energy, infrastructure and defence...recognition and awards : • iso 9001 10 million ylng 7 million...

66
Energy, Infrastructure & Defence solutions Energy, Infrastructure and D June 2011 June 2011 Defence

Upload: others

Post on 10-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Energy, Infrastructure and D

June 2011

June 2011

Defence

Page 2: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

• A global US $ 1.8 billion EPC conglomerate

Punj Lloyd GroupA global US $ 1.8 billion EPC conglomerate

• Providing services in Energy, Infrastructure and Defence s

• Present across Middle East & Africa, Asia Pacific, South A

• International offices in 20 countries• International offices in 20 countries

• Rich multicultural manpower from over 37 nationalities

• International clients from top Oil & Gas majors and Gover

• High standards of health, safety, environment and quality

• Equipment assets worth US $ 400 million

• Declared ‘Infrastructure Company of the Year’ at Essar StCNBC TV 18

June 2011

sectors

Asia, the Caspian, UK, China and Europe.

nment

eel Infrastructure Awards 2010 in association with

Page 3: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Punj Lloyd GroupPunj Lloyd GroupProviding EPC service

Energy Infrastruct

Oil & Gas

• Offshore• Onshore Field Development

Utilities• Water Treatmen• Sewage Treatm

Energy

• Onshore Field Development• Pipelines• Tanks & Terminals

Polymers & Petrochemicals

• Sewage Treatm• Reservoirs• Centralised Util

BuildingsPolymers & Petrochemicals

• Refineries• Chemicals

Process

g

• Hospitality & Le• Commercial, InResidential Com

• Healthcare

Power

• Chemicals

• Thermal• Nuclear

• Healthcare• Townships & In

Infrastructure• Subway & Metr• Nuclear y• Airports• Highways & Ex• Bridges, Flyove• Tunnels & Cave

S t & T

Renewables• Solar • Biofuels

June 2011

• Seaports & Ter

Telecom

• Biofuels• Water treatment

es for :

ture Defence

nt Facilitiesment Facilities

• Land Systems• Aviation

El t iment Facilities

lities

• Electronics

eisuredustrial, Institutional &

mplexes

dustrial Parks

ro Systemsy

xpresswaysers & Interchangeserns

i lminals

Page 4: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Punj Lloyd Group

Punj LloydPunj LloydEnergy / Infrastructure / Defence

June 2011

PL Engineering• Oil & Gas

• Petrochemicals / Chemicals

• Power – Nuclear / Thermal

• Automotive / Aerospace

Sembawang E & CSembawang E & CBuildings

InfrastructureUtilities

Page 5: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Punj Lloyd Overview

Founded in 1989

22 years of professional excellence

Active in hydrocarbon and infrastructure sectors

Revenues (Group) for Year ended March 31, 2011

Order Backlog as on March 31, 2011

Employees

Safety

June 2011

: US$ 1,810 Million

: US$ 5,041 Million

: 27,207

: Conforming to highest international standards

Page 6: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Sembawang Overview

Founded in 1982

29 years of professional excellence

Largest EPC contractor in South East Asiag

Classified under highest Unlimited Financial Category in Sin

Present in transportation, infrastructure, buildings, utilities, p

R f Y d d M h 31 2011 US$ 350Revenues for Year ended March 31, 2011 : US$ 350

Order Backlog as on March 31, 2011 : US$ 620

Employees : 483

June 2011

Acquired by Punj Lloyd in June 2006

ngapore for Civil, Building and M&E

power, environmental industries

0 Milli0 Million

0 Million

Page 7: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

E i iEngineering

PL Engineering is a multi-disciplinary Design and Ed i h d t d i I di G PL E i iand is headquartered in India, Gurgaon. PL Engineering :

• Is an ISO 9001 company

• Has a strength of over 731 people

• Serves Oil & Gas, Petrochemical/ Chemical, Power Automotive & Aerospace industry

• Provides services from Concept to Commissioning

P Bid E i i• Pre-Bid Engineering

• FEED

• Detailed Design & Engineering

• Engineering support during Procurement/Con- Works as captive for group companies as w

- Has offices in India, ME, UK & SE-Asia

June 2011

ngineering company . It is a subsidiary of Punj Lloyd

(Thermal & Nuclear), Infrastructure, Polysilicon,

structionwell as serves global clients

Page 8: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Value Drivers

Customer Integration Safe

Experience & Resources

Responsive to Market Challenges

SustainDevelop

June 2011

Quality

ety

Multi-Cultural Teams

Working Global, Thinking Local

nablepment

Page 9: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Differentiators

No.1 in Polymers Worldwide

Diversified Portfolio

Equity Participation

Technology Integration

Large Fleet of Constructi

June 2011

Total Project Life Cycle Support

Exceeding Customer Expectations

Enviable HSEQ records

In-house Engineering

on Equipment

Page 10: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Skills and Capabilities

T l D liT l D li

Engineering Procurement

Total DeliveryTotal Delivery

Engineering Procurement

Feasibility Study Procurement Services

Master Plan

Technology Packages

Concept Design / FEED

Material Management

Cost Estimates

Detailed Multi-disciplinary Design

Validation

June 2011

C biliC bili

P t C l tiConstruction

y Capabilityy Capability

Post CompletionConstruction

Project Management Ongoing technical support

Construction Management

Construction Services

Turnaround support

O&M

Technology improvements

Commissioning

Start-up / Training

Technology improvements

De-bottlenecking

Plant Expansions

Page 11: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Post Completion

Ongoing technical support

Turnaround support

De-bottlene

Plant Expan

O&M

Technology improvements

Statutory ins

EngineeringProcurement

Life Time

June 2011

Life Time

cking

nsions

spection

ConstructionPost Completion

e Supporte Support

Page 12: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Our People

• A team of highly skilled and diversified employees, attend• A rich multicultural team from over 37 nationalities, adapt• A motivated team that can be readily mobilised to any pa• A team that enjoys the challenge of a ‘complex’ project aA team that enjoys the challenge of a complex project a

June 2011

ding to every aspect of the project ting itself to the local customs and traditions of the region

art of the worldnd can think ‘out-of-the box’nd can think out of the box

Page 13: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Manpower – Punj Lloyd Group

Punj Lloyd

Project Management / E ti 22,747Execution 22,747

Project Services 1,949

E i i 90Engineering 90

Management 27

Support Services 1,180

Total 25,993

June 2011

Sembawang PL Engineering

406 0406 0

21 31

6 6596 659

5 2

45 39

483 731

Page 14: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Human Resource Development

• A committed effort towards maintaining high quality of ma• Executive Development Centre at Banmore providing co• Craftsmen Training Institutes for unskilled labour at :

• BanmoreBanmore• Chhindwara• Belgaum

• Punj Lloyd is a Founder Supporter of Indian School of Bu

June 2011

t

anpower, both skilled and unskilledmprehensive, inter-disciplinary training

usiness, enhancing the nation’s management resource

Page 15: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Beating Deadlines

Motor Spirit Quality Upgradation, Haldia Refinery Com

Dahej Vijaipur Pipeline 42”

South Sumatra to West Java Pipeline, Indonesia 32

Gas Export Pipeline, Oman 48

LNG Storage & Regasification Facilities, Dabhol “Ea

Jamnagar - Loni LPG Pipeline 8 mg p

Changi Airport Terminal 2 Extension 6 m

B l M h ht Hi h 5Belgaum - Maharashtra Highway 5 m

Vadodara - Halol Expressway 4 m

June 2011

Balongan - Jakarta Pipeline 2 m

mpletion in 18 months

” X 506 km in 9 months

” X 26.62 km of lowering in 1 day

” X 21 km of lowering in 1 day

arly completion” project milestones

months ahead of schedule

months ahead of schedule

th h d f h d lmonths ahead of schedule

months ahead of schedule

months ahead of schedule

Page 16: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Major Achievements of the Grou

All terrain pipeline Cospecialists,

With over 10,000 km,large dia pipelines

LNGIndia

Leading contractorin LDPE Plants

South East Asia’s longest and most

d d d dadvanced underground tunnel expressway

1st Industrial Park in China to receive ISO9001:2000

certification World’s largest Whea

June 2011

base Bioethanol Plant

p

onstructedG terminals in and in Yemen

Singapore’s LRT / MRT

Changi AirportChangi AirportTerminal Extension

Nuclear > 3 millionengineering manhours

130 years of experience in polymers and

petrochemicalst

petrochemicals

Page 17: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

ClientsClients

June 2011

Page 18: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

International Offices

UK

Bahrain MalaysBahrain

China

Hong Kong

Indonesia

Malays

Oman

Qatar

SaudiIndonesia

Iran

Kazakhstan

Saudi

Thaila

Turkm

June 2011

Libya

Kenya

Vietna

Yemen

India

UAE

sia

Singapore

sia

ArabiaArabia

nd

menistan

am

n

Page 19: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Organisational Structure

PUNJ LLOYD G

REGIONAL HEAD

MEA & CIS

ENERGY INFRASTRU

MEA & CISABU DHABI

MEA & CABU DHA

SOUTH ASIA SOUTH ASOUTH ASIAINDIA

SOUTH EAST ASIASINGAPORE

INDIA

SOUTH EASSINGAPO

SEMBAWANG ENCONSTRUCTOR

SINGAPOR

SINGAPORE SINGAPO

June 2011

SINGAPOR

GROUP

DQUARTERS

CTURE SPECIALISTS

CISABI

ENGINEERING

POLYMERS & PETROCHEMICALSASIA

DEFENCE

A

ST ASIAORE

NGINEERS & S PTE LTDRE

UPSTREAM

RENEWABLESORE

RE

Page 20: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

PLL O d B kl (C lid tPLL Order Backlog (Consolidate

Geographical Segment – FY 2011

Africa14%

Rest of World0%

South Asia48%

Asia Pacific23%

Middle East15%

23%

Description USD MN

South Asia 2,760

Middle East 840

Asia Pacific 1,315

Africa 820

Rest of World 4

June 2011

Total 5,739

d)d) :

Business Segment – FY 2011

PipelinePower11%

27%

Tankage2%

Process23%

Infrastructure37%

Description USD MN

Pipeline 1,540

Tankage 128

Process 1,305

Infrastructure 2,102

Power 664

Total 5,739

Page 21: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

PLL Revenue (Consolidated) Geographical Segment - FY 2011

Caspian Rest of World7%

South Asia32%

2% 7%

Middle East21%

Asia Pacific38%

Description USD MN

South Asia 625

Middl E t 290Middle East 290

Asia Pacific 767

Africa 41

Rest of World 87

June 2011

Rest of World 87

Total 1,810

Business Segment - FY 2011

Others4%

Pipeline27%

Power6%

Offshore5%

Tankage6%

Process19%Infrastructure

33%

Description USD MN

Pipeline 486

Tankage 100

Process 345

Infrastructure 597

Power 116

Offshore 72

Others 94

Total 1,810

Page 22: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

S f t St ti tiSafety Statistics

Particulars 2006 2007Particulars

Total Manhours Worked

Fatalities

2006

0

2007

48,549,540

0

36,956,522

Lost Time Injuries

L t W kd

Frequency Rates

5

34

0.03

6

35

0.02

Lost Workdays

Severity Rate

Recordable Cases

34

0.18

66

35

0.14

47

Frequency Rate =No. of LTI Cas

T t l M hq y

Severity Rate =

Total Manhours w

Mandays Lost due

Total Manhours w

Formula

June 2011

7 2008 2009 20107

0

0

2008

64,164,570

0

2009

68,541,846

0

2010

70,289,899

0

6

5

2

3

16

0.01

3

65

0.01

3

49

0.01

5

4

7

16

0.05

42

65

0.19

30

49

0.14

29

es

k dx 2,00,000

worked

e to LTI

workedx 2,00,000

Page 23: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Safety Milestones

Safety is Paramount : Man-hours witho16 illi B l• in design

• in construction• inside / outside the workplace

16 million Belga12.9 million Haldi12 million Dabh11.2 million Dahe

Achieving Safety Targets through :• safety audits• training

f d / b h ki

11.2 million Dahe10 million Saba8.5 million Kaza7.5 million Dahe

• safety records / benchmarking

Recognition and Awards :• ISO 9001

10 million YLNG7 million OGD5 million Abu 4 illi T k• OHSAS 18001

• ISO 14001

4 million Turke4 million Indon3 million Qata2 5 million Geor2.5 million Geor

June 2011

out lost time injury :M h htaum, Maharashtra

iaholej-Vijaipurej Vijaipur ah Sarawak, Malaysia akhstanejG , Yemen

D III Abu DhabiDhabi

eynesia r

rgiargia

Page 24: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Global Project Delivery Solutio

Oil & Gas Offshore, Onshore & Offshore PTerminals

Process Refineries, Polymers & Petroche

Power Thermal, Nuclear

Utilities Water & Sewage Treatment Fac

Infrastructure Subway & Metro Systems, AirpoInterchanges, Tunnels & Cavern

Hospitality & Leisure CommerciBuildings Hospitality & Leisure, CommerciHealthcare, Townships & Industr

Asset Management Asset Preservation & Maintenan

June 2011

ns for :

ipelines, Onshore Field Development, Tankage and

emicals, Chemicals

cilities, Reservoirs, Centralised Utilities

orts, Highways & Expressways, Bridges, Flyovers & ns, Seaports & Terminals

ial Industrial Institutional & Residential Complexesial, Industrial, Institutional & Residential Complexes, rial Parks

nce

Page 25: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

• Oil & Gas• Oil & Gas• InfrastructureInfrastructure• Defence

June 2011

Page 26: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Oil & GasOil & Gas

• Onshore Field Development & Gas Processing (for more details, clic

• Offshore (for more details, click on the link)

• Onshore & Offshore Pipelines (for more details, click on the link)

• Tanks & Terminals (for more details, click on the link)

• Process (for more details, click on the link)

• Power (for more details, click on the link)

June 2011

ck on the link)

Page 27: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

O h Fi ld D l t & GOnshore Field Development & GEPC of Tie-ins for Abu Dhabi Company for Onshore Oil Op

Shah Gas Gathering – Package 1 for Abu Dhabi Gas Dev

EPC of Spiking Compressor for Abu Dhabi Company for

Huwailah Field Development for Abu Dhabi Company fo

Jarn Yaphour Field Development for Abu Dhabi Nationa

New Water Treatment Plant and Central Processing Fac

Natural Gas Pipeline in Tuas and Jurong Area, Singapore

Total E&P Tambora Field Development Project Phase 2

Peciko Field Development Phase 4 for TotalFinaElf, Indo

KODECO Onshore EPC Services for Poleng Process PlaKODECO Onshore EPC Services for Poleng Process Pla

Petro China EPC Service for Betara Complex Developm

Gas Field Development for Oil India Limited, India

June 2011

BACK

G P iGas Processingperations, Abu Dhabi

velopment Co. Ltd, Abu Dhabi

Onshore Oil Operations, Abu Dhabi

r Onshore Oil Operations, Abu Dhabi

al Oil Company, Abu Dhabi

cilities Upgrade for Occidental Mukhaizna LLC, Oman

e

2, Indonesia

nesia

atformatform

ment, Sumatra

Page 28: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Off h Pi liOffshore Pipelines • Uran Trombay Jawahardeep Oil Pipeline India

• Uran Trombay Gas Pipeline Project India y p j

• Tambora Field Development, Phase 2 Indones

• Tunu Field Development Phases 4 – 9 Indones

• Panaran Pemping Gas Pipeline Indones• Panaran Pemping Gas Pipeline Indones

Offshore Platforms• Platform Compression Facilities Project IndonesPlatform Compression Facilities Project Indones

• Platform Compression Facilities Project Thailand

• Heera Redevelopment Offshore Platform India

• Betara Complex Development Project IndonesBetara Complex Development Project Indones

• South Utility Platform (TP 11 S / EPSC 5) Indones

• Poleng Process Platform, Indonesia Indones

June 2011

BACK

ONGC

ONGC

sia Total

sia Total

sia PGNsia PGN

sia Pertaminasia Pertamina

d PTT

ONGC

sia Petro Chinasia Petro China

sia Total

sia Korea Development

Page 29: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Pipelines

A k l d d f th l di i li t t• Acknowledged as one of the leading pipeline contractors

• Successfully commissioned large dia pipelines

• Laid 10,000 km pipeline world over

• Known as ‘All terrain experts’ with experience of laying p

• Owns and maintains 20 spreads of pipeline equipment u

• Owns 18 automatic welding machines. Punj Lloyd introdug j y

• Owns HDD equipment upto 400 mtr

• Owns a flotilla of pipelaying barges capable of laying in p

June 2011

i th lds in the world

ipelines in mountains, deserts, swamps and shallow water

pto 56” dia

uction this technology in Indiagy

pipe in varying depths

Page 30: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Pi li P j tPipeline ProjectsProjects Overseas

• Onshore Gas Pipeline Project, Thailand

• Strategic Gas Transmission Project, Qatar

• Sabah Sarawak EPC Gas Pipeline, MalaysiaSabah Sarawak EPC Gas Pipeline, Malaysia

• OGC Pipelines, Oman

• EPIC of Doha Urban Pipeline Relocation, Qatar

• Ethylene and Butane Pipelines QatarEthylene and Butane Pipelines, Qatar

• Melita-Tripoli & El Khoms -Tripoli Gas Pipeline, Libya

• EPC for Oil & Gas Export Pipelines, Kazakhstan

• South Sumatra to West Java Gas Pipeline Phase I Indonesia• South Sumatra to West Java Gas Pipeline Phase I, Indonesia

• Huwailah Field Development, Abu Dhabi

• Flowlines and Well Heads Installation, Abu Dhabi

Gas Export Pipeline Oman• Gas Export Pipeline, Oman

• BTC & SCP Pipeline, Georgia

• SGP Flowlines, Kazakhstan

B k Tbili i C h C d Oil Pi li P j t T k

June 2011

• Baku-Tbilisi-Ceyhan Crude Oil Pipeline Project, Turkey

• KAM Pipeline Project, Kazakhstan

Projects In India

• EPC offshore pipeline

• Vijaipur – Kota Pipeline

• Dabhol Bangalore Pipeline

• East West Gas Pipeline

• Dabhol-Panvel Pipeline

• Backwater and Onshore Pipeline, Kerala

D h j U Pi li• Dahej-Uran Pipeline

• Mundra-Delhi Pipeline

• Uran Trombay Pipeline, Mumbai

• Shore Approach Pipeline, AdaniShore Approach Pipeline, Adani

• Dahej-Vijaipur Pipeline

• Mangalore-Bangalore Multi-Product Pipeline

• Jamnagar-Loni LPG Pipeline

• Gas Rehabilitation & Expansion Project

• Kandla-Bhatinda Multi-Product Pipeline

• South Bassein Hazira Trunkline

BACK

Page 31: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Terminals & Docks• EPC Refrigeration storage tanks at Jiangsu, China

• Storage Terminal with 120,000 DWT berth, Singapore

• Oil Tanking Terminal for Oil Tanking(S) Pte Ltd, Sing

• Construction of dry dock and wharves, Singapore

• Construction & Erection of Jetty at Pulau Seraya, Si

• Construction of Container Feeder Berth, Singapore

• Finger Pier extension at Sembawang Shipyard, Sing

• Jetty Extension at Loyang Crescent, Singapore

• Karimun Shipyard Development, Indonesia

• Zouec / DPEC LPG Terminal Project in China• Zouec / DPEC LPG Terminal Project in China

June 2011

e

apore

ngapore

apore

Page 32: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Tanks and Terminals

Crude / Cryogenic LNG & LPG TanksCrude / Cryogenic LNG & LPG Tanks

• In-house design capability

• Only contractor involved in the construction of all 3 terminals in India Dabhol Hazira Dahejterminals in India – Dabhol, Hazira, Dahej

• Only Indian Contractor to have executed LPG/Cryoon EPC basis including mechanical, civil and insula

Fi t I di t t t h t t d LNG• First Indian contractor to have constructed LNG regterminal

June 2011

LNG

ogenic tanks ation work

ifi tigasification

Page 33: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Tanks and TerminalsTanks and Terminals• LPG Import Terminal Project, Oil Petronas Pvt. Ltd

Bh t T i l P j t C i E I di Li it d• Bhogat Terminal Project, Cairn Energy India Limited

• Offsite & Storage Facilities for Panipat Refinery India

• Onshore Gas Development Phase III Abu Dhabi GasOnshore Gas Development Phase III Abu Dhabi Gas

• Bulk Liquid Storage & Blending Facility at Meranti He

• Tank Terminal Project at Pulau Busing Tankstore - Sij g

• LNG Storage (2X148,000M3) Tank Expansion Dahej fo

• Jurong Bulk Liquid Product Terminal Horizon Termin

• Low Storage (2x160,000 M3) for Receiving Terminal H

• LNG Storage (3X160,000M3) and Regasification Term

• Steel Storage Tanks for Water and Power Project Tec

June 2011

Built in excess of BACK

n Oil Corporation Ltd.

Industries LtdIndustries Ltd.

elios Terminal Corporation Pte. Ltd., Singapore

ngaporeg p

or IHI

nals Pte. Ltd. - Singapore

Hazira for Shell

inal Dabhol for Skanska

chnip

8 million m3 of storage capacity

Page 34: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

ProcessProcess

June 2011

Page 35: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Refineries• As world leaders in process plants, we offer comp

construction services in turnkey and composite co

• Expertise to execute a diverse and complex rangeTreater, Amine Recovery, Sulphur Recovery, VisbrTreater, Amine Recovery, Sulphur Recovery, Visbrand vacuum Distillation

• Ability to work in live plants within restricted spacehighest standards of health, safety, quality and envhighest standards of health, safety, quality and env

• Completed 15 Refinery Modernisation projects

June 2011

lete range of planning, design, engineering and onstruction projects

e of projects ranging from Sour Water Stripper, Aminereaker, Crude Distillation, Hydrocracker, Hydrogenreaker, Crude Distillation, Hydrocracker, Hydrogen

es and under tight schedules, while maintaining vironmentvironment

Page 36: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Refineries/EPCRefineries/EPC• Process Facilities and Utilities for crude oil storage

Ltd

• Paradip Refinery Project, Indian Oil Corporation

• Cuddalore Refinery Project, Nagarjuna Oil Corporation

• EPC Kerosene Distillation Unit Plant and Constructi

• Yemen LNG Project For Utilities & Offsites Yemen LN

• Fuel Systems New Doha International Airport, Qatar

• Peciko Field Development Phase 4, Indonesia TotalFp

• Motor Spirit Quality Upgradation Project Indian Oil C

• Delayed Coker Unit, Indian Oil Corporation Ltd., India

• Sulphur Block Bharat Oman Refinery Ltd India• Sulphur Block, Bharat Oman Refinery Ltd., India

• Hydrocracker Unit & Hydrogen Generation UnitIndian Oil Corporation Ltd., India

• Sulphur Blocks Six Indian Refineriesp

• 37,000 TPA Grass Root MTBE Plant Indian Oil Corpor

• Hydrocracker Units, Mathura Refinery Indian Oil Corpo

• Constructed Critical Sections CDU/VDU/VBU Indian

June 2011

Constructed Critical Sections CDU/VDU/VBU Indian

• 10.5 MTPA Essar Refinery, Vadinar, Gujarat

Cavern, Mangalore for Indian Strategic Petroleum Reserves

n Limited

on of Main Building & Amenities, Singapore

NG Company Ltd., Yemen

inaelf

orporation Ltd., India

ation

oration

RefineriesRefineries

Page 37: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

P l & P t h i lPolymers & Petrochemicals• World’s leading specialist engineering contractor for low d

• Wealth of experience in polymers with over 70 plants to it• Wealth of experience in polymers with over 70 plants to it

• Involved in all categories ranging from LDPE, linear low d

(HDPE), polypropyline (PP), polyvinyl chloride (PVC), pol

• Designed and constructed vinyl chain, oxo alcohols and c

• EPC for 300 KTPA LDPE Plant, Thailand for PTT Polyethylene C

E i i d P j t M t f 30 000 MTPY S i l• Engineering and Project Management of 30,000 MTPY Special

• FEED & EPC for 400 KTPA LDPE Plant, UK for Huntsman

• EPC for 300 KTPA LDPE Plant, Iran for Amir Kabir

• EPC for 250 KTPA Polystyrene Plant, Iran for Pars Petrochemica

• 400 KTPA LDPE Plant, China for BASF-YPC

• 226,000 TPA LDPE Project, Jubail, Saudi Arabia

• EPC of Polyurethane Plant, Seraya, Jurong Island, Singapore

• EPCM 90,000 TPA chemical plant, China

• EPC Quaternary Ammonium Product, Jurong Island, Singapore

June 2011

• EPCM for 70,000 MTPY PA Plant, China

density Polyethylene (LDPE)

ts creditts credit

density polyethylene (LLDPE) and high density polyethylene

yester (PET) and acrylics

caprolactum projects

o.

lt Ch i l Pl t I d ilty Chemical Plants, Indonesia

al

Page 38: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

RenewablesRenewables • Punj Lloyd Delta Renewables is capable of developing,

renewable energy based projects.

• The company’s key focus is on Solar Photovoltaics and

• The Group is also focused on special projects to develoenergy - Bio-fuel and Polysilicon

Project Experience

• Recently commissioned World’s largest wheat based et

• Actively working on polysilicon projects in the Middle Ea

• Solar PV Lighting, India R

• Solar Water Treatment (850 plants), India G( p ),

• Five Turnkey Solar Power Projects G

• 5 MW Solar PV Plant - Jawaharlal Nehru National Miss

June 2011

engineering and executing

Solar Thermal

p non conventional sources of

hanol plant in the UK

ast and CIS countries

Reliance Industries

Govt. of Bihar

Govt. of Punjab

sion, Rajasthan

Page 39: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Chemicals

CRISTAL Project, Membrane Chlorine Plant; Expanded T

100 MTPD Sulphuric Acid Project, Saudi Arabia, Basic C

1000 TPD Sulphur Burning Acid Plant, TCH Belgium

Turnkey SAFCO Sulphuric Acid Project, Dammam, Saud

EPC of 45 MTPD Singapore Refining Company, Jurong, S

Agrochemicals Project for Syngenta, UKg j y g ,

June 2011

BACK

Ti02 Yanbu, Saudi Arabia

Chemicals National Company

di Arabia

Singapore

Page 40: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

PowerPower

June 2011

Page 41: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Th lThermalEPC 3 x 700 MW Power Plant - BOP Components, erection of Turbine & Generator and Coal and Ash Hand

EPC High Pressure piping system for 250 MW Power P

EPC 815 MW CCP - balance of plant including Civil & St

EPC High Pressure piping system for 150 MW Paka Pow

2 x 30 MW Coal Fired Power Project, Poyry Energy Ltd,

2 x 270 MW Thermal Power Station, Dhariwal Infrastructu2 x 270 MW Thermal Power Station, Dhariwal Infrastructu

2 x 250 MW Thermal Power Station, Rajasthan Rajya Vid

2 x 300 MW Thermal Power Project, Plant Jindal Power L

2 x 350 MW Thermal Power Project, Ind-Barath Energy (U

4 x 250 MW Jindal Power Plant, Chhattisgarh

June 2011

dling Plants, Malaysia

lant, Singapore

tructural work, Singapore

wer Plant, Malaysia

Indonesia

ure Pvt. Ltd, Maharashtraure Pvt. Ltd, Maharashtra

dhyut Utpadan Nigam Ltd., Rajasthan

Ltd., Chhattisgarh

Utkal) Ltd, Orissa

Page 42: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

NuclearUnderground Civil Work for Nuclear Power Corp. of India

EPC of nuclear equipment and piping for systems for N

Upgrade of Britain’s Submarine Refit Complex at Devon

Nuclear Fuel Reprocessing for Sellafield Facility, UK for

New Fuel Oxide Plant for BNFL, UK

Vitrification Plant for BNFL, UK

Rajasthan Atomic Power for Nuclear Power Corp. of India

June 2011

BACK

uclear Power Corp. of India

nport

r BNFL

a

Page 43: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Buildings & Infrastg• Buildings (for more click on the link)Buildings (for more, click on the link)

• Transportation (for more details, click on the link)

• Utilities (for more details, click on the link)

June 2011

tructure

Page 44: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

BuildingsExecuted a highly diverse range of projects ranging fh t l t hi h d h lthhotels to high end healthcare

Offering integrated design & construction services in

– Hospitality & Leisure including hotels and res– Commercial complexes– Industrial complexesIndustrial complexes– Healthcare– Residential complexes

Building fast-track projects with focus on value engin

June 2011

from luxurious villas and

:

sorts

neering

Page 45: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

BuildingsBuildingsCommercial Complexes• Tinjan International Building, China• The Exchange and Yangtze Plaza• German Centre for Industry & Trade, Singaporey , g p• Two commercial buildings at Hiranandani Palace Gardens

Hotels & Resorts • Marina Bay Sands Integrated Resort’s, North Podium compand Reatil arcade

• Hotels, beach villas, oceanarium and water theme park for

Industrial Parks• GE Industrial Park Beijing Economic Development Zone• GE Industrial Park, Beijing Economic Development Zone• Vietnam Singapore Industrial Park, Vietnam

Healthcare Facilities & Hospitals• Institute Complex Rai Bareli IndiaInstitute Complex, Rai Bareli, India• Medical College and Hostel Complex, AIIMS, Raipur, India• Medanta, The Medicity, India• Singapore National Eye Centre• Changi General Hospital Substructure Package

Residential Complexes• The Jumeirah Islands Villa Project, Dubai• The Edge on Carnhill in Singapore

June 2011

BACK

in Panvel, SEZ, HIRCO Group

prising the casino, theatres

Resorts World Sentosa, Singapore

Page 46: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Transportation• Enhancing commuter’s travel experience by projec

◙ Subway and metro systems◙ Airports◙ Highways & Expressways

B id Fl & I h◙ Bridges, Flyovers & Interchanges◙ Tunnels & Caverns◙ Seaports & Terminals

• In Singapore, we have built more than 75% of the

• In India, our owned bituminous road and concrete seen us deliver over 18 highway projects, some falGolden QuadrilateralGolden Quadrilateral

June 2011

cts in :

city’s LRT systems

paving equipment has lling under the prestigious

Page 47: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

T iTransportationSubway & Metro Systems

• Expansion of the existing MRT network including New C• Design and construction of elevated viaduct including str

Rail Corporation• Construction of eight stations and viaduct Bangalore Me• Construction of eight stations and viaduct, Bangalore Me

Airports• Terminal extension, runways, hangars and control tower

cargo terminals, in-flight catering centres and MRT systeChangi Airport

• The greenfield airport project in Sikkim, India

Highways & Expressways• Construction of National Highway No 9, GMR Hyderaba• Upgradation of the Belgaum-Maharashtra Border Highw• Projects for the Golden Quadrilateral including East Wes• Singapore Kallang-Paya Lebar Expressway • Tunnel Structure Linking East Coast Parkway with Nicol

June 2011

Circle Line and DownTown Line in Singaporeructural work of four stations for Delhi Metro

etro Rail Corporationetro Rail Corporation

rs, to support facilities such as training centres, freights and em for Asia’s major aviation hub, the award winning

d Vijayawada Expressways Private Limited ay Section of NH-4 in Karnatakast and North South Corridor

l Highway

Page 48: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

T t tiTransportationBridges, Flyovers & Interchanges• Construction of 330m causeway to Pulau Brani and a 28y• Construction of interchange at junction of Seletar/Centra• Foundations and Piling, U.P. State Bridge Corp. Ltd

Tunnels & CavernsTunnels & Caverns• Paya Lebar Tunnel, design and construction of 5.1km lon

tunnel and 6 shafts• Kranji Tunnel, design and construction of 12.6km long by

Seaports & Terminals• Oil Tanking Terminal, construction of Phase II of infrastru

and drainage works bundwalls and extensive ground imand drainage works, bundwalls and extensive ground im• Finger pier extension, design and construction of new 69

steel pipe and prefabricated steel jackets and precast de

June 2011

BACK

0m long bridge to Sentosa g gl Expressway/Yio Chu Kang Road

ng by 6.5m internal diameter by 30m deep

y 3.6m internal diameter tunnel and 10 access Shafts

cture works comprised of tank farm terminal including roads provement worksprovement works

95m service pier using reverse circulation drilling method, ecking systems

Page 49: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Utilities – Municipal EPC project of Utilities in Tripoli, LibyaWater-Sewerage-Storm Water mains & branch lines, Roads

Changi Water Reclamation Plant contracts for Digesters, CivSystem, Liquid Module 2, Civil Work and Scrapers

Ulu Pandan Sewage Treatment Work - covering of existing trservicing & maintenance of the Odour Treatment Facilities &

Kim Chuan Sewerage Treatment Work. West Work Phase 1 gContract 2 - Liquid Train/Liquid Stream

Deep Tunnel Sewerage System, Contract T-05 and Contract

Kim Chuan Refuse Storage and Transfer Station SingaporeKim Chuan Refuse Storage and Transfer Station, Singapore

Ulu Pandan Refuse Incineration Plant, Singapore

Newater Service Reservoirs at Tampines

June 2011

BACK

& other facilities

vil and M&E Work, Sludge Drying

reatment units contract for the & associated ductwork, Singapore

Redevelopment work p

t T-03, Singapore

Page 50: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

TelecomMajor player in telecom infrastructure services, active in the

Turnkey Services for Telecom Tower Companies, High Networks - Optical Fibre, Co-axial Cable and Microwav

Services:

Planning and System EngineeringInstallation and Commissioning of Communication systInstallation and Commissioning of Data Network

June 2011

e telecom industry for over a decade.

Quality Hybrid ve Equipment

tem

Page 51: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Defence

June 2011

Page 52: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Defence• Punj Lloyd has strategically diversified into the De

public-private partnership initiative

• Long term commitment to defence business in Ind

• Punj Lloyd is developing capability and infrastructu

programs

• Establishing itself as a credible original equipmentEstablishing itself as a credible original equipment

technology

• The group’s objective is to indigenously develop g

providing a decisive edge to the Indian Armed For

Punj Lloyd has licenses for:- Guns Rocket and Missile Artillery Systems andGuns, Rocket and Missile Artillery Systems and - Electro optical systems, Fire control systems, C3

armored fighting vehicles- Conversion of civilian aircraft into aircraft for defe

structure and Dynamic Components for Aviation

June 2011

structure and Dynamic Components for Aviation manufacture of aero-structure, airframes and ac

fence sector, under the Government of India’s

dia

ure which can be effectively leveraged for defence

t manufacturer with focus on state of the artt manufacturer with focus on state of the art

enuine force multipliers that will contribute to

rces

related Equipmentrelated Equipment31 systems and power packs associated with

fence application; Precision manufacture of aero and Land System Products; Fabrication andand Land System Products; Fabrication and cessories using composites

Page 53: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Pursuing opportunities in…

Part ofPrime Part of global supply chain

Prime Contractor for

Focus

Land Systems – Artillery, Air Defence SystemPower pack, Maintenance, R

areas Defence Aviation – Modification & MRO of air

D f El t i C4ISR BMS S illDefence Electronics- C4ISR, BMS, Surveilla

June 2011

the Licensed MRO & Offsetthe Manufacturer of

MRO & Upgrades

Offset partner

ms, Small Arms, Armoured Vehicles, Repair & Overhaul, Upgrade

rcraft, Precision manufacturing, Engineering

& Si hti S tance & Sighting Systems

Page 54: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Asset ManagementMaintenanceUpgradation of NH 31 from Khagaria to Purnea iUpgradation of NH-31 from Khagaria to Purnea iNational Highways Authority of India

740 MW gas based power plant and LNG storagDabhol Power Corporation, Maharashtra

Toll management for Vadodara - Halol Expressw

Daewoo Automobile Plant Daewoo Motors DelhiDaewoo Automobile Plant, Daewoo Motors, Delhi

Captive Power Plant, Hindustan Aeronautics, Assa

Gas processing and gathering facilities, Oil Indiap g g g ,

June 2011

n Bihar on BOT Annuity basisn Bihar on BOT Annuity basis,

e and regasification terminal,

way Vadodara-Halol Toll Road Ltd., Gujarat

am

a Ltd., Rajasthan, j

Page 55: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Insulation Services

KAEFER Punj Lloyd provides solutions for thermal insulatio

Capabilities include Electrical Heat Tracing, Roofing and Fa

Sound Quality and Safety Practices

Major projects executed Mathura, Vadodara, Reliance and P

Insulation work for LNG Terminals Dabhol, Hazira and Dahe

June 2011

on

acade Systems

Panipat refineries in India

ej

Page 56: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Horizontal Directional Drilling S

PLN Construction, a subsidiary of Punj Lloyd provides HDDDrilling through every kind of soil, the company has execute

The company owns seven rigs of 250 to 400 T capacity

Major crossings:

48” x 1,451 mtr48” x 870 mtr48 x 870 mtr42” x 1,040 mtr30” x 1,585 mtr24” x 1,942 mtr24” x 1 810 mtr24 x 1,810 mtr18” x 1,771 mtr

June 2011

Solutions

D solutions ed total crossings 89,078 mtr till date

Page 57: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

BargesThe Group owns an impressive flotilla of barges for offshorep p gcapabilities

• Kuber, a pipelay barge for laying pipelines upto 60” dia inbuilt heave compensation, a helideck, advanced navigp goperating devices, SAT diving systems, providing high e

• Mahesh 1, a pipelay barge which has laid 48” dia pipelin

M dh d i k b ith it f 650 t• Madhwa, a derrick barge with crane capacity of 650 tonand composite cable installations

• Ganpati, a push pull barge for pipelaying in shore appro

June 2011

pipelaying, greatly enhancing the company’s offshore p p y g, g y g p y

in water depths upto 150 m, outfitted with a stinger withgation systems and international tie ups for remoteg y pend positioning and tracking services.

nes in water depth upto 65 m

b ilt f i i t ll ti fl ibl i lines, purpose built for riser installations, flexible pipelines

oaches.

Page 58: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Equipment Assets

Large fleet of equipment which can be readily mobilised

Equipment assets valued at USD 400 million

The company owns equipment to cater to every terrain and

– Amphibian : including swamp excavators, dredgebarges, swamp cranes

– Pipeline - 20 spreads of equipment– Road – 13 sets of bituminous road equipment

- 3 sets of concrete paving equipment

– Offshore - 4 pipelaying barges

Young equipment fleet – minimum downtime

Single largest equipment lifted : 590 MT

June 2011

every project need:

ers, marsh buggies, flexiyoke work

Page 59: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Equipment Yard & Maintenance

Central India Facilities in Banmore spread oveCentral India Track Repair and Engine Mainten

Indonesia Sungaipurun yard, Indonesia witAccessible by land and water

Middle East &Middle East & Africa

Facilities in Qatar / Abu Dhabi / T

Caspian Base facility in Atyrau is spread storage, repair, maintenance & fa

Inventory maintained on ORACLE based ERP system Equipment managed by Oracle Enterprise Asset M t

June 2011

Management

Facilitieser 20,000 sq mtrnance facility area - 7,000 sq mtrth jetty facilities – 45,000 sq mtr

Tripoli spread over 100,000 sq m

in an area of 80,000 sq m. The facility includes abrication.

Page 60: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

CSR• Regular community improvement activities including loca

awareness and safety meetings medical and dental cheawareness and safety meetings, medical and dental che

• Recruitment opportunities provided to many locals. New

empowered with skills required for future employment

HIV/ AIDS i t l t t ll it l b ll O i• HIV/ AIDS, an integral part at all sites globally. Ongoing w

sites globally

June 2011

al infrastructure development, traffic

ck up campsck-up camps

recruits exhaustively trained and

k h HIV/AIDS tworkshops on HIV/AIDS awareness at

Page 61: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

• Promoting education with Dayawanti Punj Model School in Sinorth India

Dayawanti Punj Model School, Sitamarhi - Alla

• Affiliated to the Central Board of Secondary Education (CBSE

equips the students with the intellectual and practical skills nec

meet the challenges of a professional life.

Life Enrichment Programme for construction w• Stems from our belief that 'Each life is precious'. It is a progra

welfare of workers with a special focus on wealth HIV/AIDS.

• Creating awareness about HIV/AIDS and other diseases, provtraining, adopting safety practices at work, training in Yoga for

• Introduced first in 2007 at Medicity, Gurgaon, International Finthe World Bank Group, offered to support the programme.

• With the launch of Phase II of Life Enrichment Programme in 2other sites namely Panipat Haldia and Vadodaraother sites namely, Panipat, Haldia and Vadodara.

June 2011

tamarhi, a backward region of

ahabad

E), the school

cessary to carve a career and

workersamme which aims at the holistic

viding medical facilities, first aid r health and relaxation

nance Corporation, a member of

2008 it was introduced at three

Page 62: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Accreditation

OHSAS 18001:2

ISO 14001:2004 Env

ISO 9001:2008 Q

June 2011

2007 Health & Safety

vironmental Management

Quality Management

Page 63: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Policies

June 2011

Page 64: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

AwardsAwards• Infrastructure Excellence Award’ in association with in the Oil & • Infrastructure Company of the year - 2010 (CNBC/Essar)• Chemtech Award – Outstanding contribution to Engineering – 2Chemtech Award Outstanding contribution to Engineering 2• Top Indian company ‘Construction – Infrastructure Developmen

• Best Infrastructure Award NDTV Profit Business Leadership Aw

ENR Rankingsg• Ranked no. 58 under international contractors category by ENR• Ranked no.104 under global contractors category by ENR.com

Project Exports Promotion Council of India

• Maximum Foreign works secured in new areas for Year 2002-03• Maximum Turnover in Overseas construction contracts for year • Maximum Value of Overseas construction and engineering proje

June 2011

Gas category for the Dahej-Vijaipur Gas Pipeline - 2009

009009nt’ Dun & Bradstreet -Rolta Corporate Awards 2008

wards October 2008

R.com in 2010in 2010

3 / 2003-04 / 2004-052004-2005 / 2006-7

ects contracted for year 2005-2006 / 2007

Page 65: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

A ards P j Ll dAwards – Punj Lloyd2004 - Safety Award – BTC Pipeline ProjectGreentech Awards:2005 06 Environmental Excellence Gold2005-06 - Environmental Excellence - Gold 2007 - Safety - Gold 2008 - Environment Excellence - Platinum

- Safety Goldy

2009 - Environment Excellence - Gold

2010 - Safety Award - Gold

SEC Awards

• 20 x Construction Excellence Awards (BCA, 1987 to 2005)

• 9 x Best Buildable Design Awards (BCA, 1993 to 2005)

• 138 x Safety Performance Gold / Silver / Merit Awards (MO

• British Safety Council 5 Star Award for last five years Engin

Construction Industry Association (ECIA) y ( )

• Safe Working Award (1995)

• National Productivity Award (PSB, 1994)

O E t i A d (EDB 1997)

June 2011

• Overseas Enterprise Award (EDB, 1997)

OM, 1985 to 2005)

neering

Page 66: Energy, Infrastructure and Defence...Recognition and Awards : • ISO 9001 10 million YLNG 7 million OGD 5 million Abu 4 illi Tk • OHSAS 18001 • ISO 14001 4 million Turke 4 million

Energy, Infrastructure & Defence solutions

Our Pledge

The Safety of PeopleThe Safety of People

The Protection of the Environment

The Assurance of Speed and the Control of y

The Quality of our ServiceThe Quality of our Service

The Success of your Project

June 2011

your cost