end-to-end risk model for pavia using gem tools

17
End-to-end risk model for Pavia using GEM tools Catalina Yepes Estrada GEM Foundation, Pavia, Italy

Upload: global-earthquake-model-foundation

Post on 29-Jun-2015

183 views

Category:

Presentations & Public Speaking


0 download

DESCRIPTION

End-to-end calculations using IDCT tools

TRANSCRIPT

Page 1: End-to-end risk model for Pavia using GEM tools

End-to-end risk model for Pavia using GEM toolsCatalina Yepes Estrada

GEM Foundation, Pavia, Italy

Page 2: End-to-end risk model for Pavia using GEM tools

End-to-end risk model for Pavia using GEM tools

Masters course on Risk Assessment and Loss Estimation

Page 3: End-to-end risk model for Pavia using GEM tools

GEM Tools and models

IDCT GEM Taxonomy FF Manager OQ engineSHARE model

Page 4: End-to-end risk model for Pavia using GEM tools

Building Portfolio

1255 Buildings40 Students12 Groups (by colors)

≈ 10 hours to survey 100 buildings1220 Buildings were surveyed

Mobile Android and Windows IDCT apps

• detailed per-building exposure dataset

Page 5: End-to-end risk model for Pavia using GEM tools

Building Portfolio

Surveyed buildings according with the

material of the lateral load resisting system

Reinforced concrete

Masonry, unknown

Unreinforced masonry

Page 6: End-to-end risk model for Pavia using GEM tools

Exposure model

16 building typologiesReplacement cost of 388 €/m2Total replacement cost ≈780 M€

Presenter
Presentation Notes
----- Meeting Notes (23/06/14 12:22) ----- Write the typology in the pie chart
Page 7: End-to-end risk model for Pavia using GEM tools

Fragility and Vulnerability Functions

Page 8: End-to-end risk model for Pavia using GEM tools

Fragility and Vulnerability Functions

(Ahmad et al 2010)

Page 9: End-to-end risk model for Pavia using GEM tools

Fragility and Vulnerability Functions

(Ahmad et al 2010)

Page 10: End-to-end risk model for Pavia using GEM tools

GEM Vulnerability Database

Page 11: End-to-end risk model for Pavia using GEM tools

Hazard model from SHARE10% Probability of Exceedance in 50 Years

[g]

PGA ≈ 0.15g

Page 12: End-to-end risk model for Pavia using GEM tools

Probabilistic Event-based Risk Calculator

Set of ground motion fieldsExposure model Vulnerability functions

Loss curves Loss maps

Page 13: End-to-end risk model for Pavia using GEM tools

Total loss exceedance curve and Average Annual Loss (AAL)

AAL around 0.6% of the total replacement cost

Page 14: End-to-end risk model for Pavia using GEM tools

Economic loss maps2%, 10% and 50% Probability of Exceedance in 50 years

< 100€

140€ - 190€

300€ - 400€

> 600€

Thousand EUR

Presenter
Presentation Notes
RP: 2475, 475, 72 As a result, this exercise helped us to test the tools
Page 15: End-to-end risk model for Pavia using GEM tools
Presenter
Presentation Notes
Through this exercise we were able to test the tools, receive feedbacks regarding features that can be improved…NEXT
Page 16: End-to-end risk model for Pavia using GEM tools
Presenter
Presentation Notes
Students were able to perform Risk assessment for Pavia in appr. 2 weeks
Page 17: End-to-end risk model for Pavia using GEM tools

Except where otherwise noted, this work is licensed under: creativecommons.org/licenses/by-nc-nd/4.0/

Please attribute to the GEM Foundation with a link to -www.globalearthquakemodel.org