energy program dan cassidy manager, energy & sustainability j&j workplace solutions

28
Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

Upload: daniella-skillern

Post on 31-Mar-2015

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

Energy Program

Dan CassidyManager, Energy & Sustainability J&J

Workplace Solutions

Page 2: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

Johnson & JohnsonThe world's most comprehensive and broadly based manufacturer of health care products, as well as a provider of related services, for the Consumer, Pharmaceutical, and Medical Devices & Diagnostics markets.

• More than 250 operating companies

• More than 115,000 employees worldwide

• Selling products in more than 175 countries

• 3 Segments: Pharmaceuticals, Medical Devices & Diagnostics, and Consumer

• 2012 Sales $67.5 Billion

Page 3: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

1943 Our Credo

Robert Wood Johnson crafted Our Credo long before anyone ever heard the terms “sustainability” or “corporate social responsibility.”

Page 4: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

Up to $190 Bn savings opportunity

Page 5: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

1990-2010 Sustainability Reporting

5

Environmental Leadership – 1990 First Pollution

Prevention goals

Sustainability Goals– 1993 First Sustainability report– 2000 Next Generation goals– 2005 Healthy Planet 2010

goals– 2010 Healthy Future 2015

goals

Johnson & Johnson Environmental Report, 1993

Page 6: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

Healthy Future 2015

Healthy People Healthy Planet Healthy Business

6

• Research and development for neglected diseases

• Affordable access to medicines

• Advancing community wellness

• Fostering the most engaged, health-conscious and safe employees in the world

• Enhancing outcome measurement in philanthropy

• Partnering with suppliers that embrace sustainability

• Committing to enhanced transparency and accessing the power of external collaboration

• Building on our legacy in safeguarding the planet

• Reduce the environmental impact of our operations

• Increase the sustainable design of our products

Page 7: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

Reduce Facility Impacts

2015 Goals:• 20% absolute reduction in facility CO2 emissions by 2020• Increase onsite clean-technology energy capacity to 50 MW• 20% decrease in fleet CO2 emissions per mile• 10% absolute reduction total waste disposal & water consumption Janssen Raritan site 1,870 kW completed December 29 th 2011

Page 8: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

CO2 Reduction Strategy – Existing Buildings

• Energy Efficiency - Best Practices

• On-site co/tri-generation, fuel cells

• On-site renewables: solar, wind, biomass, landfill gas, geothermal

• Green energy procurement (PPA’s)

Page 9: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

Worldwide CO2 ResultsC

O2

Em

issi

on

s [

Th

ou

san

d M

etri

c To

ns]

Sales [B

illion

US

$]

Worldwide Results 2012 Goal vs. 2010: -4%CO2 Emissions 1990-2012 vs. Sales 2012 Actual vs. 2010: -6%

Net Emissions Offsets Sales

Page 10: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

0

200

400

600

800

1000

1200

1400

'90 '92 '94 '96 '98 '00 '02 '04 '06 '08 '10 12

2012 J&J ENERGY PROFILE – WORLDWIDE DATA

0.0

10.0

20.0

30.0

40.0

50.0

60.0

'90 '92 '94 '96 '98 '00 '02 '04 '06 '08 '10 12

Th

ou

san

d M

etr

ic T

on

s

CO2 EMISSIONS FLOOR SPACE

Milli

on

S

Q.F

T.

'90

'91

'92

'93

'94

'95

'96

'97

'98

'99

'00

'01

'02

'03

'04

'05

'06

'07

'08

'09

'10

11120.0

5.0

10.0

15.0

Tri

llio

n B

TU

’s

ENERGY USAGE

Milli

on

US

$

ENERGY COST

'90

'91

'92

'93

'94

'95

'96

'97

'98

'99

'00

'01

'02

'03

'04

'05

'06

'07

'08

'09

'10

11120

50

100

150

200

250

300

350

+31%

+38%

+181%

+12%

Page 11: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

J&J Electricity Rates

20002001

20022003

20042005

20062007

20082009

20102011

2012$0.00

$0.04

$0.08

$0.12

$0.16

$0.20

$0.24

BrazilChinaIndiaPuerto RicoUnited StatesEurope

Year

Cost

($/k

Wh)

Page 12: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

J&J Fuel Rates

20002001

20022003

20042005

20062007

20082009

20102011

2012$0.00

$0.50

$1.00

$1.50

$2.00

$2.50

BrazilChinaIndiaPuerto RicoUnited StatesEurope

Year

Cost

($/t

herm

)

Page 13: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

Commitment to Clean Energy

3,000kW Tri-GenerationLimerick, Ireland

Currently 45 MW installed or in-progress

• 34 Solar• 10 Cogeneration• 3 Biomass• 3 Geothermal• 2 Wind

Project pipeline of over 14MW

• 2 Wind• 9 Solar• 2 Cogeneration 500 kW PV array,

New Brunswick, NJ

Two 500 kW wood chip boilersCork, Ireland

Page 14: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

LEED Sustainable Building Policy: All new construction and major renovations of J&J facilities will be LEED certified.

AFFILIATE LOCATIONRATING SYSTEM

TYPE LEVEL DATE

Janssen Titusville, NJ LEED  Existing Buildings Silver 2004

J&J PRD La Jolla, CA LEED  New Construction Certified 2005

McNeil Ft. Washington, PA      LEED  Commercial Interiors Silver 2006

J&J PRD Springhouse, PA LEED  New Construction Gold 2009

Corporate New Brunswick, NJ LEED  Existing Buildings:

O&M Gold 2009

J&J Consumer China Shanghai, China LEED  New Construction Silver 2010

Lifescan Inverness, Scotland LEED New Construction Gold 2011

Select Examples of Our 15 LEED Buildings Worldwide:

Commitment to Sustainable Buildings

Page 15: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

Policy for Sustainable Design and Construction - Revised 2012

• Targets higher Energy & Atmosphere scores– Forces evaluation of new

technologies– Mandates use of

technologies with 10 year or better paybacks

• Focus on right-sizing equipment

• Added smaller buildings to policy scope

Page 16: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

CO2 Capital Funding ProcessAugust, 2004

• $40 million per year in capital relief for projects worldwide

• Projects provide good financial returns:

15% Internal Rate of Return

• Projects must provide meaningful CO2 reduction

Criteria:

Page 17: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

CO2 Projects Funding Program

• 146 projects approved

• $313.6 million US approved

• Average IRR: 19.3%

• 100 Projects Complete

• 145,887 metric tons CO2/yr

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

Actual Spending

[$ MM]$21.4 $26.4 $38.3 $12.0 $44.0 $56.4 $48.2 $22.2 $39.9 $4.8

Energy Efficiency,

100

CHP, 11

Solar PV, 27

Geothermal/Biomass, 5

Wind, 3

Page 18: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

ENERGY EFFICIENCY INITIATIVES

Page 19: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

Gas ConversionJ&J Thailand

Variable speed air compressor, J&J Mumbai

HVAC Upgrade, Raynham, MA

Chiller upgrade Vistakon, Jacksonville

Lighting upgrade HCS, Memphis

Boiler upgrade J&J UK

Energy Efficiency – Recent examples

Page 20: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

Drive Implementation through Programs

• J&J Energy Best Practices• Project Cold (Chilled water optimization)• Project Hot (Boiler system optimization)• Project Relight

Page 21: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

Coming Soon…

Project Air (compressed air retrofits)

Project Aeolus (Reduce air changes in HVAC)

Project Hydro (water reductions)

Project Clean (Improvements in CIP’s)

Project Lab (Lab hood energy reduction)

Project You (Awareness & behaviour change)

Project Zero (Carbon neutral sites)

Page 22: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

CLEAN GENERATION

Page 23: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

Janssen R&D, Springhouse PA

3800 kW MWM

Janssen, Raritan NJ3000 kW GE

Lifescan, Inverness UK229 kW Mercedes

DePuy, Cork Ireland402 kW MAN

Cogeneration Projects

Page 24: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

24

Page 25: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

25

Page 26: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

26

Page 27: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

27

Page 28: Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions

28

Thank You