energy program dan cassidy manager, energy & sustainability j&j workplace solutions
TRANSCRIPT
Energy Program
Dan CassidyManager, Energy & Sustainability J&J
Workplace Solutions
Johnson & JohnsonThe world's most comprehensive and broadly based manufacturer of health care products, as well as a provider of related services, for the Consumer, Pharmaceutical, and Medical Devices & Diagnostics markets.
• More than 250 operating companies
• More than 115,000 employees worldwide
• Selling products in more than 175 countries
• 3 Segments: Pharmaceuticals, Medical Devices & Diagnostics, and Consumer
• 2012 Sales $67.5 Billion
1943 Our Credo
Robert Wood Johnson crafted Our Credo long before anyone ever heard the terms “sustainability” or “corporate social responsibility.”
Up to $190 Bn savings opportunity
1990-2010 Sustainability Reporting
5
Environmental Leadership – 1990 First Pollution
Prevention goals
Sustainability Goals– 1993 First Sustainability report– 2000 Next Generation goals– 2005 Healthy Planet 2010
goals– 2010 Healthy Future 2015
goals
Johnson & Johnson Environmental Report, 1993
Healthy Future 2015
Healthy People Healthy Planet Healthy Business
6
• Research and development for neglected diseases
• Affordable access to medicines
• Advancing community wellness
• Fostering the most engaged, health-conscious and safe employees in the world
• Enhancing outcome measurement in philanthropy
• Partnering with suppliers that embrace sustainability
• Committing to enhanced transparency and accessing the power of external collaboration
• Building on our legacy in safeguarding the planet
• Reduce the environmental impact of our operations
• Increase the sustainable design of our products
Reduce Facility Impacts
2015 Goals:• 20% absolute reduction in facility CO2 emissions by 2020• Increase onsite clean-technology energy capacity to 50 MW• 20% decrease in fleet CO2 emissions per mile• 10% absolute reduction total waste disposal & water consumption Janssen Raritan site 1,870 kW completed December 29 th 2011
CO2 Reduction Strategy – Existing Buildings
• Energy Efficiency - Best Practices
• On-site co/tri-generation, fuel cells
• On-site renewables: solar, wind, biomass, landfill gas, geothermal
• Green energy procurement (PPA’s)
Worldwide CO2 ResultsC
O2
Em
issi
on
s [
Th
ou
san
d M
etri
c To
ns]
Sales [B
illion
US
$]
Worldwide Results 2012 Goal vs. 2010: -4%CO2 Emissions 1990-2012 vs. Sales 2012 Actual vs. 2010: -6%
Net Emissions Offsets Sales
0
200
400
600
800
1000
1200
1400
'90 '92 '94 '96 '98 '00 '02 '04 '06 '08 '10 12
2012 J&J ENERGY PROFILE – WORLDWIDE DATA
0.0
10.0
20.0
30.0
40.0
50.0
60.0
'90 '92 '94 '96 '98 '00 '02 '04 '06 '08 '10 12
Th
ou
san
d M
etr
ic T
on
s
CO2 EMISSIONS FLOOR SPACE
Milli
on
S
Q.F
T.
'90
'91
'92
'93
'94
'95
'96
'97
'98
'99
'00
'01
'02
'03
'04
'05
'06
'07
'08
'09
'10
11120.0
5.0
10.0
15.0
Tri
llio
n B
TU
’s
ENERGY USAGE
Milli
on
US
$
ENERGY COST
'90
'91
'92
'93
'94
'95
'96
'97
'98
'99
'00
'01
'02
'03
'04
'05
'06
'07
'08
'09
'10
11120
50
100
150
200
250
300
350
+31%
+38%
+181%
+12%
J&J Electricity Rates
20002001
20022003
20042005
20062007
20082009
20102011
2012$0.00
$0.04
$0.08
$0.12
$0.16
$0.20
$0.24
BrazilChinaIndiaPuerto RicoUnited StatesEurope
Year
Cost
($/k
Wh)
J&J Fuel Rates
20002001
20022003
20042005
20062007
20082009
20102011
2012$0.00
$0.50
$1.00
$1.50
$2.00
$2.50
BrazilChinaIndiaPuerto RicoUnited StatesEurope
Year
Cost
($/t
herm
)
Commitment to Clean Energy
3,000kW Tri-GenerationLimerick, Ireland
Currently 45 MW installed or in-progress
• 34 Solar• 10 Cogeneration• 3 Biomass• 3 Geothermal• 2 Wind
Project pipeline of over 14MW
• 2 Wind• 9 Solar• 2 Cogeneration 500 kW PV array,
New Brunswick, NJ
Two 500 kW wood chip boilersCork, Ireland
LEED Sustainable Building Policy: All new construction and major renovations of J&J facilities will be LEED certified.
AFFILIATE LOCATIONRATING SYSTEM
TYPE LEVEL DATE
Janssen Titusville, NJ LEED Existing Buildings Silver 2004
J&J PRD La Jolla, CA LEED New Construction Certified 2005
McNeil Ft. Washington, PA LEED Commercial Interiors Silver 2006
J&J PRD Springhouse, PA LEED New Construction Gold 2009
Corporate New Brunswick, NJ LEED Existing Buildings:
O&M Gold 2009
J&J Consumer China Shanghai, China LEED New Construction Silver 2010
Lifescan Inverness, Scotland LEED New Construction Gold 2011
Select Examples of Our 15 LEED Buildings Worldwide:
Commitment to Sustainable Buildings
Policy for Sustainable Design and Construction - Revised 2012
• Targets higher Energy & Atmosphere scores– Forces evaluation of new
technologies– Mandates use of
technologies with 10 year or better paybacks
• Focus on right-sizing equipment
• Added smaller buildings to policy scope
CO2 Capital Funding ProcessAugust, 2004
• $40 million per year in capital relief for projects worldwide
• Projects provide good financial returns:
15% Internal Rate of Return
• Projects must provide meaningful CO2 reduction
Criteria:
CO2 Projects Funding Program
• 146 projects approved
• $313.6 million US approved
• Average IRR: 19.3%
• 100 Projects Complete
• 145,887 metric tons CO2/yr
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Actual Spending
[$ MM]$21.4 $26.4 $38.3 $12.0 $44.0 $56.4 $48.2 $22.2 $39.9 $4.8
Energy Efficiency,
100
CHP, 11
Solar PV, 27
Geothermal/Biomass, 5
Wind, 3
ENERGY EFFICIENCY INITIATIVES
Gas ConversionJ&J Thailand
Variable speed air compressor, J&J Mumbai
HVAC Upgrade, Raynham, MA
Chiller upgrade Vistakon, Jacksonville
Lighting upgrade HCS, Memphis
Boiler upgrade J&J UK
Energy Efficiency – Recent examples
Drive Implementation through Programs
• J&J Energy Best Practices• Project Cold (Chilled water optimization)• Project Hot (Boiler system optimization)• Project Relight
Coming Soon…
Project Air (compressed air retrofits)
Project Aeolus (Reduce air changes in HVAC)
Project Hydro (water reductions)
Project Clean (Improvements in CIP’s)
Project Lab (Lab hood energy reduction)
Project You (Awareness & behaviour change)
Project Zero (Carbon neutral sites)
CLEAN GENERATION
Janssen R&D, Springhouse PA
3800 kW MWM
Janssen, Raritan NJ3000 kW GE
Lifescan, Inverness UK229 kW Mercedes
DePuy, Cork Ireland402 kW MAN