enduring connection policy (ecp 1): 2018 batch · 2018-08-31 · page 4 of 19 ecp-1 ruleset3 when...

19
Enduring Connection Policy (ECP-1): 2018 Batch August 2018

Upload: others

Post on 29-Mar-2020

15 views

Category:

Documents


0 download

TRANSCRIPT

Enduring Connection Policy (ECP-1): 2018 Batch August 2018

Page 2 of 19

Disclaimer All information provided is for information purposes only and does not constitute a legal contract

between either System Operator and any person or entity unless otherwise specified. Prior to taking

business decisions, interested parties should not rely on the data set out in this information paper as a

substitute for obtaining separate and independent advise to the matters covered by this document.

Information in this document does not amount to a recommendation or advice in respect of any

possible investment. The use of information contained within this document for any form of decision

making is done so at the user’s own risk.

Page 3 of 19

Executive Summary Enduring Connection Policy – 1 (ECP-1) is a new system for issuing connection offers for new generation

and storage capacity. This replaces the older systems of “Gates” and “non-GPA”. This report contains

the final list of applicants that meet the criteria to be processed as part of the 2018 batch following the

closure of the applications window on 28 May 2018 and the capacity relocation window of the 29 June

2018. Capacity relocation requests that were received as part of the CRU’s decision1 and the non-GPA

applicants that opted to ‘fold in’ to the batch have also been listed below. This is summarised per table

below:

DSO TSO Total Applications Total MEC (MW)2

DS3

Battery 10 7 17 351 Hybrid 1 1 20

Non-DS3

Biomass 1 1 2 CCGT 2 2 33

CHP 2 2 9 Gas 1 1 2 Solar 40 40 252

Wind 18 3 21 294

Total new applications 963MW

Non-GPA fold in

Solar 9 11 20 842 Wind 1 1 1

843MW

Relocations

Solar 25 25 156 Wind 6 3 9 280

436MW

113 27 140

1 ECP-1 Ruleset (CRU/18/059), ECP-1 Capacity Relocation clarification note (CRU/18/094)

2 Numbers rounded to next whole MW

Selecting DS3 Applicants The DS3 Prioritisation Criteria (CRU/18/060) was used to finalise 371MW of DS3 applications

This 371MW of DS3 projects have planning permission therefore only DS3 applicants with valid

planning permission are included

Page 4 of 19

ECP-1 Ruleset3 When assessing the scale of the applications that were received the SOs were cognisant of the principles

of ECP-1 and conscious that the CRU’s intention for ECP-1 is for it to lay “the foundations for future,

more regular batches for connection”. Also, the CRU has stated that “the priority should be to have a

manageable batch size which can help connect a significant volume of generation in reasonable

timeframe and allow for a further batch in the foreseeable future”. The SOs agreed that ECP-1 is a first

step in a fully Enduring Connection Policy and the 2018 batch size should not impede facilitating smaller,

more frequent batches in the future supporting evolving key CRU objectives. The CRU has instructed the

SOs to proceed on this basis and so the 2018 batch size has been set accordingly. Due to specific sizes of

the applications received the DS3 allocation has been finalised at 371MW as the next DS3 application

would exceed the 400MW threshold set by the CRU. Due to specific sizes of the applications received

the non-DS3 allocation has been finalised at 592MW bringing the total new capacity in the 2018 batch

to 963MW, as the next non-DS3 application would significantly exceed the 1,000MW threshold for new

capacity as set by the CRU. The 2018 batch results have been confirmed by the CRU as being consistent

with the ECP-1 decision.

2018 Batch Applications

New Applications:

The new applications received for the 2018 batch are summarised in table 1 below. Applications that are

eligible for processing as part of the 2018 batch of ECP-1 are listed in appendix 1.

Table 1: New Applications Summary

3 Detailed ruleset on the CRU website: https://www.cru.ie/wp-content/uploads/2017/04/CRU18059-Annex-I-ECP-

1-Ruleset.pdf

Selecting Non-DS3 Projects

Projects with valid planning permission have been prioritised by date of expiry of planning permission

Projects that have already had their planning permission extended must have 2 years remaining i.e.

no earlier than 28/05/2020

Projects that have not already had their planning permission extended must have 1 year remaining

i.e. no earlier than 28/05/2019

Where projects are planning exempt, a date of one year post the closing date for applications was

assigned by the SOs as a planning expiry date for the purpose of prioritisation

The date of expiry of planning permission of the last project to fall within the threshold was in Q3

2023. Any non DS3 project with an expiry of planning permission after this date has not been

successful in being included within the 2018 batch

Page 5 of 19

DSO TSO

Tech Type MW # Apps MW # Apps

Battery 588 34 1478 30

Biomass 2 1

CHP 9 2 490 1

Gas 2 1

Solar 552 78

Onshore Wind 255 25 293 8

CCGT 33 2

Hybrid 20 1

OCGT 100 1

Reciprocating Engines 50 1

Offshore Wind 1247 6

1408 141 3711 50

Over 2,100MW was received from applicants looking to be prioritised as a DS3 applicant. In assessing

these applications against the DS3 criteria, the SOs found that all applicants received could provide the

same level of service when it came to working through the prioritisation criteria as set out in

CRU/18/060. The first way in which applications could be differentiated from one another was Level 1

Prioritisation (d): Planning Permission. There are consequently 18 applications totalling 371MW included

in the 2018 batch as DS3 prioritised applications as the next application in planning priority would have

materially exceeded the 400MW threshold.

Applications received that did not request DS3 prioritisation were assessed in the order of the planning

permission expiry date. The SOs received approx. 3,200MW of these applications. The received

complete date of the connection application was used to distinguish between these applications that

had an expiry date in the same quarter. The quarter of expiry of planning permission of the last project

to fall within the threshold was Q3 2023. Any project with a planning permission expiry date falling after

this quarter was not successful in being eligible for this batch. There are 67 applications totalling

592MW eligible to be included in the 2018 batch as non-DS3 applications.

2018 Batch Fold-in Applications

As part of the CRU’s ECP final decision the CRU directed the SOs to extend the opportunity to “fold in” to

the 2018 batch to non-GPA applicants that had a live or in-process offer. The SOs will process 21

applications (843MW) that have taken up this offer. These applications will now be processed alongside

the applicants that are included in the 2018 batch.

2018 Batch – Capacity Relocations

The CRU issued a clarification note on 25 May ’18 which extended the three-month ‘grace period’ for

projects to relocate capacity to projects with a live or in process offer. The window for applications for

capacity relocations closed on 29 June 2018. There are 34 applications deemed acceptable for

Page 6 of 19

processing. These applications relate to an existing 436MW that was already contracted, live or in

process so it is not considered to be ‘new capacity’ for the batch. However the revised offers will be

processed as part of the batch. In addition, some of these applications are also requested a change in

generation type consistent with the COPP rules, amended by ECP-1 decision.

Next steps

The SOs will now proceed to issue invoices to the relevant applicants that are eligible for processing

within this batch for the balance of application fees. Applicants will have 1 month to pay the balance of

fees as per the CRU timeline for this batch. Once fees have been provided the SOs will assign these

applicants into nodes and begin scheduling connection offer dates.

Appendix 1: ECP-1 2018 batch eligible applications DS3 Applications (18 Applications totalling 371MW)

Received Complete Date

Name of Facility Applicant (legal entity) County Tech Type

MEC (MW)

Planning authority ref

Expiry Quarter of planning

21/05/2018 Rhode 20MW ESS Schwungrad Energie Ltd

Offaly E252351 N234555

Hybrid 20 PL2/14/137 Q3 2019

19/10/2016 Gardnershill FGS Flexilis Power Ltd.

Dublin E319959 N262765

Battery 8.5 FISA/0288 Q1 2021

25/05/2018 Gorey Battery Energy Storage

RES Storage Ireland Ltd.

Wexford E316967 N156700

Battery 9 2016/1217 Q4 2021

28/05/2018 Clonminam Energy Storage Facility

Highfield Storage Limited

Laois E245439 N197304

Battery 10 16/199 Q2 2022

25/05/2018 Moatstown Battery Energy Storage

RES Storage Ireland Ltd.

Kildare E265462 N196140

Battery 8 2016/1007 Q2 2022

25/05/2018 Avonbeg BESS RES Storage Ireland Ltd.

Wexford E300502 N143990

Battery 16 2017/1680 Q1 2023

26/05/2018 Knocknagoum Battery Storage

Res Storage Ireland Limited

Kerry E94760 N117865

Battery 8 PL17/1295 Q2 2023

30/09/2016 Gorman Energy Storage Station

RES Storage Ireland Limited

Meath E690004 N773014

Battery 30 LB/171475 Q2 2023

19/09/2017 Lisdrumdoagh Energy Storage Facility

Highfield Storage Limited

Monaghan E670976 N833360

Battery 60 18/5 Q2 2023

25/05/2018 Gorman Energy Storage Station - Extension

RES Storage Ireland Ltd.

Meath E690004 N773014

Battery 20 LB/171475 Q2 2023

28/05/2018 Ardagh South Energy Storage Facility

Highfield Storage Limited

Meath E283542 N294337

Battery 33 KA180156 Q2 2023

28/06/2017 Shranakilla Energy Park ESB SOLAR (IRELAND) LIMITED

Mayo E97038 N320290

Battery 3 P18/190 (Co. Mayo)

Q2 2023

Page 8 of 19

24/05/2018 MCB Battery Storage PWWP Developments Ltd.

Mayo E538433 N777600

Battery 12 P18/241 Q3 2023

25/05/2018 Glencloosagh - Phase 3 Glencloosagh Energy Limited

Kerry E105547 N148669

Battery 30 KY 13/138 Q4 2023

27/04/2018 Porterstown Battery Storage Facility

Grid System Services Limited

Kildare E297365 N222643

Battery 30 18247 Q4 2023

27/04/2018 Kilmannock Battery Storage Facility

Grid System Services Limited

Wexford E269205 N115080

Battery 30 20180506 Q4 2023

28/05/2018 Nore Power G&S Greener Ideas

Kilkenny E253165 N154862

Battery 40 PL 23.227961 Q4 2023

12/09/2017 Ballymac Storage Power Capital Renewable Energy Ltd.

Waterford E 223702 N95240

Battery 3.99 17/156 Q2 2027

Page 9 of 19

Non-DS3 Applications (67 Applications totalling 591 MW)

Received Complete Date

Name of Facility Applicant (legal entity)

County Tech Type

MEC (MW)

Planning authority ref

Expiry Quarter of planning

15/03/2017 Evaporator Upgrade Kerry Ingredients Ireland Ltd.

Cork E153840 N123098

Gas 1.5 N/A Q2 2019

28/05/2018 Camlin CHP Fishertown Property Holdings Ltd.

Longford E206239 N277724

CHP 5 N/A Q2 2019

28/05/2018 Ormonde Organics AD3 Ormonde Organics Ltd.

Waterford E247185 N117891

Biomass 1.9 N/A Q2 2019

15/09/2008 Carraigcannon Windfarm Ext.

Carraigcannon Wind Farm Ltd.

Cork E138150 N91492

Wind 3 03/4181 COUNTY CORK

Q2 2019

28/05/2018 Templederry Windfarm (extension to DG184)

Templederry Energy Resources Ltd.

Tipperary E190108 N169738

Wind 0.7 07/51/0779 PL 22.224595

Q2 2019

09/07/2011 Great Island CCGT SSE Generation Ireland Limited

Wexford E268808 N114879

CCGT 30 25/PA0016 Q2 2019

11/06/2015 Great Island CCGT SSE Generation Ireland Limited

Wexford E268808 N114879

CCGT 3 25/PA0016 Q2 2019

28/05/2018 Clooncon East Single WTG

Clooncon East Single WTG Ltd.

Galway E164904 N263947

Wind 0.9 13/1139 Q2 2019

28/05/2018 Crossmore Windfarm XMR Energy Ltd. Clare E113616 N160196

Solar 15 P09/123 Q4 2019

28/05/2018 Inchandreen Windfarm Innisfree Wind Farms Ltd.

Cork E119839 N53132

Wind 4.99 0963 Q4 2019

05/01/2010 Dromleena Wind Farm Organic Power Ltd Cork E120055 N53545

Wind 9.9 06/63 Q4 2019

27/04/2018 Fahan Wind Farm Fahan Wind Ltd. Donegal E245161 N431653

Wind 5 14/51149 Q1 2020

25/05/2018 Leanalea Wind Farm SSE Renewables (Ireland) Limited

Donegal E208741 N406102

Wind 30.5 09/50116 Q1 2020

Page 10 of 19

28/05/2018 Gortnagap Wind Farm Manogate Ltd. Kilkenny E234062 N155854

Wind 2.5 13151 / 15428 Q2 2020

25/05/2018 Cloosh Extension Wind Farm

SSE Renewables (Ireland) Limited

Galway E509827 N732787

Wind 28.8 10/303 11/429

Q3 2020

28/05/2018 Dooleeg More Windfarm Cearth Ltd. Mayo E101480 N318590

Wind 2.5 092590 PL6.236402 09259

Q3 2020

28/05/2018 Doon Single Wind Turbine

Coillte CGA Roscommon E163688 N300363

Wind 0.9 15/291 Q1 2021

28/05/2018 Mully Graffy Windfarm (Kilgorman)

Cuilfeach Teoranta Donegal E189190 N395720

Wind 29.9 PL05B.237656 Q1 2021

31/08/2015 St Johns Solar Farm Highfield Solar Ltd. Wexford E297035 N137052

Solar 4 20160207 Q2 2021

31/08/2015 Sweetfarm Solar Farm Highfield Solar Ltd. Wexford E297005 N137042

Solar 4 20160207 Q2 2021

19/07/2015 Garryndruig Amarenco Solar Timoleague Ltd.

Cork E147809 N46934

Solar 4.95 15/06968 Q2 2021

28/05/2018 Aghamore Single Wind Turbine

Coillte CGA Kerry E84306 N128956

Wind 0.9 15/341 Q3 2021

12/02/2016 The Dell PV Power Capital Renewable Energy Ltd.

Wexford E299077 N148561

Solar 3.99 20160595 Q3 2021

16/09/2015 Ballymackesy East Solar Farm

Highfield Solar Ltd. Wexford E288960 N134320

Solar 4 20160442 Q3 2021

30/11/2016 Astee Solar RES Solar Ireland Ltd. Kerry E93108 N146321

Solar 4 2015/772 Q3 2021

17/01/2016 Stamullen Solar Park WEXFORD SOLAR LIMITED

Meath E313305 N266379

Solar 3.99 AA160519 Q3 2021

15/07/2015 Lacka Solar Park WEXFORD SOLAR LIMITED

Offaly E201130 N197535

Solar 3.99 16600136 Q3 2021

28/01/2016 Ballykereen Solar Arena Capital Partners Ltd.

Wexford E306778 N110882

Solar 11 WEXFORD201660644

Q3 2021

Page 11 of 19

27/04/2018 Lisheen 3 LISHEEN III WIND FARM LTD.

Tipperary E221543 N166662

Wind 28.8 15/600924 Q3 2021

22/09/2015 Kiltorcan Elgin Energy Services Ltd.

Kilkenny E254894 N135459

Solar 4 Kilkenny 16310 Q3 2021

27/04/2018 Ballycarran Solar Park WEXFORD SOLAR LIMITED

Wexford E307726 N111933

Solar 3.999 20160520 Q3 2021

16/11/2015 Clashmagrath PV Power Capital Renewable Energy Ltd.

Kilkenny E266122 N153785

Solar 3.99 16/411 Q4 2021

16/09/2015 Drumroe East Solar Farm Highfield Solar Ltd. Waterford E214600 N97145

Solar 15 16126 Q4 2021

29/12/2015 Ballylough Crory Energy Ltd. Wexford E299161 N147974

Solar 3.99 20161097 Q4 2021

24/05/2018 Roxborough Galetech Energy Developments Ltd.

Roscommon E188450 N267920

Wind 4.95 11126 Q4 2021

11/08/2015 Davidstown Solar Davidstown Renewables Ltd.

Wexford E693027 N636578

Solar 4.95 20160487 Q4 2021

26/02/2016 Towerhill Solar Farm Solas Eireann Renewable Ltd.

Kildare E699523 N737958

Solar 6 16/777 Q4 2021

12/10/2015 Loan PV Power Capital Renewable Energy Ltd.

Kilkenny E254592 N177111

Solar 3.99 16/276 Q4 2021

22/10/2015 Gorey Solar RES Solar Ireland Ltd. Wexford E316969 N156702

Solar 4 2016/1217 Q4 2021

23/12/2015 Tiglin Solar Liam Shanahan Wicklow E329808 N201831

Solar 4 161082 Q1 2022

12/05/2016 Soleirtricity Ballykea Soleirtricity Ballykea Ltd.

Dublin E325510 N257180

Solar 4.99 F16A/0105 Q1 2022

22/09/2015 Lisnaganoge Solar Farm Elgin Energy Services Ltd.

Tipperary E210679 N156648

Solar 4 16600484 Tipperary

Q1 2022

23/12/2015 Dardistown Solar RES Solar Ireland Ltd. Meath E311093 N269030

Solar 3.5 LB16/1046 Q1 2022

Page 12 of 19

07/10/2015 Keatingstown Solar Farm Elgin Energy Services Ltd.

Kilkenny E248238 N159547

Solar 4 16634 Kilkenny Q1 2022

05/02/2016 Confey Solar Farm Solas Eireann Renewable Ltd.

Kildare E699150 N737568

Solar 9.5 16/848 Q2 2022

25/05/2015 Currabeha Amarenco Solar Beal Na Mblath Ltd.

Cork E141524 N64550

Solar 4.95 16/04783 Q2 2022

20/12/2008 Castlewaller Wind Farm Castlewaller Wind Farm Limited

Tipperary E177062 N162602

Wind 48 11510251 Q2 2022

25/05/2018

Cherryorchard Solar Farm

Meridiem Renewables Cherryorchard Ltd.

Wexford E295281 N140637

Solar 4 20170489 Q3 2022

23/05/2018 Knockeenbui wind Farm Knockeenbui Windfarm Ltd.

Cork E122269 N048743

Wind 13.8 11/00059 Q3 2022

21/01/2016 Cluide Solar Cluide Energy Ltd. Louth E305983 N289464

Solar 4 17332 Q3 2022

10/05/2016 Darthogue Solar Solar Farmers Ltd. Meath E301426 N253965

Solar 12 AA161441 Q3 2022

25/05/2018 Macallian Solar (Extension)

RES Solar Ireland Ltd. Wexford E300439 N144403

Solar 5 2016/1127 Q4 2022

22/10/2015 Macallian Solar RES Solar Ireland Ltd. Wexford E300439 N144403

Solar 4 2016/1127 Q4 2022

02/06/2015 IQ Solar Farm IQ Solar Ltd. Cork E189250 N065605

Solar 4 CORK CO CO - 165269

Q4 2022

05/10/2010 Bilboa Wind Farm Kilcarrig Quarries LTd. Carlow E264102 N171106

Wind 15 PL01.240245 ABP 11/154

Q4 2022

29/02/2016 Mackmine Solar Park Terra Solar Ltd. Wexford E296594 N132405

Solar 10 20171314 Q1 2023

03/12/2015 Kishavanna Solar Farm Vento Ludens Ltd. Offaly E264714 N233898

Solar 4 17799 Kildare Q1 2023

11/04/2016 Willville Solar Park WEXFORD SOLAR LIMITED

Louth E322058 N306348

Solar 3.99 16524 Q1 2023

Page 13 of 19

28/09/2015 Foxhall PV Power Capital Renewable Energy Ltd.

Cork E209450 N79323

Solar 3.99 17/05245 Q1 2023

23/05/2018 Enniskeane PV Power Capital Renewable Energy Ltd.

Cork E136014 N54613

Solar 3.99 17/06441 Q1 2023

14/05/2017 Caracoosh Solar Farm Grianan Solar 002 Ltd. Cork E126782 N97472

Solar 18 17-04308 Q1 2023

01/07/2016 Dennistown Solar Harmony Solar Dennistown Ltd.

Wexford E301794 N115265

Solar 26 WEXFORD20161110

Q1 2023

24/05/2018 ESK Wind Farm Phase 2 ESK Windfarm Ltd. Cork E144554 N89720

Wind 12 PL04.240281 PL 04.245196

Q1 2023

01/09/2015 Farran South Phase 2 Amarenco Solar Rathcormac Ltd.

Cork E183600 N91650

Solar 4.95 16/05414 Q1 2023

28/05/2018 Liss Wind Farm Shoremane Ltd. Kilkenny E236504 N154809

Wind 2.3 1617 Kilkenny Co. Co.

Q2 2023

18/04/2016 College Proteins CHP College Proteins Meath E282060 N289052

CHP 3.99 KA/180183 Q2 2023

28/03/2009 Carrowleagh-Kilbride Windfarm

John Duffy Mayo E136834 N320564

Wind 48.3 P.11/495 & PL16.241592

Q3 2023

Page 14 of 19

Non-GPA “fold-in” Applications (21 Applications Totalling 842 MW)

Project Ref

Name Application (legal entity) County Tech Type MEC (MW)

TG270 Glen Solar Glenview Solar Roscommon E195109,N316156

Solar 40

TG271 Gillinstown Solar Highfield Solar Ltd.

Meath E701888,N768678

Solar 95

TG281 Ballyfasy Upper Solar Farm

Coillte Cuideachta Ghniomhaiochta Ainmnithe

Kilkenny E261491,N125743

Solar 40 (reduced from 50MW)

TG279 Timahoe South Bord na Mona Powergen

Kildare E275164,N227663

Solar 81

TG283 Toorard Solar Farm Coillte Cuideachta Ghniomhaiochta Ainmnithe

Cork E136005,N113032

Solar 40 (reduced from 50MW)

TG289 Blackwater Bog Solar 1 Bord na Mona Powergen,

Offaly E197583,N224380

Solar 65

TG287 Mountdillon Solar Bord na Mona Powergen

Roscommon E198605,N273583

Solar 90

TG295 Rathnaskilloge Highfield Solar Ltd.

Waterford E237854,N100939

Solar 95

TG305 Bullockhill Solar Park Terra Solar II Ltd

Kilkenny E250357, N162759

Solar 50

TG315 Clonfad Solar JBM Solar Developments Ltd

Westmeath E252954, N245295

Solar 100

TG328 Gaskinstown Solar Farm Highfield Solar Ltd.

Meath E702944, N766756

Solar 85

DG1354 Ballycarney PV BNRG Renewables Ltd Solar 3.99

DG1372 Dungeeha Solar JBM Solar Ireland Ltd

Limerick E128529, N135146

Solar 4

DG1673 Cloonascragh Solar Lantanier Ltd,

Galway E144841, N247805

Solar 20

DG1135 Clashnagoneen Solar Farm

Highfield Solar Ltd.

Waterford E214918, N97829

Solar 4

Page 15 of 19

DG1251 Kilcummer Upper Solar Farm

Highfield Solar Ltd.

Cork E171035, N102195

Solar 10

DG1178 Farran South Amarenco Solar Rathcormac Ltd.

Cork E182600, N93700

Solar 4.95

DG1499 Piercestown SPV Temporis Ltd

Cork E169477, N59330

Solar 4

DG1117 Ballynacrusha Solar Amarenco Solar Cobh Limited

Cork E179989, N68515

Solar 4.95

DG1030 Bauville-Keeloges Wind Turbine

Corvin Wind Power Limited,

Donegal E239648, N432292

Wind 0.5

DG1103 Malapardas Amarenco Solar Cloyne Limited

Cork E192174, N67337

Solar 4.95

Page 16 of 19

Capacity Relocation Applications (34 Applications Totalling 436MW)

SO

Reference

Previous Legal

Entity

New Legal

Entity

Previous Facility

Name

New Facility

Name

Previous site

co-ordinates

New site co-

ordinates

Previous

Tech Type

New Tech

Type

Previous

MEC (MW)

New MEC

(MW)

Planning authority

ref

DG1109 Highfield Solar

Ltd.

Highfield Solar

Ltd.

Assaly Tomnalossett

Solar Farm

(Assaly)

E305718

N112817

E296303

N137354

Solar Solar 4 4 20160689

DG1115 Highfield Solar

Ltd.

Highfield Solar

Ltd.

Rathpatrick Derrynahinch

Solar Farm

(Rathpatrick)

E265494

N113197

E254804

N136603

Solar Solar 4 4 16442

DG1157 Elgin Energy

Services Ltd.

Elgin Energy

Services Ltd.

Derry more Acragar Solar

Farm (Derry

more)

E236963

N193611

E246367

N205499

Solar Solar 4 4 16/536

DG1327 Michael Wilson-

Wright

Vento Ludens

Ltd.

Coolgarrigan

Solar Farm 1

Kishavanna

Solar Farm

E264714

N233898

E264714

N233898

Solar Solar 4 4 Kildare Ref 17799

DG1260

DG1284

Gaelectric

Gaelectric

Grian PV

Longford Ltd.

Newtownforbes

SP

Newtownforbes

SP2

Grian PV Cleggill

Longford

E211722

N280286

E212050

N280130

E210674

N276971

Solar Solar 4

4

8 1747

DG1490

DG1589

Gaelectric

Elgin

Harmony Solar

Kildare Ltd.

Crosscoolharbour

Solar

Daars South

Furryhill Solar E299602

N216828

E289450

N226308

E297580

N220881

Solar Solar 4

12

16 Kildare Co Co ref

17684

DG1188 Highfield Solar

Ltd.

Highfield Solar

Ltd.

Ballycooleen

Solar Farm

Templerainy

East Solar Farm

(Ballycooleen)

E321896

N178422

E324924

N176028

Solar Solar 4 4 16\1285

Page 17 of 19

DG1111 &

DG1112

MCF Wind Ltd

Leinster Energy

Projects Devs

Ltd

Highfield Solar

Ltd.

Raheenagee Solar

Farm

Bolinaspick Solar

Farm

Tomfarney

North Solar

Farm

E304372

N152870

E704135

N652710

E286197

N132205

Solar Solar 4

4

8 20160717

DG1516 Power Capital

Renewable

Energy Ltd.

Power Capital

Renewable

Energy Ltd.

Blackland PV Blackland PV E325495

N256745

E316654

N253569

Solar Solar 3.99 3.99 F17A/0340

PL06F.249174

DG1130 Ryan Solar Ltd. Ryan Solar Ltd. Ballymarroge

Solar

Ballymarroge

Solar

E298125

N170753

E278590

N176940

Solar Solar 1.99 1.99 16/342

DG1080 Meelshane Solar

Farm Ltd

Tead More SPV

Ltd.

Meelshane Solar

Farm Phase 1

Tead More Solar

(Meelshane)

E193909

N69424

E191554

N71198

Solar Solar 3.95 3.95 16/6302

DG1079 Mark Robey and

Partners

Keiloge SPV Ltd. Coolnagapogue

Solar Farm Phase

1

Keiloge Solar

Farm

(Coolnagapogue

)

E255569

N100622

E263014

N105728

Solar Solar 3.95 3.95 17/113 granted on

appeal

PL.93.248487

DG249 Environ

Renewables Ltd

Barna Wind

Energy Ltd.

Coomleagh Wind

Farm

Barnadivane

Wind Farm Ext.

E111639

N54330

E122711

N61839

Wind Wind 7.95 7.95 15/00730 &

13/00551

DG1208 Grasstail Ltd. Grasstail Ltd. Drummartin Dromroe Solar

Array

(Drummartin)

E84645

N132110

E207498

N116221

Solar Solar 4 4 16802

DG1138 &

DG1232

Franklink Ltd.

Reeve Wave Ltd

Franklink Ltd. Ballyfowloo Solar

Farm

Lawclon Solar

Farm

Monroe East

Solar Farm

(Ballyfowloo &

Lawclon)

E210170

N139065

E217900

N125270

E207498

N116221

Solar Solar 4

4

8 16600642

DG1653 Creeve Solar

Park Ltd

Oldmill Wind

Ltd.

Corbrack Solar

Park

Grove Hill Wind

Farm

E271421

N318117

E276143

N216038

Solar Wind 3 19.1 10/485 12/306

Page 18 of 19

DG1074 &

DG1075

Mark Robey and

Partners

Premier Solar

Ltd.

Kilcawha Solar

Farm Phase 1

Kilcawha Solar

Farm Phase 2

Callatrim South

Solar Farm

E165792

N51224

E165722

N51435

E149777

N56960

Solar Solar 3.95

2

4.95 17/04098

DG1364 Coolpower

Investments Ltd

Terra Solar Ltd. Ballynamaunagh

Solar Park

Ballynamaunag

h Solar Park

E97519

N95328

E97045

N94533

Solar Solar 4.99 4.99 17/1183

DG1287 Bonavalley Engie

Developments

Ltd.

Bonavalley PV Rooaun Solar

(Bonavalley)

E205654

N240739

E185362

N232576

Solar Solar 4 4 17427

DG1294 Coolpower

Investments Ltd

Terra Solar Ltd. Firgrove Solar

Park

Firgrove Solar

Park

E142745

N163732

E142745

N163732

Solar Solar 4 4 17/31

DG145 Ecopower

Developments

Limited

Grian PV Ltd. Boolabrien Upper Grian PV

Horsepasture

(Boolabrien)

E219720

N118100

E222092

N126041

Solar Solar 21 8 16601136

DG248 Noldoon Ltd. Lightsource

Renewable

Energy Ireland

Ltd.

Curraheen Ballymacadam

(Monraha) Solar

PV Farm

(Curraheen)

E238871

N128391

E207558

N124721

Wind Solar 24 24 Tipperary ref

16600565

DG175 Cregg Wind

Farm Ltd.

Cregg Wind

Farm Ltd.

Taghart Wind

Farm

Taghart Wind

Farm

E273320

N300222

E273327

N300222

Wind Wind 23.06 23.06 16/74

DG312 Black Lough

Windfarm Ltd.

Black Lough

Windfarm Ltd.

Black Lough Wind

Farm

Black Lough

Wind Farm

E138857

N325843

E137631

N323733

Wind Wind 12.5 12.5 PL17/93 Sligo

PL15466 Sligo

DG1133 Solas Eireann

Renewable Ltd.

Solas Eireann

Renewable Ltd.

Ballygowny Solar

Farm

Ballyedock Solar

Farm

(Ballygowny)

E877340

N613888

E669804 N Solar Solar 12 12 20170330

DG1115 Highfield Solar

Ltd.

Highfield Solar

Ltd.

Rathpatrick Solar

Farm

Amberhill Solar

Farm

E250340

N108409

E250340

N108409

Solar Solar 4 4 20160442

Page 19 of 19

DG1166 Elgin Energy

Services Ltd.

Elgin Energy

Services Ltd.

Tullynally Estate Tullynally Estate E244745

N269196

E245569

N269851

Solar Solar 4 4 Westmeath

176361

DG1145 Elgin Energy

Services Ltd.

Elgin Energy

Services Ltd.

Kilcarrig Solar Kilcarrig Solar E271474

N161176

E271652

N161299

Solar Solar 4 4 Carlow 16/289

DG1124 Elgin Energy

Services Ltd.

Bioxl Ltd. Knightsbrook

Solar Farm (Prev

Glebe Solar)

Friarspark 6th

Division Solar

(Glebe)

E280356

N254767

E278565

N255532

Solar Solar 4 4 Meath Co Co

TA180167

TG73 Clare Winds Ltd. Clare Winds Ltd. Sorrell Island

(Prev Glenmore)

Sorrell Island

(Glenmore)

Wind Farm

Extension

E114719

N169051

E114719

N169051

Wind Wind 8 8 PL03.245392

P258 Cufgaze Limited Cufgaze Limited Carrickalangan Croaghonagh E204654

N405778

E205176

N386647

Wind Wind 72 72 ABP-300460-17

DG1522

DG1690

Highfield Solar

Ltd.

Bord na Mona

Powergen

Limited

Clonin North

Solar

Kilcumber Upper

Solar Farm

Cloncreen Wind

Farm

E652245

N734518

E661075

N726809

E660455

N727009

Solar Wind 50

50

100 19.PA0047

P330 Lumcloon

Energy Limited

Galetech Energy

Developments

Cloghan Limited

Shannonbridge

ESS B

Cloghan Wind

Farm

E197500

N224500

E208443

N216930

Battery Wind 34 34 14/188

TG93B /

TG93A

Coillte CGA Meenwaun

Wind Farm Ltd.

Dooray Wind

Farm

(45.001MW)

Meenwaun

Windfarm Ext.

E605330

N712245

E605330

N712245

Wind Wind 3.3 3.3 PL19.244903