emergency evac point...emergency evac point site sheds 50m road work ahead end road work 50m th...

1
Walker Street The Avenue Kendall Avenue Elliot Street Poplar Road Poplar Road Old Poplar Road Site Fence Tree Protection Zone Emergency Evac Point Site Sheds 50m ROAD WORK AHEAD END ROAD WORK 50m FOOTPATH CLOSED USE OTHER FOOTPATH FOOTPATH CLOSED USE OTHER FOOTPATH FOOTPATH CLOSED USE OTHER FOOTPATH FOOTPATH CLOSED AHEAD USE OTHER FOOTPATH FOOTPATH CLOSED AHEAD USE OTHER FOOTPATH FOOTPATH CLOSED AHEAD USE OTHER FOOTPATH LEGEND Peds Path Work Area Bollards & Tape FOOTPATH CLOSED USE OTHER FOOTPATH Municipality Date of Works Time Poplar Rd, Parkville Melbourne AS PER APPLICATION AS PER APPLICATION Melways 29 F12 Drawn Designed Checked Authorised ANNA M ANNA M Project Status Title Bike Path Reconstruction & Landscaping Issued For Implementation Client Date Drawn Scale Client Contact: NTS This Traffic Management Plan is not to scale and is intended for use as a guide only. Sign positions are indicative only and may need to be adjusted due to traffic conditions during works. M1 Traffic Control Pty Ltd accepts no responsibility for incorrect installation if implemented by others. Work site to be fully compliant with Australian Standards 1742.32009 and The Road Management Act 2004. REV Date Description Drawn Appr 19/06/2020 Location 2Construct Poplar Rd, Parkville (Bike Path Reconstruction & Landscaping) TGS 13755 v1.0 1.0 19/06/2020 Issued for implementation. AM LN 12 Richards Court, Keilor Park VIC 3042 Phone: 9310 4066 Email: [email protected] ABN: 49 139 453 268 LAUREN N LAUREN N Arrow Boards : 0 MMS : 1 Utes : 9 Michael 0403 719 925 TRAFFIC CONTROLLER INSTRUCTIONS: 1. Contact TMC 1300 107 757 to activate MOA (If Applicable) 2. Always remain vigilant to your surroundings when implementing and dismantling all traffic control devices. 3. Note any changes to TGS in use on the plan, give reasons on SWMS, all traffic staff on site must sign onto the SWMS 4. Drive through site and check signage is visual from drivers perspective. 5. Use radios to communicate, traffic flow may be stopped for work site movements. 6. Monitor signage regularly, weigh down signs in windy weather. 7. Stay safe and remember your escape zone. 8. Implement and dismantle devices according to Code Of Practice. 9. Contact 1300 107 757 to deactivate MOA at conclusion of shift. 10. Priorty must be given by Traffic controllers and workers to all Emergency Vehicles. Emergency Services: Vic Roads TMC: Public Transport Victoria: Work Safe: 000 1300 107 757 1800 800 007 13 23 60 Contact Numbers:

Upload: others

Post on 26-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Emergency Evac Point...Emergency Evac Point Site Sheds 50m ROAD WORK AHEAD END ROAD WORK 50m TH CLOSED USE OTHER TH TH CLOSED USE OTHER TH TH CLOSED USE OTHER TH TH CLOSED AHEAD USE

Walker Street

The A

venue

Kendall Avenue

Elliot S

treet

Poplar R

oad

Poplar Road

Old Poplar Road

Site Fence

Tree Protection Zone

Emergency Evac Point

Site Sheds

50m

RO

AD

WO

RK

AHEAD

END

RO

AD

WO

RK

50m

FOOTPATH

CLOSEDUSE

OTHER

FOOTPATH

FOOTPATH

CLOSED

USE

OTHER

FOOTPATH

FOOTPATHCLOSED

USEOTHERFOOTPATH

FOO

TPAT

HC

LOSE

DA

HEA

D

USE

OTHE

RFO

OTPA

TH

FOO

TPAT

H

CLO

SED

AHEA

DUS

E

OTHE

R

FOOT

PATH

FOO

TPATHC

LOSED

AH

EAD

USEOTHER

FOOTPATH

LEGEND

Peds Path

Work Area 

Bollards & Tape

FOOTPATHCLOSED

USEOTHER

FOOTPATH

Municipality

Date of Works

Time

Poplar Rd, Parkville

Melbourne

AS PER APPLICATION

AS PER APPLICATION

Melways29 F12

Drawn

Designed

Checked

Authorised

ANNA M

ANNA M

Project

Status

Title

Bike Path Reconstruction & Landscaping

Issued For Implementation

ClientDate Drawn

Scale

Client Contact:

NTSThis Traffic Management Plan is not to scale and isintended for use as a guide only. Sign positions are

indicative only and may need to be adjusted due to trafficconditions during works. M1 Traffic Control Pty Ltd

accepts no responsibility for incorrectinstallation if implemented by others. Work site to be

fully compliant with Australian Standards1742.3­2009 and The Road Management Act 2004.REV Date Description Drawn Appr

19/06/2020 Location

2Construct ­ Poplar Rd, Parkville (Bike Path Reconstruction & Landscaping) TGS ­ 13755 v1.0

1.0 19/06/2020 Issued for implementation. AM LN

12 Richards Court, Keilor Park VIC 3042  Phone: 9310 4066

Email: [email protected]: 49 139 453 268 LAUREN N

LAUREN NArrow Boards :

0MMS : 

1Utes :

9

Michael ­ 0403 719 925

TRAFFIC CONTROLLER INSTRUCTIONS:

1. Contact TMC 1300 107 757 to activate MOA (If Applicable)

2. Always remain vigilant to your surroundings when

implementing and dismantling all traffic control devices.

3. Note any changes to TGS in use on the plan, give reasons on

SWMS, all traffic staff on site must sign onto the SWMS

4. Drive through site and check signage is visual from drivers

perspective.5. Use radios to communicate, traffic flow may be stopped for work

site movements.6. Monitor signage regularly, weigh down signs in windy weather.

7. Stay safe and remember your escape zone.

8. Implement and dismantle devices according to Code Of Practice.

9. Contact 1300 107 757  to deactivate MOA at conclusion of shift.

10. Priorty must be given by Traffic controllers and workers to all

Emergency Vehicles.

Emergency Services:           Vic Roads TMC:      Public Transport Victoria:    Work Safe:

0001300 107 7571800 800 007  13 23 60

Contact Numbers: