endo note 10 preparation of straight canal
DESCRIPTION
Dr. Özkan ADIGÜZELTRANSCRIPT
1
Preparation Of Straight RootCanal
8/10/2009 Endo 10
29/12/2009
Non-vital tooth
Endo 10
Initial access
3
Cutting into the pulp
9/12/2009 Endo 10
Removal pulp roof
4
Use of Briault probe
9/12/2009 Endo 10
5
Extension of access cavity
9/12/2009 Endo 10
6
Completed access cavity.
9/12/2009 Endo 10
7
Use of barbed broach
9/12/2009
Root canal irrigation
Endo 10
8
Direct line access
9/12/2009 Endo 10
9
Prepare coronal part with gate bur
9/12/2009 Endo 10
hlTooth length Working length
9/12/2009 Endo 10 10
Apical anatomy
Apex
Apical foramen
Apical constriction
9/12/2009 Endo 10 11
Fist bound file Master K- File
9/12/2009 Endo 10 12
Master H- File
9/12/2009
Apical stop
Endo 10
After preparing first 0.5mm step
13
1mm Second step
9/12/2009
1.5mmThird step
Endo 10
Prepared apical third
14
Summary of tapering apical part
9/12/2009 Endo 10 15
Trial filling
9/12/2009
Insertion of finger spreader
Endo 10
Lateral condensation
16
Obturated canal Temporary restoration
9/12/2009 Endo 10 17
Crown restoration with GIC and LCC
9/12/2009 Endo 10 18