engineered transportation services - equipment...
TRANSCRIPT
MOORING ANCHOR(SHOWN FOR REFERENCE)
SECTION ALONGBARGE PORT
(FAR) SIDE
SECTION ALONGBARGE STARBOARD
(NEAR) SIDE
PRIMARY TUG HAS 4.5'OPERATING CLEARANCE
TO CHANNEL BOTTOM
LOADED BARGE HAS 8'OPERATING CLEARANCE
TO CHANNEL BOTTOM
PILOT TUG HAS 9.5'OPERATING CLEARANCE
TO CHANNEL BOTTOM
585' DOCK ELEVATION
564' BOTTOM ELEVATION569' SHELF ELEVATION
578' WATER ELEVATION
LOADED BARGE HAS 3'OPERATING CLEARANCETO DOCK SHELF
9' [2743]
48'[14630]
NOTE:- Elevations and water depths are taken fromoriginal channel and dock construction survey
- Water depths are also based on a predictedwater elevation of 578' per current F&OC - TCBS
published in May 1972.
forecasts.
Engineered Transportation Services
0 First IssueRev DescriptionCustomer Equipment Express / Prolec GE
Matapedia QC Transformer DeliveryProjectTitle 130 T Transformer on 19-Axle Trailer Arrangement
Paper Size RevB 0
ENGINEERING IN MOTION INC. DIVISON OF
THE FITZPATRICK GROUP OF COMPANIES / CAMBRIDGE RIGGING / EQUIPMENT EXPRESS
THIS PUBLICATION REMAINS THE PROPERTY OF THE PUBLISHER AND SHALL BE TREATED AS CONFEDENTIAL, UNLESS CONTRACTUALLY SPECIFIED OTHERWISE. NO PART OF ITMAY BE REPRODUCED STORED IN A RETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM OR BY ANY MEANS. WITHOUT THE PRIOR WRITTEN PERMISSION OF THE PUBLISHER
DateNOTES
CheckMDM MM6-Sep-11Drawn
Sheet1 of 1
DrawingEE-PGE-MQC-TRNSFMR-TR-19A-001
HEAVY LIFTING FOR MORE THAN 50 YEARS
Incorporated in the 1950’s, Equipment Express was organized to be a transportation arm to two large US rigging companies. Specializing in the movement of transformers and machine tools, Equipment Express moved into almost every industrial area over the span of 35 years.
In 2001, the management team was expanded to include the discipline of transportation engineering. This has augmented our innovation and capabilities which in turn directly benefits our customer base.
You name it, we have the means and knowledge to move it.
T/L carrier specializing in O/S commodities
Superior service at competative pricing
Courteous and knowledgable drivers
Dock, warehouse, and storage facilities at terminal
A team with over 125 years combined experience
Serving Canada, Mexico, and continental United States
Hauling capacities to 565 metric ton
Mobile cranes up to 850 ton capacity
Transformer removal
Engineered Transportation Services
ABOUT US
Contact us today for a customized proposal on how we can move you down the hall, across the street, or around the world.
60 Wanless Court, R.R. #1, Ayr, Ontario N0B 1E0
Phone: (519) 740-8008 Fax: (519) 740-6297
TF: 800-387-9791
www.equipmentexpress.com
EQUIPMENT EXPRESS TODAY
Our current line up includes 150 trailers, 60 tractors, 10 escort vehicles, and a shop of 12 employees. We can manage projects of any size, anywhere in North America. Our head office is located in Ayr, Ontario and we have a yard in Laredo, Texas.
Our services are deployed in industries such as power generation, construction, pollution control, refinery, and mining. Our office in Ayr has a fully experienced staff, which includes safety and compliance office, administration, transportation engineers, dispatchers and estimators.
Equipment Express is forever coming up with new hauling solutions to solve many transportation issues. It was over a year and a half ago, that Equipment Express became the first Canadian carrier to tackle the logistical challenges of moving 80m wind towers and other carriers have since tried to follow. As industries change, so does Equipment Express. From our way of moving equipment, to the equipment we use, we are always ready for anything new.
For more information about our transformer removal and disposal services, please visit: Greenport Enviromental.
TRACTOR STEERING TRACTOR DRIVES
AXLES 1 # 1 SPRING 3 # 2-4 AIRTRANSPORT EQUIPMENT
WEIGHT 5897 KGS 13000 LBS 9072 KGS 20000 LBS
MISC EQUIPMENT WEIGHT 0 KGS 0 LBS 18144 KGS 40000 LBS
CARGO WEIGHT 0 KGS 0 LBS 0 KGS 0 LBS
TOTAL WEIGHT 5897 KGS 13000 LBS 27216 KGS 60000 LBS
WEIGHT / AXLE 5897 KGS 13000 LBS 9072 KGS 20000 LBS
TIRES / AXLE 2 385 65 R22.5 4 12 R22.5
TOTAL WEIGHT / TIRE 2948 KGS 6500 LBS 2268 KGS 5000 LBSTOTAL WEIGHT / UNIT OF TIRE
WIDTH 7.7 KGS/MM 429 LBS/IN 7.4 KGS/MM 417 LBS/IN
STEAM GENERATOR ON DBL-WD 18-LINE GOLDHOFER
AXLES 18 # 5-22 HYDRAULICTRANSPORT EQUIPMENT
WEIGHT 120000 KGS 264552 LBS
MISC EQUIPMENT WEIGHT 0 KGS 0 LBS
CARGO WEIGHT 450000 KGS 992070 LBS
TOTAL WEIGHT 570000 KGS 1256622 LBS
WEIGHT / AXLE 31667 KGS 69812 LBS
TIRES / AXLE 16 215 70R17.5
TOTAL WEIGHT / TIRE 1979 KGS 4363 LBSTOTAL WEIGHT / UNIT OF TIRE
WIDTH 9.2 KGS / MM 516 LBS / IN
EXPRESSQUIPMENTE
NO. QTY DESCRIPTION REMARKS WEIGHTKGS WEIGHT LBS
A 1 Steam Generator 450000 992070
B 1 4-Axle Prime Mover 33113 73000
C 1 Double-wide 18-LineGoldhofer THP/SL 3000 120000 264552
D
E
TOTAL 603113 1329622
0 First IssueRev DescriptionCustomer North East Canada Power
450 Te Steam Generator TransportProjectTitle Transport Arrangement - Double-wide 18-Line Goldhofer
Paper Size RevB 0
EXPRESS
THIS PUBLICATION REMAINS THE PROPERTY OF THE PUBLISHER AND SHALL BE TREATED AS CONFEDENTIAL, UNLESS CONTRACTUALLY SPECIFIED OTHERWISE. NO PART OF ITMAY BE REPRODUCED STORED IN A RETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM OR BY ANY MEANS. WITHOUT THE PRIOR WRITTEN PERMISSION OF THE PUBLISHER
DateNOTES CheckMDM MDM18-Jan-11Drawn
Sheet1 of 1
DrawingEE-NECP-SGT-TA-DW18L-001
QUIPMENTE
0 First IssueRev DescriptionCustomer Equipment Express / Prolec GE
Matapedia QC Transformer DeliveryProjectTitle 130 T Transformer on 19-Axle Trailer Arrangement
Paper Size RevB 0
ENGINEERING IN MOTION INC. DIVISON OF
THE FITZPATRICK GROUP OF COMPANIES / CAMBRIDGE RIGGING / EQUIPMENT EXPRESS
THIS PUBLICATION REMAINS THE PROPERTY OF THE PUBLISHER AND SHALL BE TREATED AS CONFEDENTIAL, UNLESS CONTRACTUALLY SPECIFIED OTHERWISE. NO PART OF ITMAY BE REPRODUCED STORED IN A RETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM OR BY ANY MEANS. WITHOUT THE PRIOR WRITTEN PERMISSION OF THE PUBLISHER
DateNOTES
CheckMDM MM6-Sep-11Drawn
Sheet1 of 1
DrawingEE-PGE-MQC-TRNSFMR-TR-19A-001
ENGINEERED TRANSPORTATION
Equipment Express has been providing turn key solutions for many different types of projects over the years. We believe, when you incorporate the offloading services as well as the transportation, this enables the project to share management, therefore avoiding delays and additional costs to the customer. Industrial and institutional projects require a turn key style of management. Coordination of various trades under the guidance of an experienced project team has become the preferred method of completing all tasks on any given project.
We provide full engineered transportation services as well as heavy lift crane and rigging using our own in house equipment. Coordination is key when handling and transporting heavy cargo. Our project team members make sure your shipment is handled efficiently and safely from the start. We have handled projects on behalf of some of the largest companies in the world, who in turn have recognized these benefits and continued to use our services.
One call takes care of it all.
Loading, transporting and unloading of cargo of any size or weight. Our reputation speaks for itself.
PROJECT MANAGEMENT
Equipment Express specializes in loading, transporting and unloading of cargo of any size or weight.
How do I move this thing?
Engineered Transportation Services
Contact us today for a customized proposal on how we can move you down the hall, across the street, or around the world.
60 Wanless Court, R.R. #1, Ayr, Ontario N0B 1E0
Phone: (519) 740-8008 Fax: (519) 740-6297
TF: 800-387-9791
www.equipmentexpress.com
N
564'
366'
564'566'
574'
13'
578'
580'
576'
574"
572'
14'
15'
584'586'
588'
585'
590'
582'
578'
570'
14'14'14'14'
14'
564'
566'
570'
574'
569'
364'
15'
15'
15'
15'
11'
9'
9'
11'
13'
13'
2 KNOT
CURRENT
EXISTING MOORING ANCHOR
PREVAILINGWIND
9'
A
BC
D7'
5'
BUOY MARKINGSLUMP IN ARMOR STONEON NW POINT
578'
SpudWinch
E
0 First IssueRev DescriptionCustomer Fracht USA
Siemens Turbine Rotor Delivery to Bruce Power 2012ProjectTitle Barge Entry to Bruce 'A' Dock Access Channel
Paper Size RevB 0
ENGINEERING IN MOTION INC. DIVISON OF
THE FITZPATRICK GROUP OF COMPANIES / CAMBRIDGE RIGGING / EQUIPMENT EXPRESS
THIS PUBLICATION REMAINS THE PROPERTY OF THE PUBLISHER AND SHALL BE TREATED AS CONFEDENTIAL, UNLESS CONTRACTUALLY SPECIFIED OTHERWISE. NO PART OF ITMAY BE REPRODUCED STORED IN A RETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM OR BY ANY MEANS. WITHOUT THE PRIOR WRITTEN PERMISSION OF THE PUBLISHER
NO. QTY DESCRIPTION DIMENSION REMARKS REMARKSA 1 2000 HP Primary Tug 70' x 20' x 9.5' Draft Vigilant I 18 T Bollard PullB 1 Cargo Barge 180' x 54' x 12' OC 181 5'-6' Loaded DraftC 1 300 HP Pilot Tug 44' x 14' Ian Mac 3 T Bollard Pull
D 22" Polypropylene
Towing Line2" Ø x 100' +securement
Minimum 52,000 lbbreaking strength
E 1 Assist / Safety Boat 23' x 8' x 230 HP LC-23F
Total
Date
NOTES
CheckMDM MDM19-Mar-12Drawn
Sheet1 of 4
DrawingEE-FUSA-STR-BP2012-BL1-001
- For entry to channel, pilot tug (4.5' draft) tows and primary tug (9.5' draft) pushes.
NOTE:- Elevations and water depths are taken fromoriginal channel and dock construction survey
- Water depths are also based on a predictedwater elevation of 578' per current F&OC - TCBS
published in May 1972.
forecasts.
- For barge entry to channel, prior to Bruce Power will have channel re-surveyed(bathymetric), (5) channel marker buoys re-installed and channel range markers made operational.- Bearing for entering will be 182° / bearing for leaving will be 2°.
- The slump in the armor stone on the NW point is reducing barge accessclearance - if it deteriorates any further it will prohibit barge deliveries and removal will be required.- LC-23 will assist with lines and act as safety boat.
0 First IssueRev DescriptionCustomer Equipment Express / Prolec GE
Matapedia QC Transformer DeliveryProjectTitle 130 T Transformer on 19-Axle Trailer Arrangement
Paper Size RevB 0
ENGINEERING IN MOTION INC. DIVISON OF
THE FITZPATRICK GROUP OF COMPANIES / CAMBRIDGE RIGGING / EQUIPMENT EXPRESS
THIS PUBLICATION REMAINS THE PROPERTY OF THE PUBLISHER AND SHALL BE TREATED AS CONFEDENTIAL, UNLESS CONTRACTUALLY SPECIFIED OTHERWISE. NO PART OF ITMAY BE REPRODUCED STORED IN A RETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM OR BY ANY MEANS. WITHOUT THE PRIOR WRITTEN PERMISSION OF THE PUBLISHER
DateNOTES
CheckMDM MM6-Sep-11Drawn
Sheet1 of 1
DrawingEE-PGE-MQC-TRNSFMR-TR-19A-001
HAULING CAPABILITIESHOW DO I MOVE THIS THING? If you have asked yourself this question, you can count on Equipment Express for the answer. We provide transportation solutions for any logistical challenges. Our combination of specialized equipment and experienced staff has been engineering solutions for our customers for the past 50 years. No project is too large or too small. Rail and ocean associations have enhanced our ability to globalize our services.
ENGINEERED TRANSPORTATION Equipment Express Inc. offers the most extensive inventory of speacialized trailers in Ontario. From flat bed trailers to hydraulic line transporters, we have the right equipment for any size of load. In house custom fabricating allows us to cater to the most challenging transportation problems. All of our late model equipment is kept in top-notch condition by our state of the art repair facility. All of this means peace of mind, knowing your cargo will travel down the road safely without delays.
We invite you to come and visit us for a tour of our facilities and equipment.
EQUIPMENT
From flat bed trailers to 565 metric ton payload capacity transporters, we have the right equipment for any size of load.
Equipment Express provides transportation solutions for any logistical challenge.
Engineered Transportation Services
Contact us today for a customized proposal on how we can move you down the hall, across the street, or around the world.
60 Wanless Court, R.R. #1, Ayr, Ontario N0B 1E0
Phone: (519) 740-8008 Fax: (519) 740-6297
TF: 800-387-9791
www.equipmentexpress.com
0 First IssueRev DescriptionCustomer Equipment Express / Prolec GE
Matapedia QC Transformer DeliveryProjectTitle 130 T Transformer on 19-Axle Trailer Arrangement
Paper Size RevB 0
ENGINEERING IN MOTION INC. DIVISON OF
THE FITZPATRICK GROUP OF COMPANIES / CAMBRIDGE RIGGING / EQUIPMENT EXPRESS
THIS PUBLICATION REMAINS THE PROPERTY OF THE PUBLISHER AND SHALL BE TREATED AS CONFEDENTIAL, UNLESS CONTRACTUALLY SPECIFIED OTHERWISE. NO PART OF ITMAY BE REPRODUCED STORED IN A RETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM OR BY ANY MEANS. WITHOUT THE PRIOR WRITTEN PERMISSION OF THE PUBLISHER
DateNOTES
CheckMDM MM6-Sep-11Drawn
Sheet1 of 1
DrawingEE-PGE-MQC-TRNSFMR-TR-19A-001
RAIL PROJECTS If it’s too big to move by road, no problem. Equipment Express can provide transportation to and from the nearest rail siding and handle the unloading and loading of rail cars including block and brace. We have loaded and and unloaded countless numbers of rail cars over the years and our excellent reputation for safety and reliabiltiy with the rail companies will benefit you directly.
TRANSFORMERS PROJECTSEquipment Express has been handling transformers for over twenty years, from transporting and financial placement of 750,000 LB transformers to the field dressing. We provide Jack and Roll services for any size transformer. This service, along with our specially designed transformer trailers allows us to handle your next transformer project from start to finish. The vast amount of experience in handling sensitive equipment has enabled us to expand our expertise to other markets.
WIND TURBINES PROJECTSTo date, Equipment Express has safely handled hundreds of wind turbine deliveries, be it one wind tower farm or several, Equipment Express has the equipment and the expertise to meet all your requirements. This incorporated with the ability to unload ourselves makes Equipment Express the only call you need to make for your next wind turbine project.
MACHINERY PROJECTSOur rigging and millwright capabilities can move a single machine across town or relocate an entire manufacturing facility across Canada, the United states or Mexico. Whether it’s dismantling, transporting and reinstalling existing equipment, or the primary installation of a state of the art piece of equipment, our personnel can handle the task with unparalleled safety and efficiency. Using the most up to date hydraulic gantry systems and heavy capacity forklifts, we have the equipment to make your next move an easy one.
SERVICES
Engineered Transportation Services
Contact us today for a customized proposal on how we can move you down the hall, across the street, or around the world.
60 Wanless Court, R.R. #1, Ayr, Ontario N0B 1E0
Phone: (519) 740-8008 Fax: (519) 740-6297
TF: 800-387-9791 www.equipmentexpress.com
Equipment Express provides turn key solutions for many different types of projects
Specialized planning and project management
0 First IssueRev DescriptionCustomer Equipment Express / Prolec GE
Matapedia QC Transformer DeliveryProjectTitle 130 T Transformer on 19-Axle Trailer Arrangement
Paper Size RevB 0
ENGINEERING IN MOTION INC. DIVISON OF
THE FITZPATRICK GROUP OF COMPANIES / CAMBRIDGE RIGGING / EQUIPMENT EXPRESS
THIS PUBLICATION REMAINS THE PROPERTY OF THE PUBLISHER AND SHALL BE TREATED AS CONFEDENTIAL, UNLESS CONTRACTUALLY SPECIFIED OTHERWISE. NO PART OF ITMAY BE REPRODUCED STORED IN A RETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM OR BY ANY MEANS. WITHOUT THE PRIOR WRITTEN PERMISSION OF THE PUBLISHER
DateNOTES
CheckMDM MM6-Sep-11Drawn
Sheet1 of 1
DrawingEE-PGE-MQC-TRNSFMR-TR-19A-001
Engineered Transportation Services
TRAILER TYPES
Contact us today for a customized proposal on how we can move you down the hall, across the street, or around the world.
60 Wanless Court, R.R. #1, Ayr, Ontario N0B 1E0
Phone: (519) 740-8008 Fax: (519) 740-6297
TF: 800-387-9791
www.equipmentexpress.com
12-18 Line Self Propelled Goldhoffer 3 and 4 Axle Hydraulic Floates 12 Line 96 Wheel Nicolas Transporter
EXT Double Drop
Mechanical Double Drops Bed Inserts / Trailer DecksMini Deck Trailer
9 Axle Wind Tower Schinables Blade TrailersBeam Trailers
Off Road Heavy Transporters 9 Axle Perimeter Bed Trailer9 Axle 84 Ton Acpacity
6 Axle Super Load Trailer 6 Lines Self Propelled Goldhofer6 Lines Goldhofer
3 and 4 Axle Wind Tower Tailer 53 Foot Step Decks48 Foot Step Decks
LR 1250LR 1250
For more information regarding engineered services, please contact us.
60 Wanless Court, R.R. #1, Ayr, Ontario N0B 1E0
Phone: (519) 740-8008 Fax: (519) 740-6297
TF: 800-387-9791
www.equipmentexpress.com
0 First IssueRev DescriptionCustomer Equipment Express / Prolec GE
Matapedia QC Transformer DeliveryProjectTitle 130 T Transformer on 19-Axle Trailer Arrangement
Paper Size RevB 0
ENGINEERING IN MOTION INC. DIVISON OF
THE FITZPATRICK GROUP OF COMPANIES / CAMBRIDGE RIGGING / EQUIPMENT EXPRESS
THIS PUBLICATION REMAINS THE PROPERTY OF THE PUBLISHER AND SHALL BE TREATED AS CONFEDENTIAL, UNLESS CONTRACTUALLY SPECIFIED OTHERWISE. NO PART OF ITMAY BE REPRODUCED STORED IN A RETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM OR BY ANY MEANS. WITHOUT THE PRIOR WRITTEN PERMISSION OF THE PUBLISHER
DateNOTES
CheckMDM MM6-Sep-11Drawn
Sheet1 of 1
DrawingEE-PGE-MQC-TRNSFMR-TR-19A-001
ENGINEERING IN MOTION
Integrated In-house EngineersEquipment Express integrates the services of in-house engineers and trade experts through the lifecycle of all technically challenging projects. This practice strengthens our ability to provide innovative, certified solutions in increasingly technical and safety-oriented industry environments. Our thorough planning allows us to consistently deliver on time and on budget.
ENGINEERING SERVICES
MULTI-MODAL
Feasibility studies
Site surveys
Risk Assessment & management
Project pre-planning
Custom equipment design & modification
TRANSPORT
Route surveys
Transport & permit drawings
Turning radius drawings
Engineered lashing drawings
Ground bearing load analysis – roads / bridges
Engineered transport plans
HEAVY LIFTING & RIGGING
Crane / Gantry / Rigging drawings
Jack & slide drawings
Engineered lifting and rigging plans
MARINE
Ballast plans
Roll-On-Roll-Off design
Engineered lashing / securement drawings
Engineered marine transport plans
RAIL
Rail clearance drawings
Engineered lashing / securement drawings
Engineered Transportation Services
Equipment Express Inc. 60 Wanless Court, R.R. #1, Ayr, Ontario N0B 1E0
Phone: (519) 740-8008 Fax: (519) 740-6297TF: 800-387-9791
equipmentexpress.com
564'
366'
564'
566'574'
13'
14'
15'
585'
578'570'
14'
14'
14'
569'
15'
15'
11'
11'13'
SpudWinch
15'
9'
2 KNOT
CURRENT
9'
9'
AB
C
N
PREVAILINGWIND
MOORING ANCHOR
180' [54864]
63°74°
Water Force
Fwf = Sin 63° x A x P x Cd = .89 x 1080 x .03418 (2.3) ² 62.5 x 1.4 = 15,207 LBS
Definitions
A = Surface Area = 6' draft x 180' long = 1080 SFP = Water Pressure = .03418 v² x pv = Water Speed = 2 Knots = 2.3 MPHCd = Drag Coefficient = 1.4 for flat surfacep = Water Density = 62.5 PSF
�
2 KNOTCURRENT
Front Corner Restrained
Rear Corner Restraint
Rrc = Fwf x 90' Sin 74° x 180' = 15207 x 90 .96 x 180 = 7,920 LBS
D
EE
NOTE:- Elevations and water depths are taken fromoriginal channel and dock construction survey
- Water depths are also based on a predictedwater elevation of 578' per current F&OC - TCBS
published in May 1972.
forecasts.
Engineered Heavy Transportation SolutionsHeavy Haul Transportation Experts Specialized Rigging & Machinery Movers
THE FITZPATRICK GROUP COMPANIES