eng .adham ismail cv
TRANSCRIPT
References Available on Request Resume Submitted in Confidence
PERSONAL INFORMATION
Name: Adham Ismail Ahmed Ismail Awad Place of Birth: Jeddah, Saudi Arabia Nationality: Egyptian Military Status: Exempted Current Status: Electrical & Telecommunication Engineers Syndicate No: 73/08986
Iqama Available & Driving License
CONTACT INFORMATION
Current Address: Yehia El-Moalami St., Al-Rabwa, Jeddah Mobile: 0540364364 -0554004470 E-mail: [email protected]
CAREER OBJECTIVE
I am Looking Forward to working in new career to gain more experiences, get new chances, new challenges
and prove my skills (Electrical, Electro-mechanics, Energy, IT networking…).
Seeking a challenging position in a reputable Telecommunications organization, having a leading role in
the community, and whereby my skills may be used and developed in its best.
EDUCATION
January 2015 PMP (Project Management Professional), Jeddah, Saudi Arabia.
November 2010 Master Of Science In Telecommunications Technology
December 2013 From Sikkim Manipal University, India Graduation grade: EXCELLENT Graduation Project: DEVELOPMENT & IMPLEMENTATION OF CHROMATIC
DISPERSION CANCELLATION IN FIBRE OPTIC NETWORKS
Project grade : Excellent
June 2008
B.Sc. Electrical Engineering Department (Telecommunication & Electronics Engineering Major)
From Alexandria Higher Institute Of Engineering & Technology (AIET),
Alex., Egypt. Graduation grade: Very Good Graduation grade: 3.22 out of 4
Graduation Project: Neural Based E.C.G Diagnosis Project grade : Excellent
E.C.G. is a recorder of the electric activity within the heart and automatic diagnosis- using computer.
1989-1995
1996-2003
Primary Education From ALMANARAT School, Jeddah, Saudi Arabia.
Preparatory and Secondary Education from MOHAMED KORIM, Alexandria, Egypt.
References Available on Request Resume Submitted in Confidence
COURSES
August 2003
July 2004
September 2005 April 2006
3 September 2006 19 October 2006
10 February 2007 3 March 2007
Computer Hardware (Level I) 16 Credit Hours. Alexandria Higher Institute Of Engineering & Technology (AIET) , Alex., Egypt.
PCB (Printed Circuit Board) 52 Credit Hours. Alexandria Higher Institute Of Engineering & Technology (AIET) , Alex., Egypt.
AVR microcontroller. Alexandria Higher Institute Of Engineering & Technology (AIET) , Alex., Egypt.
PLC (Programmable Logical Controller Level 1) 20 Credit Hours. Alex4 you training center, Alexandria, Egypt
This course is a part in the automatically control engineering the course was applied at Siemens S7200 PLC with an Excellent Grade in its final exam. Solid Edge course 20 Credit Hours. Alex4 you training center, Alexandria, Egypt
This course is a part in the Production engineering the course with an Excellent Grade in its final exam.
25 June 2008 4 October 2008
July 2008
2 September 2008 30 October 2008
22 December 2012
2 January 2013
September 2013
December 2014
English Course.
American Language & Computer Institute (A.L.I), Alexandria, Egypt This certification from – Atlanta English Institute – in America. This course improved General English and Conversation.
GSM (Global System For Mobile Communication) 24 Credit Hours.
New Horizons, Alexandria, Egypt
CCNA (Cisco Certified Network Associate) 80 Credit Hours. New Horizons, Alexandria, Egypt Project Management Professional Course 40 Credit Hours. Jordanian Engineer Association, Jeddah AUTOCAD 2013 Course 50 Credit Hours Center Of Advanced Systems, Jeddah ArcGIS 2014 Course 50 Credit Hours
Center Of Advanced Systems, Jeddah
EXPERIENCE
(Trainee) Jeraisy Computer & Communication Services.
Jeddah, Saudi Arabia
Manage and supervise OSP duties (splicing, jointing and termination of fiber optic cables) civil works (excavation and trenching for laying pipes) ISP working
(Splitters cabling, installation and patching).
Deal with different subcontractor’s nationality, preparing site diary, revenue, BOQ.
Monitoring and closing projects with quality assurance and quality control,
working as project engineer. Propose new civil routing.
Prepare costing for civil and cable.
Monitor project progress and manage contractors. Ensure installation and testing of Fiber Optic Cable completed according to design plan and schedule.
(Trainee) Balubaid Co. Ltd. Jeddah, Saudi Arabia Provide support to end-users by trouble shooting of hardware and Software Related problems.
Systel Motorola as a BSS Engineer (AUGUST 2008- FEBRUARY 2009) Alexandria, Egypt
TELECOMAX .CO. (ELMASA), Alex, Egypt As a BSS Integration Engineer _Site Engineer (MARCH 2009- DECEMBER 2009)
Installation of HUAWEI BTS & BSC Installation of HUAWEI microwave links
Al Matbouli Sound & Communication. AV & SECURITY Systems Engineer (FEBURARY 2010- DECEMBER 2010) Jeddah, Saudi Arabia
Al-Oulaqi Company, Jeddah, Saudi Arabia as Site Engineer & Controller (FEBRUARY 2011- APRIL 2012) Companies that adopted this company:
STC MOBILY
Key tasks of the Project Engineer are:
Center of Advanced Systems Company, Jeddah, Saudi Arabia
As a Projects manager (June 2012 – Till Now)
The Projects Manager is responsible for the end-to-end implementation
of the assigned Project. Companies that adopted this company:
ARAMCO EMMAR
MOBILY
NESMA TELECOM
PEAKS CONSTRUCTION
NATIONAL WATER COMPANY ITC ( INTEGRATED TELECOM COMPANY )
Key tasks of the Projects Manager are:
Manage the consultant services, control quality and quantity of work performed, guide the team and carry the overall responsibility for the task fulfillment and the Consultant’s activities.
Set objectives and priorities for the execution of work in line with the project
scope and Client’s requirements. Ensure a detailed Project Plan and necessary and satisfactory project procedures
are established to direct all project work in order to maintain timely execution and
quality of work.
Monitor project progress and proactively track bottlenecks and related issues to
ensure that project schedules and key milestones are satisfactorily met.
Coordinate project activities with all involved departments and sections departments to ensure well-ordered, end-to-end execution of all project tasks.
Supervise work results and compare results with guidelines and project plans. Ensure that results are compiled, documented and forwarded to Client in
required format, quantity and quality, and ensure timely and correct presentation
and explanation of results.
Establish mechanism to track, review and clarify problem issues raised in the
project, and to identify actions needed to resolve project blocking issues.
Conduct regular reviews of changing project requirements, organization and
resource needs, and provide recommendations for changes accordingly. Optical Fiber splicing, optical fiber cable installation any types, optical networking,
Optical transmission, FTTH , Optical fiber System Designing , Optical fiber cable
testing and measurement by OTDR , Optical power meter , Fusion splicing .
Leading Fiber team efficiently • In depth knowledge of optical fiber and its laying, testing and jointing.
• Currently working on GPON Project for Deploying and installation of FTTH Network. • Installation & testing of the ODB at the customer premises. • Testing accurate optical power from OLT to Splitters and Splitters to ODF.
• Ability to use and read Schematic and Plant diagram for performing the given jobs.
• Optical power loss measurement test of optical fiber link by using light source and power meter.
Create and Release PR( Purchase Request ) on checked BOQ ( Bill of Quantity ) and monitor PO ( Purchase Order ) created by procurement before any
implementation job begins. Prepare a complete Drawing of OSP project by using AUTOCAD. Produced a
complete drawing of Fiber To Home Project and arrange all types of BINDERS
for HandOver
Arrange and issue all permits from AMANH and ability work on AMANH systems to issue the excavation permits for all types of projects.
References Available on Request Resume Submitted in Confidence
LANGUAGES
Arabic Native Speaker
English Upper Intermediate SKILLS & HOBBIES
2006 (2nd Year
Project)
2007 (3rd Year
Project)
2013
2014
2015
Achieved Projects Robocon 2006 Perpetration, implementation of color detection and line track detection using AVR microcontroller.
Magneto Rheological Fluids (MRF) presentation and demonstration project.
1- Submarine Cables Troubleshooting (Installing submarine cable , ALCATEL Submarine
cable closure ).
2- 200 ELIFE sites (Connecting Power to Customer Premises). 3- 20 KM installing 144 F.O.C for MOBILY in all JEDDAH.
4- Installing of 288 fiber splice closure MOBILY in all MANHOLES in JEDDAH. 5- Installing and Testing the Fibre Optical Network for ARAMCO Buildings.
6- Installing 144 F.O.C between shelters and between floors in All MOBILY Exchanges. 7- 800 FTTB Sites (Installing Cable, Connecting Power for all sites).
8- Installing 12 KM of 144 F.O.C direct buried cable between Rabigh and King Abdullah Economic City (KAEC).
1- Survey, plan and Design the OSP route for FTTH connectivity with fiber schematic in a
specified area with street cabinet including complete documentation (FDT Design). 2- Implementation FTTH MOBILY Cabinets.
3- Implementation FTTH MOBILY Telecom Infrastructure in King Abdullah Economic City Covert Resort E-1 (14 KM).
4- Re-Locate STC Submarine Cable in Andulus Road (Installing submarine cable, ALCATEL Submarine cable closure).
1- NESMA Project 54 KM (Cable Pulling, Spicing, Termination in POP). 2- SubCom Project (Pulling Submarine Cable 16 KM (Power, Ground, Fibre)) and
Splicing, Termination in POP.
3- 200 FTTB Sites (Installing Cable, Connecting Power for all sites). 4- SubCom Project on the Beach (Excavation, Manhole, Pipes, Ducts, Preparing for the
cable coming from the SEA).
5- Implementation FTTH MOBILY. 6- Implementation TIE Cable MOBILY Projects (10 Sites). 7- MOBILY SPLITTING JOBS (GSM, METRO, FDT, FTTH, EXCHANGES and FTTB).
8- STC Submarine Cable (Installing ALCATE Closure, Splicing, Termination).
References Available on Request Resume Submitted in Confidence