energy efficient building - r20 regions of climate action · 2016-10-31 · liate olutions project...

2
100 Climate Solutions Project Campaign ~ 2016 Eco-Construction REGIONS OF CLIMATE ACTION Social and environmental impact Location and population Summary Mandating Authority : Expected project CAPEX : Main stakeholders Energy efficient building Due to the possibility of load shedding and other network constraints, the community will have a building which will be able to provide service at all times. The project will reduce the municipality's carbon footprint The objective of the project is to align Buffalo City Municipality to the national strategic objective of optimizing energy usage through energy efficiency and Demand Side man- agement Projects. In addition to LED lighting, the installation of solar hot water heaters and other technologies will be considered. Buffalo City Metropolitan Municipality 1'240'000 € BCMM implementers and Contractors: for supply, delivery and installation Community: will have a green energy building Buffalo City, South Africa 900'000 inh.

Upload: others

Post on 23-Apr-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Energy efficient building - R20 Regions of Climate Action · 2016-10-31 · liate olutions Project apaign 2 liate olutions Project apaign 2 Eco-Construction REGIONS OF CLIMATE ACTION

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

Eco-Construction

REGIONS OFCLIMATE ACTION

Social and environmental impact

Location and population

Summary

Mandating Authority :

Expected project CAPEX :

Main stakeholders

Energy efficient building

Due to the possibility of load shedding and other network constraints, the community will have a building which will be able to provide service at all times. The project will reduce the municipality's carbon footprint

The objective of the project is to align Buffalo City Municipality to the national strategic objective of optimizing energy usage through energy efficiency and Demand Side man-agement Projects. In addition to LED lighting, the installation of solar hot water heaters and other technologies will be considered.

Buffalo City Metropolitan Municipality

1'240'000 €

BCMM implementers and Contractors: for supply, delivery and installation Community: will have a green energy building

Buffalo City, South Africa 900'000 inh.

Page 2: Energy efficient building - R20 Regions of Climate Action · 2016-10-31 · liate olutions Project apaign 2 liate olutions Project apaign 2 Eco-Construction REGIONS OF CLIMATE ACTION

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

Solutions intégrées CAPEX Description Comments

STAGE 1 : Concept Development, Site identification

STAGE 3 : Feasibility Studies

STAGE 2 : Pre-Feasibility Studies

Pre-feasibility study :

Feasibility study :

Surfaces

Climate

Target population

STAGE 4 : Permitting / Financing / Contracts

Land concession signed :

Environmental impact study :

Comments

Engineering, Procurement and Construction Contractor :

Operation and Maintenance Contractor :

Identified sources of fundings

STAGE 5 : Engineering / Construction / Commercial Operation

Solar water heaters

LED lighting

Citizens

Tbd

Sub tropical

This Project is classified under Infrastructure Enhancement. That is to say that the Electricity Infrastructure will be enhanced to facilitate energy efficiency.

No

No

NA

Tbd

Tbd

Not required

Tbd