emr 00 ge dia 0060 rev.d custom displays
TRANSCRIPT
C 29.01.2013 ISSUED FOR REVIEW PER JESA-TKF-DCS-2126 H.Eksi A.Bürümcek C.Ergun
B 15.12.2012 REVIEWED BY TEKFEN ISSUED FOR INFORMATION H.Eksi A.Bürümcek C.Ergun
A 06.12.2012 ISSUED FOR TEKFEN’S REVIEW H.Eksi A.Bürümcek C.Ergun
Rev. No. Date Description
Prepared Checked Reviewed ORIGINATOR TEKFEN
Groupe OCP S.A. Casablanca, 2, rue Al Abtal, Hay Erraha, Morocco
KHOURIBGA – JORF LASFAR PHOSPHATE SLURRY PIPELINE SYSTEM
CONTRACTOR
Document Title
Custom Displays
SUBCONTRACTOR Document No. Rev.
No. Total
pages (w. attachmts) Org. Code Area Code Disc. Code Doc. Type Seq. No.
EMR 00 GE DIA 0060 D 40
D 26.04.2013 ISSUED FOR REVIEW PER JESA-TKF-DCS-2341 H.Eksi A.Bürümcek C.Ergun
KHOURIBGA – JORF LASFAR PHOSPHATE SLURRY PIPELINE S YSTEM
Groupe OCP S. A. Casablanca Morocco
Document Title:
Custom Displays
Issue date : 26-04-2013 Doc. no: EMR-00-GE-DIA-0060 Rev. D Page 2 of 40
CONTENTS 1 DOCUMENT SCOPE .................................................................................. 4
2 CUSTOM DISPLAYS ................................... ............................................... 4
2.1 MEA WASH PLANT .................................................................................... 5 2.1.1 Mea Feeder Pipelines ........................................................................... 5
2.2 DAOUI PUMP STATION ............................................................................ 6 2.2.1 Daoui Pump Station Overview .............................................................. 6 2.2.2 Daoui Pump Station .............................................................................. 7 2.2.3 Daoui Pump GSW Station ..................................................................... 8 2.2.3 Daoui Energy Monitoring ....................................................................... 9
2.3 EL HALASSA PUMP STATION ........................................................... 10 2.3.1 El Halassa Pump Station Overview ..................................................... 10 2.3.2 El Halassa Pump Station ..................................................................... 11 2.2.3 El Halassa Pump GSW Station ........................................................... 12 2.2.3 El Halassa Energy Monitoring ............................................................. 13
2.4 HEAD STATION ......................................................................................... 14 2.4.1 Head Station Overview ....................................................................... 14 2.4.2 Head Station Main Line Pumps ........................................................... 15 2.4.2 Head Station GSW Pumps .................................................................. 16 2.4.3 Head Station Feed Receivers ............................................................. 17 2.4.4 Head Station Storages Tank Group I ................................................... 18 2.4.6 Head Station Storages Tank Group II .................................................. 19 2.4.7 Head Station Dilution Water and Filter Unit ......................................... 20 2.4.8 Head Station Energy Monitoring .......................................................... 21
2.5 PRESSURE MONITORING SYTEM AND VALVE STATION .......... 22 2.5.1 Pressure Monitoring System and Valve Station .................................. 22
2.6 TERMINAL STATION ................................................................................ 23 2.6.1 Terminal Station Overview ................................................................... 23 2.6.2 Terminal Station Export Tanks Group I ................................................ 24 2.6.3 Terminal Station Export Tanks Group II ............................................... 25 2.6.4 Terminal Station Local User Tank Group ............................................. 26 2.6.5 Terminal Station Choke Station ............................................................ 27 2.6.6 Terminal Station Energy Monitoring ..................................................... 28
KHOURIBGA – JORF LASFAR PHOSPHATE SLURRY PIPELINE S YSTEM
Groupe OCP S. A. Casablanca Morocco
Document Title:
Custom Displays
Issue date : 26-04-2013 Doc. no: EMR-00-GE-DIA-0060 Rev. D Page 3 of 40
2.7 PIPELINE ADVISORY SYSTEM............................................................. 29 2.7.1 Leak Detection System Signals ............................................................ 29 2.7.2 Mea Batch Tracking ............................................................................. 30 2.7.3 Daoui Batch Tracking ........................................................................... 31 2.7.4 El Halassa Batch Tracking ................................................................... 32 2.7.5 Head Station Batch Tracking ................................................................ 33
2.8 ANCILLARY SIGNALS .............................................................................. 34 2.8.1 Pressure Monitoring and Valve Station Ancillary Signals ..................... 34 2.8.2 Pump and Terminal Stations Ancillary Signals ..................................... 35
2.9 EQUIPMENT BASED DISPLAYS ........................................................... 36 2.9.1 General Input/Output Equipment Faceplates ....................................... 36 2.9.2 Motor Type Equipment Faceplates ....................................................... 37 2.9.3 Valve Equipment Faceplates ................................................................ 38 2.9.4 Electrical Equipment Faceplates .......................................................... 39 2.9.2 Hydraulic Power Unit, Filter Unit and Analyzer Faceplates .................. 40
KHOURIBGA – JORF LASFAR PHOSPHATE SLURRY PIPELINE S YSTEM
Groupe OCP S. A. Casablanca Morocco
Document Title:
Custom Displays
Issue date : 26-04-2013 Doc. no: EMR-00-GE-DIA-0060 Rev. D Page 4 of 40
Emerson Process Management 2013– Confidential and Proprietary
1. DOCUMENT SCOPE This document shows the SCADA screen pictures according to P&ID drawings for the KHOURIBGA – JORF LASFAR PHOSPHATE SLURRY PIPELINE SYSTEM Project.
2. CUSTOM DISPLAYS The SCADA screens are shown according to locations in below.
2.1- MEA WASH PLANT
2.1.1- Mea Feeder Lines
Screens P&ID's
PAC-03-PR-PID-0001 Customer : TEKFEN INSAAT
CUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY PIPELINE SYSTEM
PAC-03-PR-PID-0001
Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
5 of 40Rev:
D
Customer : TEKFEN INSAAT
Controlled By
A. Bürümcek
2.2- DAOUI PUMP STATION
2.2.1- Daoui Pump Station Overview Screen
Screens P&ID's
PAC-07-PR-PID-0001 PAC-07-PR-PID-0004
CUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY PIPELINE SYSTEM
Customer : TEKFEN INSAATPAC-07-PR-PID-0001 PAC-07-PR-PID-0004
PAC-07-PR-PID-0002 PAC-07-PR-PID-0005 Drawn By Approved By Date
PAC-07-PR-PID-0003 PAC-07-PR-PID-0006 H. Eksi A. Doğan 26.04.2013Page:
6 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.2.2- Daoui Pump Station(Storage Tanks-Feeder Line Pumps-Pig Launcher And Spillage Pump)
Screens P&ID's
PAC-07-PR-PID-0001 PAC-07-PR-PID-0005
CUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY PIPELINE SYSTEM
Customer : TEKFEN INSAATPAC-07-PR-PID-0001 PAC-07-PR-PID-0005
PAC-07-PR-PID-0002 PAC-07-PR-PID-0006 Drawn By Approved By Date
PAC-07-PR-PID-0003 H. Eksi A. Doğan 26.04.2013Page:
7 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.2.3- Daoui Pump Station GSW(GSW Pumps)
Screens P&ID's
PAC-07-PR-PID-0004
CUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY PIPELINE SYSTEM
Customer : TEKFEN INSAATPAC-07-PR-PID-0004
Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
8 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.2.4- Daoui Energy Monitoring
Screens P&ID'sCUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY
PIPELINE SYSTEM
Customer : TEKFEN INSAAT
Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
9 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.3- EL HALASSA PUMP STATION
2.3.1- El Halassa Pump Station Overview
Screens P&ID's
PAC-08-PR-PID-0001 PAC-08-PR-PID-0005
CUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY PIPELINE SYSTEM
Customer : TEKFEN INSAATPAC-08-PR-PID-0001 PAC-08-PR-PID-0005
PAC-08-PR-PID-0003 PAC-08-PR-PID-0006 Drawn By Approved By Date
PAC-08-PR-PID-0004 PAC-08-PR-PID-0007 H. Eksi A. Doğan 26.04.2013Page:
10 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.3.2- El Halassa Pump Station
Screens P&ID's
PAC-08-PR-PID-0001 PAC-08-PR-PID-0006
CUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY PIPELINE SYSTEM
Customer : TEKFEN INSAATPAC-08-PR-PID-0001 PAC-08-PR-PID-0006
PAC-08-PR-PID-0003 PAC-08-PR-PID-0007 Drawn By Approved By Date
PAC-08-PR-PID-0004 H. Eksi A. Doğan 26.04.2013Page:
11 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.3.3- El Halassa GSW Pump Station
Screens P&ID's
PAC-08-PR-PID-0005
CUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY PIPELINE SYSTEM
Customer : TEKFEN INSAATPAC-08-PR-PID-0005
Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
12 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.3.4- El Halassa Energy Monitoring
Screens P&ID'sCUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY
PIPELINE SYSTEM
Customer : TEKFEN INSAAT
Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
13 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.4- HEAD STATION
2.4.1- Head Station Overview
Screens P&ID's PAC-10-PR-PID-0010
PAC-10-PR-PID-0001 PAC-10-PR-PID-0004 PAC-10-PR-PID-0007 PAC-10-PR-PID-0011
CUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY PIPELINE SYSTEM
Customer : TEKFEN INSAATPAC-10-PR-PID-0001 PAC-10-PR-PID-0004 PAC-10-PR-PID-0007 PAC-10-PR-PID-0011
PAC-10-PR-PID-0002 PAC-10-PR-PID-0005 PAC-10-PR-PID-0008 PAC-10-PR-PID-0012 Drawn By Approved By Date
PAC-10-PR-PID-0003 PAC-10-PR-PID-0006 PAC-10-PR-PID-0009 PAC-10-PR-PID-0014 H. Eksi A. Doğan 26.04.2013Page:
14 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.4.2- Head Station Mainline Pumps
Screens P&ID's
PAC-10-PR-PID-0005
CUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY PIPELINE SYSTEM
Customer : TEKFEN INSAATPAC-10-PR-PID-0005
PAC-10-PR-PID-0007 Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
15 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.4.3- Head Station GSW Pumps
Screens P&ID's
PAC-10-PR-PID-0008
CUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY PIPELINE SYSTEM
Customer : TEKFEN INSAATPAC-10-PR-PID-0008
PAC-10-PR-PID-0009 Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
16 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.4.4- Head Station Feed Receivers
Screens P&ID's
PAC-10-PR-PID-0001 PAC-10-PR-PID-0011
CUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY PIPELINE SYSTEM
Customer : TEKFEN INSAATPAC-10-PR-PID-0001 PAC-10-PR-PID-0011
PAC-10-PR-PID-0002 PAC-10-PR-PID-0013 Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
17 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.4.5- Head Station Storage Tank Group I
Screens P&ID's
PAC-10-PR-PID-0004
CUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY PIPELINE SYSTEM
Customer : TEKFEN INSAATPAC-10-PR-PID-0004
PAC-10-PR-PID-0010 Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
18 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.4.6- Head Station Storage Tank Group II
Screens P&ID's
PAC-10-PR-PID-0003
CUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY PIPELINE SYSTEM
Customer : TEKFEN INSAATPAC-10-PR-PID-0003
PAC-10-PR-PID-0010 Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
19 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.4.7- Head Station Dilution Water And Filter Unit
Screens P&ID's
PAC-10-PR-PID-0003
CUSTOM DISPLAYS: FALSE
Customer : TEKFEN INSAATPAC-10-PR-PID-0003
Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
20 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.4.8- Head Station Energy Monitoring
Screens P&ID'sCUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY
PIPELINE SYSTEM
Customer : TEKFEN INSAAT
Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
21 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.5- PRESSURE MONITORING SYSTEM AND VALVE STATION
2.5.1- Pressure Monitoring System and Valve Station
Screens P&ID's
PAC-11-PR-PID-0001 PAC-14-PR-PID-0001
CUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY PIPELINE SYSTEM
Customer : TEKFEN INSAATPAC-11-PR-PID-0001 PAC-14-PR-PID-0001
PAC-12-PR-PID-0001 PAC-15-PR-PID-0001 Drawn By Approved By Date
PAC-13-PR-PID-0001 H. Eksi A. Doğan 26.04.2013Page:
22 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.6- TERMINAL STATION
2.6.1- Terminal Station Overview
Screens P&ID's
PAC-16-PR-PID-0001 PAC-16-PR-PID-0004 PAC-16-PR-PID-0007
CUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY PIPELINE SYSTEM
Customer : TEKFEN INSAATPAC-16-PR-PID-0001 PAC-16-PR-PID-0004 PAC-16-PR-PID-0007
PAC-16-PR-PID-0002 PAC-16-PR-PID-0005 Drawn By Approved By Date
PAC-16-PR-PID-0003 PAC-16-PR-PID-0006 H. Eksi A. Doğan 26.04.2013Page:
23 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.6.2- Terminal Station Export Tank Group I
Screens P&ID's
PAC-16-PR-PID-0002
CUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY PIPELINE SYSTEM
Customer : TEKFEN INSAATPAC-16-PR-PID-0002
PAC-16-PR-PID-0003 Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
24 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.6.3- Terminal Station Export Tank Group II
Screens P&ID's
PAC-16-PR-PID-0002
CUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY PIPELINE SYSTEM
Customer : TEKFEN INSAATPAC-16-PR-PID-0002
PAC-16-PR-PID-0004 Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
25 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.6.4- Terminal Station Local User Tank Group
Screens P&ID's
PAC-16-PR-PID-0002
CUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY PIPELINE SYSTEM
Customer : TEKFEN INSAATPAC-16-PR-PID-0002
PAC-16-PR-PID-0005 Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
26 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.6.5- Terminal Station Choke Station
Screens P&ID's
PAC-16-PR-PID-0001
CUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY PIPELINE SYSTEM
Customer : TEKFEN INSAATPAC-16-PR-PID-0001
PAC-16-PR-PID-0007 Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
27 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.6.6- Terminal Station Energy Monitoring
Screens P&ID'sCUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY
PIPELINE SYSTEM
Customer : TEKFEN INSAAT
Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
28 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.7- PIPELINE ADVISORY SYSTEM
2.7.1- Leak Detection System Signals
Screens P&ID'sCUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY
PIPELINE SYSTEM
Customer : TEKFEN INSAAT
Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
29 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.7.2- Mea Batch Tracking
Screens P&ID'sCUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY
PIPELINE SYSTEM
Customer : TEKFEN INSAAT
Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
30 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.7.3- Daoui Batch Tracking
Screens P&ID'sCUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY
PIPELINE SYSTEM
Customer : TEKFEN INSAAT
Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
31 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.7.4- El Halassa Batch Tracking
Screens P&ID'sCUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY
PIPELINE SYSTEM
Customer : TEKFEN INSAAT
Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
32 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.7.5- Head Station Batch Tracking
Screens P&ID'sCUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY
PIPELINE SYSTEM
Customer : TEKFEN INSAAT
Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
33 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.8- ANCILLARY SIGNALS
2.8.1- Pressure Monitoring And Valve Station Ancillary Signals
Screens P&ID'sCUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY
PIPELINE SYSTEM
Customer : TEKFEN INSAAT
Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
34 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.8.2- Pump And Terminal Stations Ancillary Signals
Screens P&ID'sCUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY
PIPELINE SYSTEM
Customer : TEKFEN INSAAT
Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
35 of 40Rev:
DA. Bürümcek
Customer : TEKFEN INSAAT
Controlled By
2.9- EQUIPMENT BASED DISPLAYS
2.9.1- General Input/Output Equipment Faceplates
Digital Input Note 3
Analog Input Faceplate Note 1
Digital Output Note 4
Analog Output Faceplate Note 2
Note 1: For details, refer the FDS document, EMR-00-PR-DSR-0037 AI Modules Functional Design Specification (FDS)
Note 2: For details, refer the FDS document, EMR-00-PR-DSR-0117 AO Modules Functional Design Specification (FDS)
Note 3: For details, refer the FDS document, EMR-00-PR-DSR-0092 DI Modules Functional Design Specification (FDS)
Note 4: For details, refer the FDS document, EMR-00-PR-DSR-0112 DO Modules Functional Design Specification (FDS)
Screens P&ID'sCUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY
PIPELINE SYSTEM
Customer : TEKFEN INSAAT
Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
36 of 40Rev:
DA. Bürümcek
Controlled By
2.9.2- Motor Type Equipment Faceplates
General Motor Faceplate Note 1
Pump with Gearbox Faceplate Note 2
Agitator Faceplate Note 3
Note 1: For details, refer the FDS document, EMR-00-PR-DSR-0101 MOTOR MODULES FUNCTIONAL DESIGN SPECIFICATION (FDS)
Note 2: For details, refer the FDS document, EMR-00-PR-DSR-0110 PUMP WITH GEARBOX MODULES FUNCTIONAL DESIGN SPECIFICATION (FDS)
Note 3: For details, refer the FDS document, EMR-00-PR-DSR-0109 AGT Modules Functional Design Specification (FDS)
Screens P&ID'sCUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY
PIPELINE SYSTEM
Customer : TEKFEN INSAAT
Controlled ByDrawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
37 of 40Rev:
DA. Bürümcek
Controlled By
2.9.3- Valve Equipment Faceplates
Valve with 2 Input 2 Output Faceplate Note 1
Valve with 2 Input 1 Output Faceplate Note 2
Valve with Partial Stroking Faceplate Note 3
Valve with Analaog Setpoint Faceplate Note 4
Note 1: For details, refer the FDS document, EMR-00-PR-DSR-0097 TEK_VLV_22_CL Valve Module Functional Design Specification (FDS)
Note 2: For details, refer the FDS document, EMR-00-PR-DSR-0096 TEK_VLV_12_CL VALVE MODULE FUNCTIONAL DESIGN SPECIFICATION (FDS)
Note 3: For details, refer the FDS document, EMR-00-PR-DSR-0119 TEK_VLV_22PS_CL VALVE MODULE FUNCTIONAL DESIGN SPECIFICATION (FDS)
Note 4: For details, refer the FDS document, EMR-00-PR-DSR-0098 TEK_VLV_22PID_CL VALVE MODULE FUNCTIONAL DESIGN SPECIFICATION (FDS)
Screens P&ID'sCUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY
PIPELINE SYSTEM
Customer : TEKFEN INSAAT
Controlled ByDrawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
38 of 40Rev:
DA. Bürümcek
Controlled By
2.9.3- Electrical Equipment Faceplates
Battery Charger Faceplate Note 2
Capacitor Bank Faceplate Note 3
Energy Monitoring Type 1 Faceplate Note 1
Energy Monitoring Type 2 Faceplate Note 1
Circuit Breaker Faceplate Note 4
Note 1: For details, refer the FDS document, EMR-00-PR-DSR-0100 Power Monitor Modules Functional Design Specification (FDS)
Note 2: For details, refer the FDS document, EMR-00-PR-DSR-0108 BATTERY CHARGER Modules Functional Design Specification (FDS)
Note 3: For details, refer the FDS document, EMR-00-PR-DSR-0114 CAPACITOR BANK MODULES FUNCTIONAL DESIGN SPECIFICATION (FDS
Note 4: For details, refer the FDS document, EMR-00-PR-DSR-0107 TEK_CB_CL CIRCUIT BREAKER MODULE FUNCTIONAL DESIGN SPECIFICATION (FDS)
Screens P&ID'sCUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY
PIPELINE SYSTEM
Customer : TEKFEN INSAAT
Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
39 of 40Rev:
DA. Bürümcek
Controlled By
2.9.4- Hydraulic Power Unit, Filter Unit and Anaylzer Faceplates
Filter Unit Faceplate Note 2
Filter Unit Faceplate
Hydraulic Power Unit Faceplate Note 1
Analyzer Type 1 Faceplate Note 3
Analyzer Type 2 Faceplate Note 3
Note 1: For details, refer the FDS document, EMR-00-PR-DSR-0118 HYDRAULIC POWER UNIT MODULES FUNCTIONAL DESIGN SPECIFICATION (FDS)
Note 2: For details, refer the FDS document, EMR-00-PR-DSR-0113 FILTER UNIT MODULES FUNCTIONAL DESIGN SPECIFICATION (FDS)
Note 3: For details, refer the FDS document, EMR-00-PR-DSR-0099 ANALYZER MODULES FUNCTIONAL DESIGN SPECIFICATION (FDS)
Screens P&ID'sCUSTOM DISPLAYS: KHOURIBGA-JORF LASFAR PHOSPHATE SLURRY
PIPELINE SYSTEM
Customer : TEKFEN INSAAT
Drawn By Approved By Date
H. Eksi A. Doğan 26.04.2013Page:
40 of 40Rev:
DA. Bürümcek
Controlled By