EMIS ENGIE Mobile Inspection Solution How can an app save millions on pipe inspections? Energyworld 10 th March 2016 By Øystein Ormseth, ENGIE and Eivind Mikkelsen, Bouvet

Upload: others

Post on 23-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EMIS ENGIE Mobile Inspection Solutionweb.idg.no/app/web/online/Event/energyworld/2016/pdf/ormseth.pdf · •Deliver complete pipe inspection solution in 16 weeks –On budget, schedule

EMIS – ENGIE Mobile Inspection Solution How can an app save millions on pipe inspections?

Energyworld 10th March 2016

By Øystein Ormseth, ENGIE and Eivind Mikkelsen, Bouvet

Page 2: EMIS ENGIE Mobile Inspection Solutionweb.idg.no/app/web/online/Event/energyworld/2016/pdf/ormseth.pdf · •Deliver complete pipe inspection solution in 16 weeks –On budget, schedule

Established in Norway in 2001- part of the ENGIE Group

Operator of the Gjøa field

Among the top ten producers and reserve owners on the NCS

Number of employees: 284

Head Office in Sandnes and Base and Logistics Office in Florø

Turnover of 11 890 MNOK in 2015

Holds 40% of the ENGIE Group’s proven and probable reserves and 58% of its production

ENGIE E&P Norge AS – About us

10/03/2016 @Energyworld 10th March 2016 2

Page 3: EMIS ENGIE Mobile Inspection Solutionweb.idg.no/app/web/online/Event/energyworld/2016/pdf/ormseth.pdf · •Deliver complete pipe inspection solution in 16 weeks –On budget, schedule

The piping inspection challenge

10/03/2016 @Energyworld 10th March 2016 3

Documentation

Inspection out in the field Documentation at the office desk

Page 4: EMIS ENGIE Mobile Inspection Solutionweb.idg.no/app/web/online/Event/energyworld/2016/pdf/ormseth.pdf · •Deliver complete pipe inspection solution in 16 weeks –On budget, schedule

Approx. 2.000 S316-pipes (~23 km)

20% inspecting 80% documenting

Quality of inspection data

Capacity - Inspected only high/medium critical pipes

Planning of inspection and re-inspections

How can we do inspections cheaper AND safer?

The piping inspection challenge

10/03/2016 @Energyworld 10th March 2016 4

Page 5: EMIS ENGIE Mobile Inspection Solutionweb.idg.no/app/web/online/Event/energyworld/2016/pdf/ormseth.pdf · •Deliver complete pipe inspection solution in 16 weeks –On budget, schedule

• Customer challenge

– Link photos to equipment

– Domain knowledge

– Connect photos to inspection events

• Prototype developed

– Prove ability

– Challenge understood!

• Deliver complete pipe inspection solution in 16 weeks

– On budget, schedule & agreed scope

From idea to business case

Minimum Viable

Product

Page 6: EMIS ENGIE Mobile Inspection Solutionweb.idg.no/app/web/online/Event/energyworld/2016/pdf/ormseth.pdf · •Deliver complete pipe inspection solution in 16 weeks –On budget, schedule

Key success factors

• Well established delivery model

– Incremental iterative process

– Ongoing dialogue

• Well established development team

– Proven track record

– Tuckman’s Development Model

– Performing stage - Productive

• Oracle Application Express (APEX)

– Low cost of change

– Short time to market

• Domain knowledge – Inspection

– Inspection solutions developed for other customers

Page 7: EMIS ENGIE Mobile Inspection Solutionweb.idg.no/app/web/online/Event/energyworld/2016/pdf/ormseth.pdf · •Deliver complete pipe inspection solution in 16 weeks –On budget, schedule

• Great collaboration

– Cooperative and open dialogue

– Collaborating and problem solving atmosphere

– Focus on business value

– Bi-weekly meetings

• On budget, schedule & agreed scope

Summary and most important

Idea! Prototype

2 weeks

Development

16 weeks Production

Page 8: EMIS ENGIE Mobile Inspection Solutionweb.idg.no/app/web/online/Event/energyworld/2016/pdf/ormseth.pdf · •Deliver complete pipe inspection solution in 16 weeks –On budget, schedule

EMIS – Keep It Simple Stupid (KISS)

10/03/2016 @Energyworld 10th March 2016 8

Page 9: EMIS ENGIE Mobile Inspection Solutionweb.idg.no/app/web/online/Event/energyworld/2016/pdf/ormseth.pdf · •Deliver complete pipe inspection solution in 16 weeks –On budget, schedule

EMIS – Keep It Simple Stupid (KISS)

10/03/2016 @Energyworld 10th March 2016 9

Page 10: EMIS ENGIE Mobile Inspection Solutionweb.idg.no/app/web/online/Event/energyworld/2016/pdf/ormseth.pdf · •Deliver complete pipe inspection solution in 16 weeks –On budget, schedule

EMIS – Keep It Simple Stupid (KISS)

10/03/2016 @Energyworld 10th March 2016 10

Page 11: EMIS ENGIE Mobile Inspection Solutionweb.idg.no/app/web/online/Event/energyworld/2016/pdf/ormseth.pdf · •Deliver complete pipe inspection solution in 16 weeks –On budget, schedule

EMIS – Keep It Simple Stupid (KISS)

10/03/2016 @Energyworld 10th March 2016 11

Page 12: EMIS ENGIE Mobile Inspection Solutionweb.idg.no/app/web/online/Event/energyworld/2016/pdf/ormseth.pdf · •Deliver complete pipe inspection solution in 16 weeks –On budget, schedule

EMIS – Keep It Simple Stupid (KISS)

10/03/2016 @Energyworld 10th March 2016 12

Page 13: EMIS ENGIE Mobile Inspection Solutionweb.idg.no/app/web/online/Event/energyworld/2016/pdf/ormseth.pdf · •Deliver complete pipe inspection solution in 16 weeks –On budget, schedule

80% on inspections and 20% documenting, double the amount of inspected TAG’s

Data immediately available in database via mobile ATEX devices (Paperless)

Trending and analysis reduce unnecessary pipe replacements

Inspection quality increases installation safety

Scalable and will in the future be extended to new inspection types

5 - 10 MNOK annual savings on pipe inspections

EMIS delivered on time and cost

EMIS – It’s the future Contribution to ENGIE’s digitalization

10/03/2016 @Energyworld 10th March 2016 13

Page 14: EMIS ENGIE Mobile Inspection Solutionweb.idg.no/app/web/online/Event/energyworld/2016/pdf/ormseth.pdf · •Deliver complete pipe inspection solution in 16 weeks –On budget, schedule

EMIS – ENGIE Mobile Inspection Solution - Video

10/03/2016 @Energyworld 10th March 2016 14

Link to video on Vimeo:

EMIS by ENGIE on Vimeo