emergency response planning

22
EMERGENCY RESPONSE PLANNING 2005 ARIPPA Technical Symposium David B. Binder Tanner Industries, Inc. [email protected] 215-322-1238

Upload: salvador-gilmore

Post on 03-Jan-2016

42 views

Category:

Documents


0 download

DESCRIPTION

EMERGENCY RESPONSE PLANNING. 2005 ARIPPA Technical Symposium David B. Binder Tanner Industries, Inc. [email protected] 215-322-1238. PSYCH TEST. Z. Required By. Federal OSHA – 1910.120(q) ; PSM EPA – RMPs Oil Pollution Prevention Other State County - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: EMERGENCY RESPONSE PLANNING

EMERGENCY RESPONSE PLANNING

2005 ARIPPA Technical Symposium

David B. Binder

Tanner Industries, Inc.

[email protected]

215-322-1238

Page 2: EMERGENCY RESPONSE PLANNING

PSYCH TEST

Page 3: EMERGENCY RESPONSE PLANNING

Required By

Federal OSHA – 1910.120(q) ; PSM EPA – RMPs Oil Pollution Prevention Other

StateCountyPotential – Over 17 Agency Plan Requirements

Page 4: EMERGENCY RESPONSE PLANNING

Selected ReferencesOSHA 29 CFR 1910.120 (q)

National Response Team’s “One-Plan” Integrated Contingency Plan (ICP)

Federal Emergency Management Agency

Red Cross

National Safety Council

Industry Associations

Page 5: EMERGENCY RESPONSE PLANNING

EMERGENCY RESPONSE29 CFR 1910.120(q)

Planning EAP/ERP

Rules Of Response

TRAINING Levels Time and/or Content Refreshers

Medical/PFT

RESPONSE Levels PPE

Page 6: EMERGENCY RESPONSE PLANNING

29 CFR 1910.120 (q) EMERGENCY PLANNING

Emergency Action Plan - 29 CFR 1910.38

Emergency Response Plan - 29 CFR 1910.120 (q)

Page 7: EMERGENCY RESPONSE PLANNING

ACTION Plan ELEMENTS- 29 CFR 1910.38

Escape Procedures / Routes

Shut Down SOPs

Head Count

Employee Rescue / Medical Duties

Reporting Emergencies (fire, release, etc.)

Employee Contacts for plan

Page 8: EMERGENCY RESPONSE PLANNING

RESPONSE Plan ELEMENTS - 29 CFR 1910.120 (q)

Pre-Planning / Coordinate - outside parties

Personnel roles, lines of authority, training & communication

Emergency recognition & prevention

Safe distances / places of refuge

Site security & control

Page 9: EMERGENCY RESPONSE PLANNING

RESPONSE Plan (continued)

Evacuation routes & procedures

Decon

Medical Tx / First Aid

Alerting & Response procedures

Response Critique / Follow-Up

PPE / Emergency Equipment

LEPC / SERC Plans

Page 10: EMERGENCY RESPONSE PLANNING

OSHA Compliance Directive CPL 02-02-059 – ER Enforcement

(former CPL 2-2.59A)

POTENTIAL RELEASES

IncidentalIncidental

MAYBE ERClearly ER

Page 11: EMERGENCY RESPONSE PLANNING

OSHA’s ER BENCHMARKCPL 02-02-059

ER-outside release area

Evacuation required

IDLH threat

Fire or Explosion

Act now - danger

High toxicity level

Uncertain - PPE and Equipment adequate

Situation Unclear - Lack of Data

Page 12: EMERGENCY RESPONSE PLANNING

29 CFR 1910.120 (q) – EMERGENCY RESPONSEGROUND RULESICS - IC & SAFETY OFFICER

Buddy System - Entry/Back Up

Establish Zones

Medical – Life Support & Transport

Decon

Page 13: EMERGENCY RESPONSE PLANNING

RESPONSE TRAINING LEVELS

AWARENESS

OPERATIONSDefensive Actions

TECHNICIANOffensive Actions

SPECIALIST

INCIDENT COMMAND

Page 14: EMERGENCY RESPONSE PLANNING

Awareness Level

Notification and Evacuation

Page 15: EMERGENCY RESPONSE PLANNING

Operations Level

8 Hours

Defensive Actions

Page 16: EMERGENCY RESPONSE PLANNING

Technician/Specialist Level

24 Hours Initial

Offensive Actions

Page 17: EMERGENCY RESPONSE PLANNING

Incident Command Level

Full Responsibility

Page 18: EMERGENCY RESPONSE PLANNING

RESPONSE LEVELSLEVEL A Greatest Level - Skin, Respiratory, Eye

LEVEL B Highest Resp. Protect - Lesser Skin Protect.

LEVEL C Known Conc. - Air Purifying Respirator

LEVEL D Minimal Protection

Page 19: EMERGENCY RESPONSE PLANNING

ERP COMPLIANCE QUESTIONS

Does Employer Intend To Have Employees Respond To Emergencies ?

Adequately Trained For Intended Duties ?

Properly Equipped For Intended Tasks ?

Capable Of Responding Safely ?

Managed By Competent Leaders ?

Page 20: EMERGENCY RESPONSE PLANNING

Considerations

FACILITY

SIZE

PERSONNEL

EQUIPMENT

ASSIGN ROLES

TRAINING LEVELS

FIRE DEPARTMENTPaid/VolunteerRESPONSE CAPABILITIES - Training LevelsRESPONSE TIMEKNOWLEDGE of your FACILITY

Page 21: EMERGENCY RESPONSE PLANNING

Other Planning Considerations

Overall Site Security Terrorism Sabotage

Business Recovery

Natural DisastersManagement Information Systems

Page 22: EMERGENCY RESPONSE PLANNING

Questions?