MOORING ANCHOR (SHOWN FOR REFERENCE) SECTION ALONG BARGE PORT (FAR) SIDE SECTION ALONG BARGE STARBOARD (NEAR) SIDE PRIMARY TUG HAS 4.5' OPERATING CLEARANCE TO CHANNEL BOTTOM LOADED BARGE HAS 8' OPERATING CLEARANCE TO CHANNEL BOTTOM PILOT TUG HAS 9.5' OPERATING CLEARANCE TO CHANNEL BOTTOM 585' DOCK ELEVATION 564' BOTTOM ELEVATION 569' SHELF ELEVATION 578' WATER ELEVATION LOADED BARGE HAS 3' OPERATING CLEARANCE TO DOCK SHELF 9' [2743] 48' [14630] - Elevations and water depths are taken from original channel and dock construction survey - Water depths are also based on a predicted water elevation of 578' per current F&OC - TCBS published in May 1972. forecasts. Engineered Transportation Services

Upload: others

Post on 23-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Engineered Transportation Services - Equipment Expressequipmentexpress.com/wp-content/uploads/Equipment... · administration, transportation engineers, dispatchers and estimators

MOORING ANCHOR(SHOWN FOR REFERENCE)

SECTION ALONGBARGE PORT

(FAR) SIDE

SECTION ALONGBARGE STARBOARD

(NEAR) SIDE

PRIMARY TUG HAS 4.5'OPERATING CLEARANCE

TO CHANNEL BOTTOM

LOADED BARGE HAS 8'OPERATING CLEARANCE

TO CHANNEL BOTTOM

PILOT TUG HAS 9.5'OPERATING CLEARANCE

TO CHANNEL BOTTOM

585' DOCK ELEVATION

564' BOTTOM ELEVATION569' SHELF ELEVATION

578' WATER ELEVATION

LOADED BARGE HAS 3'OPERATING CLEARANCETO DOCK SHELF

9' [2743]

48'[14630]

NOTE:- Elevations and water depths are taken fromoriginal channel and dock construction survey

- Water depths are also based on a predictedwater elevation of 578' per current F&OC - TCBS

published in May 1972.

forecasts.

Engineered Transportation Services

Page 2: Engineered Transportation Services - Equipment Expressequipmentexpress.com/wp-content/uploads/Equipment... · administration, transportation engineers, dispatchers and estimators

0 First IssueRev DescriptionCustomer Equipment Express / Prolec GE

Matapedia QC Transformer DeliveryProjectTitle 130 T Transformer on 19-Axle Trailer Arrangement

Paper Size RevB 0

ENGINEERING IN MOTION INC. DIVISON OF

THE FITZPATRICK GROUP OF COMPANIES / CAMBRIDGE RIGGING / EQUIPMENT EXPRESS

THIS PUBLICATION REMAINS THE PROPERTY OF THE PUBLISHER AND SHALL BE TREATED AS CONFEDENTIAL, UNLESS CONTRACTUALLY SPECIFIED OTHERWISE. NO PART OF ITMAY BE REPRODUCED STORED IN A RETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM OR BY ANY MEANS. WITHOUT THE PRIOR WRITTEN PERMISSION OF THE PUBLISHER

DateNOTES

CheckMDM MM6-Sep-11Drawn

Sheet1 of 1

DrawingEE-PGE-MQC-TRNSFMR-TR-19A-001

HEAVY LIFTING FOR MORE THAN 50 YEARS

Incorporated in the 1950’s, Equipment Express was organized to be a transportation arm to two large US rigging companies. Specializing in the movement of transformers and machine tools, Equipment Express moved into almost every industrial area over the span of 35 years.

In 2001, the management team was expanded to include the discipline of transportation engineering. This has augmented our innovation and capabilities which in turn directly benefits our customer base.

You name it, we have the means and knowledge to move it.

T/L carrier specializing in O/S commodities

Superior service at competative pricing

Courteous and knowledgable drivers

Dock, warehouse, and storage facilities at terminal

A team with over 125 years combined experience

Serving Canada, Mexico, and continental United States

Hauling capacities to 565 metric ton

Mobile cranes up to 850 ton capacity

Transformer removal

Engineered Transportation Services

ABOUT US

Contact us today for a customized proposal on how we can move you down the hall, across the street, or around the world.

60 Wanless Court, R.R. #1, Ayr, Ontario N0B 1E0

Phone: (519) 740-8008 Fax: (519) 740-6297

TF: 800-387-9791

www.equipmentexpress.com

EQUIPMENT EXPRESS TODAY

Our current line up includes 150 trailers, 60 tractors, 10 escort vehicles, and a shop of 12 employees. We can manage projects of any size, anywhere in North America. Our head office is located in Ayr, Ontario and we have a yard in Laredo, Texas.

Our services are deployed in industries such as power generation, construction, pollution control, refinery, and mining. Our office in Ayr has a fully experienced staff, which includes safety and compliance office, administration, transportation engineers, dispatchers and estimators.

Equipment Express is forever coming up with new hauling solutions to solve many transportation issues. It was over a year and a half ago, that Equipment Express became the first Canadian carrier to tackle the logistical challenges of moving 80m wind towers and other carriers have since tried to follow. As industries change, so does Equipment Express. From our way of moving equipment, to the equipment we use, we are always ready for anything new.

For more information about our transformer removal and disposal services, please visit: Greenport Enviromental.

TRACTOR STEERING TRACTOR DRIVES

AXLES 1 # 1 SPRING 3 # 2-4 AIRTRANSPORT EQUIPMENT

WEIGHT 5897 KGS 13000 LBS 9072 KGS 20000 LBS

MISC EQUIPMENT WEIGHT 0 KGS 0 LBS 18144 KGS 40000 LBS

CARGO WEIGHT 0 KGS 0 LBS 0 KGS 0 LBS

TOTAL WEIGHT 5897 KGS 13000 LBS 27216 KGS 60000 LBS

WEIGHT / AXLE 5897 KGS 13000 LBS 9072 KGS 20000 LBS

TIRES / AXLE 2 385 65 R22.5 4 12 R22.5

TOTAL WEIGHT / TIRE 2948 KGS 6500 LBS 2268 KGS 5000 LBSTOTAL WEIGHT / UNIT OF TIRE

WIDTH 7.7 KGS/MM 429 LBS/IN 7.4 KGS/MM 417 LBS/IN

STEAM GENERATOR ON DBL-WD 18-LINE GOLDHOFER

AXLES 18 # 5-22 HYDRAULICTRANSPORT EQUIPMENT

WEIGHT 120000 KGS 264552 LBS

MISC EQUIPMENT WEIGHT 0 KGS 0 LBS

CARGO WEIGHT 450000 KGS 992070 LBS

TOTAL WEIGHT 570000 KGS 1256622 LBS

WEIGHT / AXLE 31667 KGS 69812 LBS

TIRES / AXLE 16 215 70R17.5

TOTAL WEIGHT / TIRE 1979 KGS 4363 LBSTOTAL WEIGHT / UNIT OF TIRE

WIDTH 9.2 KGS / MM 516 LBS / IN

EXPRESSQUIPMENTE

NO. QTY DESCRIPTION REMARKS WEIGHTKGS WEIGHT LBS

A 1 Steam Generator 450000 992070

B 1 4-Axle Prime Mover 33113 73000

C 1 Double-wide 18-LineGoldhofer THP/SL 3000 120000 264552

D

E

TOTAL 603113 1329622

0 First IssueRev DescriptionCustomer North East Canada Power

450 Te Steam Generator TransportProjectTitle Transport Arrangement - Double-wide 18-Line Goldhofer

Paper Size RevB 0

EXPRESS

THIS PUBLICATION REMAINS THE PROPERTY OF THE PUBLISHER AND SHALL BE TREATED AS CONFEDENTIAL, UNLESS CONTRACTUALLY SPECIFIED OTHERWISE. NO PART OF ITMAY BE REPRODUCED STORED IN A RETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM OR BY ANY MEANS. WITHOUT THE PRIOR WRITTEN PERMISSION OF THE PUBLISHER

DateNOTES CheckMDM MDM18-Jan-11Drawn

Sheet1 of 1

DrawingEE-NECP-SGT-TA-DW18L-001

QUIPMENTE

Page 3: Engineered Transportation Services - Equipment Expressequipmentexpress.com/wp-content/uploads/Equipment... · administration, transportation engineers, dispatchers and estimators

0 First IssueRev DescriptionCustomer Equipment Express / Prolec GE

Matapedia QC Transformer DeliveryProjectTitle 130 T Transformer on 19-Axle Trailer Arrangement

Paper Size RevB 0

ENGINEERING IN MOTION INC. DIVISON OF

THE FITZPATRICK GROUP OF COMPANIES / CAMBRIDGE RIGGING / EQUIPMENT EXPRESS

THIS PUBLICATION REMAINS THE PROPERTY OF THE PUBLISHER AND SHALL BE TREATED AS CONFEDENTIAL, UNLESS CONTRACTUALLY SPECIFIED OTHERWISE. NO PART OF ITMAY BE REPRODUCED STORED IN A RETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM OR BY ANY MEANS. WITHOUT THE PRIOR WRITTEN PERMISSION OF THE PUBLISHER

DateNOTES

CheckMDM MM6-Sep-11Drawn

Sheet1 of 1

DrawingEE-PGE-MQC-TRNSFMR-TR-19A-001

ENGINEERED TRANSPORTATION

Equipment Express has been providing turn key solutions for many different types of projects over the years. We believe, when you incorporate the offloading services as well as the transportation, this enables the project to share management, therefore avoiding delays and additional costs to the customer. Industrial and institutional projects require a turn key style of management. Coordination of various trades under the guidance of an experienced project team has become the preferred method of completing all tasks on any given project.

We provide full engineered transportation services as well as heavy lift crane and rigging using our own in house equipment. Coordination is key when handling and transporting heavy cargo. Our project team members make sure your shipment is handled efficiently and safely from the start. We have handled projects on behalf of some of the largest companies in the world, who in turn have recognized these benefits and continued to use our services.

One call takes care of it all.

Loading, transporting and unloading of cargo of any size or weight. Our reputation speaks for itself.

PROJECT MANAGEMENT

Equipment Express specializes in loading, transporting and unloading of cargo of any size or weight.

How do I move this thing?

Engineered Transportation Services

Contact us today for a customized proposal on how we can move you down the hall, across the street, or around the world.

60 Wanless Court, R.R. #1, Ayr, Ontario N0B 1E0

Phone: (519) 740-8008 Fax: (519) 740-6297

TF: 800-387-9791

www.equipmentexpress.com

N

564'

366'

564'566'

574'

13'

578'

580'

576'

574"

572'

14'

15'

584'586'

588'

585'

590'

582'

578'

570'

14'14'14'14'

14'

564'

566'

570'

574'

569'

364'

15'

15'

15'

15'

11'

9'

9'

11'

13'

13'

2 KNOT

CURRENT

EXISTING MOORING ANCHOR

PREVAILINGWIND

9'

A

BC

D7'

5'

BUOY MARKINGSLUMP IN ARMOR STONEON NW POINT

578'

SpudWinch

E

0 First IssueRev DescriptionCustomer Fracht USA

Siemens Turbine Rotor Delivery to Bruce Power 2012ProjectTitle Barge Entry to Bruce 'A' Dock Access Channel

Paper Size RevB 0

ENGINEERING IN MOTION INC. DIVISON OF

THE FITZPATRICK GROUP OF COMPANIES / CAMBRIDGE RIGGING / EQUIPMENT EXPRESS

THIS PUBLICATION REMAINS THE PROPERTY OF THE PUBLISHER AND SHALL BE TREATED AS CONFEDENTIAL, UNLESS CONTRACTUALLY SPECIFIED OTHERWISE. NO PART OF ITMAY BE REPRODUCED STORED IN A RETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM OR BY ANY MEANS. WITHOUT THE PRIOR WRITTEN PERMISSION OF THE PUBLISHER

NO. QTY DESCRIPTION DIMENSION REMARKS REMARKSA 1 2000 HP Primary Tug 70' x 20' x 9.5' Draft Vigilant I 18 T Bollard PullB 1 Cargo Barge 180' x 54' x 12' OC 181 5'-6' Loaded DraftC 1 300 HP Pilot Tug 44' x 14' Ian Mac 3 T Bollard Pull

D 22" Polypropylene

Towing Line2" Ø x 100' +securement

Minimum 52,000 lbbreaking strength

E 1 Assist / Safety Boat 23' x 8' x 230 HP LC-23F

Total

Date

NOTES

CheckMDM MDM19-Mar-12Drawn

Sheet1 of 4

DrawingEE-FUSA-STR-BP2012-BL1-001

- For entry to channel, pilot tug (4.5' draft) tows and primary tug (9.5' draft) pushes.

NOTE:- Elevations and water depths are taken fromoriginal channel and dock construction survey

- Water depths are also based on a predictedwater elevation of 578' per current F&OC - TCBS

published in May 1972.

forecasts.

- For barge entry to channel, prior to Bruce Power will have channel re-surveyed(bathymetric), (5) channel marker buoys re-installed and channel range markers made operational.- Bearing for entering will be 182° / bearing for leaving will be 2°.

- The slump in the armor stone on the NW point is reducing barge accessclearance - if it deteriorates any further it will prohibit barge deliveries and removal will be required.- LC-23 will assist with lines and act as safety boat.

Page 4: Engineered Transportation Services - Equipment Expressequipmentexpress.com/wp-content/uploads/Equipment... · administration, transportation engineers, dispatchers and estimators

0 First IssueRev DescriptionCustomer Equipment Express / Prolec GE

Matapedia QC Transformer DeliveryProjectTitle 130 T Transformer on 19-Axle Trailer Arrangement

Paper Size RevB 0

ENGINEERING IN MOTION INC. DIVISON OF

THE FITZPATRICK GROUP OF COMPANIES / CAMBRIDGE RIGGING / EQUIPMENT EXPRESS

THIS PUBLICATION REMAINS THE PROPERTY OF THE PUBLISHER AND SHALL BE TREATED AS CONFEDENTIAL, UNLESS CONTRACTUALLY SPECIFIED OTHERWISE. NO PART OF ITMAY BE REPRODUCED STORED IN A RETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM OR BY ANY MEANS. WITHOUT THE PRIOR WRITTEN PERMISSION OF THE PUBLISHER

DateNOTES

CheckMDM MM6-Sep-11Drawn

Sheet1 of 1

DrawingEE-PGE-MQC-TRNSFMR-TR-19A-001

HAULING CAPABILITIESHOW DO I MOVE THIS THING? If you have asked yourself this question, you can count on Equipment Express for the answer. We provide transportation solutions for any logistical challenges. Our combination of specialized equipment and experienced staff has been engineering solutions for our customers for the past 50 years. No project is too large or too small. Rail and ocean associations have enhanced our ability to globalize our services.

ENGINEERED TRANSPORTATION Equipment Express Inc. offers the most extensive inventory of speacialized trailers in Ontario. From flat bed trailers to hydraulic line transporters, we have the right equipment for any size of load. In house custom fabricating allows us to cater to the most challenging transportation problems. All of our late model equipment is kept in top-notch condition by our state of the art repair facility. All of this means peace of mind, knowing your cargo will travel down the road safely without delays.

We invite you to come and visit us for a tour of our facilities and equipment.

EQUIPMENT

From flat bed trailers to 565 metric ton payload capacity transporters, we have the right equipment for any size of load.

Equipment Express provides transportation solutions for any logistical challenge.

Engineered Transportation Services

Contact us today for a customized proposal on how we can move you down the hall, across the street, or around the world.

60 Wanless Court, R.R. #1, Ayr, Ontario N0B 1E0

Phone: (519) 740-8008 Fax: (519) 740-6297

TF: 800-387-9791

www.equipmentexpress.com

Page 5: Engineered Transportation Services - Equipment Expressequipmentexpress.com/wp-content/uploads/Equipment... · administration, transportation engineers, dispatchers and estimators

0 First IssueRev DescriptionCustomer Equipment Express / Prolec GE

Matapedia QC Transformer DeliveryProjectTitle 130 T Transformer on 19-Axle Trailer Arrangement

Paper Size RevB 0

ENGINEERING IN MOTION INC. DIVISON OF

THE FITZPATRICK GROUP OF COMPANIES / CAMBRIDGE RIGGING / EQUIPMENT EXPRESS

THIS PUBLICATION REMAINS THE PROPERTY OF THE PUBLISHER AND SHALL BE TREATED AS CONFEDENTIAL, UNLESS CONTRACTUALLY SPECIFIED OTHERWISE. NO PART OF ITMAY BE REPRODUCED STORED IN A RETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM OR BY ANY MEANS. WITHOUT THE PRIOR WRITTEN PERMISSION OF THE PUBLISHER

DateNOTES

CheckMDM MM6-Sep-11Drawn

Sheet1 of 1

DrawingEE-PGE-MQC-TRNSFMR-TR-19A-001

RAIL PROJECTS If it’s too big to move by road, no problem. Equipment Express can provide transportation to and from the nearest rail siding and handle the unloading and loading of rail cars including block and brace. We have loaded and and unloaded countless numbers of rail cars over the years and our excellent reputation for safety and reliabiltiy with the rail companies will benefit you directly.

TRANSFORMERS PROJECTSEquipment Express has been handling transformers for over twenty years, from transporting and financial placement of 750,000 LB transformers to the field dressing. We provide Jack and Roll services for any size transformer. This service, along with our specially designed transformer trailers allows us to handle your next transformer project from start to finish. The vast amount of experience in handling sensitive equipment has enabled us to expand our expertise to other markets.

WIND TURBINES PROJECTSTo date, Equipment Express has safely handled hundreds of wind turbine deliveries, be it one wind tower farm or several, Equipment Express has the equipment and the expertise to meet all your requirements. This incorporated with the ability to unload ourselves makes Equipment Express the only call you need to make for your next wind turbine project.

MACHINERY PROJECTSOur rigging and millwright capabilities can move a single machine across town or relocate an entire manufacturing facility across Canada, the United states or Mexico. Whether it’s dismantling, transporting and reinstalling existing equipment, or the primary installation of a state of the art piece of equipment, our personnel can handle the task with unparalleled safety and efficiency. Using the most up to date hydraulic gantry systems and heavy capacity forklifts, we have the equipment to make your next move an easy one.

SERVICES

Engineered Transportation Services

Contact us today for a customized proposal on how we can move you down the hall, across the street, or around the world.

60 Wanless Court, R.R. #1, Ayr, Ontario N0B 1E0

Phone: (519) 740-8008 Fax: (519) 740-6297

TF: 800-387-9791 www.equipmentexpress.com

Equipment Express provides turn key solutions for many different types of projects

Specialized planning and project management

Page 6: Engineered Transportation Services - Equipment Expressequipmentexpress.com/wp-content/uploads/Equipment... · administration, transportation engineers, dispatchers and estimators

0 First IssueRev DescriptionCustomer Equipment Express / Prolec GE

Matapedia QC Transformer DeliveryProjectTitle 130 T Transformer on 19-Axle Trailer Arrangement

Paper Size RevB 0

ENGINEERING IN MOTION INC. DIVISON OF

THE FITZPATRICK GROUP OF COMPANIES / CAMBRIDGE RIGGING / EQUIPMENT EXPRESS

THIS PUBLICATION REMAINS THE PROPERTY OF THE PUBLISHER AND SHALL BE TREATED AS CONFEDENTIAL, UNLESS CONTRACTUALLY SPECIFIED OTHERWISE. NO PART OF ITMAY BE REPRODUCED STORED IN A RETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM OR BY ANY MEANS. WITHOUT THE PRIOR WRITTEN PERMISSION OF THE PUBLISHER

DateNOTES

CheckMDM MM6-Sep-11Drawn

Sheet1 of 1

DrawingEE-PGE-MQC-TRNSFMR-TR-19A-001

Engineered Transportation Services

TRAILER TYPES

Contact us today for a customized proposal on how we can move you down the hall, across the street, or around the world.

60 Wanless Court, R.R. #1, Ayr, Ontario N0B 1E0

Phone: (519) 740-8008 Fax: (519) 740-6297

TF: 800-387-9791

www.equipmentexpress.com

12-18 Line Self Propelled Goldhoffer 3 and 4 Axle Hydraulic Floates 12 Line 96 Wheel Nicolas Transporter

EXT Double Drop

Mechanical Double Drops Bed Inserts / Trailer DecksMini Deck Trailer

9 Axle Wind Tower Schinables Blade TrailersBeam Trailers

Off Road Heavy Transporters 9 Axle Perimeter Bed Trailer9 Axle 84 Ton Acpacity

6 Axle Super Load Trailer 6 Lines Self Propelled Goldhofer6 Lines Goldhofer

3 and 4 Axle Wind Tower Tailer 53 Foot Step Decks48 Foot Step Decks

Page 7: Engineered Transportation Services - Equipment Expressequipmentexpress.com/wp-content/uploads/Equipment... · administration, transportation engineers, dispatchers and estimators

LR 1250LR 1250

For more information regarding engineered services, please contact us.

60 Wanless Court, R.R. #1, Ayr, Ontario N0B 1E0

Phone: (519) 740-8008 Fax: (519) 740-6297

TF: 800-387-9791

www.equipmentexpress.com

0 First IssueRev DescriptionCustomer Equipment Express / Prolec GE

Matapedia QC Transformer DeliveryProjectTitle 130 T Transformer on 19-Axle Trailer Arrangement

Paper Size RevB 0

ENGINEERING IN MOTION INC. DIVISON OF

THE FITZPATRICK GROUP OF COMPANIES / CAMBRIDGE RIGGING / EQUIPMENT EXPRESS

THIS PUBLICATION REMAINS THE PROPERTY OF THE PUBLISHER AND SHALL BE TREATED AS CONFEDENTIAL, UNLESS CONTRACTUALLY SPECIFIED OTHERWISE. NO PART OF ITMAY BE REPRODUCED STORED IN A RETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM OR BY ANY MEANS. WITHOUT THE PRIOR WRITTEN PERMISSION OF THE PUBLISHER

DateNOTES

CheckMDM MM6-Sep-11Drawn

Sheet1 of 1

DrawingEE-PGE-MQC-TRNSFMR-TR-19A-001

ENGINEERING IN MOTION

Integrated In-house EngineersEquipment Express integrates the services of in-house engineers and trade experts through the lifecycle of all technically challenging projects. This practice strengthens our ability to provide innovative, certified solutions in increasingly technical and safety-oriented industry environments. Our thorough planning allows us to consistently deliver on time and on budget.

ENGINEERING SERVICES

MULTI-MODAL

Feasibility studies

Site surveys

Risk Assessment & management

Project pre-planning

Custom equipment design & modification

TRANSPORT

Route surveys

Transport & permit drawings

Turning radius drawings

Engineered lashing drawings

Ground bearing load analysis – roads / bridges

Engineered transport plans

HEAVY LIFTING & RIGGING

Crane / Gantry / Rigging drawings

Jack & slide drawings

Engineered lifting and rigging plans

MARINE

Ballast plans

Roll-On-Roll-Off design

Engineered lashing / securement drawings

Engineered marine transport plans

RAIL

Rail clearance drawings

Engineered lashing / securement drawings

Engineered Transportation Services

Page 8: Engineered Transportation Services - Equipment Expressequipmentexpress.com/wp-content/uploads/Equipment... · administration, transportation engineers, dispatchers and estimators

Equipment Express Inc. 60 Wanless Court, R.R. #1, Ayr, Ontario N0B 1E0

Phone: (519) 740-8008 Fax: (519) 740-6297TF: 800-387-9791

equipmentexpress.com

564'

366'

564'

566'574'

13'

14'

15'

585'

578'570'

14'

14'

14'

569'

15'

15'

11'

11'13'

SpudWinch

15'

9'

2 KNOT

CURRENT

9'

9'

AB

C

N

PREVAILINGWIND

MOORING ANCHOR

180' [54864]

63°74°

Water Force

Fwf = Sin 63° x A x P x Cd = .89 x 1080 x .03418 (2.3) ² 62.5 x 1.4 = 15,207 LBS

Definitions

A = Surface Area = 6' draft x 180' long = 1080 SFP = Water Pressure = .03418 v² x pv = Water Speed = 2 Knots = 2.3 MPHCd = Drag Coefficient = 1.4 for flat surfacep = Water Density = 62.5 PSF

2 KNOTCURRENT

Front Corner Restrained

Rear Corner Restraint

Rrc = Fwf x 90' Sin 74° x 180' = 15207 x 90 .96 x 180 = 7,920 LBS

D

EE

NOTE:- Elevations and water depths are taken fromoriginal channel and dock construction survey

- Water depths are also based on a predictedwater elevation of 578' per current F&OC - TCBS

published in May 1972.

forecasts.

Engineered Heavy Transportation SolutionsHeavy Haul Transportation Experts Specialized Rigging & Machinery Movers