engagement skills trainer 2000 (est 2000) basic combat training brm strategy

12
1 Engagement Skills Trainer 2000 (EST 2000) Basic Combat Training BRM Strategy

Upload: bela

Post on 06-Feb-2016

109 views

Category:

Documents


0 download

DESCRIPTION

Engagement Skills Trainer 2000 (EST 2000) Basic Combat Training BRM Strategy. BOTTOM LINE UP FRONT. EST 2000 is: Most advanced/effective/proven simulation … meets total Army requirements including IET. Cost-effective alternative to LMTS and NOPTEL. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Engagement Skills Trainer 2000 (EST 2000) Basic Combat Training BRM Strategy

1

Engagement Skills Trainer 2000

(EST 2000)

Basic Combat Training BRM Strategy

Page 2: Engagement Skills Trainer 2000 (EST 2000) Basic Combat Training BRM Strategy

2

EST 2000 is:

• Most advanced/effective/proven simulation … meets total Army requirements including IET.

• Cost-effective alternative to LMTS and NOPTEL.

• IET BRM training strategy with integrated EST 2000 is defined … sound & effective.

• Can be fielded to ATCs (Knox & Benning) in Oct 03

• If facilities remain tall pole, then ISO containers remain low cost alternative to MILCON.

BOTTOM LINE UP FRONT

Page 3: Engagement Skills Trainer 2000 (EST 2000) Basic Combat Training BRM Strategy

6

FUNDAMENTALSPRELIMINARY

RIFLE INSTRUCTION

BR 026 Hours

BR 015 Hours

BR 036 Hours

WEAPONEER

BR 048 Hours

GROUPING

BR 058 Hours

ZERO

BR O68 Hours

DOWN RANGEFEEDBACK

BR 074 Hours

FIELDFIRE

BR O84 Hours

FIELDFIRE

BR 098 Hours

PRACTICERECORD FIRE I

BR 108 Hours

PRACTICERECORD FIRE II

BR 122 Hours

BR 133 Hours

BR 143 Hours

ARM-BURSTFIRE

ARM-NBCARM-NIGHTQUALIFICATION

PERIOD 118 Hours

Basic Combat TrainingCurrent BRM Strategy

81 Hours

Page 4: Engagement Skills Trainer 2000 (EST 2000) Basic Combat Training BRM Strategy

7 GATES

PERIOD 015 Hours

PRELIMINARYRIFLE INSTRUCTION

PERIOD 026 Hours

FUNDAMENTALS Of

RIFLE MARKSMANSHIP EST 2000 GROUPING/ZERO

PERIOD 098 Hours

PRACTICE

QUALIFICATION (Live)

PERIOD 068 Hours

LOMAH Down Range Feedback

(Live)

GROUPING (Live)

PERIOD 048 Hours

PERIOD 058 Hours

ZERO (Live)

Basic Combat TrainingNEW BRM Strategy with EST 2000

75 Hours

EST 2000 FIELD FIRE

2nd Multiple Exposure

PERIOD 088 Hours

PERIOD 038 Hours

EST 2000 FIELD FIRE

1st Single Exposure

PERIOD 076 Hours

PERIOD 088 Hours

QUALIFICATION (Live)

PERIOD 108 Hours

ARM - NBCEST 2000

PERIOD 122 Hours

Page 5: Engagement Skills Trainer 2000 (EST 2000) Basic Combat Training BRM Strategy

8

ATCs EST 2000 REQUIREMENTS

Benning Jackson Leonardwood Knox Sill

BCT 9 24 9 6 6

OSUT 15 9(12) 9 6

24 24 18 (21) 15 12SUBSYSTEMS

• 24 x 5-lane EST 2000s (subsystems) available Oct 03

• First 9 subsystems will go to Benning; 15 go to Knox

• Benning (9+15), Jackson (24), LW (18) (21), Sill (12) require EST facilities in FY 04/05 … ISO containers can achieve facilities issues

• Total EST Container requirement is for 78 x 5-lane subsystems at $3.9M

Page 6: Engagement Skills Trainer 2000 (EST 2000) Basic Combat Training BRM Strategy

9

EST 2000 REQUIREMENTSARMY TRAINING CENTERS

JACKSON BENNING LEONARD WOOD KNOX SILL

OCT 03 (FY04) 0 9 0 15 0

OCT 04 (FY05) 12 6 9 0 9

OCT 05 (FY06) 12 9 9 (12) 0 3

JACKSON BENNING LEONARD WOOD KNOX SILL

BCT BNs 8 3 3 2 2

OSUT BNs 0 5 3 (4) 3 2

Total Fielded 24 24 18 (21) 15 12

Total Bns 8 8 6 (7) 5 4

Page 7: Engagement Skills Trainer 2000 (EST 2000) Basic Combat Training BRM Strategy

17

O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

LOT IV A FIELD END(60 Subsystems)(20 Reserve, 20 National Guard, 20 Active)

LOT V A FIELD END(239 Subsystems)

FY03 FY04 FY051 2 3 41 2 3 41 2 3 4

PROPOSED FIELDING PLAN

- 93 ATC Subsystems can be procured over FY03 and FY04- 78 ATC Subsystems can be placed in 26 Deployable Containers (15 Subsystems will be housed in fixed facilities at Ft Knox)- OPA Funds required/ OMA mix could be utilized

Page 8: Engagement Skills Trainer 2000 (EST 2000) Basic Combat Training BRM Strategy

18

Container Cost Estimates: - 5 Lane Prototype = $60K - 5 Lane Configuration in Production = $50K - 10/ 15 Lane Configuration in Production = $140K * 26 (10/ 15 Lane Configuration Containers) x $140K = $3,640M * 26 (Site Preparation) x 10K = $260K * Total EST 2000 Requirement = $3.9M (UFR)

Notes: - Other Procurement Army (OPA) Funds & Operational Maintenance Army (OMA) mix - PEO STRI/ PM GCTT Needs to Develop the Sustainment Requirement/ Profile - Cost are a Rough Order of Magnitude (ROM) Based on Initial Contractor Discussions

EST 2000DEPLOYABLE CONTAINER

2 Container Configurations: - 5 Lane Deployable Container (Prototype Developed) = 20ft x 40ft footprint - 10/ 15 Lane Container = 40ft x 52ft footprint

Page 9: Engagement Skills Trainer 2000 (EST 2000) Basic Combat Training BRM Strategy

19

Recommendations: - Field the Army Training Centers the 10/ 15 Lane Configuration

Deployable Container for EST 2000 Marksmanship Training Device: - Pursue as an EST 2000 Program Strategy the use of the Deployable Container as Either the Interim and/ or Long Term Solution to the MCA/ Facilities Requirement where Applicable

EST 2000DEPLOYABLE CONTAINER

Page 10: Engagement Skills Trainer 2000 (EST 2000) Basic Combat Training BRM Strategy

21

Blue = aim point before round fired

Red = round hit target

Yellow = aim point after round fired

Instructor ratio can be1:5 - 1:15

Trigger pressure andweapon cant recorded

Aim point trace

System collects data tohelp instructor diagnosemarksmanship problems

Visual feedback to shooters at conclusionof training event

Weapons zero recordedand stored for nexttraining session

•Supports training of all BRM / ARM skills

•209 Courses of Fire

•Post Fielding Training Effectiveness Analysis

MARKSMANSHIP

Page 11: Engagement Skills Trainer 2000 (EST 2000) Basic Combat Training BRM Strategy

23

• IET BRM training strategy must transform to include simulations … to remain sound & effective

• Integration of EST 2000 with integrated “gated” training strategy will:

• Improve BRM skills & feedback• Reduce BRM training periods• Reduce ammunition• Reduce environmental impacts on ranges

• EST 2000 meets all Army requirements … supports all Army standard courses of fire.

CONCLUSION

Page 12: Engagement Skills Trainer 2000 (EST 2000) Basic Combat Training BRM Strategy

24

• Tasks for Army Training Centers.– Confirm need for shelters, that is, fixed facilities are not available and

will not accommodate EST 2000s.– Identify number of 5-, 10-, and 15-lane EST 2000 configurations that

are required (see total requirement matrix below).– Identify minimum weapons required for each configuration. Priority is

BRM POI immediate needs with spares.– Ensure response concurrence from ATC Commanding General.

• SUSPENSE: 3 February 2003

• Assumption: BCTs will get M16A2s only for their EST 2000s. OSUTs must determine any other weapons needed. An example of this is Fort Knox stated at the brief they would need M16A2s for BCT and a M16/M4 mix with M9s for OSUT.

Course of Actions