Energizing Mexico. Generating electricity, efficiently. JANUARY 2011. National System . Installed capacity : CFE + IPP. INFORMATION: APRIL, 2010. Long term purchase agreements. LNG purchase at Baja California. LNG purchase at Altamira. LNG purchase at Manzanillo. GNL ALTAMIRA. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Energizing Mexico. Generating electricity, efficiently

Energizing Mexico.Generating electricity, efficiently

JANUARY 2011

Page 2: Energizing Mexico. Generating electricity, efficiently

OIL & GAS FUELED, THERMALAL23,474.67

46%

HIDRO11,134.90

22%

COAL POWERED STEAM

2,600.005%

GEOTHERMAL964.5

2%

WINDPOWER85.25

0%

NUCLEAR1,364.88

3%IPP’S

11,456.9022%

INSTALLED CAPACITY (51,081.10 MW)

INFORMATION: APRIL, 2010

National System. Installed capacity: CFE + IPP

Page 3: Energizing Mexico. Generating electricity, efficiently

Long term purchase agreements

3

LNG purchase at Altamira

LNG purchase atBaja California

LNG purchase at Manzanillo

Page 4: Energizing Mexico. Generating electricity, efficiently

Service Contracts

4

GNL Terminal at Manzanillo

Manzanillo – Guadalajara Pipeline

GNL ALTAMIRA

A Palmillas

Naranjos – Tamazunchale Pipeline

Page 5: Energizing Mexico. Generating electricity, efficiently

51/ Las cifras están redondeadas a números enteros, por lo que los totales podrían no corresponder exactamente

Santa Rosalía II y III(15 y 11 MW)

Valle de México II y III (2 x 601 MW)

Manzanillo II rep. U1 (460 MW)

Noreste (Escobedo)

(1,034 MW)

Norte III (Juárez)

(954 MW)

Baja California Sur V (Coromuel (86 MW)

Norte IV (Chihuahua)(918 MW)

Noroeste (El Fresnal)

(772 MW)

Río Moctezuma(92 MW)

Baja California II y III (La Jovita)(591 y 294 MW)

Los Cabos TG I

(105 MW)

Salamanca Fases I y II

(470 MW y 629 MW)

Guerrero Negro IV(7 MW)

Azufres III Fases I y II(50 y 25 MW)

Jorge Luque I y II

(2x600 MW )

Occidental I y II (Bajío)(2x470 MW)

Baja California Sur III IV (Coromuel) (2 X 43 MW)

Mérida

(567 MW)

Tenosique(420 MW)

Sureste

Santa Rosal ía IV

(7 MW)

Norte V (Torreón)

(944 MW)

Guadalajara I

(453 MW)

Noroeste II y III

(1,400 MW)

Baja California V (La Jovita)

(591 MW)

Noreste III y IV (Sabinas)(2 x 700 MW)

Paso de la Reina

(510 MW)

Azufres IV(75 MW)

Baja California Sur VII y VIII (Todos Santos)(2 x 86 MW)

Valladolid

(540 MW)

Acala(135 MW)

Mazatlán(867 MW)

Baja California VI (Mexicali) (554 MW)

Noreste II (Monterrey) (1,041 MW)

Cruces

(475 MW)

Central I y II (Tula)

(2x1,160 MW)

(601 MW)Valle de México IV

Carboeléctrica del Pacífico II y III

(1,400 MW) La Parota U1, U2, y U3

(3X300 MW)

Noreste V(1,041 MW)

Oriental l Y II

(1,400 MW)

Occidental III (Bajío)

(940 MW)

Baja California Sur VI (Coromuel) (86 MW)

Hermosillo(836 MW)

Manzanillo II rep. U2 (460 MW)

Baja California IV (SLRC) (565 MW)

Guerrero Negro V(7 MW)

Copainalá(232 MW)

Total: 32 095 MW*

Hydro 2 764

Coal 2 800

Combined Cycle 10 653

Turbogàs 575

Internal Combustion 305

Free 14 848

Geotermic 150

Total MW 32 095

POISE: Generation capacity requirements2010 - 2024

* Excluding capacity under construction or public tender

Page 6: Energizing Mexico. Generating electricity, efficiently

Investment requirements 2010 - 2024

6

44.9

17.0 18.5

10.6

0.8

Generation Transmission Distribution Maintenance Other

TOTAL INVESTMENT:

91.8 BILLION USD

Page 7: Energizing Mexico. Generating electricity, efficiently

7

COMBINED CYCLE & GAS

Page 8: Energizing Mexico. Generating electricity, efficiently

8

CC Valle de México II

MW

Bidding Process 1 430

To tender (2024) 17 10,364

CC Baja California III

CC Valle de México IIICC Valle de México IV

NoresteNoreste II

Tamazunchale II

Centro I

Occidental IOccdiental II

Merida

CC Repot. Manzanillo II U1-U2

Norte IVNorte V

Metropolitana

Guadalajara IGuadalajara II

Cogeneración Salamanca

Valladolid

COMBINED CYCLES. FUTURE

Page 9: Energizing Mexico. Generating electricity, efficiently

CC BAJA CALIFORNIA III

Page 10: Energizing Mexico. Generating electricity, efficiently

Baja California III, TENDER PROCESS

EVENT DATE

Tender Publication November 2010

Reception of proposals April 2011

Allocation May 2011

Contract signature June 2011

Start up of works December 2011

Commissioning April 2014

Page 11: Energizing Mexico. Generating electricity, efficiently

Trayecto del Gasoducto Morelos

Page 12: Energizing Mexico. Generating electricity, efficiently

Morelos Pipeline Schedule

Event Date

Tender Publication February 08, 2011

Opening of proposals June 07, 2011

Allocations June 24, 2011

Contract signature July 14, 2011

Start up of construction July 15, 2011

Commissioning August 01, 2012

Page 13: Energizing Mexico. Generating electricity, efficiently

13 13

Renewable Energy

Page 14: Energizing Mexico. Generating electricity, efficiently

14 14

Page 15: Energizing Mexico. Generating electricity, efficiently

SURESTE

NOROESTE

NORTE

WIND FARMS FOR TENDER

WF PROGRAMMEDTOTAL

CAPACITY (MW)

1 SURESTE I 3002 SURESTE II 300

2wf

EFFECTIVE CAPACITY

Programmed: 600 MW

1 2

Page 16: Energizing Mexico. Generating electricity, efficiently

Contact: Alberto Ramos Elorduy W. [email protected] de Desarrollo de Proyectos