Page 1: Emergency core shelter program 30 k

Property of Rebuild Bohol Foundation, Inc.

BALAY BOL-ANONCORE SHELTER PROGRAM

a project of

REBUILD BOHOL FOUNDATION, INC.

Page 2: Emergency core shelter program 30 k

Property of Rebuild Bohol Foundation, Inc.

More than a month

after the 7.2 magnitude

earthquake, 14,000

families remain

homeless while 54,000

families suffered heavy

damages to their homes

and properties.

Photo courtesy of Rebuild Bohol

Page 3: Emergency core shelter program 30 k

Property of Rebuild Bohol Foundation, Inc.

Beyond food and water relief packages, we need to heal our people by rebuilding homes.

Page 4: Emergency core shelter program 30 k

Property of Rebuild Bohol Foundation, Inc.

Around us are examples of homes built on sustainable and resilient local materials…

Page 5: Emergency core shelter program 30 k

Property of Rebuild Bohol Foundation, Inc.

… that withstood the earthquake’s intensity

Page 6: Emergency core shelter program 30 k

Property of Rebuild Bohol Foundation, Inc.

Built using a combination of “amakan” walls, G.I. sheet roofing and concrete flooring, we can

provide safe shelters to our people now.

Page 7: Emergency core shelter program 30 k

Property of Rebuild Bohol Foundation, Inc.

A core shelter of 16sqm can house a family of five. The

house has two bedrooms of 4sqm each and a kitchen and dining area of

8sqm. It also includes a 2sqm porch as well

as a 2sqm outdoor toilet (in most cases,

we are merely repairing the

beneficiary’s existing toilet facility).

Page 8: Emergency core shelter program 30 k

Property of Rebuild Bohol Foundation, Inc.

0.60m

2.6m

1.3m

2.0m

0.60m

1.3m

2.0m

0.60m

Design Engineer: Jermalou Jones Binangbang

Page 9: Emergency core shelter program 30 k

Property of Rebuild Bohol Foundation, Inc.

We started to build this house…

FRONT FACADE SIDE FACADE REAR FACADE

Page 10: Emergency core shelter program 30 k

Property of Rebuild Bohol Foundation, Inc.

…that sits on a concrete floor base with all columns driven down encased in a concrete mix. The beams, ribbing support for the roof and the

GI sheets are also bolted to the columns to provide a sturdy shelter that can be resistant to tropical storms and typhoons….

Page 11: Emergency core shelter program 30 k

Property of Rebuild Bohol Foundation, Inc.

and finished it in 10 days (November 10, 2013)

Page 12: Emergency core shelter program 30 k

Property of Rebuild Bohol Foundation, Inc.

Typhoon rated, the materials cost for this house is P32,000.00 while the labor equity of the

beneficiary is P12,000.00

SCOPE OF WORK:

Item I: Pedestal-Pedestal Footing / Post 2,585.40

Item II: Walling / Partitions (including doors & windows) 9,445.00

Item III: Concrete Flooring 2,485.00

Item IV: Roofing 8,375.00

Item V: Assorted Nails 900.00

Item VI: Porch 1,636.60

Item VII: Comfort Room 4,035.00

Item VIII: Plumbing Works 1,100.00

Item IX: Administration Cost 1,438.00

TOTAL MATERIAL COST 32,000.00

Page 13: Emergency core shelter program 30 k

Property of Rebuild Bohol Foundation, Inc.

Building this house will generate additional income opportunities for rural communities

Page 14: Emergency core shelter program 30 k

Property of Rebuild Bohol Foundation, Inc.

QUALIFIED BENEFICIARIES

In order to qualify for this program, the beneficiary must:

1. Submit a duly accomplished application form

2. Provide a barangay certification that he is a resident in the area and has a tenurial right over the property

3. Provide the labor equity of at least 2 carpenters and 3 laborers

4. Agree to build the Balay Bol-anon core shelter according to specifications

Note: the applicant is also encouraged to secure NHA, DSWD, HUDCC, LGU, etc. financial assistance where and when applicable to help defray the construction costs.

Page 15: Emergency core shelter program 30 k

Property of Rebuild Bohol Foundation, Inc.

HELP US TODAY!

Page 16: Emergency core shelter program 30 k

Property of Rebuild Bohol Foundation, Inc.BALAY BOL-ANON Bill of Materials and Cost Estimates

Item I: Pedestal-Pedestal Footing / Post

2bags Portland Cement 240.00 /bag 480.00

3cans Approved Sand 19.00 /can 57.00

5cans Gravel 19.00 /can 95.00

4pcs 10 mm dia. Def. Bars 145.00 /pc 580.00

0.5kg G.I. Tie Wire, # 16 80.00 /kg 40.00

66.67bdft 5" x 5" x 8' Good Lumber ( 4 pcs) 20.00 /bdft 1,333.40

TotaL Material Cost P 2,585.40

Page 17: Emergency core shelter program 30 k

Property of Rebuild Bohol Foundation, Inc.BALAY BOL-ANON Bill of Materials and Cost Estimates

Item II: Walling / Partitions (including doors & windows)

3 bags Portland Cement 240.00/bag 720.00

20 cans Approved Sand 19.00/can 380.00

95 pcs 4" x 8" x 16" CHB 10.00/pc 950.00

3 pcs 10 mm dia. Def. Bars 145.00/pc 435.00

0.5 kg G.I. Tie Wire, # 16 80.00/kg 40.00

80 bdft 2" x 3" x 8' Good Lumber ( 20 pcs) 20.00/bdft 1,600.00

5 bdft 2" x 3" x 5' Good Lumber ( 2 pcs) 20.00/bdft 100.00

17.5 bdft 2" x 3" x 7' Good Lumber ( 5 pcs) 20.00/bdft 350.00

12 bdft 2" x 2" x 6' Good Lumber ( 6 pcs) 20.00/bdft 240.00

32 bdft 2" x 2" x 8' Good Lumber ( 12 pcs) 20.00/bdft 640.00

10 bdft 2" x 2" x 10' Good Lumber ( 3 pcs) 20.00/bdft 200.00

16 bdft 2" x 2" x 12' Good Lumber ( 4 pcs) 20.00/bdft 320.00

20 shts 4' x 8' Amakan 140.00/sht 2,800.00

14 pairs Loose Pin Hinges, 1" x 3" 30.00/pair 420.00

10 pcs Bamboo Poles 25.00/pc 250.00

TotaL Material Cost P 9,445.00

Page 18: Emergency core shelter program 30 k

Property of Rebuild Bohol Foundation, Inc.BALAY BOL-ANON Bill of Materials and Cost Estimates

Item III: Concrete Flooring

6 bags Portland Cement 240.00/bag 1,440.00

22 cans Approved Sand 19.00/can 418.00

33 Cans Gravel 19.00/can 627.00

TotaL Material Cost P 2,485.00

Item IV: Roofing

16 shts Corr. G.I. Sheet, #26 x 10' 220.00/sht 3,520.00

1 sht Plain G.I. Sheet, #26 x 8' 175.00/sht 175.00

2 kgs Umbrella Nails, # 2-1/2 80.00/kg 160.00

40 bdft 2" x 4" x 10' Good Lumber ( 6 pcs) 20.00/bdft 800.00

26 bdft 2" x 4" x 13' Good Lumber ( 3 pcs) 20.00/bdft 520.00

30 bdft 2" x 4" x 15' Good Lumber ( 3 pcs) 20.00/bdft 600.00

100 bdft 2" x 3" x 10' Good Lumber ( 20 pcs) 20.00/bdft 2,000.00

30 pcs Carriage Bolt, 1/2" x 5" 20.00/pc 600.00

TotaL Material Cost P 8,375.00

Item V: Assorted Nails

15 kg Assorted Nails (# 2, # 3, # 4) 60.00/kg P 900.00

Page 19: Emergency core shelter program 30 k

Property of Rebuild Bohol Foundation, Inc.BALAY BOL-ANON Bill of Materials and Cost Estimates

Item VI: Porch

3 Shts Corr. G.I. Sheet, #26 x 6' 130.00/sht 390.00 0.5 Kg Umbrella Nails, # 2-1/2 80.00/kg 40.00

39 Bdft 2" x 3" x 6' Good Lumber ( 13 pcs) 20.00/bdft 780.00

21.33 Bdft 4" x 4" x 8' Good Lumber ( 2 pcs) 20.00/bdft 426.60 TotaL Material Cost P 1,636.60

Item VII: Comfort RoomA. Roofing

3 Shts Corr. G.I. Sheet, #26 x 6' 130.00/sht 390.00 1 Kgs Umbrella Nails, # 2-1/2 80.00/kg 80.00

10.67 bdft 2" x 4" x 8' Good Lumber ( 2 pcs) 20.00/bdft 213.40

8 bdft 2" x 4" x 6' Good Lumber ( 2 pcs) 20.00/bdft 160.00 52 bdft 2" x 3" x 8' Good Lumber ( 13 pcs) 20.00/bdft 1,040.00

TotaL Material Cost P 1,883.40 B. Walling

16 bdft 4" x 4" x 6' Good Lumber ( 2 pcs) 20.00/bdft 320.00

37.33 bdft 2" x 2" x 8' Good Lumber ( 14 pcs) 20.00/bdft 746.60

3 shts 4' x 8' Amakan 180.00/sht 540.00 TotaL Material Cost P 1,606.60

Page 20: Emergency core shelter program 30 k

Property of Rebuild Bohol Foundation, Inc.

C. Concrete Flooring

1 bags Portland Cement 240.00/bag 240.00 2 cans Approved Sand 19.00/can 38.00 3 cans Gravel 19.00/can 57.00

TotaL Material Cost P 335.00 D. Assorted Nails

3.5 kg Assorted Nails (# 2, # 2-1/2, # 3, # 4) 60.00/kg P 210.00 Item VIII. Plumbing Works

1 pc Kitchen Sink 200.00/pc 200.00

1 pc Toilet Bowl Ceramic 650.00/pc 650.00

1 pc PVC Sanitary Pipe, 4" dia. x 10' 205.00/pc 205.00 1 pc PVC Sanitary Elbow, 4" dia. 45.00/pc 45.00

TotaL Material Cost P 1,100.00 Item IX: Administration Cost P 1,438.00

BALAY BOL-ANON Bill of Materials and Cost Estimates