eng. khaled sonbol (cv)
TRANSCRIPT
1
Curriculum Vitea
Khaled Hussein El-Sayed Sonbol
PERSONAL DATA:
Name : Khaled Hussein El-Sayed Sonbol
Date of Birth : 12th
of December 1962
Nationality : Egyptian
Marital Status : Married+3child
Mobile : 01020480866
01025051418 Phone : 0403313709
Home Address : Fathi basha Street, from Botros Street
Tanta, Gharbia, Egypt
Email : [email protected]
Driving License : Available
Passport No. : a15616909 Expiry Date: 29/05/2022
QUALIFICATION:
B.SC. Power Mechanical Engineering, June 1985, Alexandria University
LANGUAGES:
Arabic : Mother Tongue
English : excellent
SKILLS
Computer Skills: Microsoft Office (Word + Excel), AutoCAD, Internet Browsers,
Emails and Hardware background.
2
TRAINING COURSES
Projects Management (C.P.M).
Hydraulic Circuits
PREVIOUS EXPERIEN
1. Sep 2013 – to date
EMPLOYER: GAMA FOR CONTRACTING&TRADING.
Project: EDITA II 6TH
OCTOBER
Consultant: COSMOS
Owner: EDITA
Position: Construction Manager.
Duties: 1-Electromechanical installations for the factory which includes:
a- HVAC
b- Firefighting (pumps-piping-sprinkler system-FM200-CO2-FHC)
c- Water supply system.
d- Compressed air system.
e- Steam piping.
f- Plumbing system.
2. Feb 2013 – Sep 2013
EMPLOYER: O RASCOM CONSTRUCTION
Project: Greater Cairo METRO III Contractor: COLLAS RAIL
Project Manager: VENCI CONSTRUCTION GRAND PROJECTS.
Owner: NATIONAL AUTHORITY OF TUNNELS
Position: Deputy Construction Manager.
Duties:
Installation of Elevators for stations (Thyssen Krupp).
Installation of Ascalators for stations (Thyssen Krupp).
Installation of metro work shop (abbasia) complete with all utility
Electromechanical works(hvac, fire fighting and plumbing).
3. Apr 2009 – Nov2012
EMPLOYER: ORASCOM CONSTRUCTION ALGERIA
3
Project: SORFERT FERTILIZER COMPLEX, ALGERIA
FERTILIZER PLANT ARZEW Contractor: UHDE –AWG (GERMANY)
Project Manager: SORFERT (2 billion $)
Owner: SONATRAC&ORASCOM
Position: Construction Manager.
Duties:
Installation of steam power plant of the project (3x50MW) HITACHI -
SIEMENS.
Installation of sea water intake equipment ,tanks & piping.
Installation of NH3 Process Equipment(Static-Rotating)&piping
( steel structure, cladding ,equipments and piping works) .
Installation of gas pressure reduction station & gas metering station.
4. May 2006 – up Apr 2009:
EMPLOYER: ORASCOM CONSTRUCTION NIGERIA
Project: UCC, CALABAR, UNICEM, NIGERIA
CEMENT PLANT Contractor: F L SMIDTH (DENMARK)
Project Manager: ORASOM
Owner: UNICEM
Position: Mech. Construction Manager.
Duties:
Installation of preheater tower steel structure ,equipments and piping.
Installation of klinker storage steel structure and equipments Work.
Installation of captive power plant 3(+1)x18V50DF,WARTSILA FINLAND.
(steel structure, cladding, equipments, feul &oil tanks and piping works)
Installation of cable gallery steel structure
Installation of cement silo steel structure and equipments
Commissioning works for the a/m buildings +Rotary kiln and Klinker Cooler
5. September2004 – up to May 2006:
EMPLOYER: Industrial & Construction Engineering Co. (SIAC)
Project: President El-Saleh Mosque – Sana'a - Yemen Contractor: SIAC
Project Manager: Presidency office of Yemen
Consultant: DAR EL-HANDASA (International)
4
Owner: Arab Republic of Yemen
Position: MEP Construction Engineer & technical office
Duties:
Following up & Submitting for approval the materials & shop drawings of
HVAC, Plumbing & Fire Fighting Work
Following up the executing of Builders Work.
Electro-Mechanical / Civil coordination.
Following up the fabrication & erection of MEP works.
Checking of pumps and fans head calculation and material submittals.
6. April2004 – Sep. 2004:
Industrial & Construction Engineering Co. (SIAC)
Project: Alex. City Center ( Carrefour) Contractor: Joint Venture (Murray & Roberts and SIAC)
Consultant: A. MEZ & MOH. HEGAZY
Owner: Maged Al-Fateem Position: MEP Senior Construction Engineer
Duties:
Following up the executing of Builders Work on site.
Following up the fabrication & erection of firefighting, HVAC & Plumbing
.works.
7. August2002 – April2004:
Industrial & Construction Engineering Co. (SIAC)
Project: Plant for cement at Al-Areesh - Sinai Contractor: SIAC
Owner: Sinai Cement Co. Position: Mechanical Engineer
Duties:
Erection of mech. Equipments & piping ( packing line )
Executing, Testing & start up & commissioning of Mechanical Works.
8. August2003 – July2004:
Industrial & Construction Engineering Co. (SIAC)
Project: Plant for steel rebar at Suez Contractor: SIAC
Owner: Al-Attal. Position: executive manager
Duties:
Executing, Testing & Operating of Piping Networks for Rolling Mill Plant
such as (compressed air, water supply, fuel, natural gas & Oxygen).
Executing, Testing, Pickling & Flushing of Hydraulic Piping System.
5
Erection of Mechanical Equipments of Rolling Mill Plant.
Overhead cranes.
9. August2001 – July2003:
Industrial & Construction Engineering Co. (SIAC)
Project: Plant for steel melt shop at Suez
Contractor: SIAC
Owner: Suez Steel Company
Position: Mechanical Engineer
Duties:
Executing, Testing & Operating of Piping Networks for Rolling Mill Plant
such as (compressed air, water supply, fuel, natural gas & Oxygen).
Executing, Testing, Pickling & Flushing of Hydraulic Piping System.
Erection of Mechanical Equipments of melt shop Plant (pump station, comp.
stations, cooling towers).
Fume extraction plant.
10. August1998 – July2001:
Industrial & Construction Engineering Co. (SIAC)
Project: Special Steel Factory at El-Sadat City Contractor: SIAC
Owner: Arab Company for Special Steel (ARCO STEEL)
Position: Mechanical Engineer
Duties:
Executing, Testing & Operating of Piping Networks for Rolling Mill Plant
such as (compressed air, water supply, fuel, natural gas & Oxygen).
Executing, Testing, Pickling & Flushing of Hydraulic Piping System.
Erection of Mechanical Equipments of Melt shop Plant.
11. Oct.1996 – August 1998:
Integrated Oil Industry Company
Position: Maintenance Section Head
Duties:
Maintenance of the factory equipments such as:-
Boilers ( high – medium pressure )
Water treatment plant
Refining equipments
Packing lines.
12. Feb.1991 – Sep.1996:
Sinai Manganese Company
Position: Maintenance Engineer
Duties:
6
Maintenance of the factory equipments such as:-
21 KVA elect. furnace
All the facility for the factory.
Material handling equipments (crushers, belt conveyors, vibrators).
Overhead cranes – hyd. Equipments – piping – pump station )
Gas cleaning plant ( filter house )
Erection & Industrial Services Co. (ERISCOM)
1. June 1988 – Jan. 1991:
a) July 1990- Jan.1991
Project: Ferro-manganese Plant at south of Sinai Contractor: ERISCOM
Owner: Sinai Manganese Company Position: Mechanical Engineer
Duties:
Erection of gas turbine power plant 3x120MW (SIMENS) .
Erection & operating of machines
Executing, Testing & Operating of Piping Networks .
b) June.1988-June 1990
Project: Valves & Pipe fittings factory Contractor: ERISCOM
Owner: El-Nasr Casting Company Position: Mechanical Engineer
Duties:
Executing, Testing & Operating of Piping Networks.
Erection of machines (furnace, material handling, O.H. cranes, cooling
towers, pump stations, comp. stations).
2. Oct. 1985 – Jan. 1988:
Ministry of Defense
Position: Tech. Affairs Officer ( Army )
Duties:
Maintenance and repair of heavy equipments in the army .