enactus tar uc 1 part 3
TRANSCRIPT
POSITIVE IMPACTS
Huge Economic Potential
Social Integration Overall well-being
of society
Positive Image
CAUSE & EFFECTCHAIN ANALYSIS
Accessibility problems of the disabled
Lack of suitable infrastructure
Lack of understanding of facilities needed to
be built
Insufficient knowledge to approaching
disability
Insufficient/unreliable information
Insufficient research on the issue
Lack of funds allocated for such
effort
Lack of consideration towards disability
requirements
Lack of initiative to tackle disability requirements
Perceived as unnecessary
Perceived as costly
Unhelpful management
assistance
Uninformed/ ignorant about accessibility
issues
Prejudice or discrimination
Poor/ confusing signage
Poor development planning
Lack of knowledge to assess level of
disabled-friendliness
Lack of accurate/reliable
information available
Too limited and general data
Inadequate research
Absence of suitable channels
Lack of education & awareness
SUBSTANCE-FIELD ANALYSIS
Information Field (F1)
Government (S1)
Disabled Community
(S2)
Information Field (F1)
Disabled Community
(S2)Government
(S1)
Private Sector (S3)
CONTRADICTION MATRIX
If disability awareness education is provided, then the public’s understanding and awareness towards social integration are increased, but this is not only costly but
also time-consuming to implement.
Worsening ParameterImprovingParameter
#25 Loss of Time
#35 Adaptability 35, 28
#27 Reliability 10, 30, 4
#33 Ease of Operation 4, 28, 10, 34
If an appropriate channel is used, then it can effectively deliver sufficient, accurate and reliable information on accessibility, but it is a time-consuming and complex process.
Worsening ParameterImprovingParameter
#25 Loss of time
#36 Device Complexity
#34 Ease of repair
#24 Loss of information 24, 26, 28, 32 - -
#26 Quantity of substance 35, 38, 18, 16 3, 13, 27, 10 2, 32, 10, 25
#28 Measurement accuracy 24, 34, 28, 32 27, 35, 10, 34 1, 32, 13, 11
#27 Reliability 10, 30, 4 13, 35, 1 1, 11
#39 Productivity - 12, 17, 28, 24 1, 32, 10, 25
#33 Ease of operation 4, 28, 10, 34 32, 26, 12 , 17 12, 26, 1, 32
#38 Extent of automation 24, 28, 35, 30 15, 24, 10 1, 35, 13
PROPOSED SOLUTIONS
DiscardingMechanics
Substitution Asymmetry
Flexible ActionPreliminary
Action
Parameter Change