▪ Project Requirements
▪ Existing Conditions
▪ Proposed Design
October 17, 2017
EMERGENCY LANDING ZONE – CP Presentation2
ELZ– PROJECT REQUIREMENTS
▪ Requirement established by DHS memo of April 28, 2011
▪ Area of reinforced lawn to accommodate helicopters exclusively for emergencies
▪ Location must meet FAA guidelines for obstruction-free approach and departure paths
▪ Location shall respect existing trees
October 17, 2017
EMERGENCY LANDING ZONE – CP Presentation3
ELZ – PROPOSED CAMPUS LOCATION
October 17, 2017
EMERGENCY LANDING ZONE – CP Presentation4
MLK JR. AVE. SE
CENTER BLDG
MUNRO BLDG
EMERGENCY
LANDING ZONE
GATE 1
ELZ – LOCATION
October 17, 2017
EMERGENCY LANDING ZONE – CP Presentation5
▪ GSA is currently conducting a tree survey
▪ Area of reinforced turf limited to TLOF (54’ x 54’ or 2,916 SF)
ELZ – APPEARANCE AND CONSTRUCTION
October 17, 2017
EMERGENCY LANDING ZONE – CP Presentation6
Installed Views
Overview of the installed assembly Installation detail
Installed Views Installed Views