energy summit 2018 - emc canada...•7 companies implemented iso 50001 •4 to full certification...
TRANSCRIPT
May 30th 2018
Energy Summit 2018
Strategic Energy Management –
ISO 50001 GAP
Kevin Wallace, P. Eng., CEM
Senior Program Manager
1. How big is the GAP?
2. Where is the GAP?
3
4
5
SEM Minimum Elements
7
Customer Commitment
Planning & Implementation
Monitoring, Tracking and
Reporting
Canfor Pulp – Northwood Mill
Hours required
to attain ISO
conformance:
155
8
9
Biggest Gaps – Areas of Focus
10
4.4.6 Energy Objectives, Targets & Action Plans
4.5.2 Competence, Training & Awareness
4.5.7 Procurement of Energy Services, Products, Equipment and Energy
4.6.3 Internal Audit of the EnMS
Biggest Gaps – Areas of Focus
11
4.4.6 Energy Objectives, Targets & Action Plans 40
4.5.2 Competence, Training & Awareness 20
4.5.7 Procurement of Energy Services, Products, Equipment and Energy 10
4.6.3 Internal Audit of the EnMS 8
Biggest Gaps – Areas of Focus
12
4.4.6 Energy Objectives, Targets & Action Plans 40
4.5.2 Competence, Training & Awareness 20
4.5.7 Procurement of Energy Services, Products, Equipment and Energy 10
4.6.3 Internal Audit of the EnMS 8
4.6.1 Monitoring, Measurement & Analysis 15
Canfor Pulp – Prince George Pulp and Intercontinental Mill
13
Hours required
to attain ISO
conformance:
192
14
Biggest Gaps – Areas of Focus
15
4.4.6 Energy Objectives, Targets, & Action Plans
4.5.2 Competence, Training, & Awareness
4.5.5 Operational Control
4.6.1 Monitoring, Measurement, & Analysis
Biggest Gaps – Areas of Focus
16
4.4.6 Energy Objectives, Targets, & Action Plans 30
4.5.2 Competence, Training, & Awareness 30
4.5.5 Operational Control 20
4.6.1 Monitoring, Measurement, & Analysis 20
Biggest Gaps – Areas of Focus
17
4.4.6 Energy Objectives, Targets, & Action Plans 30
4.5.2 Competence, Training, & Awareness 30
4.5.5 Operational Control 20
4.6.1 Monitoring, Measurement, & Analysis 20
4.5.7 Procurement of Energy Services, Products, Equipment, and Energy 10
Focus on Energy SEM Leaders Program-EPS Scope
• 14 largest energy using companies in the state
• Food processing, steel, plastic injection molding, printing, pulp and paper, corrugated box, pharma
• Cohort events and 1 on 1 coaching and direct support
• Individual ISO 50001/EMIS Audit at each site early in process (energy management system business case)
Company Process
Foremost Farms Dairy processing
Quad Graphics Printing
GKN Sinter Metals Metals
Aptar Injection molding
Menasha Printing
Georgia Pacific Pulp & paper
Charter Steel Steel (mini-mill)
Phillips Medsize Injection molding
ST Paper Paper
JBS Packaging Food processing
Flambeau River Paper Pulp & paper
Green Bay Packaging Paper
Kohler Power Systems Engine mfg
Saputo Food processing
• Overall starting scores for 14 plants range from 21% to 49% of ISO 50001 but most plants around 20%
• Low level of Operational Control of SEUs, Training, Measurement and correction of significant deviations in energy performance
Focus on Energy SEM Leaders Program-EPS Scope-Results (14 companies total)• 7 companies implemented ISO 50001
• 4 to full certification• 3 to 50001 Ready (under US DOE)
• 10 companies implemented full EMIS systems as per the EMIS Audits (business cases) and are using them to control significant energy uses
• 2 drop-outs
• Average 12-month operational electricity savings = 2.2%
Other GAPs
22
Closing the GAP
23
24
25
Acknowledgements
Peter Basset, EPS
Teddy Townsley, Canfor Pulp
Nick Finch, Canfor Pulp
Chad Gilles, Stillwater
Jess Burgess, CEE
Greg Lehoux, BC Hydro
26
27