Page 1: Energy mix varies · 2013 in GW Reliable available capacity Peak load % excess Import capacity % excess with import Winter reference point AT 17,6 10,7 64% 0 64%

Energy mix varies

Page 2: Energy mix varies · 2013 in GW Reliable available capacity Peak load % excess Import capacity % excess with import Winter reference point AT 17,6 10,7 64% 0 64%

RetailGasPrices(household)Q4 2014

Page 3: Energy mix varies · 2013 in GW Reliable available capacity Peak load % excess Import capacity % excess with import Winter reference point AT 17,6 10,7 64% 0 64%

RetailElectricityPrices(household)Q4 2014

Page 4: Energy mix varies · 2013 in GW Reliable available capacity Peak load % excess Import capacity % excess with import Winter reference point AT 17,6 10,7 64% 0 64%

WholesaleElectricityPricesQ4 2014

Page 5: Energy mix varies · 2013 in GW Reliable available capacity Peak load % excess Import capacity % excess with import Winter reference point AT 17,6 10,7 64% 0 64%

Commissioning date < 2017

Commissioning date 2017 to 2020

Commissioning date > 2020

Projects of Common Interest:

High-Voltage Lines

Offshore hubs

Baltic Integration and Synchronisation

Electricity Storages

Source: © Eurogeographics for the administrative boundaries;

© PLATTS for the underlying energy network.

Cartography: European Commission, Energy DG, June 2013

Commissioning date < 2017

Commissioning date 2017 to 2020Commissioning date > 2020

Energy Infrastructure - Electricity

Page 6: Energy mix varies · 2013 in GW Reliable available capacity Peak load % excess Import capacity % excess with import Winter reference point AT 17,6 10,7 64% 0 64%

Annual cost of capacity remuneration

Market design Total cost

EURO (m)

Euro/MWh

per grosselectricity gen.

Euro/MWh

per committedcapacity

Committedcapacity

MW

Greece Capacity payment 451 9,18 41,030 11,008

Ireland Capacity payment 529 14,9 78,000 6,778

Italy Capacity payment 100-160 0,5

Spain Capacity payment 758 2,7 30,506 24,847

Sweden Strategic reserve 12 0,1 6,981 1,726

Finland Strategic reserve 19 0,3 31,216 600

Norway Strategic reserve 25 0,2 82,753 300

PJM (USA) Capacity payment 4,275 5,5 31,401 136,144

http://ec.europa.eu/energy/sites/ener/files/documents/com_2013_public_intervention_swd01_en.pdf page 24

Page 7: Energy mix varies · 2013 in GW Reliable available capacity Peak load % excess Import capacity % excess with import Winter reference point AT 17,6 10,7 64% 0 64%

2013 in GW

Reliable available capacity

Peak load % excess Import capacity % excess with import

Winter reference pointAT 17,6 10,7 64% 0 64%BE 12,3 13,79 -11% 3,5 15%BG 11,2 6,95 61% 1,45 82%CY 1,2 0,9 33% 0 33%CZ 11,6 10,3 13% 3 42%DE 93 91,77 1% 16,9 20%DK 5,38 6,23 -14% 5,68 78%EE 2,02 1,64 23% 0,65 63%ES 51,8 44,6 16% 2,9 23%FI 13,31 15 -11% 4,7 20%FR 96,6 83 16% 8 26%GB 61,99 57,7 7% 4,19 15%GR 11,04 8,83 25% 1,5 42%HR 3,4 3,2 6% 3,1 103%HU 5,09 5,9 -14% 2,4 27%IE 6,66 4,94 35% 0,8 51%IT 67,3 58,6 15% 10,5 33%LT 2,4 1,85 30% 1,3 100%LU 1,6 1,12 43% 4,14 413%LV 1,3 1,28 2% 2 158%NI 2,22 1,72 29% 0,45 55%NL 26,37 17,4 52% 5,17 81%PL 26,15 24,48 7% 0,82 10%PT 11,42 8,43 35% 1,28 51%RO 11,6 8,93 30% 1,5 47%SE 27,21 26 5% 9,7 42%SI 2,41 2 21% 2,11 126%SK 4,17 3,82 9% 4,66 131%

SUM 588,34 521,08 13% 102,4 133%

Net generating capacity, load and import capacityhttp://ec.europa.eu/energy/sites/ener/files/documents/com_2013_public_intervention_swd01_en.pdf page 11

Page 8: Energy mix varies · 2013 in GW Reliable available capacity Peak load % excess Import capacity % excess with import Winter reference point AT 17,6 10,7 64% 0 64%

Heating and cooling

46% of total energy

21.5%

Transport

33% of total energy

10%

Electricity

21% of total energy

34%

5.7%

25.7%16.6%

Energy service

Overallshare

RES :Target 2020

Share* 2014

Renewable energy 2014

Page 9: Energy mix varies · 2013 in GW Reliable available capacity Peak load % excess Import capacity % excess with import Winter reference point AT 17,6 10,7 64% 0 64%

Source: Bloomberg New Energy Finance

Technology cost reductions

Page 10: Energy mix varies · 2013 in GW Reliable available capacity Peak load % excess Import capacity % excess with import Winter reference point AT 17,6 10,7 64% 0 64%

• Proportion of floor areas

for single family houses

is highest in Greece,

Ireland, Norway and the

UK

• Proportion of floor areas

for apartments is highest

in Estonia, Latvia and

Spain

Residential floor areas share by type of dwellingFloor area share

Floor area share for residential buildings

Source: Buildings Performance Institute Europa

Page 11: Energy mix varies · 2013 in GW Reliable available capacity Peak load % excess Import capacity % excess with import Winter reference point AT 17,6 10,7 64% 0 64%

CO² emissions per m²