eng. khaled sonbol (cv)

6

Click here to load reader

Upload: khaled-sonbol

Post on 11-Feb-2017

140 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: eng. khaled sonbol (cv)

1

Curriculum Vitea

Khaled Hussein El-Sayed Sonbol

PERSONAL DATA:

Name : Khaled Hussein El-Sayed Sonbol

Date of Birth : 12th

of December 1962

Nationality : Egyptian

Marital Status : Married+3child

Mobile : 01020480866

01025051418 Phone : 0403313709

Home Address : Fathi basha Street, from Botros Street

Tanta, Gharbia, Egypt

Email : [email protected]

Driving License : Available

Passport No. : a15616909 Expiry Date: 29/05/2022

QUALIFICATION:

B.SC. Power Mechanical Engineering, June 1985, Alexandria University

LANGUAGES:

Arabic : Mother Tongue

English : excellent

SKILLS

Computer Skills: Microsoft Office (Word + Excel), AutoCAD, Internet Browsers,

Emails and Hardware background.

Page 2: eng. khaled sonbol (cv)

2

TRAINING COURSES

Projects Management (C.P.M).

Hydraulic Circuits

PREVIOUS EXPERIEN

1. Sep 2013 – to date

EMPLOYER: GAMA FOR CONTRACTING&TRADING.

Project: EDITA II 6TH

OCTOBER

Consultant: COSMOS

Owner: EDITA

Position: Construction Manager.

Duties: 1-Electromechanical installations for the factory which includes:

a- HVAC

b- Firefighting (pumps-piping-sprinkler system-FM200-CO2-FHC)

c- Water supply system.

d- Compressed air system.

e- Steam piping.

f- Plumbing system.

2. Feb 2013 – Sep 2013

EMPLOYER: O RASCOM CONSTRUCTION

Project: Greater Cairo METRO III Contractor: COLLAS RAIL

Project Manager: VENCI CONSTRUCTION GRAND PROJECTS.

Owner: NATIONAL AUTHORITY OF TUNNELS

Position: Deputy Construction Manager.

Duties:

Installation of Elevators for stations (Thyssen Krupp).

Installation of Ascalators for stations (Thyssen Krupp).

Installation of metro work shop (abbasia) complete with all utility

Electromechanical works(hvac, fire fighting and plumbing).

3. Apr 2009 – Nov2012

EMPLOYER: ORASCOM CONSTRUCTION ALGERIA

Page 3: eng. khaled sonbol (cv)

3

Project: SORFERT FERTILIZER COMPLEX, ALGERIA

FERTILIZER PLANT ARZEW Contractor: UHDE –AWG (GERMANY)

Project Manager: SORFERT (2 billion $)

Owner: SONATRAC&ORASCOM

Position: Construction Manager.

Duties:

Installation of steam power plant of the project (3x50MW) HITACHI -

SIEMENS.

Installation of sea water intake equipment ,tanks & piping.

Installation of NH3 Process Equipment(Static-Rotating)&piping

( steel structure, cladding ,equipments and piping works) .

Installation of gas pressure reduction station & gas metering station.

4. May 2006 – up Apr 2009:

EMPLOYER: ORASCOM CONSTRUCTION NIGERIA

Project: UCC, CALABAR, UNICEM, NIGERIA

CEMENT PLANT Contractor: F L SMIDTH (DENMARK)

Project Manager: ORASOM

Owner: UNICEM

Position: Mech. Construction Manager.

Duties:

Installation of preheater tower steel structure ,equipments and piping.

Installation of klinker storage steel structure and equipments Work.

Installation of captive power plant 3(+1)x18V50DF,WARTSILA FINLAND.

(steel structure, cladding, equipments, feul &oil tanks and piping works)

Installation of cable gallery steel structure

Installation of cement silo steel structure and equipments

Commissioning works for the a/m buildings +Rotary kiln and Klinker Cooler

5. September2004 – up to May 2006:

EMPLOYER: Industrial & Construction Engineering Co. (SIAC)

Project: President El-Saleh Mosque – Sana'a - Yemen Contractor: SIAC

Project Manager: Presidency office of Yemen

Consultant: DAR EL-HANDASA (International)

Page 4: eng. khaled sonbol (cv)

4

Owner: Arab Republic of Yemen

Position: MEP Construction Engineer & technical office

Duties:

Following up & Submitting for approval the materials & shop drawings of

HVAC, Plumbing & Fire Fighting Work

Following up the executing of Builders Work.

Electro-Mechanical / Civil coordination.

Following up the fabrication & erection of MEP works.

Checking of pumps and fans head calculation and material submittals.

6. April2004 – Sep. 2004:

Industrial & Construction Engineering Co. (SIAC)

Project: Alex. City Center ( Carrefour) Contractor: Joint Venture (Murray & Roberts and SIAC)

Consultant: A. MEZ & MOH. HEGAZY

Owner: Maged Al-Fateem Position: MEP Senior Construction Engineer

Duties:

Following up the executing of Builders Work on site.

Following up the fabrication & erection of firefighting, HVAC & Plumbing

.works.

7. August2002 – April2004:

Industrial & Construction Engineering Co. (SIAC)

Project: Plant for cement at Al-Areesh - Sinai Contractor: SIAC

Owner: Sinai Cement Co. Position: Mechanical Engineer

Duties:

Erection of mech. Equipments & piping ( packing line )

Executing, Testing & start up & commissioning of Mechanical Works.

8. August2003 – July2004:

Industrial & Construction Engineering Co. (SIAC)

Project: Plant for steel rebar at Suez Contractor: SIAC

Owner: Al-Attal. Position: executive manager

Duties:

Executing, Testing & Operating of Piping Networks for Rolling Mill Plant

such as (compressed air, water supply, fuel, natural gas & Oxygen).

Executing, Testing, Pickling & Flushing of Hydraulic Piping System.

Page 5: eng. khaled sonbol (cv)

5

Erection of Mechanical Equipments of Rolling Mill Plant.

Overhead cranes.

9. August2001 – July2003:

Industrial & Construction Engineering Co. (SIAC)

Project: Plant for steel melt shop at Suez

Contractor: SIAC

Owner: Suez Steel Company

Position: Mechanical Engineer

Duties:

Executing, Testing & Operating of Piping Networks for Rolling Mill Plant

such as (compressed air, water supply, fuel, natural gas & Oxygen).

Executing, Testing, Pickling & Flushing of Hydraulic Piping System.

Erection of Mechanical Equipments of melt shop Plant (pump station, comp.

stations, cooling towers).

Fume extraction plant.

10. August1998 – July2001:

Industrial & Construction Engineering Co. (SIAC)

Project: Special Steel Factory at El-Sadat City Contractor: SIAC

Owner: Arab Company for Special Steel (ARCO STEEL)

Position: Mechanical Engineer

Duties:

Executing, Testing & Operating of Piping Networks for Rolling Mill Plant

such as (compressed air, water supply, fuel, natural gas & Oxygen).

Executing, Testing, Pickling & Flushing of Hydraulic Piping System.

Erection of Mechanical Equipments of Melt shop Plant.

11. Oct.1996 – August 1998:

Integrated Oil Industry Company

Position: Maintenance Section Head

Duties:

Maintenance of the factory equipments such as:-

Boilers ( high – medium pressure )

Water treatment plant

Refining equipments

Packing lines.

12. Feb.1991 – Sep.1996:

Sinai Manganese Company

Position: Maintenance Engineer

Duties:

Page 6: eng. khaled sonbol (cv)

6

Maintenance of the factory equipments such as:-

21 KVA elect. furnace

All the facility for the factory.

Material handling equipments (crushers, belt conveyors, vibrators).

Overhead cranes – hyd. Equipments – piping – pump station )

Gas cleaning plant ( filter house )

Erection & Industrial Services Co. (ERISCOM)

1. June 1988 – Jan. 1991:

a) July 1990- Jan.1991

Project: Ferro-manganese Plant at south of Sinai Contractor: ERISCOM

Owner: Sinai Manganese Company Position: Mechanical Engineer

Duties:

Erection of gas turbine power plant 3x120MW (SIMENS) .

Erection & operating of machines

Executing, Testing & Operating of Piping Networks .

b) June.1988-June 1990

Project: Valves & Pipe fittings factory Contractor: ERISCOM

Owner: El-Nasr Casting Company Position: Mechanical Engineer

Duties:

Executing, Testing & Operating of Piping Networks.

Erection of machines (furnace, material handling, O.H. cranes, cooling

towers, pump stations, comp. stations).

2. Oct. 1985 – Jan. 1988:

Ministry of Defense

Position: Tech. Affairs Officer ( Army )

Duties:

Maintenance and repair of heavy equipments in the army .