Page 1: Energy Performance Contracting...No need to pass a levy Savings are guaranteed Useful life of equipment is longer than term of debt ... as one team No performance/savings guarantee

October 10, 2017

Energy Performance Contracting

Page 2: Energy Performance Contracting...No need to pass a levy Savings are guaranteed Useful life of equipment is longer than term of debt ... as one team No performance/savings guarantee

Why is Energy Efficiency a Focus?

CHALLENGES OBJECTIVES

� Increasing utility and

maintenance costs

� Aging infrastructure and

Maintenance Intensive

� Tax Payers Expect to do

More with Less

� Save Money, Reduce Energy,

Operational, Maintenance Costs

� Improve schools without capital

funds

� Replace Old Equipment &

Increase Reliability and

Efficiency

Page 3: Energy Performance Contracting...No need to pass a levy Savings are guaranteed Useful life of equipment is longer than term of debt ... as one team No performance/savings guarantee

� Operating budget is

lowered which pays

debt service for

improvements

� No need to pass a levy

� Savings are

guaranteed

� Useful life of

equipment is longer

than term of debt

service

How Does an ESPC Work?

Page 4: Energy Performance Contracting...No need to pass a levy Savings are guaranteed Useful life of equipment is longer than term of debt ... as one team No performance/savings guarantee

The Energy Performance Contracting process mirrors and streamlines a traditional project delivery method, while meeting all public procurement requirements.

A common EPC includes:

� Comprehensive energy study

� Design of selected improvements

� Competitive subcontract pricing

� Financing assistance

� Construction

� Commissioning & Training

� Measurement & Verification (M&V)

Services are “Bundled” under an EPC

Page 5: Energy Performance Contracting...No need to pass a levy Savings are guaranteed Useful life of equipment is longer than term of debt ... as one team No performance/savings guarantee

Benefits of a Stepped Approach

Comprehensive Energy Audit (CEA)• ECM Cost/Benefit realistically presented

• ECMs selected for design phase

Design Phase• ECMs designed

• ECM Cost/Benefit updated and reviewed

Execute Performance

Contract Documents

Finance Closing• BANS, Bonds, Municipal Lease

Construction• Install ECMs

Competitive Bidding• Contractors and venders compete based on design docs

• ECM Cost/Benefit finalized

Owner makes

2nd go/no go

decision

Owner makes 1st go/no go decision

Owner makes final go/no go

decision

EPC RFP• Qualification based

• Fully disclosed ESCO Fees and Mark ups

• Open book requirement

Page 6: Energy Performance Contracting...No need to pass a levy Savings are guaranteed Useful life of equipment is longer than term of debt ... as one team No performance/savings guarantee

Benefits of an Energy Performance Contract

� “Repurpose” money that is already in operating (utility costs)

budgets into needed capital improvements

� Accelerated/Simplified project implementation (WV Code 18,5, 9A)

� A single point of contact/responsibility

� Do not public bid material & labor (no low bidder)

� Financing and grant assistance

� A positive cash flow makes projects “self funding”

� Energy savings are guaranteed

Page 7: Energy Performance Contracting...No need to pass a levy Savings are guaranteed Useful life of equipment is longer than term of debt ... as one team No performance/savings guarantee

EPC Model vs. Traditional DBB

Traditional Design-Bid-Build Energy Performance Contract

Project funding required in budget Utilizes operational budget savings to

“self-fund” project

Design is a focus: life cycle cost is not Both design and life cycle cost are focus

Familiar delivery model Design-Build delivery model

Multiple points of contact Single point of contact

Design firm and construction company

in adversarial roles

Design firm and construction company act

as one team

No performance/savings guarantee Performance/savings guaranteed

Low bid could mean poorly qualified

contractor

Avoids low bid, low qualified contractor

headache

Transparent “open book” cost Transparent “open book” cost

Prevailing wage Prevailing wage

Page 8: Energy Performance Contracting...No need to pass a levy Savings are guaranteed Useful life of equipment is longer than term of debt ... as one team No performance/savings guarantee

EPC Implementation Strategies

Combine longer payback upgrades with proven shorter payback energy conservation improvements to financially accomplish project goals. For example:

� Short Payback Items (i.e. LED Lighting)

� Short Payback Items (i.e. VFDs)

� Short Payback Items (i.e. RetroCx)

� Medium Payback Items (i.e. Equipment Controls)

� Long Payback Items (i.e. New Boiler)________________________________________________________________________________________________________________________

RESULT = Project that pays for itself (neutral cash flow)

Page 9: Energy Performance Contracting...No need to pass a levy Savings are guaranteed Useful life of equipment is longer than term of debt ... as one team No performance/savings guarantee

EPC Pitfalls

� Guaranteed savings didn’t materialize

� Lack of transparency in procurement of labor and materials

� Hidden fees and mark-ups discovered after implementation

� Owner did not have control of the project

Page 10: Energy Performance Contracting...No need to pass a levy Savings are guaranteed Useful life of equipment is longer than term of debt ... as one team No performance/savings guarantee

EPC Pitfalls and how to avoid them

� Public bidding laws

� Upfront disclosure of fees and mark-ups

� Define what unburdened construction costs are

� Transparent review of pricing from contractors

� Disclosure of escalation rates:

� Energy costs

� O&M Costs

� Measurement and verification

� Service/Maintenance agreements

� Transparent project contingency

Page 11: Energy Performance Contracting...No need to pass a levy Savings are guaranteed Useful life of equipment is longer than term of debt ... as one team No performance/savings guarantee

Unburdened Construction Cost (1)

Less than

$1,000,000

$1,000,000

to $3,000,000

Greater than

3,000,000

Construction Mark-up (2)

(as a % of total unburdened construction cost) ____________ % ____________ % ____________ %

Program Management and Planning ____________ % ____________ % ____________ %

Design and Specifications (Engineer of Record) ____________ % ____________ % ____________ %

Administration ____________ % ____________ % ____________ %

Cost of Risk ____________ % ____________ % ____________ %

Construction Management and ESCO General Conditions ___________ % ____________ % ____________ %

Hazardous Waste Abatement ____________ % ____________ % ____________ %

Commissioning ____________ % ____________ % ____________ %

Training ____________ % ____________ % ____________ %

Profit ____________ % ____________ % ____________ %

Corporate Overhead ____________ % ____________ % ____________ %

Other: ____________ % ____________ % ____________ %

Total: ____________ % ____________ % ____________ %

ESCO Fee PricingProject Fee Sample

Page 12: Energy Performance Contracting...No need to pass a levy Savings are guaranteed Useful life of equipment is longer than term of debt ... as one team No performance/savings guarantee

Competitive Subcontractor PricingBenefit of Competitive Construction Pricing

Total Savings Over Bidder B: $725,666

Pricing of ESCO Subcontractors

Page 13: Energy Performance Contracting...No need to pass a levy Savings are guaranteed Useful life of equipment is longer than term of debt ... as one team No performance/savings guarantee

Construction

Cost(competitive pricing)

ESCO Cost of

Risk(Contingency kept by ESCO)

Construction

Cost

Transparent

Contingency(Goes back to Customer)

Fin

al C

ost

$

Open Book,

Fully Transparent ESCO

Closed Book ESCO

Establishing Contract ValueBottom Up Approach…More Project. Less Cost.

Contract

Cost

Difference

Page 14: Energy Performance Contracting...No need to pass a levy Savings are guaranteed Useful life of equipment is longer than term of debt ... as one team No performance/savings guarantee

Energy Conservation Measures

� Lighting & Lighting Controls

� Energy Management and Control Systems

� HVAC Equipment Upgrades/Replacements

� Motors & Variable Speed Drives

� Computer Power Management System

� Demand Controlled Ventilation

� Heat Pumps

� Water Conservation

� Building Envelope

Page 15: Energy Performance Contracting...No need to pass a levy Savings are guaranteed Useful life of equipment is longer than term of debt ... as one team No performance/savings guarantee

Energy Conservation Measures

� Photovoltaic

� Wind Turbines

� Solar Thermal

� Geothermal

� Hydro Turbine

� Fuel Cell

Page 16: Energy Performance Contracting...No need to pass a levy Savings are guaranteed Useful life of equipment is longer than term of debt ... as one team No performance/savings guarantee

Case Study

Implemented improvements included:

� Lighting & Lighting Controls Upgrades

� HVAC Controls

� HVAC and DHW Equipment Replacements

� Dishwasher Booster Heater

� Computer Power Management Software

Doddridge County Schools- Energy Performance Contract • Project Cost: $1,737,201

Total Annual Savings: $68,043 • School Building Authority Funds $768,950

Page 17: Energy Performance Contracting...No need to pass a levy Savings are guaranteed Useful life of equipment is longer than term of debt ... as one team No performance/savings guarantee

Case Study

Guaranteed Annual Energy Savings

1,115,590 kWh

2,592 kW

494 mmBtu

$122,272

Annual Equivalent Savings for Comparison

Cars Removed from Road 148

Barrels of Oil Saved 1,766

Homes Energy Use 66

Implemented improvements included:

� Indoor Lighting

� Gymnasium Lighting

� Variable Frequency Drives

� Energy Management System Upgrades

� HVAC Replacements

� Air Conditioner Replacements

� Water Conservation

� Computer Power Management

Roane County Schools- Energy Performance Contract

Project Cost: $1,563,035 • Guaranteed Annual Savings: $122,272

Page 18: Energy Performance Contracting...No need to pass a levy Savings are guaranteed Useful life of equipment is longer than term of debt ... as one team No performance/savings guarantee

Mason County Schools- Energy Performance Contract

Estimated Capital Cost: $5,200,000 • SBA Funding: $614,880

K-12 Case Study

Annual Energy Use and Costs Prior

to Implementation

3,110 kW

9,000,000 kWh

15,000 mmbtu

$1,100,000

Estimated Annual Energy Savings

76,000 kWh

450 mmbtu

$250,000

Implemented improvements included:

� Lighting and Occupancy Sensor Upgrades

� Boiler Burner Replacement

� Boiler Plant Replacements

� Steam Trap Upgrades and Replacements

� Thermostatic Radiator Controls

� Window AC Control Optimization

� Digital Air Handler Controls Upgrade

� High Efficiency DHW Replacement

� Premium Efficient Motor Replacement

15

K-12 Case Study

Page 19: Energy Performance Contracting...No need to pass a levy Savings are guaranteed Useful life of equipment is longer than term of debt ... as one team No performance/savings guarantee

Architectural &

Engineering Services

Est. 1940

Construction

Est. 1983

Energy Services

Since 1992

EPC

Success

WendelWendel’s Fully Integrated Professional Services

Reinforcing Cycle

Page 20: Energy Performance Contracting...No need to pass a levy Savings are guaranteed Useful life of equipment is longer than term of debt ... as one team No performance/savings guarantee

� Implemented over $200 Million in ESPCs & Implementation

� $55 Million in the K-12 market

� $135 Million currently in development

� $28 Million in the K-12 market

� Professional Credentials

� Licensed Engineers

� Registered Architects

� Certified Energy Managers

� Certified Energy Auditors

� Certified Commissioning Professionals

QualificationsCredentials

� Renewable Energy Professionals

� LEED Accredited Professionals

� Certified Measurement &

Verification Professionals

Page 21: Energy Performance Contracting...No need to pass a levy Savings are guaranteed Useful life of equipment is longer than term of debt ... as one team No performance/savings guarantee

Thank you.