engineering all handsengineering.lbl.gov/.../allhandsmeeting/engineering-all-hands-7-7-2017.pdf ·...

17
7-7-2017 Henrik von der Lippe July 7, 2017 Engineering All Hands 1

Upload: others

Post on 29-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Engineering All Handsengineering.lbl.gov/.../AllHandsMeeting/Engineering-All-Hands-7-7-2017.pdf · Engineering All Hands 1. 7-7-2017 Our address: • B50 Auditorium, (Seaborg Road)

7-7-2017

Henrik von der LippeJuly 7, 2017

Engineering All Hands

1

Page 2: Engineering All Handsengineering.lbl.gov/.../AllHandsMeeting/Engineering-All-Hands-7-7-2017.pdf · Engineering All Hands 1. 7-7-2017 Our address: • B50 Auditorium, (Seaborg Road)

7-7-2017

Our address:• B50 Auditorium,

(Seaborg Road)• LBNL

One Cyclotron Road,Berkeley, CA 94720

Our evacuation/assemblypoint:• H1 Parking lot

Thanks to Deborah Wendtfor the idea

Pre-Meeting Safety Check

2

The nearest AED:• Around the corner

to the left as youexit the auditorium

Volunteers:• Who is CPR certified and

willing to perform?• Who will call 911?• Who will lead the evacuation?• Who will meet the emergency

vehicles?• Who will sweep the room?

Page 3: Engineering All Handsengineering.lbl.gov/.../AllHandsMeeting/Engineering-All-Hands-7-7-2017.pdf · Engineering All Hands 1. 7-7-2017 Our address: • B50 Auditorium, (Seaborg Road)

7-7-2017

● Overview of Accelerator Technology and Applied Physics (ATAP) Activities and Initiatives - Wim Leemans

● Division updates● New Employees over the last year● 2017 new hires & retirees● Engineering Process Guide

● Ice Cream Social B50C-Patio

3

Outline

Page 4: Engineering All Handsengineering.lbl.gov/.../AllHandsMeeting/Engineering-All-Hands-7-7-2017.pdf · Engineering All Hands 1. 7-7-2017 Our address: • B50 Auditorium, (Seaborg Road)

7-7-2017

New Employees ME/Magnetics

Adam BaloghThomas ClemonsFausto MaciarelloKayla MasonChris OrmanKristopher PearsonDenny TanLi Wang

ESIEPhat SanethavongNigel Mesta Hired 12/2016

4

New Employees & Retirees

RetireesESIE

Mark AmmanPaul BaraleRandy CandelarioHelen ChenJonathan ElkinsSergio RogoffRick Steele

ME/Magnetics Mark CampagnaManuel PereiraPaul Pipersky

Page 5: Engineering All Handsengineering.lbl.gov/.../AllHandsMeeting/Engineering-All-Hands-7-7-2017.pdf · Engineering All Hands 1. 7-7-2017 Our address: • B50 Auditorium, (Seaborg Road)

7-7-2017

10 YearsRick Bloemhard (Feb.)Roman Dockal (Apr.)Ian Johnson (May)

15 YearsChris Redding (Feb.)Monte Whisenhunt (Mar.)Daniel Ellis (Jul.)

20 YearsDawn Munson (Mar.)Alex Ratti (Mar.)

25 YearsSergio Gavida (Feb.)Harold Yaver (Apr.)

5

Career Milestones

Page 6: Engineering All Handsengineering.lbl.gov/.../AllHandsMeeting/Engineering-All-Hands-7-7-2017.pdf · Engineering All Hands 1. 7-7-2017 Our address: • B50 Auditorium, (Seaborg Road)

7-7-2017

Qiang Du

Scalable Control on Multidimensional Coherent Combining for High Average Power Ultrafast Laser

Explore engineering aspects of beam combining diagnostics and controls methods. Study and implement optimized multi-input multi-output (MIMO) control for each dimensional local control, including calibration and feedback control of cavity phasing and modulations in temporal stacking, stabilization of parallel channel phasing errors in spatial combining, and spectral optimization with understanding of phase dispersion and nonlinear effects in spectral combining. Apply system engineering and integration between multi-layers of controls for robustness.

6

Early Career Award

Page 7: Engineering All Handsengineering.lbl.gov/.../AllHandsMeeting/Engineering-All-Hands-7-7-2017.pdf · Engineering All Hands 1. 7-7-2017 Our address: • B50 Auditorium, (Seaborg Road)

7-7-2017

FY17 budget was passed by Congress and signed by the President in April

LBNL: ● FY17: $574M ● DESI and LZ each receive an additional $2M in

FY17 ● ALS-U receive $5M

FY18 President's Budget Request for The Office of Science proposal -18%

● Wait for Congress to complete their proposals

7

Budgets

Page 8: Engineering All Handsengineering.lbl.gov/.../AllHandsMeeting/Engineering-All-Hands-7-7-2017.pdf · Engineering All Hands 1. 7-7-2017 Our address: • B50 Auditorium, (Seaborg Road)

7-7-2017 8

5 Steps to Federal Budget

1 2 3 4 5

We Are Here

Page 9: Engineering All Handsengineering.lbl.gov/.../AllHandsMeeting/Engineering-All-Hands-7-7-2017.pdf · Engineering All Hands 1. 7-7-2017 Our address: • B50 Auditorium, (Seaborg Road)

7-7-2017 9

DOE 413.3B Projects

DESI

LCLS-II injector

LCLS-II HGVPU

LZ

ATLAS upgrade

ALS-U

IGB

GRETA

LARP

Page 14: Engineering All Handsengineering.lbl.gov/.../AllHandsMeeting/Engineering-All-Hands-7-7-2017.pdf · Engineering All Hands 1. 7-7-2017 Our address: • B50 Auditorium, (Seaborg Road)

7-7-2017 14

Laptop Ergo

Using Laptops in Non-Office Environments

Page 15: Engineering All Handsengineering.lbl.gov/.../AllHandsMeeting/Engineering-All-Hands-7-7-2017.pdf · Engineering All Hands 1. 7-7-2017 Our address: • B50 Auditorium, (Seaborg Road)

7-7-2017

January through May 2017 Data:● 3% signature reports missing

Great improvement!Please continue.

15

LETS reporting improvements

Page 16: Engineering All Handsengineering.lbl.gov/.../AllHandsMeeting/Engineering-All-Hands-7-7-2017.pdf · Engineering All Hands 1. 7-7-2017 Our address: • B50 Auditorium, (Seaborg Road)

7-7-2017

● 33 obsolete or malfunctioning computers

● 13 rolling bins and 3/4 of a dumpster of paper and cardboard

● 28 hoppers, rolling bins, barrels, and pallets of excess equipment and miscellaneous scrap and salvage

● 1 cargo container filled with still-needed items that were not in active use

● 0 accidents and injuries — the best statistic of all, thanks to appropriate PPE and staying within our training and abilities

16

ENG/ATAP safety day

Page 17: Engineering All Handsengineering.lbl.gov/.../AllHandsMeeting/Engineering-All-Hands-7-7-2017.pdf · Engineering All Hands 1. 7-7-2017 Our address: • B50 Auditorium, (Seaborg Road)

7-7-2017

Questions?

B50C Patio

This presentation will be posted on our Engineering.lbl.gov site

17