSC (PDMS)DANIELI ENGINEERING IMPIANTO KSC (PDMS) (subcontract): (subcontract): water treatment, compressor room, laboratory, external distribution, fire fighting network. water treatment, compressor room, laboratory, external distribution, fire fighting network. Modelling with PDMS :Modelling with PDMS :-piping (730 lines);-piping (730 lines);-civil, basements, basins, buildings;-civil, basements, basins, buildings;-pipe-rack, not standard supports;-pipe-rack, not standard supports;-equipments, pumps, filters;-equipments, pumps, filters;-extrapolation from the model: pipelines map / standard supports, isometrics, fire-fighting pits.-extrapolation from the model: pipelines map / standard supports, isometrics, fire-fighting pits.-piping stress with Cezar 2.-piping stress with Cezar 2.

DANIELI ENGINEERING - TRIERER STAHLWERK GMBHDANIELI ENGINEERING - TRIERER STAHLWERK GMBH (PDMS)(PDMS) (subcontract): (subcontract): water treatment, compressor room.water treatment, compressor room.Modelling with PDMS :Modelling with PDMS :-piping;-piping;-civil, basements, basins, buildings;-civil, basements, basins, buildings;-pipe-rack, not standard supports;-pipe-rack, not standard supports;-equipments, pumps, filters;-equipments, pumps, filters;-extrapolation from the model: piping map / standard supports.-extrapolation from the model: piping map / standard supports.

NUOVO PIGNONE NUOVO PIGNONE (subcontract):(subcontract):skid machine development including pipelines for every kind of centrifugal compressor and both skid machine development including pipelines for every kind of centrifugal compressor and both steam and gas turbines.steam and gas turbines.

T.M.E. T.M.E. post water treatment plant for industrial use in Rosignano Solvay:post water treatment plant for industrial use in Rosignano Solvay:proposed study piping map, drawing up of isometrics and supports.proposed study piping map, drawing up of isometrics and supports.

T.M.E. T.M.E. thermo-destruction plant in Casal Borsetti (RA), in Granarolo (BO) and in Lecco.thermo-destruction plant in Casal Borsetti (RA), in Granarolo (BO) and in Lecco.proposed study and drawing up of isometrics and supports.proposed study and drawing up of isometrics and supports.

T.M.E.:T.M.E.:water treatment plant in Alon Tabor:water treatment plant in Alon Tabor:Layout of piping and supports.Layout of piping and supports.

VATECH ESCHER WYSSVATECH ESCHER WYSS (subcontract): (subcontract): Premadio II plant, hydroelectric plant in cavePremadio II plant, hydroelectric plant in cavedevelopment pipelines map e drawing up isometricsdevelopment pipelines map e drawing up isometricsproposed study of supports.proposed study of supports.

METANO IMPIANTIMETANO IMPIANTI (subcontract): (subcontract):Compressing Skid gas Compressing Skid gas basic and special study and development of pipelines, isometrics, foundations, MTO, steel work e basic and special study and development of pipelines, isometrics, foundations, MTO, steel work e metallic structures.metallic structures.

TERMOKIMIKTERMOKIMIK (subcontract): (subcontract):plant water treatment with development of pipelines, isometrics, supports and relative material list.plant water treatment with development of pipelines, isometrics, supports and relative material list.

ABBABB (subcontract) : (subcontract) :Gas pipeline Pedro Duran Farell : development of pipelines map with relative isometrics and Gas pipeline Pedro Duran Farell : development of pipelines map with relative isometrics and supports.supports.

ABB ABB (subcontract) :(subcontract) :PDMSPDMSGPDF gas compression station in Algeria.GPDF gas compression station in Algeria.

SAIPEMSAIPEM (subcontract): (subcontract): coupling plant of pipes coupling plant of pipes castoro 2castoro 2 : basic and special study and pipelines development. : basic and special study and pipelines development.

PROCTER AND GAMBLEPROCTER AND GAMBLE (subcontract): (subcontract):Realization of drawings for the expanding of plants, steel work Realization of drawings for the expanding of plants, steel work and pipelines.and pipelines.

SAINT GOBAINSAINT GOBAIN (subcontract): (subcontract):Building study for Naphtha burners.Building study for Naphtha burners.

MITSUBAMITSUBA (subcontract): (subcontract):Industrialization of magnetic flywheel for scooter Piaggio, Industrialization of magnetic flywheel for scooter Piaggio, starter, electronic ignition, high voltage coil, pick-up, product starter, electronic ignition, high voltage coil, pick-up, product drawing, equipment, production cycle, working phase, flow-drawing, equipment, production cycle, working phase, flow-chart, check list.chart, check list.

SIEMENS AUTOMOTIVE:SIEMENS AUTOMOTIVE:Equipment for Equipment for modulablemodulable spray test. spray test.

BREDA:BREDA:Building study and assembly drawings for railcars and bus.Building study and assembly drawings for railcars and bus.

SARPLAST:SARPLAST: ( (FibreglassFibreglass ,GRP, Prfv,) ,GRP, Prfv,)pipelines map, isometrics building studies with material list to pipelines map, isometrics building studies with material list to the side, pipe supports.the side, pipe supports.

NUOVO PIGNONE - MODULO P34 PETROBRAS (PDMS) NUOVO PIGNONE - MODULO P34 PETROBRAS (PDMS) (subcontract):(subcontract):Modelling with PDMS of piping, equipment, main and service Modelling with PDMS of piping, equipment, main and service steel work.steel work.

ORGANIZATION CHARTORGANIZATION CHART

COMPANY PURPOSECOMPANY PURPOSE

We furnish high level engineering services for the main plant design field. We We furnish high level engineering services for the main plant design field. We achieve it by combining the different skills, competences, experiences and achieve it by combining the different skills, competences, experiences and resources. We have the priority purpose to satisfy our customers.resources. We have the priority purpose to satisfy our customers.

WHERE WE AREWHERE WE ARE

TCS ENGINEERING TCS ENGINEERING s.n.c. s.n.c.

Piazza Ivan Iori, 6 Piazza Ivan Iori, 6 57023 Cecina 57023 Cecina

LIVORNOLIVORNO

ITALYITALY

Tel. +39 (0) 586 631067 or (0) 586 630128Tel. +39 (0) 586 631067 or (0) 586 630128Fax. +39 (0) 586 632761Fax. +39 (0) 586 632761

P.iva 01139810491P.iva 01139810491

CONTACT US:CONTACT US:

Managing director Managing director e-mail e-mail : : [email protected]@tecnocadservice.it (mobile +39 339 3114647) (mobile +39 339 3114647)

Technical plant designer / mechanical manager e-mail : Technical plant designer / mechanical manager e-mail : [email protected]@tecnocadservice.it (mobile +39 334 6788309)(mobile +39 334 6788309) Technical electro instrumentalTechnical electro instrumental manager manager e-mail e-mail : : [email protected]@tecnocadservice.it