employee general information
TRANSCRIPT
![Page 1: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/1.jpg)
Quest.doc
1 March 2019
The numbers at the end of each line/area in parenthesis preceded by either an "A" or an "N", indicate the
alpha or numeric character space allowed in that field. Do not exceed the limits of our database.
Employee General Information
Firm Sequence Number (if unknown, leave blank)____________________________ (A8)
Firm Name __________________________________________________________ (A120)
Employee Sequence Number (if unknown, leave blank)_________________________(A8)
Employee Name __ ____________________________________________________ (A30)
Last First Middle
Personnel Number____________ (N15) (Sequential order of employees being entered beginning with 01, 02, 03, etc or any number you assign.)
Employee Branch Number _______________ (N2) (Enter 00 if the employee works in the main office. Enter 01, 02, etc., indicating the branch office number
where the employee works.)
Employee Expertise (Engineer, Surveyor, Planner, Architect, Landscape Architect, Technician or
Scientist) ___________________________________________________ (A20)
Employee Certification Information
Use the space you need to provide us with the information needed to meet the minimum
academic or professional requirement for all categories that the employee is requesting.
1. Degree Type _____________________________________ (A10)
(Type of degree, if any, held by this individual.)
Training Type __________________________________________________ (A2)
(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)
Training Date ____________________________________ (A8) Year Month Day
Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for
Type code and description.)
Issue Date ________________________________ (A8) Month Day Year
Expiration Date ____________________________ (A8) Year Month Day
![Page 2: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/2.jpg)
Emp-Quest-2019.doc
2 March 2019
Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)
Issuing Agency ___________________________________________ (A30)
(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of
Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)
2. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)
Training Type __________________________________________________ (A2)
(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)
Training Date ____________________________________ (A8) Month Day Year
Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for
Type code and description or, 112000 for Surveyor, 1000000 for P.E..)
Issue Date ________________________________ (A8) Month Day Year
Expiration Date ____________________________ (A8) Month Day Year
Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)
Issuing Agency ___________________________________________ (A30)
(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of
Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)
3. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)
Training Type __________________________________________________ (A2)
(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)
Training Date ____________________________________ (A8) Month Day Year
Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for
Type code and description or, 112000 for Surveyor, 1000000 for P.E..)
Issue Date ________________________________ (A8) Month Day Year
![Page 3: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/3.jpg)
Emp-Quest-2019.doc
3 March 2019
Expiration Date ____________________________ (A8) Month Day Year
Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)
Issuing Agency ___________________________________________ (A30)
(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of
Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)
4. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)
Training Type __________________________________________________ (A2)
(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)
Training Date ____________________________________ (A8) Month Day Year
Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for
Type code and description or, 112000 for Surveyor, 1000000 for P.E..)
Issue Date ________________________________ (A8) Month Day Year
Expiration Date ____________________________ (A8) Month Day Year
Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)
Issuing Agency ___________________________________________ (A30)
(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of
Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)
5. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)
Training Type __________________________________________________ (A2)
(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)
Training Date ____________________________________ (A8) Month Day Year
![Page 4: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/4.jpg)
Emp-Quest-2019.doc
4 March 2019
Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for
Type code and description or, 112000 for Surveyor, 1000000 for P.E..)
Issue Date ________________________________ (A8) Month Day Year
Expiration Date ____________________________ (A8) Month Day Year
Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)
Issuing Agency ___________________________________________ (A30)
(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of
Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)
6. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)
Training Type __________________________________________________ (A2)
(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)
Training Date ____________________________________ (A8) Month Day Year
Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for
Type code and description or, 112000 for Surveyor, 1000000 for P.E..)
Issue Date ________________________________ (A8) Month Day Year
Expiration Date ____________________________ (A8) Month Day Year
Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)
Issuing Agency ___________________________________________ (A30)
(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of
Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)
7. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)
Training Type __________________________________________________ (A2)
(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)
![Page 5: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/5.jpg)
Emp-Quest-2019.doc
5 March 2019
Training Date ____________________________________ (A8) Month Day Year
Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for
Type code and description or, 112000 for Surveyor, 1000000 for P.E..)
Issue Date ________________________________ (A8) Month Day Year
Expiration Date ____________________________ (A8) Month Day Year
Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)
Issuing Agency ___________________________________________ (A30)
(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of
Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)
8. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)
Training Type __________________________________________________ (A2)
(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)
Training Date ____________________________________ (A8) Month Day Year
Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for
Type code and description or, 112000 for Surveyor, 1000000 for P.E..)
Issue Date ________________________________ (A8) Month Day Year
Expiration Date ____________________________ (A8) Month Day Year
Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)
Issuing Agency ___________________________________________ (A30)
(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of
Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)
9. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)
Training Type __________________________________________________ (A2)
(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)
![Page 6: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/6.jpg)
Emp-Quest-2019.doc
6 March 2019
Training Date ____________________________________ (A8) Month Day Year
Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for
Type code and description or, 112000 for Surveyor, 1000000 for P.E..)
Issue Date ________________________________ (A8) Month Day Year
Expiration Date ____________________________ (A8) Month Day Year
Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)
Issuing Agency ___________________________________________ (A30)
(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of
Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)
10. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)
Training Type __________________________________________________ (A2)
(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)
Training Date ____________________________________ (A8) Month Day Year
Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for
Type code and description or, 112000 for Surveyor, 1000000 for P.E..)
Issue Date ________________________________ (A8) Month Day Year
Expiration Date ____________________________ (A8) Month Day Year
Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)
Issuing Agency ___________________________________________ (A30)
(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of
Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)
11. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)
![Page 7: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/7.jpg)
Emp-Quest-2019.doc
7 March 2019
Training Type __________________________________________________ (A2)
(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)
Training Date ____________________________________ (A8) Month Day Year
Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for
Type code and description or, 112000 for Surveyor, 1000000 for P.E..)
Issue Date ________________________________ (A8) Month Day Year
Expiration Date ____________________________ (A8) Month Day Year
Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)
Issuing Agency ___________________________________________ (A30)
(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of
Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)
12. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)
Training Type __________________________________________________ (A2)
(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)
Training Date ____________________________________ (A8) Month Day Year
Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for
Type code and description or, 112000 for Surveyor, 1000000 for P.E..)
Issue Date ________________________________ (A8) Month Day Year
Expiration Date ____________________________ (A8) Month Day Year
Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)
Issuing Agency ___________________________________________ (A30)
(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of
Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)
![Page 8: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/8.jpg)
Emp-Quest-2019.doc
8 March 2019
13. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)
Training Type __________________________________________________ (A2)
(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)
Training Date ____________________________________ (A8) Month Day Year
Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for
Type code and description or, 112000 for Surveyor, 1000000 for P.E..)
Issue Date ________________________________ (A8) Month Day Year
Expiration Date ____________________________ (A8) Month Day Year
Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)
Issuing Agency ___________________________________________ (A30
(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of
Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)
14. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)
Training Type __________________________________________________ (A2)
(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)
Training Date ____________________________________(A8) Month Day Year
Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for
Type code and description or, 112000 for Surveyor, 1000000 for P.E..)
Issue Date ________________________________ (A8) Month Day Year
Expiration Date ____________________________ (A8) Month Day Year
Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)
![Page 9: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/9.jpg)
Emp-Quest-2019.doc
9 March 2019
Issuing Agency ___________________________________________ (A30)
(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of
Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)
15. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)
Training Type __________________________________________________ (A2)
(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)
Training Date ____________________________________ (A8) Month Day Year
Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for
Type code and description or, 112000 for Surveyor, 1000000 for P.E..)
Issue Date ________________________________ (A8) Month Day Year
Expiration Date ____________________________ (A8) Month Day Year
Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)
Issuing Agency ___________________________________________ (A30)
(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of
Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)
Employee Category of Work Information
Select From the Precertification Work Categories listed on Attachment B
Reference Attachment B - Precertification Requirements by Category - for Category Numbers.
Enter leading "0's" before each single digit category number, for example, Category 1.1.1 would
be entered as 01.01.01. All Categories listed here must also be listed under your projects.
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
![Page 10: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/10.jpg)
Emp-Quest-2019.doc
10 March 2019
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
![Page 11: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/11.jpg)
Emp-Quest-2019.doc
11 March 2019
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Category ________________________ (N6) Category________________________ (N6)
Project Information
* = required fields
* please user 4 digits when entering year fields
* Please use current date for (Date completed), if on-going project
Note: We do not want a description of a project. We need to see the actual work that you
performed on the project that demonstrates to us how you meet the minimum requirement for any
category you want. In other words, how did you get from point a to point c? What was the
actual work?
Project 1
*Project Name _____________________________________________________ (A60)
*Location __________________________________________________ (A30) (Highway/road or bridge name or the City/County/State, or physical address.)
![Page 12: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/12.jpg)
Emp-Quest-2019.doc
12 March 2019
*Date Began __________________________________ (A8) Month Date Year
* Date Completed ______________________________ (A8) Month Date Year
*Enter A General Description of the Work Done on this Project. You may abbreviate as
long as we can tell what you are trying to say:
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
Contract Number: ____________________ (A15)
Project Manager Name: __________________________________________ (A30) Last First Middle
Client Name: _____________________________________________ (A30)
Client Phone Number: ________________________ (A10)
Client contact Name:_____________________________________________ (A30)
**Enter Construction Cost and Project Fees in Whole Dollars – Decimals, Commas and/or
Special Characters are NOT allowed
Estimated Construction Cost: ____________________ (N12)
Estimated Project Fees: _________________________________ (N12)
Select Up to 10 Categories of Work That Pertain To This Project
You May Describe The Actual Work Completed For Each Category, But It Is Not Required.
***Caution, Only 120 Characters, (2 Lines), Will be Stored in the System
1. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
![Page 13: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/13.jpg)
Emp-Quest-2019.doc
13 March 2019
_________________________________________________________________ (A60)
2. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
3. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
4. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
5. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
6. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
7. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
8. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
![Page 14: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/14.jpg)
Emp-Quest-2019.doc
14 March 2019
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
9. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
10. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
Project 2
*Project Name _____________________________________________________ (A60)
*Location __________________________________________________ (A30) (Highway/road or bridge name or the City/County/State, or physical address.)
*Date Began __________________________________ (A8) Month Date Year
* Date Completed ______________________________ (A8) Month Date Year
*Enter A General Description of the Work Done on this Project. You may abbreviate as
long as we can tell what you are trying to say:
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
Contract Number: ____________________ (A15)
![Page 15: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/15.jpg)
Emp-Quest-2019.doc
15 March 2019
Project Manager Name: __________________________________________ (A30)
Last First Middle
Client Name: _____________________________________________ (A30)
Client Phone Number: ________________________ (A10)
Client contact Name:_____________________________________________ (A30)
**Enter Construction Cost and Project Fees in Whole Dollars – Decimals, Commas and/or
Special Characters are NOT allowed
Estimated Construction Cost: ____________________ (N12)
Estimated Project Fees: _________________________________ (N12)
Select Up to 10 Categories of Work That Pertain To This Project
You May Describe The Actual Work Completed For Each Category, But It Is Not Required.
***Caution, Only 120 Characters, (2 Lines), Will be Stored in the System
1. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
2. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
3. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
4. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
![Page 16: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/16.jpg)
Emp-Quest-2019.doc
16 March 2019
_________________________________________________________________ (A60)
5. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
6. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
7. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
8. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
9. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
10. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
Project 3
![Page 17: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/17.jpg)
Emp-Quest-2019.doc
17 March 2019
*Project Name _____________________________________________________ (A60)
*Location __________________________________________________ (A30) (Highway/road or bridge name or the City/County/State, or physical address.)
*Date Began __________________________________ (A8) Month Date Year
* Date Completed ______________________________ (A8) Month Date Year
*Enter A General Description of the Work Done on this Project. You may abbreviate as
long as we can tell what you are trying to say:
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
Contract Number: ____________________ (A15)
Project Manager Name: __________________________________________ (A30) Last First Middle
Client Name: _____________________________________________ (A30)
Client Phone Number: ________________________ (A10)
Client contact Name:_____________________________________________ (A30)
**Enter Construction Cost and Project Fees in Whole Dollars – Decimals, Commas and/or
Special Characters are NOT allowed
Estimated Construction Cost: ____________________ (N12)
Estimated Project Fees: _________________________________ (N12)
Select Up to 10 Categories of Work That Pertain To This Project
You May Describe The Actual Work Completed For Each Category, But It Is Not Required.
***Caution, Only 120 Characters, (2 Lines), Will be Stored in the System
![Page 18: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/18.jpg)
Emp-Quest-2019.doc
18 March 2019
1. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
2.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
3.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
4.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
5.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
6.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
7.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
![Page 19: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/19.jpg)
Emp-Quest-2019.doc
19 March 2019
8.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
9.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
10. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
Project 4
*Project Name _____________________________________________________ (A60)
*Location __________________________________________________ (A30) (Highway/road or bridge name or the City/County/State, or physical address.)
*Date Began __________________________________ (A8) Month Date Year
* Date Completed ______________________________ (A8) Month Date Year
*Enter A General Description of the Work Done on this Project. You may abbreviate as
long as we can tell what you are trying to say:
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
![Page 20: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/20.jpg)
Emp-Quest-2019.doc
20 March 2019
Contract Number: ____________________ (A15)
Project Manager Name: __________________________________________ (A30) Last First Middle
Client Name: _____________________________________________ (A30)
Client Phone Number: ________________________ (A10)
Client contact Name:_____________________________________________ (A30)
**Enter Construction Cost and Project Fees in Whole Dollars – Decimals, Commas and/or
Special Characters are NOT allowed
Estimated Construction Cost: ____________________ (N12)
Estimated Project Fees: _________________________________ (N12)
Select Up to 10 Categories of Work That Pertain To This Project
You May Describe The Actual Work Completed For Each Category, But It Is Not Required.
***Caution, Only 120 Characters, (2 Lines), Will be Stored in the System
1. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
2. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
3. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
4. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
![Page 21: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/21.jpg)
Emp-Quest-2019.doc
21 March 2019
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
5. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
6. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
7. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
8. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
9. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
10. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
![Page 22: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/22.jpg)
Emp-Quest-2019.doc
22 March 2019
Project 5
*Project Name _____________________________________________________ (A60)
*Location __________________________________________________ (A30) (Highway/road or bridge name or the City/County/State, or physical address.)
*Date Began __________________________________ (A8) Month Date Year
* Date Completed ______________________________ (A8) Month Date Year
*Enter A General Description of the Work Done on this Project. You may abbreviate as
long as we can tell what you are trying to say:
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
Contract Number: ____________________ (A15)
Project Manager Name: __________________________________________ (A30) Last First Middle
Client Name: _____________________________________________ (A30)
Client Phone Number: ________________________ (A10)
Client contact Name:_____________________________________________ (A30)
**Enter Construction Cost and Project Fees in Whole Dollars – Decimals, Commas and/or
Special Characters are NOT allowed
Estimated Construction Cost: ____________________ (N12)
Estimated Project Fees: _________________________________ (N12)
Select Up to 10 Categories of Work That Pertain To This Project
![Page 23: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/23.jpg)
Emp-Quest-2019.doc
23 March 2019
You May Describe The Actual Work Completed For Each Category, But It Is Not Required.
***Caution, Only 120 Characters, (2 Lines), Will be Stored in the System
1. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
2.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
3.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
4.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
5.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
6.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
7.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
![Page 24: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/24.jpg)
Emp-Quest-2019.doc
24 March 2019
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
8.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
9.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
10. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
Project 6
*Project Name _____________________________________________________ (A60)
*Location __________________________________________________ (A30) (Highway/road or bridge name or the City/County/State, or physical address.)
*Date Began __________________________________ (A8) Month Date Year
* Date Completed ______________________________ (A8) Month Date Year
*Enter A General Description of the Work Done on this Project. You may abbreviate as
long as we can tell what you are trying to say:
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
![Page 25: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/25.jpg)
Emp-Quest-2019.doc
25 March 2019
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
Contract Number: ____________________ (A15)
Project Manager Name: __________________________________________ (A30) Last First Middle
Client Name: _____________________________________________ (A30)
Client Phone Number: ________________________ (A10)
Client contact Name:_____________________________________________ (A30)
**Enter Construction Cost and Project Fees in Whole Dollars – Decimals, Commas and/or
Special Characters are NOT allowed
Estimated Construction Cost: ____________________ (N12)
Estimated Project Fees: _________________________________ (N12)
Select Up to 10 Categories of Work That Pertain To This Project
You May Describe The Actual Work Completed For Each Category, But It Is Not Required.
***Caution, Only 120 Characters, (2 Lines), Will be Stored in the System
1. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
2.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
3.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
![Page 26: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/26.jpg)
Emp-Quest-2019.doc
26 March 2019
_________________________________________________________________ (A60)
4.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
5.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
6.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
7.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
8.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
9.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
10. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
![Page 27: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/27.jpg)
Emp-Quest-2019.doc
27 March 2019
_________________________________________________________________ (A60)
Project 7
*Project Name _____________________________________________________ (A60)
*Location __________________________________________________ (A30) (Highway/road or bridge name or the City/County/State, or physical address.)
*Date Began __________________________________ (A8) Month Date Year
* Date Completed ______________________________ (A8) Month Date Year
*Enter A General Description of the Work Done on this Project. You may abbreviate as
long as we can tell what you are trying to say:
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
Contract Number: ____________________ (A15)
Project Manager Name: __________________________________________ (A30) Last First Middle
Client Name: _____________________________________________ (A30)
Client Phone Number: ________________________ (A10)
Client contact Name:_____________________________________________ (A30)
**Enter Construction Cost and Project Fees in Whole Dollars – Decimals, Commas and/or
Special Characters are NOT allowed
Estimated Construction Cost: ____________________ (N12)
Estimated Project Fees: _________________________________ (N12)
![Page 28: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/28.jpg)
Emp-Quest-2019.doc
28 March 2019
Select Up to 10 Categories of Work That Pertain To This Project
You May Describe The Actual Work Completed For Each Category, But It Is Not Required.
***Caution, Only 120 Characters, (2 Lines), Will be Stored in the System
1. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
2.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
3.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
4.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
5.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
6.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
![Page 29: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/29.jpg)
Emp-Quest-2019.doc
29 March 2019
7.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
8.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
9.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
10. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
Project 8
*Project Name _____________________________________________________ (A60)
*Location __________________________________________________ (A30) (Highway/road or bridge name or the City/County/State, or physical address.)
*Date Began __________________________________ (A8) Month Date Year
* Date Completed ______________________________ (A8) Month Date Year
*Enter A General Description of the Work Done on this Project. You may abbreviate as
long as we can tell what you are trying to say:
___________________________________________________________________ (A60)
![Page 30: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/30.jpg)
Emp-Quest-2019.doc
30 March 2019
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
Contract Number: ____________________ (A15)
Project Manager Name: __________________________________________ (A30) Last First Middle
Client Name: _____________________________________________ (A30)
Client Phone Number: ________________________ (A10)
Client contact Name:_____________________________________________ (A30)
**Enter Construction Cost and Project Fees in Whole Dollars – Decimals, Commas and/or
Special Characters are NOT allowed
Estimated Construction Cost: ____________________ (N12)
Estimated Project Fees: _________________________________ (N12)
Select Up to 10 Categories of Work That Pertain To This Project
You May Describe The Actual Work Completed For Each Category, But It Is Not Required.
***Caution, Only 120 Characters, (2 Lines), Will be Stored in the System
1. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
2.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
3.Select A Category of Work: ________________ (A8)
![Page 31: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/31.jpg)
Emp-Quest-2019.doc
31 March 2019
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
4.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
5.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
6.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
7.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
8.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
9.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
![Page 32: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/32.jpg)
Emp-Quest-2019.doc
32 March 2019
10. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
Project 9
*Project Name _____________________________________________________ (A60)
*Location __________________________________________________ (A30) (Highway/road or bridge name or the City/County/State, or physical address.)
*Date Began __________________________________ (A8) Month Date Year
* Date Completed ______________________________ (A8) Month Date Year
*Enter A General Description of the Work Done on this Project. You may abbreviate as
long as we can tell what you are trying to say:
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
Contract Number: ____________________ (A15)
Project Manager Name: __________________________________________ (A30) Last First Middle
Client Name: _____________________________________________ (A30)
Client Phone Number: ________________________ (A10)
Client contact Name:_____________________________________________ (A30)
**Enter Construction Cost and Project Fees in Whole Dollars – Decimals, Commas and/or
Special Characters are NOT allowed
![Page 33: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/33.jpg)
Emp-Quest-2019.doc
33 March 2019
Estimated Construction Cost: ____________________ (N12)
Estimated Project Fees: _________________________________ (N12)
Select Up to 10 Categories of Work That Pertain To This Project
You May Describe The Actual Work Completed For Each Category, But It Is Not Required.
***Caution, Only 120 Characters, (2 Lines), Will be Stored in the System
1. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
2. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
3. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
4. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
5. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
6. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
![Page 34: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/34.jpg)
Emp-Quest-2019.doc
34 March 2019
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
7. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
8. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
9. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
10. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
Project 10
*Project Name _____________________________________________________ (A60)
*Location __________________________________________________ (A30) (Highway/road or bridge name or the City/County/State, or physical address.)
*Date Began __________________________________ (A8) Month Date Year
* Date Completed ______________________________ (A8) Month Date Year
*Enter A General Description of the Work Done on this Project. You may abbreviate as
![Page 35: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/35.jpg)
Emp-Quest-2019.doc
35 March 2019
long as we can tell what you are trying to say:
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
___________________________________________________________________ (A60)
Contract Number: ____________________ (A15)
Project Manager Name: __________________________________________ (A30) Last First Middle
Client Name: _____________________________________________ (A30)
Client Phone Number: ________________________ (A10)
Client contact Name:_____________________________________________ (A30)
**Enter Construction Cost and Project Fees in Whole Dollars – Decimals, Commas and/or
Special Characters are NOT allowed
Estimated Construction Cost: ____________________ (N12)
Estimated Project Fees: _________________________________ (N12)
Select Up to 10 Categories of Work That Pertain To This Project
You May Describe The Actual Work Completed For Each Category, But It Is Not Required.
***Caution, Only 120 Characters, (2 Lines), Will be Stored in the System
1. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
2.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
![Page 36: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/36.jpg)
Emp-Quest-2019.doc
36 March 2019
_________________________________________________________________ (A60)
3.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
4.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
5.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
6.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
7.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
8.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
9.Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
![Page 37: Employee General Information](https://reader031.vdocuments.mx/reader031/viewer/2022022820/621c2ff2330b4334675efc90/html5/thumbnails/37.jpg)
Emp-Quest-2019.doc
37 March 2019
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)
10. Select A Category of Work: ________________ (A8)
Description of Work Completed in This Category (Up to 2 Lines/Optional):
_________________________________________________________________ (A60)
_________________________________________________________________ (A60)