emr detector lying beam -face up in geneva workshop

20
EMR detector lying beam-face up in Geneva workshop

Upload: tillie

Post on 18-Jan-2016

39 views

Category:

Documents


0 download

DESCRIPTION

EMR detector lying beam -face up in Geneva workshop. EMR detector closed on its supports. Events from the cosmic run in EMR: top: x and y views of digital readout . There are two tracks ! - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: EMR detector   lying beam -face up in Geneva workshop

EMR detector lying beam-face up in Geneva workshop

Page 2: EMR detector   lying beam -face up in Geneva workshop

EMR detector closed on its supports

Page 3: EMR detector   lying beam -face up in Geneva workshop

Events from the cosmic run in EMR: top: x and y views of digital readout. There are two tracks!middle: the time over threshold readout (approximate pulse height: these are mips. (muons)bottom: time readout: clearly there is a red track and a blue track at different times.

Page 4: EMR detector   lying beam -face up in Geneva workshop

a simple cosmic track

Page 5: EMR detector   lying beam -face up in Geneva workshop

a more tilted single track

Page 6: EMR detector   lying beam -face up in Geneva workshop

probably a low energy particle (lots of scattering)

Page 7: EMR detector   lying beam -face up in Geneva workshop

several tracks at once, ‘a cosmic air shower’

Page 8: EMR detector   lying beam -face up in Geneva workshop

another air shower

Page 9: EMR detector   lying beam -face up in Geneva workshop

Event with a high energy photon

Page 10: EMR detector   lying beam -face up in Geneva workshop

a more complicated one

Page 11: EMR detector   lying beam -face up in Geneva workshop

a big splash

Page 12: EMR detector   lying beam -face up in Geneva workshop

a decay?

Page 13: EMR detector   lying beam -face up in Geneva workshop

EMR group :Etam, François, Ruslan, Alain and Yordan

Page 14: EMR detector   lying beam -face up in Geneva workshop

Tuesday 24 September: loaded on the truck!

Page 15: EMR detector   lying beam -face up in Geneva workshop

EMR installed in step IV position in the MICE hall

Page 16: EMR detector   lying beam -face up in Geneva workshop

29 September -- EMR in the hall on its joint trolley with KL

Page 17: EMR detector   lying beam -face up in Geneva workshop

2 October EMR is fully cabled

Page 18: EMR detector   lying beam -face up in Geneva workshop

nominalMICE beam direction

An Oxfordshire cosmic!

Page 19: EMR detector   lying beam -face up in Geneva workshop

nominalMICE beam direction

muon stop and decay (decay product at different time from primary)

Page 20: EMR detector   lying beam -face up in Geneva workshop

nominalMICE beam direction

Another muon stop and decay -- entering from the beam face now ready for beam!