endcap shielding senarios : ye1-2 gap senarios – (ref. boki c vs surkov 6)

23
Endcap shielding senarios: •YE1-2 Gap senarios – (Ref. Boki C vs Surkov 6) • YE1 closed and YE2 opened 3.05m •YE2-3 Gap senario – (Ref Boki E vs Surkov 2) • YE1 open 3.74m YE2 open 3.84m and YE3 opened 7.64m •YE3-4 Gap senario – (Variation of Surkov 3) • YE1 and YE2 closed YE3 open 0.1m YE4 opened 3.8m. • Note 1: YE3 and YE4 can be opened more if gap remains at 3.7m as long as YE4 is not opened more then 6.7m • Note 2: Supporting outriggers with a 3.7m gap and no or

Upload: zaide

Post on 23-Feb-2016

34 views

Category:

Documents


0 download

DESCRIPTION

Endcap shielding senarios : YE1-2 Gap senarios – (Ref. Boki C vs Surkov 6) YE1 closed and YE2 opened 3.05m YE2-3 Gap senario – (Ref Boki E vs Surkov 2) YE1 open 3.74m YE2 open 3.84m and YE3 opened 7.64m YE3-4 Gap senario – (Variation of Surkov 3) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

Endcap shielding senarios:

•YE1-2 Gap senarios – (Ref. Boki C vs Surkov 6)• YE1 closed and YE2 opened 3.05m

•YE2-3 Gap senario – (Ref Boki E vs Surkov 2)• YE1 open 3.74m YE2 open 3.84m and YE3

opened 7.64m •YE3-4 Gap senario – (Variation of Surkov 3)• YE1 and YE2 closed YE3 open 0.1m YE4 opened

3.8m. • Note 1: YE3 and YE4 can be opened more if gap

remains at 3.7m as long as YE4 is not opened more then 6.7m• Note 2: Supporting outriggers with a 3.7m gap

and no or minimal bracing to YE3 allows for cherry picker access and maximum crane coverage

Page 2: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

ISO view of shielding assembly

Removable third leg for setting on the floor

For guiding into position over beam- pipe

Linear slide for bottom lead plates

Page 3: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

Steps of installationStep 1 - Drilling and taping of holes for shielding supportNote: This is done after the existing beam pipe is removed

Will add a view to show drilling

Page 4: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

Step 2 - Install permanent mountsNote: leaving the shielding mounting hardware on YE2 requires a small modification to the spacer disk shielding

Will add a view to show permanent mounting features

Page 5: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

Step 3 - Installation of the guidesThe guide post slides into base and is secured with a quick release pin. The guides should be installed for both the external and internal shielding assemblies

Base

Guide

Weight is approximately 10 pounds (5 kg)

Rated side force is approximately 310 lbs(140kg)

Page 6: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

Step 4 - Adjust pick point on lifting beamMatch the pitch of the shield to the pitch of the hall.

Pick point slides to adjust

Secures pick point to set position

Page 7: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

Step 5 - Install and secure external half of shielding assemblyISO view of shielding before installation

Note will show ropes/tethers for additional guidance

Page 8: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

Step 5 - ContinuedIso view of shielding in place.

Page 9: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

Step 5 continued - Securing the shielding assemblyEnd view of shielding in place showing cherry picker positions for securing shielding

Bottom corner of cherry picker

Additional fixtation will be located here

Page 10: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

Step 6 - Close the bottom doorsDoors must be closed before the second shielding assembly is installed

Will show a end view with doors closed

Page 11: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

Step 7 - Install and secure IP side of the shielding assembly

Repeat steps 4-6

Will add a view showing the second half being installed

Page 12: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

Removal Done in reverse order of assembly

Note: If additional lead is added after installation, it must be removed to establish the original center of gravity. The pick point of the lifting beam must be returned to its original position for that assembly before removing that assembly

Page 13: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

Adapter is required for mounting the to the front of the YE3 disk

Top mount point on YE2

Adapter for mounting on YE3

Page 14: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

Side view of shielding mounted in YE2-3 gap

Will add view

Page 15: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

T1 cables and flexible pipes will be pulled back to the external side of the YE4 inner disk The cables and flexible gas and water lines will be disconnected from the IP side of the YE4-outer so it can be moved with the YE4 wall. The cables and flexibles will be tied back on the external side so that they are not damaged when the shield is installed on the IP side?

View of the external side of the YE-4 inner

Page 16: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

Side view of shielding in YE3-4 gap

Will add view

Page 17: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

Strength of M20 fasteners

2750kg (6050lbs)

875

Ry

Rx

Rx

2663

2xM20

Reacts against the 10mm step of the inner ring

w 2750kg 9.81Nkg

dcg 875mm

dmount 2663mm

As 245mm2

yp 640N

mm2

Rx wdcgdmount

RxsRx2

xRxsAs

x 18.09N

mm2

FSypx

FS 35.378

Rxs 4.432 103 N

FS=5.5 w/o 10mm step and nofriction

Page 18: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

Plan for testing the shielding assembly

Will show shielding mounts being tested by hanging assembly on a fork lift.

Page 19: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

Back up slides follow this page

Page 20: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

Widest part if beam pipe is bracket for vacuum pump at 440mm

Page 21: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

Cherry picker access to end cap gaps

Page 22: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

Another ISO view

Page 23: Endcap  shielding  senarios : YE1-2 Gap  senarios – (Ref.  Boki C  vs Surkov 6)

Side View of shield in place